Extreme engineering – part 2 IX-2009 (Part 00 EE, PP 2007, animation+p/r : 2010.02.15) ready 1 Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited.
23
Embed
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
presentation as whole or in parts in any form or by any means, electronic,
photocopying, recording or otherwise, without prior written
permision is prohibited.
2
ready
3
ready
4
ready
Water inflow into Icelandic rock mass:- Ólafsfjördur Tunnel
ready
6Héðinsfjarðargöng Project - leakage at the face of Ólafsfjördur Tunnel ready
7
ready
8ready
9ready
10ready
Project description:- The TBM tunnel with HERRENKNECHT Earth Pressure Balance Type TBM (shield 6.120 mm diameter):Total length 3.300m, including ca. 1.500m marine crossing section.
The first tunnel in the world between two continents.
11readyCoast ...... “5’ to 12.00 o’clock” – Jurata (Poland) March 1993Designer and responsible for delivery of gabions
- the first site with gabions based on double twisted mesh (March 1993)First storm – April 1993After completion of works – May 1993July 1996