Page 1: Target K. Long, 23 August 2009 Sunday 23Aug09 Water and power connections made Test water, check power Will plan soak test.

Target

K. Long, 23 August 2009

Sunday23Aug09

Water and powerconnections made

Test water, checkpower

Will plan soak test

Page 2: Target K. Long, 23 August 2009 Sunday 23Aug09 Water and power connections made Test water, check power Will plan soak test.

Status of build:• Target 1:– Complete, 50 k actuations done OK • Target 2:

– Complete

Page 3: Target K. Long, 23 August 2009 Sunday 23Aug09 Water and power connections made Test water, check power Will plan soak test.

Critical path:

• Issue:– Modified power supply:

• Charge/discharge time-constant differs between +ve and –ve capacitor banks

• S.Griffiths will investigate– Testing continues with power supply brought to RAL form Sheffield

• Installation planned ‘on schedule’:– Tuesday/Wednesday 25/26Aug09