Top Banner
SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4 http://fdotd4-shrp2c20.com/ Status Update Meeting March 11, 2015
12

SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4

Jan 11, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: / SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4

SHRP2 Freight Demand Modeling and Data Improvement (C20) Program

Port Everglades Petroleum Commodity Flow Pilot Study

FDOT District 4http://fdotd4-shrp2c20.com/

Status Update Meeting

March 11, 2015

Page 2: / SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4

• Data Collection and Analysis

• ATRI routing data

• FDOT fuel tax data

• Technologies

• Outreach and Coordination

• Project Workplan Status

• Discussion

2

Agenda

Page 3: / SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4

3

Data Collection and Analysis

ATRI Data

• FDOT issued task order to USF – Dr. Pinjari

• Kickoff meeting on March 3rd.

• Refining data request to ATRI

• Data will cover 2 weeks September 2013

• 3-month work effort – March - May

Page 4: / SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4

4

Data Collection and Analysis Fuel Tax Data - Florida Department of Revenue

• Obtained updated data to coincide with PEV fiscal year 2013

• Data provides/allows

Gas and diesel volume at: location, TAZ, MAZ, Zip, County level

Volume to truck conversion

Volume overlay with land use

• Data error rate up to 40% (incorrectly coded addresses)

Other state tax agency

• Similar data available through open records offices confirmed- OR, WA, TX, MD,

• Also likely available for CA, GA, NC, NJ, MA

TAZ

Page 5: / SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4

5

Data Collection and Analysis

Alternate approaches: commodity flow data

• Transearch data available from CO

Will use fuel tax data to help improve Transearch data coverage

• Requests to trucking companies for delivery logs

Coordinate through Port

Page 6: / SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4

6

Data Collection and Analysis

Technologies - recognition

Image Processing

Miovision

Citilog

Laser Scanner / LIDAR

SICK / Perrone Robotics

MANDLI / Certainty3D

License Plate Recognition

Transcore

Raytheon

Transponders

Bluetooth

FTPK

Page 7: / SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4

7

Data Collection and Analysis

Image Processing Technology• Miovision

Video specifications

Cost per hour

Open-source discussion

Contract – account to benefit other transportation agencies

• Alternate image sourcesDeploy Video Data Collection Cameras

Sync 2 views

Lighting challenge

Site access

Cost

Page 8: / SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4

8

Data Collection and Analysis

Verification counts

• Port Everglades exit gates (3)

• License plate matching

Static cameras

Manual counts

Page 9: / SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4

9

Outreach & Coordination

Regular stakeholder meetings

Agency coordination

• Port Everglades

Video/counts at gates

Terminal operator survey

• Video feed acquisition

FDOT legal

FEC Intermodal yard

• Feb 19, 2015

Trucking companies

• Driver surveys

• Delivery log requests

Project website:

• http://fdotd4-shrp2c20.com/

TRB publication/presentation (planned)

Page 10: / SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4

10

Workplan Status

Date Meeting D4 FHWA Regional Partners Stakeholders

HQRsrce Cntr Division

PortBR

MPOTrucking FEC Petro Airports

PB MPO

MD MPO

D6CO

11-Mar Quarterly

8-Apr

15-Apr

4-May

3-Jun

10-Jun Quarterly

8-Jul

15-Jul

5-Aug

12-Aug

Page 11: / SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4

11

Next Steps

Traffic/rail video data

Commodity flow OD and volume from fuel tax data

Tanker truck route choice from ATRI data

Additional trucking company surveys for route choice

Test and assess identified technology alternatives

TRB presentation

Page 12: / SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4

12

Questions?