SHRP2 Freight Demand Modeling and Data Improvement (C20) Program Port Everglades Petroleum Commodity Flow Pilot Study FDOT District 4 http://fdotd4-shrp2c20.com/ Status Update Meeting March 11, 2015
Jan 11, 2016
SHRP2 Freight Demand Modeling and Data Improvement (C20) Program
Port Everglades Petroleum Commodity Flow Pilot Study
FDOT District 4http://fdotd4-shrp2c20.com/
Status Update Meeting
March 11, 2015
• Data Collection and Analysis
• ATRI routing data
• FDOT fuel tax data
• Technologies
• Outreach and Coordination
• Project Workplan Status
• Discussion
2
Agenda
3
Data Collection and Analysis
ATRI Data
• FDOT issued task order to USF – Dr. Pinjari
• Kickoff meeting on March 3rd.
• Refining data request to ATRI
• Data will cover 2 weeks September 2013
• 3-month work effort – March - May
4
Data Collection and Analysis Fuel Tax Data - Florida Department of Revenue
• Obtained updated data to coincide with PEV fiscal year 2013
• Data provides/allows
Gas and diesel volume at: location, TAZ, MAZ, Zip, County level
Volume to truck conversion
Volume overlay with land use
• Data error rate up to 40% (incorrectly coded addresses)
Other state tax agency
• Similar data available through open records offices confirmed- OR, WA, TX, MD,
• Also likely available for CA, GA, NC, NJ, MA
TAZ
5
Data Collection and Analysis
Alternate approaches: commodity flow data
• Transearch data available from CO
Will use fuel tax data to help improve Transearch data coverage
• Requests to trucking companies for delivery logs
Coordinate through Port
6
Data Collection and Analysis
Technologies - recognition
Image Processing
Miovision
Citilog
Laser Scanner / LIDAR
SICK / Perrone Robotics
MANDLI / Certainty3D
License Plate Recognition
Transcore
Raytheon
Transponders
Bluetooth
FTPK
7
Data Collection and Analysis
Image Processing Technology• Miovision
Video specifications
Cost per hour
Open-source discussion
Contract – account to benefit other transportation agencies
• Alternate image sourcesDeploy Video Data Collection Cameras
Sync 2 views
Lighting challenge
Site access
Cost
8
Data Collection and Analysis
Verification counts
• Port Everglades exit gates (3)
• License plate matching
Static cameras
Manual counts
9
Outreach & Coordination
Regular stakeholder meetings
Agency coordination
• Port Everglades
Video/counts at gates
Terminal operator survey
• Video feed acquisition
FDOT legal
FEC Intermodal yard
• Feb 19, 2015
Trucking companies
• Driver surveys
• Delivery log requests
Project website:
• http://fdotd4-shrp2c20.com/
TRB publication/presentation (planned)
10
Workplan Status
Date Meeting D4 FHWA Regional Partners Stakeholders
HQRsrce Cntr Division
PortBR
MPOTrucking FEC Petro Airports
PB MPO
MD MPO
D6CO
11-Mar Quarterly
8-Apr
15-Apr
4-May
3-Jun
10-Jun Quarterly
8-Jul
15-Jul
5-Aug
12-Aug
11
Next Steps
Traffic/rail video data
Commodity flow OD and volume from fuel tax data
Tanker truck route choice from ATRI data
Additional trucking company surveys for route choice
Test and assess identified technology alternatives
TRB presentation
12
Questions?