Transcript
Page 1: ) Q DeliveringthejobProducon)Plant) 160tph Batch Plant •6 Cold Feed Bins •2.4m dia counter flow drum •2.25t mixer •3 filler silos •3 x 100t finished product silos •4 bitumen

Strategic  Allia

nce  Worksho

p  EM

E  De

mon

stra7o

n  project  in  Q  

02  Ge&ng  the  mix  design  to  work  –  Dis6n   1  

Supported  by  

Delivering  the  job  -­‐  Produc4on  

Chris  Lange  Boral  Asphalt  

Page 2: ) Q DeliveringthejobProducon)Plant) 160tph Batch Plant •6 Cold Feed Bins •2.4m dia counter flow drum •2.25t mixer •3 filler silos •3 x 100t finished product silos •4 bitumen

Strategic  Allia

nce  Worksho

p  EM

E  De

mon

stra7o

n  project  in  Q  

Produc6on    –    Chris  Lange   2  

Overview  •  Plant  •  Materials  management  •  Process  control  •  Mixing  •  QA  

Aggregate Stockpile Management

Page 3: ) Q DeliveringthejobProducon)Plant) 160tph Batch Plant •6 Cold Feed Bins •2.4m dia counter flow drum •2.25t mixer •3 filler silos •3 x 100t finished product silos •4 bitumen

Strategic  Allia

nce  Worksho

p  EM

E  De

mon

stra7o

n  project  in  Q  

Produc6on    –    Chris  Lange   3  

Plant  

160tph Batch Plant • 6 Cold Feed Bins

• 2.4m dia counter flow drum

• 2.25t mixer

• 3 filler silos

• 3 x 100t finished product silos

• 4 bitumen tanks – electric heated

• Computerised mixing system

Page 4: ) Q DeliveringthejobProducon)Plant) 160tph Batch Plant •6 Cold Feed Bins •2.4m dia counter flow drum •2.25t mixer •3 filler silos •3 x 100t finished product silos •4 bitumen

Strategic  Allia

nce  Worksho

p  EM

E  De

mon

stra7o

n  project  in  Q  

Produc6on    –    Chris  Lange   4  

Schema4c  of  Plant  

Page 5: ) Q DeliveringthejobProducon)Plant) 160tph Batch Plant •6 Cold Feed Bins •2.4m dia counter flow drum •2.25t mixer •3 filler silos •3 x 100t finished product silos •4 bitumen

Strategic  Allia

nce  Worksho

p  EM

E  De

mon

stra7o

n  project  in  Q  

Produc6on    –    Chris  Lange   5  

Materials  Management  Aggregate  •  Careful  a?en@on  to  

aggregate  quality    –  mee@ngs  with  

Quarries  –  stock  pile  gradings  

checked  •  High  percentage  

crusher  dust  (90%  higher  than  DG20HM)  

•  No  natural  sand  •  High  percentage  

passing  the  75  micron    

Aggregate Stockpile Management

Page 6: ) Q DeliveringthejobProducon)Plant) 160tph Batch Plant •6 Cold Feed Bins •2.4m dia counter flow drum •2.25t mixer •3 filler silos •3 x 100t finished product silos •4 bitumen

Strategic  Allia

nce  Worksho

p  EM

E  De

mon

stra7o

n  project  in  Q  

Produc6on    –    Chris  Lange   6  

Materials  Management  Bitumen  –  EME  Binder  •  Ensure  tank  able  to  heat  and  maintain  temperature  of  1850C  

•  Electrically  heated  (thyristor  control  to  ensure  slow  rise)  

•  Tank  flushed  prior  to  taking  load  of  EME  binder  

 

EME Binder Temp: 1850C

Page 7: ) Q DeliveringthejobProducon)Plant) 160tph Batch Plant •6 Cold Feed Bins •2.4m dia counter flow drum •2.25t mixer •3 filler silos •3 x 100t finished product silos •4 bitumen

Strategic  Allia

nce  Worksho

p  EM

E  De

mon

stra7o

n  project  in  Q  

Produc6on    –    Chris  Lange   7  

Process  Control  Aggregate  •  Calibra@on  of  cold  feed  

bins  •  High  %  crusher  dust  –  ran  

two  feeders  to  ensure  accuracy  

•  Baghouse  fines  quan@@es  required  -­‐  checked  

•  Blend  sheets  reviewed  and  checked  

•  Plant  trials  to  check  gradings  /  binder  contents    

•  Plant  scales  calibrated    

Aggregate Stockpile Management

Cold Feed Calibration: Bin 1 - 10mm Aggregate

0102030405060

1 2 3

Belt Speed

tph

Page 8: ) Q DeliveringthejobProducon)Plant) 160tph Batch Plant •6 Cold Feed Bins •2.4m dia counter flow drum •2.25t mixer •3 filler silos •3 x 100t finished product silos •4 bitumen

Strategic  Allia

nce  Worksho

p  EM

E  De

mon

stra7o

n  project  in  Q  

Produc6on    –    Chris  Lange   8  

Process  Control  •  Bitumen  

–  Tank  selec@on  –  Circula@on    –  Temperature  during  

mixing  –  Inline  samples  taken  

during  produc@on  –  Samples  taken  at  

supplier  depot  and    on  delivery  from  tanker  

 

 

Aggregate Stockpile Management

Page 9: ) Q DeliveringthejobProducon)Plant) 160tph Batch Plant •6 Cold Feed Bins •2.4m dia counter flow drum •2.25t mixer •3 filler silos •3 x 100t finished product silos •4 bitumen

Strategic  Allia

nce  Worksho

p  EM

E  De

mon

stra7o

n  project  in  Q  

Produc6on    –    Chris  Lange   9  

Mixing  and  Batching  •  Operators  briefed  on  ITP  • Mixing  temperature  monitored  closely:  target  1850C  and  then  1800C  

•  75  micron  target  8.4%  •  Batching  cycle  @mes  50sec  •  Bitumen  temperature  maintained  at  1850C  

Page 10: ) Q DeliveringthejobProducon)Plant) 160tph Batch Plant •6 Cold Feed Bins •2.4m dia counter flow drum •2.25t mixer •3 filler silos •3 x 100t finished product silos •4 bitumen

Strategic  Allia

nce  Worksho

p  EM

E  De

mon

stra7o

n  project  in  Q  

Produc6on    –    Chris  Lange   10  

Grading  Achieved  

0

10

20

30

40

50

60

70

80

90

100

0.075 0.15 0.3 0.6 1.18 2.36 4.75 6.7 9.5 13.2 19 26.5 37.5

Sieve size (mm) (not to log scale)

% P

assi

ng

Page 11: ) Q DeliveringthejobProducon)Plant) 160tph Batch Plant •6 Cold Feed Bins •2.4m dia counter flow drum •2.25t mixer •3 filler silos •3 x 100t finished product silos •4 bitumen

Strategic  Allia

nce  Worksho

p  EM

E  De

mon

stra7o

n  project  in  Q  

Produc6on    –    Chris  Lange   11  

Compliance  tes4ng  Sieve  size   Max  tolerance  spec   Actual  13.2mm   +-­‐  6  %   4  

9.5mm   +-­‐  6  %   -­‐1  

6.7mm   +-­‐  6  %   -­‐2  

4.75mm   +-­‐  6  %   -­‐2  

2.36mm   +-­‐  3  %   2  

1.18mm   +-­‐  3  %   -­‐1  

0.6mm   +-­‐  3  %   -­‐1  

0.3mm   +-­‐  3  %   -­‐1  

0.15mm   +-­‐  3  %   0  

0.075mm   +-­‐  1  %   +1.1  

Binder  content     +-­‐  0.5  %   -­‐0.1