Portfolio committee May 2007 SIYANDA NAM AKW A KGALAGADI PIXLEY KA SEM E FRANCES BAARD North West North West NCDM A08 H antam U buntu Mier N CD M A06 N CD M A08 Karoo H oogland K areeberg N am a K hoi Em thanjeni K am iesberg K hai-M a Siyancum a NCDM ACB1 !K heis NCDM A07 NCDM A08 NCDM A07 R ichtersveld K ai!G arib SiyaThem ba Thembelihle NCDM A09 Um sobom vu Tsantsebane R enosterberg //Khara H ais Ga Segonyana K gatelopele NCDM A06 Gam agara D ikgatlong SolPlaatje M agareng Phokw ane - Northern Cape - - Northern Cape - Strategic review of the Strategic review of the National water sector backlogs National water sector backlogs and targets and targets MEC JF van Wy Department Housing and Local Governmen
17
Embed
- Northern Cape - Strategic review of the National water sector backlogs and targets
- Northern Cape - Strategic review of the National water sector backlogs and targets. May 2007. Portfolio committee. MEC JF van Wyk Department Housing and Local Government. Meeting the Targets. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Portfolio committeeMay 2007
SIYANDA
NAMAKWA
KGALAGADI
PIXLEY KA SEME
FRANCESBAARD
North West
North West
NCDMA08
Hantam
Ubuntu
Mier
NCDMA06
NCDMA08
Karoo Hoogland
Kareeberg
Nama Khoi
Emthanjeni
Kamiesberg
Khai-Ma
Siyancuma
NCDMACB1
!KheisNCDMA07
NCDMA08
NCDMA07
RichtersveldKai !Garib
SiyaThemba
Thembelihle
NCDMA09
Umsobomvu
Tsantsebane
Renosterberg
/ / Khara Hais
Ga Segonyana
Kgatelopele
NCDMA06
Gamagara
Dikgatlong
Sol Plaatje
Magareng
Phokwane
- Northern Cape - - Northern Cape - Strategic review of the National Strategic review of the National
water sector backlogs and water sector backlogs and targetstargets
MEC JF van WykDepartment Housing and Local Government
2
Meeting the Targets Meeting the Targets
THE STRATEGIC FRAMEWORK FOR WATER SERVICES sets out the targets for addressing water and sanitation backlog.
2005 - 09
2007
2007
2008
2010 All PEOPLE have access to a functioning basic SANITATION facility
All PEOPLE have access to a functioning basic WATER SUPPLY facility
All CLINICS have adequate and safe WATER SUPPLY and SANITATION SERVICES
All BUCKET TOILETS on formal areas (pre ’94) are eradicated
All SCHOOLS have adequate and safe WATER SUPPLY and SANITATION SERVICES
3
School servicesSchool services 21 school (3,048 learners) not water onsite. 17 of the 21 in Kgalagadi Funding needs = R960,000 DWAF Funding Channel Awaiting Final Allocation
Ratio of 1 to 33 learners (average taken 1:25 girls and 1:40 boys) 279 schools do not meet norm – an estimated 1,667 toilets
required.
Water supply Total
No water on school site 21
Cost per water supply
To supply from community point @ R10,000 each R210,000
Drilling & equipping at 5 sites @ R150,000 each R750,000
TOTAL R960,000
School with toilet Nr of schools
Flush VIP Total Cost @ R6,600 VIP
R25,000 flush
All below basic 119 13 539 552 R3,882,400
Mixed 33 29 179 208 R1,904,400
All basic & above but below the ratio norm
127 861 46 907 R21,828,600
Total 279 903 764 1,667 R27,617,400
4
Clinic water and Clinic water and sanitationsanitation
2 clinics in Siyanda district Total need R900,000 DWAF Funding Channel R 1.2M (Sufficient)
Water needs at clinics
Clinic water cost
Sanitation needs at clinics
Clinic sanitation
cost
Frances Baard 0 R0 0 R0
Pixley ka Seme 0 R0 0 R0
Kgalagadi 0 R0 0 R0
Namakwa 0 R0 0 R0
Siyanda 2 R300,000 2 R600,000
Northern Cape 2 R300,000 2 R600,000
5
SIYANDA
NAMAKWA
KGALAGADI
PIXLEY KA SEME
FRANCES BAARD467
10825643
0
8900
448
1506
3771
1121
Bucket eradication in Bucket eradication in formal settlementsformal settlements
Buckets = 6,846 Funds received R 65,9M Ring fenced bucket funds
sufficient. Municipalities to sign off for inclusion in DORA
Although funding should be sufficient, challenges still exist to eradicate the backlog Bulk services should first be in place Tender procedures are time consuming Delivery rate must increase significantly
Revision of the MIG 2007/2008 MIG bucket eradication allocations according to the Northern Cape’s report ‘Strategic review of the national water sector backlogs and targets’
Business plan compilation is time consuming and quality information lacks
Insufficient long term planning at municipal level Support to municipalities not always coordinated Unsustainable development – Water borne sanitation is
implemented in areas where water infrastructure is in adequate and treatment works too small
Tender procedures are time consuming due to lack of capacity at municipal level
Housing projects are implemented at a slow pace Small funding allocations to municipalities Water shortages in areas delays implementation of projects
where households will not accept dry sanitation Quality of construction is a cause of concern Lack of technical staff on municipal level Update and verify all backlogs on formal and informal stands Project management MIG funding is ring fenced within municipalities for water and
sanitation services and not per district
13
How can delivery be How can delivery be acceleratedaccelerated
Multi year business plans combined with increased DORA funding
Channeling funding through DM Assistance with business plans Prioritising water and sanitation
projects Housing projects accelerated Monitoring/tracking progress Capacity building & training Shared services and O&M units at DMs Interim sanitation provision &