COUNTY AGENCY PIN PROJECT DESCRIPTION FUND SOURCES FFY TOTAL 4-YEAR PROGRAM in millions of dollars PHASE AQ CODE FFY 2022 FFY 2023 FFY 2021 FFY 2020 4-YEAR PROGRAM (FFY) Starting October 01, 2019 Tuesday, November 3, 2020 Page 1 of 74 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST 0.108 NHPP 0.108 DETLDES 2020 DETLDES 0.027 0.027 2020 NFA 0.173 NHPP 0.173 PRELDES 2020 PRELDES 0.043 0.043 2020 NFA 0.189 0.189 CONINSP NHPP 2021 CONINSP 0.047 0.047 2021 NFA 1.828 1.828 CONST NHPP 2021 CONST 0.456 0.456 2021 NFA NYSDOT 100132 NY 2 BRIDGE OVER NY 22, BRIDGE REPLACEMENT TOWN OF PETERSBURG, RENSSELEAR COUNTY, BIN 1000250. R313 2.871 0.351 2.520 0.000 0.000 AQC:A19P TOTAL 4YR COST : RENSSELAER TPC : $2-$4 M 0.266 NHPP 0.266 CONINSP 2020 CONINSP 0.067 0.067 2020 NFA 2.660 NHPP 2.660 CONST 2020 CONST 0.665 0.665 2020 NFA 0.160 NHPP 0.160 DETLDES 2020 DETLDES 0.040 0.040 2020 NFA 0.031 NHPP 0.031 ROWACQU 2020 ROWACQU 0.007 0.007 2020 NFA 0.001 NHPP 0.001 ROWINCD 2020 ROWINCD 0.001 0.001 2020 NFA NYSDOT 100136 NY RT. 2 BRIDGE OVER THE POESTENKILL, BRIDGE REPLACEMENT TOWN OF BRUNSWICK, RENSSELAER COUNTY, BIN 1000190. R316 3.898 3.898 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST : RENSSELAER TPC : $3.3-$5.6 M 0.004 NHPP 0.004 ROWINCD 2020 ROWINCD 0.001 0.001 2020 NFA 0.224 0.224 CONINSP NHPP 2021 CONINSP 0.056 0.056 2021 NFA 2.255 2.255 CONST NHPP 2021 CONST 0.564 0.564 2021 NFA 0.125 0.125 DETLDES NHPP 2021 DETLDES 0.031 0.031 2021 NFA 0.056 0.056 ROWACQU NHPP 2021 ROWACQU 0.014 0.014 2021 NFA NYSDOT 100716 NY RT. 144 BRIDGE OVER HANNACROIS CREEK, BRIDGE REPLACEMENT TOWN OF COEYMANS, ALBANY COUNTY, BIN 1038070. A576 3.330 0.005 3.325 0.000 0.000 AQC:A19P TOTAL 4YR COST : ALBANY TPC : $3.3-$5.6 M
74
Embed
** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 1 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
TWO ROUNDABOUTS (ONE AT CARMAN ROAD AND LYDIUS STREET AND ONE AT CARMAN ROAD AND THE RAMP TO I-890/I-90)
TOWNS OF GUILDERLAND & ROTTERDAM, ALBANY & SCHENECTADY COUNTY, A583 & S272
THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER
ALL BUT $4.650M OF THESE FUNDS ARE FROM A STATEWIDE SOLICITATION AND DO NOT COUNT AGAINST CDTC - ' CORE' FUNDING. THE $4.65M HSIP REFLECTS CDTC TRADING $4.65M OF NHPP FOR HSIP.
7.010 0.386 6.624 0.000 0.000 AQC:D2P TOTAL 4YR COST :MULTI TPC : $6-$9.4 M
NY RT.146 AND CLIFTON COUNTRY ROAD INTERSECTION: SAFETY PROJECT (RM 146 1504 1063-1068), HIGH ACCIDENT LOCATION
INCLUDES RECONSTRUCTING THE INTERSECTION AND REBUILDING THE SIGNAL, IMPROVED PEDESTRIAN ACCOMMODATIONS, AND RESURFACING AND RESTRIPING FROM TALLOW WOOD TO PLANK ROAD.
THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER
TOWN OF CLIFTON PARK, SARATOGA COUNTY. SA319
4.849 0.500 0.350 3.999 0.000 AQC:A6Z TOTAL 4YR COST :SARATOGA TPC : $4.6-$7.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 6 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
NY 146 AND NY 146A BICYCLE AND PEDESTRIAN ACCESS IMPROVEMENTS, INTERSECTION OF NY 146 AND NY 146A (VISCHER FERRY RD).
1) NEW CURBING AND SIDEWALK & 10-FOOT WIDE MULTI-USE PATH ON NY 146 NORTH SIDE 2) 10-FOOT WIDE MULTI-USE PATH ON EAST SIDE OF VISCHER FERRY RD (CR 90) 3) ADD RECTANGULAR RAPID FLASHING BEACONS AT TWO INTERSECTIONS 4) PEDESTRIAN COUNTDOWN TIMERS WITH PUSH BUTTONS AT NY 146 AND SCHOOL DRIVE 5) BICYCLE SYMBOLS ON NY 146 SHOULDERS.
TOWN OF CLIFTON PARK, SARATOGA COUNTY, SA323
0.182 0.000 0.000 0.182 0.000 AQC:C2Z TOTAL 4YR COST :SARATOGA TPC : $1.2-$2.5 M
0.035 0.035 DETLDESSTBG LG URB 2022DETLDES 0.009 0.009 2022NFA
0.035 0.035 PRELDESSTBG LG URB 2022PRELDES 0.009 0.009 2022NFA
0.046 0.046 CONINSPSTBG LG URB 2023CONINSP 0.012 0.012 2023NFA
0.385 0.385 CONSTSTBG LG URB 2023CONST 0.097 0.097 2023NFA
TN OF GUILDERLAND
108549
CARMAN ROAD SIDEWALKS, OKARA DRIVE TO JUST SOUTH OF EAST OLD STATE ROAD.
CONSTRUCT A 5-FOOT CONCRETE SIDEWALK ON THE EAST SIDE OF CARMAN ROAD.
TOWN OF GUILDERLAND, ALBANY COUNTY. A604
0.628 0.000 0.000 0.088 0.540 AQC:C2Z TOTAL 4YR COST :ALBANY TPC : $0.6-$1.5 M
ROUTE 4 CULVERT C180001, ROUTE 4 OVER SLOCUM CREEK. LARGE CULVERT REPLACEMENT PROJECT - CURRENTLY CIN C180001, FUTURE STRUCTURE WILL EXCEED 20’ CLEAR SPAN AND BE CLASSIFIED AS A BRIDGE. LOCATED AT RM ROUTE 4 1803-1018, TOWN OF GREENWICH, WASHINGTON COUNTY.
1.330 0.100 1.230 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WASHINGTON TPC : $1.2-$2.5 M
THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER
TOWN OF EAST GREENBUSH, RENSSELAER COUNTY. R340
4.434 0.292 0.000 0.292 3.850 AQC:D1Z TOTAL 4YR COST :RENSSELAER TPC : $3.3-$5.6 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 7 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
PHASE TWO OF NEW YORK'S FIRST EVER COMPREHENSIVE PEDESTRIAN SAFETY ACTION PLAN. THIS FIVE-YEAR, MULTI-AGENCY INITIATIVE PROVIDES NEW YORK STATE DEPARTMENT OF TRANSPORTATIONS' REGION ONE (ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, AND WASHINGTON COUNTIES) WITH $3.2 MILLION TO IMPROVE SAFETY FOR PEDESTRIANS THROUGH INFRASTRUCTURE IMPROVEMENTS, PUBLIC EDUCATION EFFORTS, AND INCREASED LAW ENFORCEMENT EFFORTS, AND INSTALL SYSTEMIC PEDESTRIAN SAFETY FEATURES AT LOCATIONS IDENTIFIED IN THE PEDESTRIAN SAFETY ACTION PLAN (PSAP). THE NEW YORK STATE DEPARTMENT OF HEALTH AND THE GOVERNOR'S TRAFFIC SAFETY COMMITTEE ARE PARTNERS WITH NYSDOT IN THIS INITIATIVE.
2.550 2.550 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $2-$4 M
CULVERT REPLACEMENT (BRIDGE PROJECT): ROUTE 74 CULVERT C120086, ROUTE 74 OVER EAGLE LAKE CHANNEL. THIS IS LOCATED AT RM ROUTE 74 1201-1113, TOWN OF CROWN POINT, ESSEX COUNTY.THIS LARGE CULVERT IS GOING TO BE REPLACED WITH A BRIDGE (THE NEW CLEAR SPAN IS (Formerly PIN: 104359)
2.830 0.350 2.480 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $2-$4 M
RT. 9L PAVING FROM THE CITY LINE TO QUAKER RD. AND FROM SUNNYSIDE RD. TO CLEMENTS RD. TOWN OF QUEENSBURY, WARREN COUNTY. REPURPOSE EARMARK DEMO ID NY060, FUND RPS0
1.690 1.690 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :WARREN TPC : $1.2-$2.5 M
STATE ROUTE 7 INTERCHANGE WITH INTERSTATE-87. ADD MERGE LANE ON BOTH ON-RAMPS TO I-87.
THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER
TOWN OF COLONIE, ALBANY COUNTY. A602
1.998 0.000 0.348 1.650 0.000 AQC:A19Z TOTAL 4YR COST :ALBANY TPC : $1.2-$2.5 M
IMPROVE THE RESILIENCY AND SAFETY OF THE STATE ROUTE 73 CORRIDOR IN THE VICINITY OF THE CASCADE LAKES, STABILIZATION OF ROADSIDE SLOPES, INSTALLATION OF PERMANENT RAIL WITH APPROPRIATE DEFLECTION DISTANCE BASED ON THE LOCATION, AND REHABILITATION OF THE PAVEMENT. REHABILITATION OF DETERIORATED RETAINING WALLS, SLOPES, AND SECTIONS OF ROUTE 73 PRONE TO EROSION AND POTENTIAL WASHOUT IN HEAVY PRECIPITATION. OTHER ISOLATED LOCATIONS TO BE INCLUDED BETWEEN ROUTE 9 AND THE CASCADE LAKES TO REPAIR SIMILAR DETERIORATED BARRIER. TOWNS OF KEENE AND NORTH ELBA, ESSEX COUNTY.
19.205 0.000 19.005 0.200 0.000 AQC:N/A TOTAL 4YR COST :ESSEX TPC : $15-$25 M
THIS PROJECT WILL EITHER REHABILITATE THE EXISTING BRIDGE DECK FOR THE I-87 EXIT 32 NB OFF RAMP OR RECONFIGURE THE RAMP AND REMOVE THE EXISTING BRIDGE BASED ON RECOMMENDATIONS. TOWN OF LEWIS, ESSEX COUNTY. ESSEX
1.860 0.150 1.710 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $1.2-$2.5 M
SOUTH TROY INDUSTRIAL PARK ROAD PHASE I (SOUTHERN END)
IMPROVE EXISTING EAST INDUSTRIAL PARKWAY FROM MAIN STREET/ BURDEN AVENUE (US 4) TO NORTHERN TERMINUS AND CONSTRUCT A NEW TWO-LANE ROAD FROM THERE TO MONROE STREET, INCLUDING SIDEWALKS AND BIKE LANES.
CITY OF TROY, RENSSELAER COUNTY. FINAL TREATMENTS WILL BE IDENTIFIED IN THE DESIGN PROCESS. R195
4.039 4.039 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :RENSSELAER TPC : $9.5-15.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 14 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
BRIDGE REPAIR OR REPLACEMENT TO ADDRESS CONDITION RATING, CR10 (MIDDLETON BRIDGE) OVER SCHROON RIVER, BIN 3305150, TOWN OF BOLTON AND TOWN OF WARRENSBURG, WARREN COUNTY WAR100
3.817 0.000 0.126 0.000 3.691 AQC:N/A TOTAL 4YR COST :WARREN TPC : $3.3-$5.6 M
CULVERT REPAIR OR REPLACEMENT TO ADDRESS CONDITION RATING: C.R.57 SOUTH JOHNSBURG RD OVER MILL CREEK, BIN:3305370, TOWN OF JOHNSBURG, WARREN CO. WAR176
1.694 0.011 1.683 0.000 0.000 AQC:N/A TOTAL 4YR COST :WARREN TPC : $1.2-$2.5 M
0.028 STBG LG URB 0.028 ROWACQU2020ROWACQU 0.006 0.006 2020NFA
0.080 0.080 CONINSPSTBG LG URB 2022CONINSP 0.020 0.020 2022NFA
1.129 1.129 CONSTSTBG LG URB 2022CONST 0.282 0.282 2022NFA
RENSSELAER CO
175815
CR 68 OVER WYNANTSKILL CREEK
BRIDGE REPAIR OR REPLACEMENT TO ADDRESS CONDITION RATING
BIN 3303610, RENSSELAER COUNTY R287
TOWN OF POESTENKILL
COMBINED WITH 1760.48 (R312).
1.545 0.034 0.000 1.511 0.000 AQC:A19P TOTAL 4YR COST :RENSSELAER TPC : $1.2-$2.5 M
0.023 0.023 ROWACQUSTBG LG URB 2021ROWACQU 0.005 0.005 2021NFA
0.400 0.400 CONINSPSTBG LG URB 2022CONINSP 0.100 0.100 2022NFA
3.856 3.856 CONSTSTBG LG URB 2022CONST 0.964 0.964 2022NFA
CITY OF SCHENECTADY
175895
KINGS ROAD (CR 65) OVER CSX, BRIDGE REPLACEMENTCITY OF SCHENECTADY, SCHENECTADY COUNTY, BIN 2203130. S204
INCLUDES 5 FOOT SHOULDERS FOR BIKES
5.348 0.000 0.028 5.320 0.000 AQC:A19P TOTAL 4YR COST :SCHENECTADY TPC : $4.6-$7.5 M
PROJECT WILL REPLACE EXISTING TRAFFIC SIGNALS WITH UPDATED INTERCONNECTED SIGNALS AT SITTERLY RDS INTERSECTIONS WITH WOODIN RD AND CROSSINGS BLVD. IT WILL ALSO CONSTRUCT A NEW LEFT HAND TURNING LANE ON THE WOODIN RD APPROACH TO SITTERLY. CLIFTON PARK SA281
RESULT OF MOU, ALL LOCAL MATCH IS PIT BOND PER REGION ONE
1.930 1.930 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :SARATOGA TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 16 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
BIN 3303280 CR23B (MAIN ST) OVER THE SHINGLEKILL BRIDGE PRESERVATION PROJECT. TOWN OF CAIRO, GREENE COUNTY. GREENE
0.777 0.777 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :GREENE TPC : $0.6-$1.5 M
0.068 STBG LG URB 0.068 CONINSP2020CONINSP 0.017 0.017 2020NFA
0.616 STBG LG URB 0.616 CONST2020CONST 0.154 0.154 2020NFA
vil of Green Island
176029
HUDSON AVENUE MILL & FILL FROM THE INTERSECTION WITH TIBBITS AVE TO THE WATERVLIET CITY LINE. INCLUDES IMPROVEMENT TO ADA COMPLIANT CROSSWALKS, INSTALLATION OF HIGH VISIBILITY CROSSWALKS, AND IMPROVEMENTS FOR CYCLIST SAFETY. VILLAGE OF GREEN ISLAND, ALBANY COUNTY. A568
0.855 0.855 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ALBANY TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 17 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
for REGION 01
TOTAL PROJECT COST
0.051 0.051 CONINSPSTBG LG URB 2022CONINSP 0.013 0.013 2022NFA
0.468 0.468 CONSTSTBG LG URB 2022CONST 0.117 0.117 2022NFA
TN OF SAND LAKE
176034
SAND LAKE HAMLETS SIDEWALK ENHANCEMENTS
REHABILITATE 2200 FEET OF SIDEWALK & REPLACE 43 PIECES OF SIDEWALK
TOWN OF SAND LAKE, RENSSELAER COUNTY. R310
SHARED JURISDICTION: SAND LAKE & RENSSELAER COUNTY
0.649 0.000 0.000 0.649 0.000 AQC:C2P TOTAL 4YR COST :RENSSELAER TPC : $0.6-$1.5 M
REPLACEMENT OF CHURCH STREET BRIDGE OVER THE METTAWEE RIVER, VILLAGE OF GRANVILLE, WASHINGTON COUNTY. BIN #3-20366-0. SPAN CONSTRUCTED IN 1920. SUPPLEMENTAL PROJECT THROUGH STATE MOU.
4.787 0.050 0.000 4.737 0.000 AQC:EXEMPT TOTAL 4YR COST :WASHINGTON TPC : $4.6-$7.5 M
BRANDYWINE AVENUE, I-890 TO STATE STREET: SAFETY ENHANCEMENTS, CITY OF SCHENECTADY
SIGNAL UPGRADES, PEDESTRIAN IMPROVEMENTS, CORRIDOR LIGHTING (CITY SHARE) & LANE RECONFIGURATION (MODIFICATION TO STRIPING)
THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER
1.134 0.000 1.134 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :SCHENECTADY TPC : $1.2-$2.5 M
WASHINGTON/WESTERN BRT PHASE 1, 2017, CITY OF ALBANY
BUS STOP WORK, ENHANCED LIGHTING, RAISED MEDIANS, TURN LANES, ON-STREET PARKING, SIGNALIZED MID-BLOCK PEDESTRIAN CROSSINGS, CURB EXTENSIONS AND BUMP OUTS. THE DESIGN WORK WAS COMPLETED UNDER PROJECT T90 . (FORMERLY PIN: 1760.59)
SOME HSIP, NHPP & STP-FLEX FUNDS IN 2016-17 ARE DUPLICATED AS FTA MISC IN ORDER TO ALLOW CDTA TO OBLIGATE THE FUNDS IN 17-18, BUT DON’T REPRESENT ADDITIONAL FUNDS.
0.500 0.500 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ALBANY TPC : $50-$85 M
REDESIGN INTERSECTION WITH NEW TURN LANE. INCLUDES MILL AND FILL OF NOTT STREET FROM BALLTOWN ROAD TO CLIFTON PARK ROAD.
TOWN OF NISKAYUNA, SCHENECTADY COUNTY. S249
THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER
1.353 0.000 0.000 1.353 0.000 AQC:D1P TOTAL 4YR COST :SCHENECTADY TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 21 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
for REGION 01
TOTAL PROJECT COST
CONST 0.160 0.160 2021NFA 0.040 0.040 CONINSPSTBG LG URB 2021
CONINSP 0.010 0.010 2021NFA 0.350 0.350 CONSTSTBG LG URB 2021
CONST 0.087 0.087 2021NFA
CITY OF SCHENECTADY
176062
ROSA RD, WENDELL AVE AND NOTT ST INTERS. IMPROVEMENTS5-LEG SIGNAL, PED ACCOMMODATIONS, REFUGE ISLANDS, HIGH VISIBILITY CROSSWALKS, IMPROVED STRIPING. S245
CITY OF SCHENECTADY, SCHENECTADY COUNTY
0.647 0.000 0.647 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :SCHENECTADY TPC : $0.6-$1.5 M
THIS PROJECT WILL CONSTRUCT APPROXIMATELY 2,250 FEET OF ADA COMPLIANT SIDEWALK ON THE SOUTHERN SIDE OF STATE ROUTE 20 (WESTERN AVENUE) FROM DEVONSHIRE DRIVE TO MERCY CARE LANE. TOWN OF GUILDERLAND, ALBANY COUNTY.
THIS INCLUDES CURBS AND INTERSCTIONRAMPS.
A586
0.730 0.000 0.730 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ALBANY TPC : $0.6-$1.5 M
THIS PROJECT WILL CLOSE AN EXISTING GAP ON THE MOE ROAD MULTI-USE PATH BY CONSTRUCTING AN EXTENSION THAT WILL CONNECT OKTE ELEMENTARY SCHOOL TO HOUSING DEVELOPMENTS LOCATED OFF OF MOE ROAD AND TERMINATE AT THE INTERSECTION WITH SUGARBUSH ROAD.
TOWN OF CLIFTON PARK, SARATOGA COUNTY. SA306
THESE FUNDS ARE CAPPED
0.884 0.000 0.000 0.884 0.000 AQC:C2P TOTAL 4YR COST :SARATOGA TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 22 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
for REGION 01
TOTAL PROJECT COST
0.018 TAP LG URBAN 0.018 ROWACQU2020ROWACQU 0.005 0.005 2020NFA
0.160 0.160 CONINSPTAP LG URBAN 2021CONINSP 0.040 0.040 2021NFA
0.960 0.960 CONSTTAP LG URBAN 2021CONST 0.240 0.240 2021NFA
CITY OF RENSSELAER
176084
RENSSELAER RIVERFRONT MULTI-USE TRAIL
THIS PROJECT CONSTRUCTS 3750 FEET OF MULTI-USE TRAIL AND 100 FEET OF BIKE/PED ACCOMODATIONS BETWEEN DELAETS LANDING AND RIVERFRONT PARK.
CITY OF RENSSELAER, RENSSELAER COUNTY, R323
THESE FUNDS ARE CAPPED
1.423 0.023 1.400 0.000 0.000 AQC:C2P TOTAL 4YR COST :RENSSELAER TPC : $1.2-$2.5 M
0.118 TAP LG URBAN 0.118 ROWACQU2020ROWACQU 0.029 0.029 2020NFACONST 0.421 0.421 2021NFA
0.195 0.195 CONINSPTAP LG URBAN 2021CONINSP 0.049 0.049 2021NFA
1.073 1.073 CONSTTAP LG URBAN 2021CONST 0.269 0.269 2021NFA
CITY of SARATOGA SPR
176086
SARATOGA GREENBELT DOWNTOWN CONNECTOR, SARATOGA SPRINGS, SARATOGA COUNTY
THE PROJECT BEGINS AT LAKE AVENUE,EXTENDS ALONG HIGH ROCK AND EXCELSIORAVENUES AND CONNECTS TO THE BICYCLE-PEDESTRIAN BRIDGE I-87 EXIT 15.
NEW SIDEWALKS, MULTI-USE TRAILS, BIKELANES, BE (FORMERLY PIN: 176084)
2.154 0.147 2.007 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :SARATOGA TPC : $2-$4 M
FIRST PHASE OF A PROPOSED 2.2-MILE TRAIL INCLUDES A 700-FOOT TRAIL EXTENSION FROM THE CURRENT TERMINUS TO SEWER PLANT ROAD, INSTALLATION OF A 5-CAR TRAILHEAD PARKING LOT, AND TRAILHEAD AMENITIES
RENSSELAER CO, TN OF HOOSICK FALLS, S236
0.120 0.015 0.000 0.105 0.000 AQC:EXEMPT TOTAL 4YR COST :RENSSELAER TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 23 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
THIS IS A 1.5 MILE SHARED USE PATH THAT WILL CONNECT THE EXISTING ALBANY COUNTY HUDSON-HELDERBERG RAIL TRAIL AT ITS TRAIL HEAD IN THE CITY OF ALBANY’S SOUTH END, APPROXIMATELY A QUARTER MILE FROM THE INTERSECTION OF SOUTH PEARL STREET AND MOUNT HOPE DRIVE AND THE MOHAWK HUDSON BIKE HIKE TRAIL AT ITS TRAIL HEAD IN ALBANY AT THE INTERSECTION OF BROADWAY AND QUAY STREET
CITY OF ALBANY, ALBANY COUNTY, A589
OPRHP PROJECT NUMBER “175160”
LOCAL MATCH IS 50%
0.325 0.000 0.325 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ALBANY TPC : < $0.75 M
PAVEMENT PRESERVATION, SPOT REPAIRS, SIDEWALK REPLACEMENT AND 21 ADA RAMPS ALONG 0.64 MILES OF DIX AVENUE FROM RIDGE STREET TO PLATT STREET, CITY OF GLENS FALLS, WARREN COUNTY.PROJECT AWARDED FROM A/GFTC LOCAL HIGHWAY PAVEMENT PRESERVATION PROGRAM SETASIDE.
2.435 2.435 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $2-$4 M
CR 28 PAVEMENT CORRECTIVE MAINTENANCE, PART 1, CR27 TO RESERVOIR RD (1.6 MILES) AND PART 2, RESERVOIR ROAD TO NYS ROUTE 197 (1.0 MILES), TOWN OF MOREAU, SARATOGA COUNTY. TOWN OF MOREAU, SARATOGA COUNTY. THIS PIN NOW INCLUDES PIN 176139.
0.974 0.974 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :SARATOGA TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 27 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
PAVEMENT REHABILITATION PROJECT TO RESTORE CONDITION FOR 1.05 MILES OF CR 39 (SUNNYSIDE EAST) FROM NYS 9L (RIDGE ROAD) TO WASHINGTON COUNTY LINE, AND 0.96 MILES OF CR 54 (SUNNYSIDE ROAD) FROM NYS 9L (RIDGE ROAD) TO CR 7 (BAY ROAD), TOWN OF QUEENSBURY, WARREN COUNTY. PROJECT AWARDED FROM A/GFTC LOCAL PAVEMENT PRESERVATION PROGRAM SETASIDE (1TO427). THIS PIN NOW INCLUDES 176100.
1.726 1.726 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $1.2-$2.5 M
SARATOGA COUNTY BRIDGE PRESERVATION: CLARK ROAD OVER SNOOK KILL (BIN 3304130) AND CR 29 (RIVER RD) OVER SNOOK KILL (BIN 3304140), TOWN OF MOREAU, SARATOGA COUNTY. THIS PIN NOW INCLUDES PIN 176104.
0.260 0.260 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :SARATOGA TPC : < $0.75 M
WASHINGTON COUNTY BRIDGE PRESERVATION: DR. JOHNSON RD OVER BATTEN KILL (BIN 3306080) AND CEMETERY RD OVER BLACK CREEK (BIN 3203730). TOWNS OF JACKSON AND SALEM, WASHINGTON COUNTY. WAS 164
0.426 0.426 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WASHINGTON TPC : < $0.75 M
REPLACEMENT OF BRIDGE (BIN 3360320) CARRYING WARREN COUNTY ROUTE 7 (BAY ROAD) OVER HALFWAY CREEK (BROOK), TOWN OF QUEENSBURY, WARREN COUNTY. PROJECT IS A BRIDGE NY PROGRAM AWARD. TOLL CREDITS TO PROVIDE 15% SHARE.
2.548 0.000 2.548 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $2-$4 M
CR 28 PAVEMENT PRESERVATION PROJECT - PART 2, RESERVOIR ROAD TO NYS ROUTE 197 (1.0 MILES), TOWN OF MOREAU, SARATOGA COUNTY. THIS PIN WAS MERGED INTO PIN 176098
0.027 0.027 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :SARATOGA TPC : < $0.75 M
Johnsburg Bridges over Glen Creek, Bridge Replacements, Dippikill Road (3305490) and Glen Creek Road (3305500). Town of Johnsburg, Warren County WAR187
2.729 0.413 0.000 2.316 0.000 AQC:N/A TOTAL 4YR COST :WARREN TPC : $2-$4 M
CR 16 (East River Drive) and CR 32 (Call Street) Rehabilitation, Warren County Line to Hawk Road (3.7 miles),Town of Lake Luzerne, Warren County WAR190
1.390 0.150 0.000 1.240 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $1.2-$2.5 M
CR 61 OVER BATTEN KILL (BATTEN-DUGAN) BRIDGE REPLACEMENT, BIN 3306370, TOWNS OF GREENWICH AND JACKSON, WASHINGTON COUNTY. CONSTRUCTION ANTICIPATED FOR FFY 2023-2024.
0.271 0.049 0.222 0.000 0.000 AQC:N/A TOTAL 4YR COST :WASHINGTON TPC : $4.6-$7.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 34 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
COUNTY ROUTE 74 OVER FLY CREEK, BRIDGE REPLACEMENT (BIN 3306170), TOWN OF EASTON, WASHINGTON COUNTY AND HICKORY HILL ROAD OVER CAMDEN VALLEY CREEK, BRIDGE REPLACEMENT (BIN 3306600), TOWN OF SALEM, WASHINGTON COUNTY . THIS PIN NOW INCLUDES 176156. WAS170
1.854 0.000 0.000 0.316 1.538 AQC:N/A TOTAL 4YR COST :WASHINGTON TPC : $1.2-$2.5 M
0.087 STBG LG URB 0.087 DETLDES2020DETLDES 0.023 0.023 2020NFA
0.087 STBG LG URB 0.087 PRELDES2020PRELDES 0.023 0.023 2020NFA
0.144 0.144 CONINSPSTBG LG URB 2022CONINSP 0.036 0.036 2022NFA
1.200 1.200 CONSTSTBG LG URB 2022CONST 0.300 0.300 2022NFA
CITY OF SARATOGA SPR
176158
MISSING LINKS PROGRAM: CITY OF SARATOGA SPRINGS
ADD CONCRETE SIDEWALK, ADA CROSSWALKS, AMENITIES AND SOME CURBING AND DRAINAGE IN SEVERAL LOCATIONS.
CITY OF SARATOGA SPRINGS, SARATOGA COUNTY. SA322
1.900 0.220 0.000 1.680 0.000 AQC:C2Z TOTAL 4YR COST :SARATOGA TPC : $1.2-$2.5 M
0.094 0.094 DETLDESSTBG LG URB 2021DETLDES 0.023 0.023 2021NFA
0.094 0.094 PRELDESSTBG LG URB 2021PRELDES 0.023 0.023 2021NFA
0.194 0.194 ROWACQUSTBG LG URB 2021ROWACQU 0.048 0.048 2021NFA
0.016 0.016 ROWINCDSTBG LG URB 2021ROWINCD 0.004 0.004 2021NFA
0.112 0.112 CONINSPSTBG LG URB 2022CONINSP 0.028 0.028 2022NFA
0.934 0.934 CONSTSTBG LG URB 2022CONST 0.233 0.233 2022NFA
TN OF GLENVILLE
176159
FREEMANS BRIDGE ROAD MULTI-USE PATH
FROM THE SCOTIA-GLENVILLE LOOP SEGMENT OF THE MOHAWK-HUDSON TRAIL TO DUTCH MEADOWS LANE
CONSTRUCT A 4,800 FOOT LONG AND 10 FOOT WIDE PROTECTED MULTI-USE PATH WITH 3 NEW CROSSWALKS.
TOWN OF GLENVILLE, SCHENECTADY COUNTY. S265
1.803 0.000 0.496 1.307 0.000 AQC:C2Z TOTAL 4YR COST :SCHENECTADY TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 35 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
for REGION 01
TOTAL PROJECT COST
0.030 0.030 DETLDESSTBG LG URB 2022DETLDES 0.007 0.007 2022NFA
0.030 0.030 PRELDESSTBG LG URB 2022PRELDES 0.007 0.007 2022NFA
0.038 0.038 CONINSPSTBG LG URB 2023CONINSP 0.009 0.009 2023NFA
0.319 0.319 CONSTSTBG LG URB 2023CONST 0.080 0.080 2023NFA
CITY OF SCHENECTADY
176160
FRANKLIN STREET CYCLE TRACK, CITY OF SCHENECTADY
INSTALL A PROTECTED TWO-WAY CYCLE TRACK ON FRANKLIN STREET FROM NOTT TERRACE TO JAY STREET.
CITY OF SCHENECTADY, SCHENECTADY COUNTY. S266
0.520 0.000 0.000 0.074 0.446 AQC:C2Z TOTAL 4YR COST :SCHENECTADY TPC : < $0.75 M
0.227 0.227 DETLDESSTBG LG URB 2022DETLDES 0.057 0.057 2022NFA
0.227 0.227 PRELDESSTBG LG URB 2022PRELDES 0.057 0.057 2022NFA
CITY OF TROY
176161
NY 2 CORRIDOR PROJECT, NY 2 (CONGRESS AND FERRY STREETS) FROM 11TH STREET WEST TO THE CONGRESS STREET BRIDGE RAMPS
CORRIDOR IMPROVEMENTS, INCLUDES: MILL & FILL, RESTRIPING TO ONE DRIVING LANE EACH, REPAIR 50% OF SIDEWALKS, ADD CURB EXTENSIONS AND BIKE LANES
CITY OF TROY, RENSSELAER COUNTY. R339
0.568 0.000 0.000 0.568 0.000 AQC:A10Z TOTAL 4YR COST :RENSSELAER TPC : $3.3-$5.6 M
0.276 0.276 DETLDESSTBG LG URB 2021DETLDES 0.069 0.069 2021NFA
0.276 0.276 PRELDESSTBG LG URB 2021PRELDES 0.069 0.069 2021NFA
0.292 0.292 CONINSPSTBG LG URB 2022CONINSP 0.073 0.073 2022NFA
2.994 2.994 CONSTSTBG LG URB 2022CONST 0.748 0.748 2022NFA
VIL OF SCOTIA
176162
SUNNYSIDE ROAD OVER AMTRAK, BRIDGE REHABILITATION
REPAIR CONCRETE PIERS, CAP BEAMS, AND STEEL STRUCTURAL MEMBERS, REPLACE STEEL BEARINGS AND DECK INCLUDING RAILINGS, BIKE LANES, AND SIDEWALK ON SOUTH SIDE.
VILLAGE OF SCOTIA, SCHENECTADY COUNTY, BIN 2257170. S263
4.797 0.000 0.690 4.107 0.000 AQC:A19Z TOTAL 4YR COST :SCHENECTADY TPC : $7.5-$12 M
0.054 0.054 DETLDESSTBG LG URB 2021DETLDES 0.014 0.014 2021NFA
0.054 0.054 PRELDESSTBG LG URB 2021PRELDES 0.014 0.014 2021NFA
0.071 0.071 CONINSPSTBG LG URB 2022CONINSP 0.018 0.018 2022NFA
0.592 0.592 CONSTSTBG LG URB 2022CONST 0.148 0.148 2022NFA
CITY OF ALBANY
176163
HENRY JOHNSON BOULEVARD MILL & FILL, FROM SHERIDAN AVENUE TO LIVINGSTON AVENUE
CITY OF ALBANY, ALBANY COUNTY. A593
0.965 0.000 0.136 0.829 0.000 AQC:A10Z TOTAL 4YR COST :ALBANY TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 36 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
for REGION 01
TOTAL PROJECT COST
0.042 0.042 DETLDESSTBG LG URB 2021DETLDES 0.010 0.010 2021NFA
0.042 0.042 PRELDESSTBG LG URB 2021PRELDES 0.010 0.010 2021NFA
0.055 0.055 CONINSPSTBG LG URB 2022CONINSP 0.014 0.014 2022NFA
0.456 0.456 CONSTSTBG LG URB 2022CONST 0.115 0.115 2022NFA
CITY OF ALBANY
176164
LARK STREET MILL & FILL, FROM MADISON AVENUE TO WASHINGTON AVENUE
ADA-COMPLIANT PEDESTRIAN AMENITIES FOR ALL SIDEWALKS AND CROSSWALKS. REPLACE 1,200 SQUARE FEET OF SIDEWALK.
CITY OF ALBANY, ALBANY COUNTY. A594
0.744 0.000 0.104 0.640 0.000 AQC:A10Z TOTAL 4YR COST :ALBANY TPC : $0.6-$1.5 M
0.032 STBG LG URB 0.032 DETLDES2020DETLDES 0.008 0.008 2020NFA
0.032 STBG LG URB 0.032 PRELDES2020PRELDES 0.008 0.008 2020NFA
0.043 0.043 CONINSPSTBG LG URB 2021CONINSP 0.011 0.011 2021NFA
0.354 0.354 CONSTSTBG LG URB 2021CONST 0.088 0.088 2021NFA
CITY OF RENSSELAER
176165
CITY OF RENSSELAER THIRD AVENUE PAVEMENT REHABILITATION & BIKE/PED IMPROVEMENTS, FROM THE BRIDGE TO CITY/TOWN LINE
CITY OF RENSSELAER, RENSSEALER COUNTY. R338
0.576 0.080 0.496 0.000 0.000 AQC:A10Z TOTAL 4YR COST :RENSSELAER TPC : < $0.75 M
0.040 0.040 DETLDESSTBG LG URB 2021DETLDES 0.010 0.010 2021NFA
0.045 0.045 PRELDESSTBG LG URB 2021PRELDES 0.011 0.011 2021NFA
0.080 0.080 CONINSPSTBG LG URB 2022CONINSP 0.020 0.020 2022NFA
0.721 0.721 CONSTSTBG LG URB 2022CONST 0.180 0.180 2022NFA
SCHENECTADY CO
176166
GUILDERLAND AVENUE MILL & FILL FROM CURRY ROAD (NY 7) TO THE SCHENECTADY CITY LINE
ADD 8 CURB RAMP NODES AT ALL THE TOWN INTERSECTIONS WITHIN THE PROJECT LIMITS, ADD APPROXIMATELY 100 FEET OF SIDEWALK AND CONCRETE CURBING IN FRONT OF THE BELLEVUE GOSPEL CHAPEL, IMPROVE THE TWO EXISTING CURB RAMPS AT THE CURRY ROAD/GUILDERLAND AVENUE INTERSECTION.
ANDHELDERBERG AVENUE MILL & FILL, FROM CURRY ROAD (STATE ROUTE 7) TO CITY OF SCHENECTADY MUNICIPAL LINE (NEAR AMELIA STREET)
SIDEWALK: REPLACE OR REPAIR 750 LINEAR FEET, ADD 200 FEET NEW, INSTALL 28 ADA CURB RAMPS, IMPROVE PAVEMENT MARKINGS & SIGNAGE WHERE NEEDED.
TOWN OF ROTTERDAM, SCHENECTADY COUNTY. S261THIS PIN NOW INCLUDES PIN 176167 (S262)
1.107 0.000 0.106 1.001 0.000 AQC:A10Z TOTAL 4YR COST :SCHENECTADY TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 37 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
MILL & FILL FROM ELSMERE AVENUE TO NORMANS KILL BRIDGE, COMPLETE STREETS & ROAD DIET PROJECT
TOWN OF BETHLEHEM, ALBANY COUNTY. A601
FUNDING FOR PAVEMENT PRESERVATION IS NOT INCLUDED HERE AND WILL BE PAID FOR BY THE NYSDOT PAVEMENT PRESERVATION SET-ASIDE
3.640 0.000 0.485 0.045 3.110 AQC:A2Z,A10Z TOTAL 4YR COST :ALBANY TPC : $4.6-$7.5 M
0.025 0.025 DETLDESSTBG LG URB 2022DETLDES 0.006 0.006 2022NFA
0.025 0.025 PRELDESSTBG LG URB 2022PRELDES 0.006 0.006 2022NFA
0.062 0.062 CONINSPSTBG LG URB 2023CONINSP 0.015 0.015 2023NFA
0.516 0.516 CONSTSTBG LG URB 2023CONST 0.129 0.129 2023NFA
CITY OF SCHENECTADY
176169
CRAIG STREET PAVEMENT REHABILITATION, FROM ALBANY STREET TO WYLLIE STREET
INCLUDES SELECT FULL DEPTH REPAIRS, ADA NON-COMPLIANT INTERSECTIONS WILL BE MADE COMPLIANT. HIGH VISIBILITY, LADDER BAR STYLE, CROSSWALKS WILL BE INSTALLED AT EVERY CROSSING.
CITY OF SCHENECTADY, SCHENECTADY COUNTY. S259
0.784 0.000 0.000 0.062 0.722 AQC:A10Z TOTAL 4YR COST :SCHENECTADY TPC : $0.6-$1.5 M
INCLUDES A MULTI-USE PATH, SIDEWALK & CROSSWALKS CONNECTING RESIDENTIAL NEIGHBORHOODS TO THE COLLINS LAKE ACCESS AREA AND TO AN EXISTING TRAIL CONNECTOR.
VILLAGE OF SCOTIA, SCHENECTADY COUNTY. S268
0.891 0.000 0.190 0.701 0.000 AQC:C2 TOTAL 4YR COST :SCHENECTADY TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 41 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
REPLACEMENT OF 6100 FT OF DETERIORATED SIDEWALK AND 2,900 FT NEW SIDEWALK ON RIVER STREET BETWEEN PERRY LANE AND JOHNSON DRIVE, TOWN OF WARRENSBURG, WARREN COUNTY. INCLUDES CROSSWALKS AND ADA DETECTABLE WARNING PLATES AND PEDESTRIAN SIGNING AND STRIPING.
1.019 0.219 0.800 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $0.6-$1.5 M
0.042 TAP FLEX 0.042 DETLDES2020DETLDES 0.011 0.011 2020NFA
0.064 TAP FLEX 0.064 PRELDES2020PRELDES 0.016 0.016 2020NFA
SLOPE REPAIR SFY 24, TO ADDRESS SPECIFIC NEEDS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
0.397 0.000 0.000 0.000 0.397 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
0.120 NHPP 0.120 MISC2020MISC 0.030 0.030 2020NFA
0.120 0.120 MISCNHPP 2021MISC 0.030 0.030 2021NFA
0.120 0.120 MISCNHPP 2022MISC 0.030 0.030 2022NFA
NYSDOT
180950
TMC ITS PROJECTS
WITHIN ALBANY, RENSSELAER, SARATOGA AND SCHENECTADY COUNTIES. RG37C
0.450 0.150 0.150 0.150 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 44 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
TRAFFIC SIGNALS REBUILD SFY19 (WAS 1T0852) ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
0.894 0.057 0.837 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 45 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
BRIDGE PRESERVATION SFY19 ON FEDERAL AID ELIGIBLE STATE HIGHWAYS: RT 140 OVER ALBANY RAIL TRAIL (BIN 1095909), TOWN OF BETHLEHEM, ALBANY COUNTY. WASHINGTON AVE EXT OVER I-87 (BIN 1093209), CITY OF ALBANY, ALBANY COUNTY.
4.832 4.832 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ALBANY TPC : $4.6-$7.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 46 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
CULVERT REPAIR/REPLACE SFY 20 ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS: CA00265 (DESIGN APPROVAL 1810.09) IN WARREN COUNTY AND C120192 (DESIGN APPROVAL 1810.14), C120207 (DESIGN APPROVAL 1810.14), C120213 (DESIGN APPROVAL 1810.14), C120020, C120022, C120092 IN ESSEX COUNTY.
4.756 0.350 4.406 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
0.320 NHPP 0.320 MISC2020MISC 0.080 0.080 2020NFA
NYSDOT
181046
TMC OPERATIONS 19-20 (WAS PIN 180948)
11/1/2019-10/31/2020
PERSONNEL, OPERATIONS CONTRACTS, REPAIRS EQUIPING A NEW TMC BUILDING, AND OTHER RECURRING COSTS. RG37A
0.400 0.400 0.000 0.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $2-$4 M
1.080 NHPP 1.080 MISC2020MISC 0.270 0.270 2020NFA
NYSDOT
181051
FUNDING TMC ENGINEERING SUPPORT FROM 9/1/2020 TO 7/31/21 (REPLACED PIN 180949). RG37B
1.350 1.350 0.000 0.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 47 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
RUSTIC RAIL REPLACEMENT SFY20, ROUTE 73 AND ROUTE 3 IN ESSEX COUNTY; AND ROUTES 9N, 418 AND 912Q IN WARREN COUNTY. EMPIRE STATE TRAIL SIGN INSTALLATION IN ALBANY, SARATOGA, AND WASHINGTON COUNTIES UTILIZING NON-FEDERAL FUNDS RG119
5.334 5.334 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
DURABLE PAVEMENT MARKINGS SFY20 ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC COUNTERMEASURE.
4.481 4.481 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 48 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
SLOPE REPAIR SFY 25, PREVENTIVE AND/OR DEMAND, TO ADDRESS SPECIFIC NEEDS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
3.600 0.000 0.300 3.300 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
TRAFFIC SIGNALS REBUILD SFY21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
1.104 0.056 1.048 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 49 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
0.016 0.016 CONINSPSTBG LG URB 2021CONINSP 0.004 0.004 2021NFA
0.160 0.160 CONSTSTBG LG URB 2021CONST 0.040 0.040 2021NFA
NYSDOT
181065
DURABLE PAVEMENT MARKINGS SFY21 ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC COUNTERMEASURE.
3.795 0.119 3.676 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
PAVEMENT MAINTENANCE SFY20A:ROUTE 86 S.H. 1151, 1177, 1178 RM 86-1202-1017 (-543) TO RM 86-1202-1085 (-400) (TOWN OF NORTH ELBA & VILLAGE OF LAKE PLACID)ROUTE 196 S.H. 9312, 1080, 720, 720A RM 196-1801-1001 (-509) TO RM 196-1801-1013 (+154) (VILLAGE OF HUDSON FALLS AND TOWN OF KINGSBURY)ROUTE 9N S.H. 843, 418 RM 9N-1702-1133 (-685) TO RM 9N-1702-1222 (+625) (TOWNS OF LAKE GEORGE AND BOLTON)ROUTE 149 S.H. 9359 RM 149-1701-1006 (-300) TO RM 149-1701-1026 (+30) (TOWN OF QUEENSBURY)ROUTE 149 S.H. 104, 5404, 9320 RM 149-1802-1251 (-370) TO RM 149-1802-1260 (+26) AND RM 149-1802-1262 TO RM 149-1802-1265 (+624) (VILLAGE OF GRANVILLE) HSIP WILL BE UTILIZED TO ADDRESS SPECIFIC LOCATIONS EVALUATED BY THE REGIONAL SAFETY ENGINEER AND APPROVED BY THE REGIONAL TRAFFIC ENGINEER. LOCATIONS ARE DETERMINED CONTINUALLY AND WILL BE CERTIFIED TO MEET THE HSIP CRITERIA FOR INCLUSION IN THIS PROJECT.
9.250 9.250 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $7.5-$12 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 50 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
PAVEMENT MAINTENANCE SFY20 - ON FEDERAL AID ELIGIBLE STATE HIGHWAYS: NY ROUTE 2 FROM RM 1033 TO RM 1036, TOWN OF COLONIEUS 9W FROM RM 1104 TO RM 1121, TOWN OF BETHLEHEMNY 397 FROM RM 1000 TO RM 1031, TOWN OF GUILDERLAND/VILLAGE OF ALTAMONTNY 910B (WOLF ROAD) FROM RM 1000 TO RM 1018, TOWN OF COLONIE/VILLAGE OF COLONIENY 296 FROM RM 1000 TO RM 1028, TOWNS OF JEWETT AND HUNTER/VILLAGE OF HUNTERUS 20 FROM RM 1000 TO RM 1039, TOWN OF DUANESBURGNY 32 FROM RM 1000 TO RM 1060, TOWNS OF WESTERLO AND COEYMANSUS 9W FROM RM 1000 TO RM 1060, TOWN OF CATSKILL/VILLAGE OF CATSKILLNY 406 FROM RM 1000 TO RM 1035, TOWNS OF PRINCETOWN AND ROTTERDAM
12.910 12.910 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M
PAVEMENT MAINTENANCE AT THE FOLLOWING SITES: US ROUTE 9 FROM LANSING LANE TO STATE ROUTE 146 IN THE TOWN OF HALFMOON AND STATE ROUTE 9N FROM MYRTLE STREET TO NORTH GREENFIELD ROAD/SPIER FALLS ROAD IN THE CITY OF SARATOGA SPRINGS AND TOWN OF GREENFIELD; SARATOGA COUNTY. AND US ROUTE 2 FROM STEWART ROAD TO THE MASSACHUSETTS STATE LINE IN THE TOWN OF PETERSBURGH AND STATE ROUTE 150 FROM US ROUTES 9/20 TO BEST ROAD IN THE TOWNS OF SAND LAKE AND SCHODACK; RENSSELAER COUNTY. HSIP WILL BE UTILIZED TO ADDRESS SPECIFIC LOCATIONS EVALUATED BY THE REGIONAL SAFETY ENGINEER AND APPROVED BY THE REGIONAL TRAFFIC ENGINEER. LOCATIONS ARE DETERMINED CONTINUALLY AND WILL BE CERTIFIED TO MEET THE HSIP CRITERIA FOR INCLUSION IN THIS PROJECT.
13.354 13.354 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $12.5-$19 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 51 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
PAVEMENT MAINTENANCE SFY21 2ND PROJECT - ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS:PAVEMENT MAINTENANCE SFY21 2ND PROJECT:RT 9 FROM DUNNING ST TO SARATOGA SPRINGS CITY LIMIT, TOWN OF MALTA AND CITY OF SARATOGA SPRINGS, SARATOGA COUNTYNY 8 FROM SUMMIT DR TO NY 9N, TOWN OF HAGUE, WARREN COUNTYNY 9L (RIDGE RD) FROM RT 254 (QUAKER RD) TO SUNNYSIDE RD, TOWNS OF QUEENSBURY AND LAKE GEORGE, WARREN COUNTYNY 9L (RIDGE RD) FROM CLEMENTS RD TO PILOT KNOB RD, TOWNS OF QUEENSBURY AND LAKE GEORGE, WARREN COUNTYNY 149 (ANN ST) FROM WASHINGTON COUNTY LINE TO RT 4, TOWN OF KINGSBURY, WARREN COUNTY.
13.825 0.108 13.717 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $12.5-$19 M
0.800 0.800 MISCNHPP 2021MISC 0.200 0.200 2021NFA
NYSDOT
181070
TMC OPERATIONS 20-21 (WAS PIN 180948)
11/1/2020-10/31/2021
PERSONNEL, OPERATIONS CONTRACTS, REPAIRS EQUIPING A NEW TMC BUILDING, AND OTHER RECURRING COSTS. RG37A
1.000 0.000 1.000 0.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
0.600 0.600 MISCNHPP 2021MISC 0.150 0.150 2021NFA
NYSDOT
181071
FUNDING TMC ENGINEERING SUPPORT FROM 8/1/2021 TO 4/30/2022 (REPLACED PIN 180949). RG37B
0.750 0.000 0.750 0.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
RUSTIC RAIL SFY21 VARIOUS LOCATIONS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS: ROUTE 73 FROM RM 73-1201-1539 (GILMORE HILL ROAD) TO 1656 (NEWMAN ROAD), ESSEX COUNTYI-87 FROM RM 87I-1211-1133 (BLUE RIDGE ROAD) TO 1572 (BRIDGE OVER AUSABLE RIVER), ESSEX COUNTYI-87 EXITS 21, 22, 23, AND 24, WARREN COUNTYROUTE 22 FROM RM 22-1209-1000 (WASHINGTON COUNTY LINE) TO 1021 (LAWSON LANE), ESSEX COUNTYROUTE 22 FROM RM 22-1808-1736 (ESSEX COUNTY LINE) TO 1570 (CATDEN ROAD), WASHINGTON COUNTY
4.358 0.094 4.264 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 52 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
BRIDGE PRESERVATION SFY 20, BINS 1007620 & 1054460 RT. 9W OVER I-787, CITY OF ALBANY, ALBANY COUNTY BIN 1033210 SITTERLY RD. OVER I-87, TOWN OF CLIFTON PARK, SARATOGA COUNTY BIN 1038670 RT. 156 OVER BEAVERDAM CREEK, TOWN OF BERNE, ALBANY COUNTY BIN 1017930 RT. 23A OVER EAST KILL, TOWN OF JEWETT, GREENE COUNTY BIN 1017799 RT. 23 OVER RT. 911V, TOWN OF CATSKILL, GREENE COUNTY
8.023 0.438 7.585 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $7.5-$12 M
BRIDGE PRESERVATION SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
8.023 0.219 0.219 7.585 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $7.5-$12 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 53 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
BRIDGE PRESERVATION SFY 22, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
5.523 0.000 0.219 0.219 5.085 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
BRIDGE PRESERVATION SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
0.438 0.000 0.000 0.219 0.219 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
BRIDGE PRESERVATION SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
0.219 0.000 0.000 0.000 0.219 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 54 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
CULVERT REPAIR/REPLACE SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
3.899 0.318 0.328 3.253 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 55 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
CULVERT REPAIR/REPLACE SFY 22, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
4.086 0.000 0.318 0.328 3.440 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
CULVERT REPAIR/REPLACE SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
0.646 0.000 0.000 0.318 0.328 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
CULVERT REPAIR/REPLACE SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
0.318 0.000 0.000 0.000 0.318 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 56 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
GUIDERAIL REPLACEMENT SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
2.305 0.120 2.185 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $2-$4 M
GUIDERAIL REPLACEMENT SFY 22, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
1.280 0.000 0.120 1.160 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 57 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
GUIDERAIL REPLACEMENT SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
1.280 0.000 0.000 0.120 1.160 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
GUIDERAIL REPLACEMENT SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
0.120 0.000 0.000 0.000 0.120 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
0.020 0.020 CONINSPSTBG LG URB 2022CONINSP 0.005 0.005 2022NFA
0.300 0.300 CONSTSTBG LG URB 2022CONST 0.075 0.075 2022NFA
NYSDOT
181098
DURABLE PAVEMENT MARKINGS SFY 22, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC COUNTERMEASURE.
3.975 0.000 0.119 3.856 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 58 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
0.020 0.020 CONINSPSTBG LG URB 2023CONINSP 0.005 0.005 2023NFA
0.300 0.300 CONSTSTBG LG URB 2023CONST 0.075 0.075 2023NFA
NYSDOT
181099
DURABLE PAVEMENT MARKINGS SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC COUNTERMEASURE.
3.975 0.000 0.000 0.119 3.856 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
DURABLE PAVEMENT MARKINGS SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC COUNTERMEASURE.
0.119 0.000 0.000 0.000 0.119 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
0.600 0.600 MISCNHPP 2022MISC 0.150 0.150 2022NFA
NYSDOT
181102
FUNDING TMC ENGINEERING SUPPORT FROM 2/1/22 TO 10/31/22(REPLACED PIN 180949). RG37B
0.750 0.000 0.000 0.750 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
0.800 0.800 MISCNHPP 2022MISC 0.200 0.200 2022NFA
NYSDOT
181107
TMC OPERATIONS 21-22
PERSONNEL, OPERATIONS CONTRACTS, REPAIRS EQUIPING A NEW TMC BUILDING, AND OTHER RECURRING COSTS. RG37A
1.000 0.000 0.000 1.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 59 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
PAVEMENT CORRECTIVE MAINTENANCE SFY 21A: RT 32 FROM WATERVLIET CITY LINE TO COHOES CITY LINE, TOWN OF COLONIE, ALBANY COUNTYRT 396 FROM RT 144 (RIVER ROAD) TO BLODGETT HILL ROAD, TOWN OF BETHLEHEM, ALBANY COUNTYRT 296 FROM RT 23A TO RT 23, TOWN OF HUNTER, GREENE COUNTYUS 9W FROM THRUWAY TO RT 32, TOWN OF BETHLEHEM, ALBANY COUNTYNY 67 FROM HUNT ROAD TO WASHINGTON COUNTY LINE, TOWN OF HOOSICK, RENSSELAER COUNTYNY 29 (SPRING STREET) FROM BRYANT BRIDGE ROAD TO ROUTE 4/32, TOWN OF SARATOGA, SARATOGA COUNTYUS 20 FROM MUDGE ROAD TO NY 7, TOWN OF DUANESBURG, SCHENECTADY COUNTY
17.635 0.560 16.408 0.667 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $15-$25 M
PAVEMENT CORRECTIVE MAINTENANCE SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE UTILIZED TO ADDRESS SPECIFIC LOCATIONS EVALUATED BY THE REGIONAL SAFETY ENGINEER AND APPROVED BY THE REGIONAL TRAFFIC ENGINEER. LOCATIONS ARE DETERMINED CONTINUALLY AND WILL BE CERTIFIED TO MEET THE HSIP CRITERIA FOR INCLUSION IN THIS PROJECT.
8.042 0.000 0.000 1.600 6.442 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $7.5-$12 M
PAVEMENT CORRECTIVE MAINTENANCE SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
1.600 0.000 0.000 0.000 1.600 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 60 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
TRAFFIC SIGNALS REBUILD SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
0.200 0.000 0.000 0.000 0.200 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
SIGN REPLACEMENT PROJECT SFY 21 ON VARIOUS FEDERAL AID ELIGIBLE INTERSTATES IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX. RENSSELAER, SARATOGA, SCHENECTADY, WARREN (EXACT LOCATIONS TO BE DETERMINED).
0.560 0.000 0.560 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
SIGN REPLACEMENT PROJECT SFY 22 ON VARIOUS FEDERAL AID ELIGIBLE INTERSTATES IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX. RENSSELAER, SARATOGA, SCHENECTADY, WARREN (EXACT LOCATIONS TO BE DETERMINED).
0.637 0.000 0.066 0.571 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
SIGN REPLACEMENT PROJECT SFY 23 ON VARIOUS FEDERAL AID ELIGIBLE INTERSTATES IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX. RENSSELAER, SARATOGA, SCHENECTADY, WARREN (EXACT LOCATIONS TO BE DETERMINED).
0.628 0.000 0.000 0.026 0.602 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
NAVIGATIONAL LIGHTS PROGRAM SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
1.690 0.000 1.690 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 61 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
RUSTIC RAIL REPLACEMENT AT VARIOUS LOCATIONS, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN ESSEX, GREENE, WARREN, AND WASHINGTON COUNTIES(EXACT LOCATIONS TO BE DETERMINED).
5.764 0.000 0.316 0.316 5.132 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
INTERSTATE OVERHEAD SIGN STRUCTURE REPLACEMENT, SFY 20, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
3.871 0.236 3.635 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
INTERSTATE OVERHEAD SIGN STRUCTURE REPLACEMENT, SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
3.871 0.000 0.236 3.635 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 62 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
BRIDGE WASHING SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
1.237 0.000 1.237 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
BRIDGE WASHING SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
1.316 0.000 0.079 0.000 1.237 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
BRIDGE WEATHERING STEEL WASHING, SFY 22, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
2.316 0.079 0.000 2.237 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $2-$4 M
BRIDGE DECK REPLACEMENT PROJECT SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
3.632 0.000 0.316 0.316 3.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 63 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
BRIDGE DECK REPLACEMENT PROJECT SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
0.632 0.000 0.000 0.316 0.316 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
BRIDGE DECK REPLACEMENT PROJECT SFY 25, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
0.316 0.000 0.000 0.000 0.316 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
INTERSTATE OVERHEAD SIGN STRUCTURE REPLACEMENT, SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
3.560 0.000 0.120 0.120 3.320 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
INTERSTATE OVERHEAD SIGN STRUCTURE REPLACEMENT, SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).
0.240 0.000 0.000 0.000 0.240 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
BRIDGE DECK REPLACEMENT PROJECT SFY21, ON VARIOUS FEDERAL AID ELIGIBLESTATE HIGHWAYS IN THE FOLLOWING 8COUNTIES: ALBANY, ESSEX, GREENE,RENSSELAER, SARATOGA, SCHENECTADY,WARREN, WASHINGTON (EXACT LOCATIONSTO BE DETERMINED).
1.940 0.200 1.740 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 64 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
0.016 0.016 CONINSPSTBG LG URB 2022CONINSP 0.004 0.004 2022NFA
0.082 0.082 CONSTSTBG LG URB 2022CONST 0.020 0.020 2022NFA
NYSDOT
181139
WRONG WAY DRIVING INITIATIVE TO ADDRESS @ 250 LIMITED ACCESS EXIT RAMPS WITH SIGNING AND POSSIBLE PAVEMENT MARKINGS. LOW CLEARANCE BRIDGE INITIATIVE WILL UPGRADE SIGNS TO MEET SIGNING AND REFLECTIVITY STANDARDS.THIS IS A REGION-WIDE PROJECT WITH A PORTION OF THE TOTAL LISTED FUNDS TO SPENT WITHIN THE A/GFTC AREA.
1.965 0.000 0.220 1.745 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
REPLACEMENT OF STAR (SPECIAL TRANSIT SERVICE AVAILABLE BY REQUEST) CUSTOM VEHICLES FOR PARATRANSIT USE. INCLUDEDS FUNDS FOR EXPANSION OF THE STAR FLEET. T6B
2.880 0.570 0.755 0.770 0.785 AQC:B10P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 65 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
CONST 0.174 0.174 2020NFA 0.400 TAP FLEX 0.400 CONINSP2020
CONINSP 0.100 0.100 2020NFA 3.184 TAP FLEX 3.184 CONST2020
CONST 0.796 0.796 2020NFA
CDTA
182215
WASHINGTON/WESTERN BRT PHASE 2
CONSTRUCTION TRANSIT, ROADWAY, AND PEDESTRIAN INFRASTRUCTURE FOR THE FUTURE WASHINGTON-WESTERN BUS RAPID TRANSIT LINE IN THE CITY OF ALBANY ADJACENT TO THE UNIVERSITY AT ALBANY’S DOWNTOWN CAMPUS AND THE NEW ETEC CAMPUS, T122
CITY AND COUNTY OF ALBANY
STP-FLEX IS A DRAWDOWN ON THE BRT SET-ASIDE CDTC31.
5.514 5.514 0.000 0.000 0.000 AQC:NON TOTAL 4YR COST :ALBANY TPC : $50-$85 M
SERVICE AND OPERATIONAL RELATED EXPENSES (SUCH AS DRIVER SALARIES AND BENEFITS, FUEL, BUS MAINTENANCE, ETC.) OF THE RIVER CORRIDOR BUS RAPID TRANSIT PROJECT BEGINNING IN THE FALL OF 2020, T124
ALBANY, MENANDS, WATERVLIET, TROY, COHOES, AND WATERFORDALBANY & RENSSELAER COUNTIES
13.250 5.544 0.000 3.806 3.900 AQC:NON TOTAL 4YR COST :MULTI TPC : $50-$85 M
INCLUDING VEHICLES, THAT IMPROVE ACCESS AND MOBILITY FOR SENIORS AND INDIVIDUALS WITH DISABILITIES. OPERATING AND ADMINISTRATIVE COSTS ARE ALSO ELIGIBLE UNDER THIS PROGRAM, T6A
3.100 0.775 0.775 0.775 0.775 AQC:B10P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
PURCHASE OF ONE (1) NINE PASSENGER VEHICLE TO REPLACE EXISTING FLEET VEHICLE, FORT HUDSON NURSING CENTER, FOR OPERATION IN WARREN, WASHINGTON, AND SARATOGA COUNTIES. AGFTC FTA SECTION 5310 AWARD.
0.072 0.072 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : < $0.75 M
PURCHASE OF TWO (2) REPLACEMENT VEHICLES BY COMMUNITY, WORK, AND INDEPENDENCE, INC. (CWI) FOR OPERATIONS IN WARREN, WASHINGTON, AND SARATOGA COUNTIES. AGFTC FTA SECTION 5310 AWARD.
0.202 0.202 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : < $0.75 M
PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 73 FROM RM 1408 (2 MILES NORTH OF RT 9) TO RM 1469 (MARKET ST KEENE VALLEY), AND FROM ALAN WASHBOND DRIVE TO AIRPORT ROAD, TOWN OF KEENE, ESSEX COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.
1.658 0.000 1.658 0.000 0.000 AQC:N/A TOTAL 4YR COST :ESSEX TPC : $1.2-$2.5 M
PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 74 FROM RM 1143 (PYRAMID ROAD) TO RM 1203 (RT 9), TOWN OF SCHROON, ESSEX COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.
1.344 0.000 1.344 0.000 0.000 AQC:N/A TOTAL 4YR COST :ESSEX TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 71 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 9N FROM RM 1000 (WARREN COUNTY LINE) TO RM 1047 (TICONDEROGA MONUMENT), ESSEX COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.
1.051 0.000 1.051 0.000 0.000 AQC:N/A TOTAL 4YR COST :ESSEX TPC : $0.6-$1.5 M
PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 145 FROM RM 1200 (CLAY HILL ROAD) TO RM 1232 (ALBANY COUNTY LINE), TOWNS OF DURHAM AND CAIRO, GREENE COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.
1.116 0.000 1.116 0.000 0.000 AQC:N/A TOTAL 4YR COST :GREENE TPC : $0.6-$1.5 M
PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 23A FROM RM 1255 TO RM 1286 AND FROM RM 1293 TO RM 1319, TOWN OF CATSKILL, GREENE COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.
1.250 0.000 1.250 0.000 0.000 AQC:N/A TOTAL 4YR COST :GREENE TPC : $0.6-$1.5 M
PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 423 FROM RM 1000 (RT 9P) TO RM 1039 (RT 32), TOWN OF STILLWATER, SARATOGA COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.
1.351 0.000 1.351 0.000 0.000 AQC:N/A TOTAL 4YR COST :SARATOGA TPC : $1.2-$2.5 M
PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 8 (GRAPHITE MOUNTAIN ROAD) FROM RM 1377 (SPUYTENDUIVEL BROOK) TO RM 1418 (NORTH POND) AND FROM RM 1418 TO RM 1443 (SUMMIT DRIVE), TOWNS OF HORICON AND HAGUE, WARREN COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.
1.379 0.000 1.379 0.000 0.000 AQC:N/A TOTAL 4YR COST :WARREN TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 72 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 149 FROM RM 1088 (RT 4) TO RM 1168 (RT 40), TOWNS OF KINGSBURY AND HARTFORD, WASHINGTON COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.
2.853 0.000 2.853 0.000 0.000 AQC:N/A TOTAL 4YR COST :WASHINGTON TPC : $2-$4 M
PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 313 FROM RM 1000 (RT 22) TO RM 1045 (EAGLEVILLE ROAD), TOWN OF WHITE CREEK, WASHINGTON COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.
1.008 0.000 1.008 0.000 0.000 AQC:N/A TOTAL 4YR COST :WASHINGTON TPC : $0.6-$1.5 M
PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 4 FROM RM 1000 (SARATOGA COUNTY LINE) TO RM 1098 (VILLAGE OF FORT EDWARD), TOWNS OF GREENWICH AND FORT EDWARD, WASHINGTON COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.
3.115 0.000 3.115 0.000 0.000 AQC:N/A TOTAL 4YR COST :WASHINGTON TPC : $2-$4 M
TRANSIT OPERATIONS SUPPORT FOR SARATOGA SERVICE: PREVENTIVE MAINTENANCE & OPERATING ASSISTANCE
SECTION 5307-SAR FUNDS ARE ALLOCATED FOR TRANSIT (CAPITAL OR OPERATING) USE IN SARATOGA SPRINGS DUE TO ITS SMALL URBAN AREA STATUS. MATCH ON OPERATING ASSISTANCE IS 50%.
TOA FUNDING BEYOND YEAR 1 IS ESTIMATED.
7.418 1.832 1.833 1.862 1.891 AQC:B1P TOTAL 4YR COST :SARATOGA TPC : $9.5-15.5 M
PHASE 1 INCLUDES: TRANSIT SIGNAL PRIORITY, STATION SITEWORK, PED INFRASTRUCTURE, UNCLE SAM TRANSIT CENTER AND DESIGN WORK FOR THE TROY BUS GARAGE EXPANSION.
ALBANY, MENANDS, WATERVLIET, TROY AND COHOES.ALBANY & RENSSELAER COUNTY.
3.687 3.687 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $50-$85 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL 4-YEAR
PROGRAM
in millionsof dollars
PHASE
AQ CODE
FFY 2022
FFY 2023
FFY 2021
FFY 2020
4-YEAR PROGRAM (FFY)
Starting October 01, 2019
Tuesday, November 3, 2020 Page 73 of 74
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
CONNECTS WATERFORD TO DOWNTOWN ALBANY VIA TROY, WATERVLIET, AND MENANDS. INCLUDES BUSES, STATIONS, TRANSIT SIGNAL PRIORITY, REPLACEMENT OF 10 TRAFFIC SIGNALS, QUEUE BYPASS LANES, REAL-TIME BUS ARRIVAL INFORMATION, TWO PARK AND RIDE FACILITIES, EXPANDING A MAINTENANCE AND STORAGE FACILITY AND PROFESSIONAL SERVICES.
FOR 5309, THE DISCRETIONARY ID# IS D2018-NWST-TBD
FOR 5339, THE DISCRETIONARY ID# IS D2018-BUSC-198
ALBANY AND RENSSELAER COUNTIES, T122
42.513 42.513 0.000 0.000 0.000 AQC:NON TOTAL 4YR COST :MULTI TPC : $50-$85 M