Top Banner
MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES
36

MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

Jan 12, 2016

Download

Documents

Mildred Thomas
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES

Page 2: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

1. Brief primer on MT’s Numeric Nutrient Standards

2. State agency directly helping communities meet new nutrient effluent limits (directed technical assistance)

3. Biological Nutrient Removal is not new

4.Completely shifting the focus from engineering/construction to operations

5. The value of educating operators Effluent quality Non-tangible benefits

Page 3: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 4: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 5: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 6: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

120 mg Chl120 mg Chlaa/m/m2240 mg Chl40 mg Chlaa/m/m22 300 mg Chl300 mg Chlaa/m/m22

Attached algae growth commonly quantified as Attached algae growth commonly quantified as chlorophyll chlorophyll aa per square meter of stream bottom per square meter of stream bottom

Page 7: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

Ecoregion-based In-Stream Values are Really, Really

Low Total Nitrogen

Western Montana – Approx 0.3 mg/l Eastern Montana - 0.5 to 1.3 mg/l

Total Phosphorous Western Montana – 0.025 mg/l Eastern Montana - 0. 03 to 0.15 mg/l

Larger Rivers and Lakes Forthcoming

Page 8: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

General Variance allows for: Mechanical Plants > 1 MGD: 10 TN and 1 TP Mechanical Plants < 1 MGD: 15 TN and 2 TP Lagoons: hold the line

This is a starting point 20-yr Goal: Meet the actual in-stream

standards Optimization Study required

– MCA 75-5-313 (9)(a)

Page 9: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

MECH PLANTS > 1 MGD MECH PLANTS < 1 MGD

2016: 10 TN 1TP

5 yrs later 8 TN 0.8TP

5 yrs later 8 TN 0.5TP

5 yrs later ????

2016 15 TN 2 TP

5 years 10 TN 1 TP

5 years 8 TN 0.8TP

5 years ?????

Page 10: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

Training Engineers on Nutrient Removal Design 6 years of advanced training World’s leaders in BNR design Grad school-level crash courses Free training

Did not address the cost of projects Significant impact to Montana ratepayers

Page 11: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

Can we reduce nutrients without building/ upgrading treatment plants?

What if we focused on operations? Do we have the expertise in-house? Is anyone else trying this?

Page 12: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

Using existing infrastructure, can we re-engineer our operations to make the

facility do things it was not originally designed to do?

OR Can we get better performance from

our existing infrastructure, including BNR plants, by operating the facilities differently?

Completely shifting the focus from engineering to operations

Page 13: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

Operators are on the front line of environmental protection efforts.

They are the implementers of water pollution control regulations.

The success or failure of a designed system falls on the shoulders of the operator.

The un-sung heroes of our profession.

Page 14: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

• UNDER-APPRECIATED

• UNDER-UTILIZED

• UNDER-TRAINED

Page 15: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

Design Engineer trains the operator how to run the plant initially – O&M Manual

Operator will pick a couple of parameters MLSS, DO, wasting rate, etc.

Same approach passed on through the years Operator lacks necessary detailed

knowledge of what is really going on within the plant

Plant cannot be manipulated without this knowledge

We need more and better training

Page 16: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

Classroom Training Very targeted education Biochemistry of BNR Operator collaboration on case studies An Expert operator training operators –

key On-site training

3 – 7 facilities per year 3 visits to each facility over 3 months Regular Email follow up

It’s Free to the communities

Page 17: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

Give the operators knowledge and confidence

Get the operators to understand and identify the specific areas within their facility to create the conditions necessary to achieve nitrification, denitrification and/or phosphorous release and uptake

Get operators to understand how to manipulate the various unit processes to create the desired conditions within the constraints of their existing infrastructure

Page 18: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

The trainer’s qualifications and intent are critical to the success of this approach. No substitute for operational experience Operators relate to other operators Typically a microbiologist or biochemist Engineer???? A motivational person –

May live in a van down by the river

There aren’t many qualified trainers left

Page 19: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

BEFORE AFTER 6 WEEKS

Manhattan, MT Biowheel TN - 10.7 mg/l

Chinook, MTOxidation ditch

TN – 25.3 mg/l

Conrad, MTSimple CAS System

TN - 26.3 mg/l

Manhattan TN – 7.4 mg/l 31% improvement

Chinook TN – 13 mg/l 48% improvement

Conrad TN – < 5 mg/l 80+% improvement

Page 20: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

What is important to success? Existing Infrastructure – what do you

have? Loading - industrial sources? Capacity – growth? Public works/City council buy-in Regulator cooperation/understanding

State/ Federal Operations staff attitude – most important

Page 21: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

Operators have a much better understanding of wastewater treatment

Operators are typically more engaged in the performance of the facility. Collect meaningful data Understand why the data is important Understand how to use data to improve

performance Operators are empowered

Page 22: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 23: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 24: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 25: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 26: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 27: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 28: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 29: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 30: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 31: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 32: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

MECH PLANTS > 1 MGD MECH PLANTS < 1 MGD

2016: 10 TN 1TP

5 yrs later 8 TN 0.8TP

5 yrs later 8 TN 0.5TP

2016 15 TN 2 TP

5 years 10 TN 1 TP

5 years 8 TN 0.8TP

Page 33: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

Lagoon-based Nutrient and Ammonia reduction research project Potential Pilot Study

Lagoon Optimization Contract Continue with Mech Plant

Optimization

Page 34: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

Major retrofits or upgrades for nutrient removal can be avoided or minimized in many cases through well thought-out operational strategies – enormous cost savings with relatively immediate results

The trainer/consultant is critical to success Choose him or her carefully

We’re shifting the focus from engineers to operators – choose them wisely.

The ultimate example of sustainability?

Page 35: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
Page 36: MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.

Paul LaVigneWater Pollution Control SRF

Montana [email protected](406) 444-5321

Grant WeaverThe Water Planet Company

[email protected]