Top Banner
~ Military ATCO Training Option Zoltán Schönek HR Director NATO ATMC Autumn Meeting 2012.
11
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ~ Military ATCO Training Option Zoltán Schönek HR Director NATO ATMC Autumn Meeting 2012.

~

Military ATCO Training Option

Zoltán SchönekHR Director

NATO ATMC Autumn Meeting

2012.

Page 2: ~ Military ATCO Training Option Zoltán Schönek HR Director NATO ATMC Autumn Meeting 2012.

Hungarian Air Traffic Controllers direct 600 000 AIRCRAFT per YEAR. Our mission: Providing safe and efficient air navigation services.

2

HungaroControl- Hungarian Air Navigation Services

PROFICIENCY TECHNOLOGY

RELIABILITYEFFICIENCY INNOVATION

Page 3: ~ Military ATCO Training Option Zoltán Schönek HR Director NATO ATMC Autumn Meeting 2012.

ANS III the most significant

project

Aim: - building a state-of-the-art ATC center

- launching IP based network

EU TEN-T allocation: Maximum obtainable: € 5 964 000

Safety Increase

Core business

TWR reconstruction operated by BA Plc.

Reserved Virtual Tower

Virtual Tower

- Just Culture conception

- Paradigm shift- New technologies

3

Page 4: ~ Military ATCO Training Option Zoltán Schönek HR Director NATO ATMC Autumn Meeting 2012.

Creating business venture from the CRDS center acquired from EUROCONTROL

― Flight Profile Generator― RadarTester

― Contingency ATS center― Training center― R & D activities― 3D 360 TWR simulator

New businesses

Common developments

with BTU researchers

New research, development and simulationcenter

ANS I reconstructi

on

Training Center

Competitive training- and academic center― State-of-the-art training

― Possibility to break into the training market

NEW BUSINESSES

4

Page 5: ~ Military ATCO Training Option Zoltán Schönek HR Director NATO ATMC Autumn Meeting 2012.

Preparation

The Hungarian Ministry of Defense is a natural strategic partner of HungaroControl Pte. Ltd. Co.

End of 2011: development of the visual database the 3 current Hungarian military airports (by Adacel)

Delivery of airport data and photographsOfficial handover

Beginning of 2012: preparation for the simulation properIntroduction of airspace data and procedures into the systemInputting the exercises prepared by the military partnerExercise testingClose liaison between HungaroControl, Ministry of Defense and

ATCOs at the respective military airportsSetting up a dedicated professional team (air traffic controller

expert, pseudo-pilots, etc.)

Page 6: ~ Military ATCO Training Option Zoltán Schönek HR Director NATO ATMC Autumn Meeting 2012.

Project Realization (1)

Simulation dates: May 7, 2012. – June 29, 2012. Participating aerodromes:

Pápa (LHPA) Kecskemét (LHKE) Szolnok (LHSN)

Every single air traffic controller received training on the simulator Simulation objectives:

Competency maintenance Refresher training Individual capacity increase Practicing complex and

emergency situations

Page 7: ~ Military ATCO Training Option Zoltán Schönek HR Director NATO ATMC Autumn Meeting 2012.

Project Realization (2)

Simulator capabilities: 3 ATCO positions, 1 supervisor position 1 exercise supervisor position, 6 pseudo-pilots 180° 3D view Most military aircraft types (fighter, transport and rotary-wing aircraft) with several military insignia Commmon ICAO and NATO STANAG arrival and departure procedures Able to accommodate typical military needs (hook wire, silent coordination between PAR and ADC,

etc.) Realistic 3D aerodrome models

Page 8: ~ Military ATCO Training Option Zoltán Schönek HR Director NATO ATMC Autumn Meeting 2012.

Personnel: On behalf of HungaroControl:

Dedicated ATCO expert (civilian) Dedicated pseudo-pilot team (civilian) Project team created from the simulator staff

On behalf of the Military: Preparation of exercises (paper-based) Close liaison (contact person: training manager at each aerodrome) Delegation of expert on the pseudo-pilot side (to conduct coordination)

Project Realization (3)

Page 9: ~ Military ATCO Training Option Zoltán Schönek HR Director NATO ATMC Autumn Meeting 2012.

Possible Future Development

Simulation capacity will be expanded in the future

The Tower simulator will be expanded to 360° view

More ATCO positions (6 in total)

More realistic look and feel

Enhanced controller functions

(A-SMGCS, stripless environment on request)

The device may be divided in two

Areas of possible future collaboration include:

Refresher trainings

Emergency simulations

Experimental simulations, Safety Cases

Maintaining continuous professional liaison

Pseudo-pilot function fulfilled by military user on request

Training for future NATO missions (on synthetic aerodrome)

Page 10: ~ Military ATCO Training Option Zoltán Schönek HR Director NATO ATMC Autumn Meeting 2012.

Any questions?Contact:

Mr. Zoltán SCHÖNEKHR Director

[email protected]

Tel.: +361-293-4048

Fax: +361-290-4058

Contact

Page 11: ~ Military ATCO Training Option Zoltán Schönek HR Director NATO ATMC Autumn Meeting 2012.

11

Thank you for your attention!

Straight to the point