Top Banner
KazAgro” National management holding” JSC Investment projects of Agricultural sector Doing together, Achieving more Date: Venue:
43

“ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

Jan 20, 2016

Download

Documents

Ella Wright
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Investment projects of Agricultural sector

Doing together, Achieving more

Date: Venue:

Page 2: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Agricultural processing logistics center - Taraz

Farmer

Logistics center

Customer

Project initiator: Akimat of Zhambyl oblast’ in corporation with “National company “Social entrepreneur corporation “Taraz” JSCProject Location: Kazakhstan, Zhambyl oblast’, Zhambyl region, Sholdala village.Project Aim:• Food security;• Infrastructure creation for integration of the regional agricultural sector into interregional food distribution network;• Organization of the controlled supply chain from farmer to customer;• Agricultural production effectiveness improvement.Project capacity: 571,5 thousand tonsTotal project cost: 488 mln. USDMain advantages: Land area -370 ha;• Main agricultural raw material suppliers are allocated within 250 km in Zhambyl and South Kazakhstan oblasts,in Talas region of Kyrgystan and Fergana oblast’ of Uzbekistan.Current project status: feasibility study is designed,project estimate documentation; conclusion of the Government expertise on project feasibility study.

Page 3: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Construction of Agricultural wholesale market with regional terminals

Project initiator:“Expert Agricultural company” LP (subsidiary of JSC “KazAgro”)Project Aim:• Low price agricultural products

supply toAstana city, North and Central regions of the country Project capacity:• 100 thousand tons of fruits and

vegetables, meat and fish, and 7,9 tons of storage capacity.

Total project cost: 8 623,123 mln KZT (56,4 mln USD) Project realization:• Wholesale market of Astana city

(North-West area);• Regional terminals in South

Kazakhstan,East Kazakhstan and Mangystau oblasts’.• Current project status: Feasibility

Study is developed..

Farmer

Wholesale market

Customer

Page 4: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Vegetable storage facility construction

Project initiator:“Agrofirm “Astana Agro” LPProject Aim:• Vegetables storage facility

constructionProject capacity:• 10 thousand tonsTotal project cost:• 31,8 mln USDProject realization:• Karaganda oblast’,

Nurinskyi region, Karim Mynbayev village.

Farmer

Vegetable storage facility

Markets

Page 5: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Vegetable storage facility construction

Project initiator: LLP “DarSat”Project Aim:• Vegetables storage facility

constructionProject capacity:• 10 thousand tonsTotal project cost:• 1,1 mln USDProject Location:• North Kazakhstan region, Ualikhanov

region, Zhambul villagePayback period: 6 years Main Advantages: Modern equipment (climate control and ventilation equipment, universal drying equipment)

Farmer

Vegetable storage facility

Markets

Page 6: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Vegetable storage facility construction

Farmer

Vegetable storage facility

Markets

Project initiator: “Saga Astana” LPProject Aim: Modern vegetable storage facility constructionProject capacity: 14 thousand tonesTotal project cost: 3,5 mln. USD;Investment needed: 2 mln. USDProject realization:• 1 phase of the vegetable storage

facility construction for 7000 tons during 2013-2014;

• 2 phase of vegetable storage facility construction for 6000 tons of vegetables and 1000 tons of fruits in 2015-2016 years.

Project location:• Astana city, Sary-Arka region,

Ondiris street• Payback period: 4 years

Page 7: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Fruits and vegetables production with drip irrigation system

Fruits and vegetables production

Vegetable storage facility

Processing plant

Project initiator:• “Agrofirm “NurAgro” LLC (subsidiary

company of JSC “KazAgro”)Project Aim:• Production, processing and storage of

fruits and vegetables Project capacity:• Vegetable storage facility capacity – 13

thousand tonnes, tomato processing plant – 600 tonnes per day, seed bed land area – 1,8 ha

Total project cost: 4 160 mln KZT (27,2 mln USD)Investment needed: 2 mln. USDProject location:• Almaty oblast’, Shengel’di region,

Kerbulak village.Products:• Onions, tomatoes, tomato paste

concentrate, tomato paste, ketchup, tomato sauce, apples

Payback period: 6 years

Page 8: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Organization of the chain of potato and vegetables producers

Project initiator:“National company “Social entrepreneur corporation “Soltustik” JSCProject Aim:• Organization and the chain of potato

and vegetables producers with storage facilities in North Kazakhstan oblast’

Project capacity:• Production capacity 5000 tons a year,

storage capacity 3500 tons.Total project cost:• 3,354 bln KZT (22,4 mln. USD) Product market:• Bordering regions of Russian

Federation;Project Location:• North Kazakhstan region

Page 9: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Grain production and processing

Starch production

Gluten production

Glucose syrups

Feed additives

Project initiator: “PIER LOTI” LLCProject Aim:• Grain processing,

production of gluten, glucose syrups, starch and feed additives

Total project cost:• 94,7 mln USDProject location:• Kostanay cityPayback period: 6 years

Page 10: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Grain processing

Starch production

Gluten production

Glucose syrups

Feed additives

Project initiator: “Nomad” LLCProject Aim:• Grain processing, production of

gluten, glucose syrups, starch and feed additives

Project capacity:• Production capacity of gluten – 4 100

tons, glucose syrups – 22 800 tons, feed additives – 27 700 tons.

Total project cost:• 36 488,86 mln KZT (43,51 mln USD)Investment needed:• 5 303 mln. KZT (35,56 mln. USD)Project Location:• Karaganda cityPayback period: 6 years

Page 11: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Grain and oilseeds productionProject initiator:“Agrarian credit corporation” JSC, “Pisarevskoe” JSCProject capacity:• Production capacity of gluten – 4 100

tons, glucose syrups – 22 800 tons, feed additives – 27 700 tons.

Total project cost:• 4,8 mln USAPayback period: 5 yearsProject realization:• North Kazakhstan oblast’,

Zhumabayev region, Pisarevka village

Product market• CIS states

Page 12: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Oilseeds production and processing

Project initiator:“Batys Kunbagys” JSCProduct:• Sunflower and safflower oils Total project cost:• 16 mln USDInvestment needed: • Working assets – 1,34 mln USD, or

acquiring the whole object – 16 mln USD.

Project capacity:• 7 400 thousand liters per yearProject allocation:• West Kazakhstan oblast’, Terekti

region, Poima village.Payback period: 10 years

Oilseeds production

Oilseeds processing

Market

Page 13: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Oilseeds processing plant construction

Project initiator:“National Company “Food contract corporation” JSCProject Allocation: North Kazakhstan region, Musrepov region, Novoishimskoe villageTotal project cost:• 22,3 mln USDProduct:• Oilseeds storage and raw oil

production;Payback period: 10 years Project capacity:• Oilseeds processing capacity – 30

thousand tons, oilcake production – 21 thousand tons, vegetable oil – 9 thousand tons a year.

Project status: feasibility study is being developed

Oilseeds production

Oilseeds processing

Market

Page 14: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Vegetable and fruits processingProject initiator:“Dry Food” CompanyProject aim: fruits and vegetables processing, production of dry fruits.Project Allocation: • Zhambyl oblast’, Zhambyl region.Total project cost:• 1,8 mln USDInvestment needed: • 1,3 mln. USDMaterial and technical resources:• Land plot and industrial spacePayback period: 2 yearsProduct market:• Kazakhstan, Russia, CIS states;Notice: Business plan and feasibility study are being developed. There is a cooperation agreement between “National company “Social entrepreneur corporation “Taraz” JSC and “Dry Food” Company

Page 15: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Production of contained fruits and vegetables

Project Allocation: • Zhambyl oblast’, Taraz city, land area of

Agricultural processing logistics centerTotal project cost:• 10,19 mln USDInvestor project share: 49%Agricultural raw materials: Zhambyl oblast’ accounts for almost 653,2 tons of fruits and vegetables production. Also potential agricultural raw material suppliers are South Kazakhstan oblast’, Kyrgyzstan and Uzbekistan.Material and technical resources: • In the frame government program

“Business Road map - 2020” infrastructure construction is planned (water supply systems, electricity supply, canalization systems and other communication)

Payback period: 3 yearsProduct market:• Domestic market of Kazakhstan

Page 16: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Slaughterhouses constructionProject initiator:JSC "Agricultural Credit Corporation" LLP, "Altyn Kazyk“Project allocation: Akmola oblast’, Tselinograd region, village KoshchiProducts: • Sale and slaughter of livestockProject capacity:• 200 heads of cattle per day and 100

heads of small cattle per day. Product market:• Astana city, Akmola oblast’Total project cost:• 1,8 mln. USDAvailability of material and technical base:• commercial and industrial complex

includes a hotel, winter and summer corral, storage room, a restaurant, a bazaar, a slaughterhouse, and a sausage shop.

Cattle growing

farms

Slaughter houses

Market or

processing plants

Page 17: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Vegetable storage facility construction

Project initiator:JSC "Agricultural Credit Corporation", Rural consumer cooperative "Arshaly Zhemis" Location of the project: Akmola oblast’, Arshalinskiy region, village Arshaly.Products: primary processing, storage and sale of fruits and vegetablesTotal project cost:351,8 mln KZT (2,2 mln USD) Project realization:• Astana, Akmola region

Farmer

Vegetable storage

facility

Markets

Page 18: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Grain production and realizationProject initiator:• JSC "Agricultural Credit

Corporation“, LLP KantauLocation of the project: • Akmola region, Yesil District,

s.KalachiProducts: • Production of wheat, barley

and perennial grassTotal project cost:• 0,5 mln USDProduct market:• Kazakhstan's domestic

market

Page 19: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Development of fruits and vegetables production with use of drip irrigation in the South-

Kazakhstan region Project initiator:• “Zhana Ak Dala” Agrocompany” Ltd.Location of the project: • South-Kazakhstan oblast’, Aryss town,

Ak Dala village;Total project cost:• 8,5 mln USD• Material and technical Product market:• Domestic and foreign market;Material and technical base availability• Land plot – 2700 ha including• Fruit garden - 170 ha• Tomato processing plant with capacity

of processing – 600 tons of tomatoes a day;

Readiness to give share in the project: 51%

Fruits and

vegetables

production

Vegetable storage

facility

Processing plant

Page 20: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Construction of FeedlotsProject initiator:• Maksut-NLocation of the project: • Kostanay oblast’, Taranovskiy regionTotal project cost:• 16,4 million USDInvestment required:• 15,7 mln USDPayback period: 3 yearsProduct market:• 60% domestic market, 40% for export;Material and technical base availability• There is rent of 29 364 ha of

agricultural lands including arable land 8 670 ha, pasture 20 693 ha.

Page 21: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Establishment of feedlot for 1500 heads of cattle

Project initiator:• “Kamenskuralskoye” Ltd.Location of the project: • Kostanay region, Kamenskuralsk

village.Total project cost:• 15 million USDInvestment required:• 15 mln USDProduct market:• 60% domestic market, 40% for export;Material and technical base availability• Electricity supply is laid, land lot for

construction, livestock houses required repair.

Page 22: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Construction of feedlots

Project initiator:• “Smart Agro” Ltd.Location of the project: • Zhambyl oblast’Total project cost:• 20 million USDInvestment required:• 20 mln USD

Project passport: Establishment of feedlot

Project initiator:• “ArayMarzhankulAgro” Ltd. Location of the project: • Karaganda region,

Osakarovka district, Uyzbay village

Total project cost:• 4,9 mln USD

Livestock complex with full cycle of “Halal” production

Page 23: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Construction of feedlots

Project aim:• Establishment of feedlot for up to

5 000 heads of cattle with developed infrastructure and two breeding reproductive farms up to 1000 heads of seed stock each.

• Location of the project: Zhambyl oblast’Total project cost:• 20 million USDInvestment required:• 20 mln USD

Project passport: Establishment of feedlot

Page 24: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Quarantine-export lot for small cattle

Project initiator:• “KazAgroProduct” JSCLocation of the project: • Aktobe region, Mugalzhar

districtTotal project cost:• 1,3 mln USDProject capacity• Annual keeping of up to 30

thousand of cattle heads;

Page 25: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Feedlot construction

Project initiator:• “KazAgroProduct” JSC,

“Crown Batys” Ltd. Location of the project: • Yanaikino village, Zelenovsk

district, West-Kazakhstan oblast’

Total project cost:• 23,3 mln USDInvestment needed: 6,9 mln USDPayback period:7 years;Project capacity• One-time keeping of up to

8 640 heads of cattle, meat plant – slaughtering of up to 120 heads of cattle per shift.

Modern feedlot with developed infrastructure for 8 640 heads of cattle (“KazAgroProduct” JSC)

Page 26: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Modern feedlot with developed infrastructure

Project initiator:• “KazAgroProduct” JSC,

“OtesBioAsia” Ltd. Location of the project: • Akdala village, Balkhash

district, Almaty region Total project cost:• 20,6 mln USDInvestment needed: 30,7 mln USDPayback period:10 years;Project capacity:•One-time keeping of up to 5000 heads of cattle, slaughter point – slaughtering of 40 heads of cattle per shift.

Page 27: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Project initiator:• Kazakhstan initiator (not

specified) jointly with “Oral” Social entrepreneurship corporation.

Location of the project: • West-Kazakhstan oblast’Total project cost:• 10 mln USDProduct market: Kazakhstan, boundary regions of the Russian Federation, Samara, Saratov and Orenburg regions.

Project passport: Development of breeding livestock in the West-Kazakhstan region

Breeding reproductive farms construction

Page 28: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Breeding reproductive farms construction

Project passport: Development of breeding livestock in the North-Kazakhstan region

Project initiator:•“Soltustik” Social entrepreneurship corporation.Location of the project: • North Kazakhstan oblast’Project goal: Breeding of high-productive cattle of the best world selections (Angus and Hereford)Total project cost:• 10 mln USDProduct market: Kazakhstan, boundary regions of the Russian Federation, Samara, Saratov and Orenburg regions.

Page 29: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Breeding reproductive farms construction

Project initiator:•“Agro Temay” Ltd.Location of the project: • Karaganda region, Nura

districtProject goal: Breeding of high-productive cattle of the best world selections (Angus and Hereford)Total project cost:• 8,7 mln USD

Project passport: Establishment of modern breeding farm on the basis of “Topar greenhouses” Ltd.

Project passport: organization of breeding reproduction of foreign selections cattle

Project initiator:•“Topar” breeding farm” Ltd. Location of the project: • Karaganda region, Abay

district, Topar settlement • Project goal: Breeding of

cattle and its sale for population and peasants, sale of meat and dairy products.

Total project cost:• 3,5 mln USD• Investments requirered:1,5

milk, USD• Implementation stage –

expansion on the basis of operating enterprise

Page 30: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Meat processingProject initiator:•“Agrarian credit corporation” JSC, Tulpar social-entrepreneurship corporation. Location of the project: • Akmola region, Arshaly district,

Vishnevka station.Total project cost:• 0,9 mln USDPayback period – 7 yeasrInvestments requirered:1,5 mln, USDImplementation stage – expansion on the basis of operating enterprise;• Product market: Sale of ready

products through trade nets;Material and technical basis availability:• Equipment for meat processing and

production of sausages of Austrian manufacture;

Page 31: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Broiler poultry farm construction

Project initiator:•“Zhaiyk Kus” Ltd jointly with “Oral” NC” SEC. Location of the project: • The West-Kazakhstan region,

Zelenovsk district, Kushum rural area

Total project cost:• 23 mln, USDInvestments required: 19,6 mln USD;Payback period – 7 yearsCapacity of production: 6350 tons per yearProduct market: Domestic market – 60%, export – 40%

Page 32: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Project initiator:•“AgroKusInvest” LtdLocation of the project: •Karaganda region, Osakarovka district, Nikolayeva village Total project cost:• 26,7 mln, USDInvestments required: 26,7 mln, USDCapacity of production: 4000 tons per year

Broiler poultry farm construction

Page 33: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Project passport: Broiler poultry farm construction – Saryarka Kus LTD

Project initiator:•“SaryArk Kus” Ltd Location of the project: • Akmola region, Zerenda

district, near Akkol village Total project cost:• 63 mln, USDInvestments required: 54 mln USD;Payback period – 8,3 yearsCapacity of production: 12 thousand tonesProduct market: Domestic market

Page 34: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Passport of investment project: Modernization of poultry plant

Project initiator:•“Agrarian credit corporation” JSC, “Kemer-M” Ltd. Location of the project: • Akmola region, Shchuchinsk

district, Zelenyi Bor village Total project cost:• 9,8 mln USDMaterial and technical basis availability: • Property complex of poultry

plant has 38 workshops, building of slaughter point, boiler house, storage and administrative facilities.

Page 35: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Agricultural MachineryProject initiator:•“SaryArk Kus” Ltd Location of the project: • North-Kazakhstan region.Total project cost:• 10 mln USDInvestments required: • 7,6 mln USD

Page 36: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Greenhouses construction

Project initiator:•“Zhami-Agro” peasant farmLocation of the project: • Almaty region, Zhambyl

district, Sarybay villageTotal project cost:• 5,1 mln, USDInvestments required: 0,5 mln USD;Payback period – 8 yearsProject aim: 1) construction of greenhouse with area of 1 ha with infrastructure (boiler house, void, electrical substation, roads, treatment facilities, etc.) for 10 ha 2) construction of greenhouse with area of 9 ha with infrastructure expansion.

Project passport: Construction of industrial-innovative greenhouse

Page 37: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Construction of greenhouse

Project initiator:•Greencor LtdLocation of the project: •Akmola region, Shortandy district Total project cost:• 10,1 mln, USDInvestments required: 10,1 mln, USD;Payback period – 6 yearsMaterial and technical basis availability: •Land lot 20 ha; •permission for construction is received;

Construction of greenhouse in Akmola region

Construction of greenhouse using Holland technology

Project initiator:•“AgroInvest SK” Ltd.Location of the project: •Aktobe regionTotal project cost:• 10,2 mln, USD• Project capacity: 1800 tons

of tomato per year• Land area: 3,3 ha

Page 38: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Project initiator:•“Pavlodar” SEC” NC” JSC, Greencor Ltd.Location of the project: •Pavlodar city, East industrial area Total project cost:• 10,5 mln, USDInvestments required: 7,6 mln USD;Payback period – 7 yearsMaterial and technical basis availability: •land area 7,9920 ha; •permission for construction is received; •project is included into Regional map of industrialization; •Agreement is signed with the Holland partner dated 23.03.2013.Current situation: •infrastructure construction is finished for 80% including construction of boiler house, electricity line with electricity substation and voids with pump station.

Project passport: Construction of greenhouse in Pavlodar city

Oilseeds production

Oilseeds processing

Market

Page 39: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Oilseeds production

Oilseeds processing

Market

Oilseeds processing plant construction

Project initiator:“Food contract corporation” National company” JSC;Location of the project: •Novoishimsk village, district named after G.Musrepov, the North-Kazakhstan region Total project cost:• 22,3 mln, USDPayback period – 10 yearsProject capacity: •Amount of oil crops processing – 30 thousand tons of oil seeds per year, including•press-cake – 21 thousand tons per year;•vegetable oil – 9 thousand tons per year.

Page 40: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

 Milk products production

Project initiator:“Burnensk cheese plant” Ltd. Location of the project: Zhambyl region, B. Momyshuly village.(60 km from Taraz city)Total project cost:• 1,52 mln, USDInvestment required: 0,81 mln USDPayback period – 7 yearsProject capacity: •15 500 tons of milk products per year

Page 41: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Milk processing - “Rudnensk gormolzavod” Ltd

Project initiator:“KazAgroProduct” JSCLocation of the project: •Kostanay region, Rudniy townTotal project cost:• 7,3 mln, USDPayback period – 10 yearsProject capacity: •170 tons of milk processing per day;•production of skim milk powder 6 000 kg;•and dairy butter 6 500 kg per day.

Page 42: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Leather processingProject initiator:“Umut” LtdLocation of the project: •Kostanay region, Arkalyk town, industrial area, meat plant Total project cost:• 0,42 mln, USDInvestment required: 0,53 mln USDPayback period: – 10 yearsProject capacity: •1 440 tons per year;

Page 43: “ KazAgro” National management holding” JSC Doing together, Achieving more Date: Venue:

“KazAgro” National management holding” JSC

Consulting foreign companies on obtaining investment

preferences and subsidies

The “ONE STOP SHOP” for FOREIGN INVESTORS in AGRICULTURE OF KAZAKHSTAN

Thank you for your attention!

Department on Attracting Foreign Investments at the National Management Holding KazAgro

Republic of Kazakhstan, Astana city 010000, 24 Republic avenue“KazAgro” National management holding” JSC

Tel: +7 (7172) 705 597 (ext. 1800) fax: +7 (7172) 705 689www.kazagro.kz, e-mail: [email protected]

Providing information about investment

projects and analytical information

Assisting in finding a local partner

Assisting in obtaining land plots, arranging meeting with

key-decision makers