è é ë ë ë è é ë ë ë è é ë ë ë è é ë ë ë D D D D D D See Inset 4 ? Ê I z Quarry RUCKER RD RUCKER RD SPRING VALLEY RD SPRING VALLEY RD RUCKER RD US 77/K-18 Plan Plates ? Ê A Ý ? å ! " a $ I z I z Junction City Milford Lake Geary Co. Riley Co. Dickinson Co. Clay Co. 3 2 1 9 8 7 5 4 6 11 10 20 19 18 17 15 14 13 12 21 16 I 0 300 600 Feet US 77 / K-18 Corridor Study Ultimate Improvements (+/- 2018) Plate No. 5 Disclaimer: These concepts are current as of December 2008 and depict recommended improvements for US 77 from Lyons Creek Road to 12th Street and K-18 from US 77 to the Dickinson County Line. The exact location, design, and right-of-way for the corridor cannot be determined from these concepts and could be different from that shown. Additional preliminary design will need to be performed to further refine these improvements and the right-of-way requirements. Parcel Boundaries Corps of Engineers Limits City Limits US-77/K-18 Mainline 4 Lane Section 2 - 3 Lane Section Pedestrian Connection D Future Access Removal " ) Opportunity Access Removal (Grandfathered Access) Pavement Removal Bridge Proposed Right of Way Parallel Road Network Arterial Collector Local Road New Roadway (All Types)
4
Embed
èéëëë - Kansas Department of Transportation€¦ · èéëëë èéëëë D èéëëë D èéëëë!"f$ Iz c R oad ST t r VD Connection 0 èéëëë D D RUCKER RD RUCKER RD RD
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
èéëëë
èéëëë
èéëëë
èéëëë
D
D
D
D
DD
See Inset 4
?Ê
IzQuarry
RUCKER RD
RUCKER RD
SPRING VALLEY RD
SPRING VALLEY RD
RU
CK
ER
RD
US 77/K-18 Plan Plates
?Ê
AÝ
?å
!"a$
Iz
Iz
Junction City
Milford Lake
Geary Co.
Riley Co.
Dickinson Co.
Clay Co.
3
2
1
9
8
7
5
4
6
1110
20 19 18 17
15
14
13
12
2116
I0 300 600
Feet
US 77 / K-18 Corridor Study
Ultimate Improvements(+/- 2018)Plate No. 5
Disclaimer: These concepts are current as of December 2008 and depict recommended improvements for US 77 fromLyons Creek Road to 12th Street and K-18 from US 77 to the Dickinson County Line. The exact location, design, and right-of-way for the corridor cannot be determined from these concepts and could be different from that shown. Additional preliminary design will need to be performed to further refine these improvements and the right-of-way requirements.
Disclaimer: These concepts are current as of December 2008 and depict recommended improvements for US 77 fromLyons Creek Road to 12th Street and K-18 from US 77 to the Dickinson County Line. The exact location, design, and right-of-way for the corridor cannot be determined from these concepts and could be different from that shown. Additional preliminary design will need to be performed to further refine these improvements and the right-of-way requirements.
Disclaimer: These concepts are current as of December 2008 and depict recommended improvements for US 77 fromLyons Creek Road to 12th Street and K-18 from US 77 to the Dickinson County Line. The exact location, design, and right-of-way for the corridor cannot be determined from these concepts and could be different from that shown. Additional preliminary design will need to be performed to further refine these improvements and the right-of-way requirements.
0 10050
Feet
Parcel BoundariesCorp of EngineersLimits
City Limits
US-77/K-18 Mainline
4 Lane Section
2 - 3 Lane Section
PedestrianConnection
D Future Access Removal
Pavement Removal
Bridge
Parallel Road Network
Arterial
Collector
Local Road
New Roadway (All Types)
èéëëë")
")
")
")") ")
")
Iz
?åAÝ
WALLA W
ALLA RDAugust
October
Fort Riley Property
?å
Republican R
iver
GE ROAD
Corps of Engineers Property
US 77/K-18 Plan Plates
?Ê
AÝ
?å
!"a$
Iz
Iz
Junction City
Milford Lake
Geary Co.
Riley Co.
Dickinson Co.
Clay Co.
3
2
1
9
8
7
5
4
6
1110
20 19 18 17
15
14
13
12
2116
I0 300 600
Feet
US 77 / K-18 Corridor Study
Ultimate Improvements(+/- 2018)Plate No. 7
Disclaimer: These concepts are current as of December 2008 and depict recommended improvements for US 77 fromLyons Creek Road to 12th Street and K-18 from US 77 to the Dickinson County Line. The exact location, design, and right-of-way for the corridor cannot be determined from these concepts and could be different from that shown. Additional preliminary design will need to be performed to further refine these improvements and the right-of-way requirements.