. , ,, --- , h reuter-stokes Edison Park. B499 Darrow Rd., Twinsburg Ohio 44087. Telephone (216) 425-3755 January 5, 1988 f! Chief, Materials Licensing Section 3 / U.S. Nuclear Regulatory Commission j f Region III y[ 799 Roosevelt Road - h Glen Ellyn, IL 60137 Subject: Reuter-Stokes, Inc. Byproduct Material License No. 34- 18156-01, License Condition No. 19 In compliance with Reuter-Stokes, Inc. Byproduct Material License Q No. 34-18156-01, License Condition No. 19, we are submitting the results of a radiation survey for areas around and above the irradiator in the shielded and unshielded positions. The gamma radiation survey was performed using a calibrated Reuter-Stokes Instruments Environmental Monitor (pressurized ion chamber) Model Number RSS-111-100. A copy of the instrument calibration certificate is enclosed as Attachment 1. Prior to loading the 30 curie Cobalt-60 source, we reshielded the room in which the irradiator is located to provide approximately four inches of lead with additional concrete support to the walls and a lead filled door. The 30 curie source was loaded by Amersham Corporation who is licensed to perform the service under NRC License No. 20-12836-01. Shortly after loading, the radiation survey was performed before any restart of irradiator operations began. The radiation levels of areas around and above the facility are shown on Diagrams 1-7. All areas above the facility are close to background levels when the source is in both the shielded and unshielded position. The closest unrestricted pathway around the irradiator had readings of less than 0.3 mR/hr when the source is in the unshielded position. I hope this satisfies our license condition. If I can be of any further assistance, please don't hesitate to contact me. Sincerely, GE/REUTER-STOKES * gg JAN 1119BB EEGIONIII Eileen Openbrier EO/mg Health Physicist CONTROL NO 8 6 6 9 3 g){11 M 9303260099 920520 PDR FOIA FRANCESC92-97 PDR
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Subject: Reuter-Stokes, Inc. Byproduct Material License No. 34-18156-01, License Condition No. 19
In compliance with Reuter-Stokes, Inc. Byproduct Material LicenseQ No. 34-18156-01, License Condition No. 19, we are submitting the
results of a radiation survey for areas around and above theirradiator in the shielded and unshielded positions. The gammaradiation survey was performed using a calibrated Reuter-StokesInstruments Environmental Monitor (pressurized ion chamber) ModelNumber RSS-111-100. A copy of the instrument calibrationcertificate is enclosed as Attachment 1.
Prior to loading the 30 curie Cobalt-60 source, we reshieldedthe room in which the irradiator is located to provideapproximately four inches of lead with additional concretesupport to the walls and a lead filled door. The 30 curiesource was loaded by Amersham Corporation who is licensed toperform the service under NRC License No. 20-12836-01. Shortlyafter loading, the radiation survey was performed before anyrestart of irradiator operations began.
The radiation levels of areas around and above the facility areshown on Diagrams 1-7. All areas above the facility are close tobackground levels when the source is in both the shielded andunshielded position. The closest unrestricted pathway around theirradiator had readings of less than 0.3 mR/hr when the source isin the unshielded position.
I hope this satisfies our license condition. If I can be of anyfurther assistance, please don't hesitate to contact me.
'3. DOCKET NUMBE R LS) 4. LtCENSE NUMBE R(S) S. D ATE OF INSPECTION
03014418, 03014608, g g [ 34-18156-02E, SNM-182$ d / UJ34-18233-01, 34-18155-81
JANUARY 12' 1990'
03030673, 07002872 |Licensee: I
The mspection was an examinat#on of the activities conducted under your license as they relate to radssteon safety and to compliance with the Nuclear f
Reguletory Commission's (NRC) rules and reguistions and the conditions of your hcense. The inspection consisted of selective examinations of procedures
and representatwe records, mterviews, with personnel, and observations by the inspector. The fmdmgs as a result of this inspection are as f ollows:
1. Withm the scope of this inspectson, no violetions were observed.
] 2. The mtpector also verif,ed the steps you have teken to correct the violations identif ed during the last inspection. We have no further questions onthose actions at this time. !,
] 3. Durma this mspection certam of your activities, as checked below, were in violetion of NRC requirements. fTHIS IS A NOTICE OF VIOLATION which is required to be posted in accordance with 10 CFR 19.11. '
A. was not properly posted to indicate the presence fof a .10 CF R 20203(b), (c), (d), (e) or 34.42.
f.
B. Contemers located in were not property ;
labeied to indicate the presence of radioactive materiet.10 CF R 20203(f)(1), or (f)(2),'
t,
C. of seated sources we.e not performed at the proper 5
f requencies.10 CF R License condition Number :
|
D. Records of were not property maintamed. I
10 CF R or License Condition Number I
{ E. Documents were not property ported or otherwise made available.10 CFR 19.11. f:
F. Reports or notif. cations of were not made in accordancewith 10 CF R or License Condition Number
H.
]1.
J. '
)(h
K ,==
-/.i hereby state that w6 thin 30 days the actions described by me to the inspector will be taken to correct the vlotetions identifeed in the items checked abovethis steiement at corrective actions is med in accordance with the requirements of to CF R 2.20s. No further response will be subrnitted unlets req r
the NRC.