Waste ReductionWaste Reduction Initial Diversion Rate of 40%40% Implemented:
◦ Performed Waste Audit (Baseline)◦ Increased Number of Recycling Bins◦ Improved Staff Education◦ Reduced Size of General Waste◦ Sustainable Purchasing
Achieved 82%82% Waste Diversion (September 2008)
$ 42,828 Implementation Costs $ 21,888 Annual Savings 14% Annual Energy Savings 2 years Payback
Water Projects - Savings Beyond EnergyWater Projects - Savings Beyond Energy
• Implemented:o Installed of low flow plumbing fixtureso Installed of aerators on faucets and dual flush valves on water
closetso Installed Light-Powered touch-free faucetso Installed Sub-meters on process systems (café’ and cooling tower)o Replaced irrigation water use by:
– Replacing scrubs with decomposed granite– Replacing spray irrigation with bubbles– Replacing existing plants with more water efficient plantings
$ 39,597 Implementation Costs $ 5,111 Annual Savings 50% Annual Water Savings 7.5 years Payback