Top Banner
© Facility Engineering Associates 2010 VSP Vision Care VSP Vision Care HQ1, AT A GLANCE: 152,000 SF 9,700SF Data Center Fully automated Rancho Cordova, CA Constructed in 1992 Began certification effort in 2007 Internal Team – 5 people External Team – FEA and Commissioning Agent
9

© Facility Engineering Associates 2010 VSP Vision Care HQ1, AT A GLANCE: 152,000 SF 9,700SF Data Center Fully automated Rancho Cordova, CA Constructed.

Jan 17, 2016

Download

Documents

Kevin Wright
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: © Facility Engineering Associates 2010 VSP Vision Care HQ1, AT A GLANCE: 152,000 SF 9,700SF Data Center Fully automated Rancho Cordova, CA Constructed.

© Facility Engineering Associates 2010

VSP Vision CareVSP Vision CareHQ1, AT A GLANCE:

• 152,000 SF

• 9,700SF Data Center

• Fully automated

• Rancho Cordova, CA

• Constructed in 1992

• Began certification effort in 2007

• Internal Team – 5 people

• External Team –

FEA and Commissioning Agent

Page 2: © Facility Engineering Associates 2010 VSP Vision Care HQ1, AT A GLANCE: 152,000 SF 9,700SF Data Center Fully automated Rancho Cordova, CA Constructed.

© Facility Engineering Associates 2010

IMPLEMENTATION RESULTS……….

Energy Saving Energy Saving Started with an Energy Star rating of 29!29! Implemented:

◦ Optimized lighting and HVAC controls◦ Sub-metered electricity◦ Scheduled Janitorial daytime cleaning◦ Developed training for employees

Received ENERGY STAR Label in 20092009

$ 123,254 Implementation Costs $ 64,030 Annual Savings 14% Annual Energy Savings 2 years Payback Energy Star rating of 93!93!

Page 3: © Facility Engineering Associates 2010 VSP Vision Care HQ1, AT A GLANCE: 152,000 SF 9,700SF Data Center Fully automated Rancho Cordova, CA Constructed.

© Facility Engineering Associates 2010

IMPLEMENTATION RESULTS………

Waste ReductionWaste Reduction Initial Diversion Rate of 40%40% Implemented:

◦ Performed Waste Audit (Baseline)◦ Increased Number of Recycling Bins◦ Improved Staff Education◦ Reduced Size of General Waste◦ Sustainable Purchasing

Achieved 82%82% Waste Diversion (September 2008)

$ 42,828 Implementation Costs $ 21,888 Annual Savings 14% Annual Energy Savings 2 years Payback

Page 4: © Facility Engineering Associates 2010 VSP Vision Care HQ1, AT A GLANCE: 152,000 SF 9,700SF Data Center Fully automated Rancho Cordova, CA Constructed.

© Facility Engineering Associates 2010

IMPLEMENTATION RESULTS……….

Water Projects - Savings Beyond EnergyWater Projects - Savings Beyond Energy

• Implemented:o Installed of low flow plumbing fixtureso Installed of aerators on faucets and dual flush valves on water

closetso Installed Light-Powered touch-free faucetso Installed Sub-meters on process systems (café’ and cooling tower)o Replaced irrigation water use by:

– Replacing scrubs with decomposed granite– Replacing spray irrigation with bubbles– Replacing existing plants with more water efficient plantings

$ 39,597 Implementation Costs $ 5,111 Annual Savings 50% Annual Water Savings 7.5 years Payback

Page 5: © Facility Engineering Associates 2010 VSP Vision Care HQ1, AT A GLANCE: 152,000 SF 9,700SF Data Center Fully automated Rancho Cordova, CA Constructed.

© Facility Engineering Associates 2010

IMPLEMENTATION RESULTS……….

Indoor Environmental QualityIndoor Environmental Quality

• Implemented:o Meet ASHREA 62.1-2004 Standardo Relocated Smoking Sheltero Installed CO2 and Humidity Sensorso Installed MVR13 Filters

$ 82,546 Implementation Costs

Page 6: © Facility Engineering Associates 2010 VSP Vision Care HQ1, AT A GLANCE: 152,000 SF 9,700SF Data Center Fully automated Rancho Cordova, CA Constructed.

© Facility Engineering Associates 2010

LEED by the NumbersLEED by the Numbers

The difference is $ 425,845.

Consulting Fees $84,050

USGBC Certification Fees

$5,002

Total Soft Costs $89,052

Energy Reduction Implementation Costs

$123,254

Water Reduction Implementation Costs

$39,597

Waste Reduction Implementation Costs

$42,828

IEQ

Implementation Costs

$82,546

INNO - Dolphin System $42,897

Total Hard Costs $331,122

Internal Staff $96,000

Total Others $96,000

Total Costs: $516,174Estimated Baseline Savings

$90,329

Page 7: © Facility Engineering Associates 2010 VSP Vision Care HQ1, AT A GLANCE: 152,000 SF 9,700SF Data Center Fully automated Rancho Cordova, CA Constructed.

© Facility Engineering Associates 2010

Innovation – Raising the BarInnovation – Raising the Bar

Exemplary Performance

• Recycling 82% - September 2008

• Water Efficiency 36% below the water use Baseline

Innovative Operation

Chemical-free cooling water treatment.

Solar battery recharging station – decreased the amount of battery purchased as well as the recycling cost

Page 8: © Facility Engineering Associates 2010 VSP Vision Care HQ1, AT A GLANCE: 152,000 SF 9,700SF Data Center Fully automated Rancho Cordova, CA Constructed.

© Facility Engineering Associates 2010

Sustainable Sites 7 points

Water Efficiency 3 points

Energy & Atmosphere 20 points

Materials & Resources 16 points

Indoor Environmental Quality 14 points

Innovation 5 points

Total 65 points

VSP Vision CareVSP Vision Care

ACHIEVED PLATINUM CERTIFICATION UNDER LEED – EB VERSION 2.0 - AUGUST 2008

Certified 32-39, Silver 40-47, Gold 48-63, Platinum 64-85

Page 9: © Facility Engineering Associates 2010 VSP Vision Care HQ1, AT A GLANCE: 152,000 SF 9,700SF Data Center Fully automated Rancho Cordova, CA Constructed.

© Facility Engineering Associates 2010

Achievements: VSPAchievements: VSP

• Over 2,200 VSP team hours

1600VSP hours + 600 FEA hours = 2,200 team hours

• Achieved Platinum – August 2008

• Achieving Operational Excellence

14% annual energy savings

50% annual water savings

82% high, waste recycled (Sept ’08)

• Received 5% reduction on insurance premium