Page 1: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

…Concept to Completion

J Satyanarayana

e-Government Project Life Cycle

Page 2: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Agenda

• e-Government – Track Record

• Implementation Dynamics

• Project Development & Project Management

• Effective Project Management

Page 3: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Most Failures are rooted inimproper

Project Development&

Project Management

Success & Failure Rate

• 35 % of eGov projects are total failures• Initiatives not implemented• Initiatives abandoned immediately

• 50% of eGov projects are partial failures• Main stated goals not achieved• Initial success but failure after an year• Success for one group but failure for

others

• 15% of eGov projects are successes• All stakeholders benefited• No adverse results

Page 4: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

7 Steps in Implementation

Conceptualize1

Architect2 Develop

3

Pilot4

Rollout5Evaluate

6Enhance

7

Project Development

Project Management

Page 5: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Project Development VsProject Management

Project Development

• Creativity

• Research & Analysis

• Consultation

• High-end Resources

Project Management

• Planning Ability

• Field Work

• Coordination

• Medium Resources

Page 6: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Principles of Project Management

Page 7: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Project & Program

A Project is an endeavour to create a unique Product, Service or Result that has inter-related activitiesand is progressively elaborated

A Program is a group of projects managed in a coordinated way

Page 8: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Components of Project Mgt.

Integration Management

Scope Management

Time Management

Cost Management

Quality Management

HR Management

Communications Management

Risk Management

Procurement Management

Page 9: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Triple Constraint of Project Mgt

QualityCostTim

e

Scope

Page 10: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Components of a Project Plan

1. Project Charter2. Project Management Approach3. Scope Statement4. Work Breakdown Structure5. Responsibility Chart6. Major Milestones7. Budget8. Schedule9. Resources10. Change Control Plan11. Project Management Baselines

Page 11: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

CADS Methodology of Project Development (NISG)

• Study•AS IS

• Best Practice• Stakeholder Consultation• Develop

•Vision•Mission

• Objectives• Business Case Analysis

Conceptualize

• Functional Architecture •Technology Architecture •Process Architecture •People Architecture

Architect

• Services • Roles & Responsibilities • Service Levels •Business Model

• RFP

Define

• POC • Bid Process Management

•Evaluation

• Project Management

• Assessment

Support

Page 12: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Anatomy of Project Documentation

… the 3 part approach

Page 13: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Part I – Functional & Technical Specs

• Vision, Mission, Objectives, Outcomes

• National/ International Best Practices• Service Definition• Functional Architecture• Technology Architecture

• Including Security Management Requirements

• Process Architecture• Outcome of GPR

• People Architecture

Page 14: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Part II- Commercial & Bid Specifications

• Prequalification Criteria

• Technical Bid Formats

• Commercial Bid Formats

• Evaluation Criteria

• Bidding Terms & Conditions

Page 15: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Part III – Legal Specs & SLA

• Roles & Responsibilities of parties

• Scope of Work of Partner• Service Level Agreement• Consequences of Breach • Terms of Payment• Governance Structure• Exit Management

Page 16: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

About SLA

• SLA= Service Level Agreement• Justification for SLA

• Govt is buying services not hardware, software & networks

• Specifies quantity & quality of services• Payments – part or full – are linked to

performance against SLA• Contains rewards & penalties• Drives the partners – both public & private

– to better performance

Page 17: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Evaluation

• Prequalification criteria• Turnover limit – in relation to Project size• Experience in e-Government project

• Technical Criteria• Past Project Experience• Quality of Solution Offered• Implementation Plan• Key Project Personnel

• Commercial Evaluation• Relative to Lowest Cost

• Combined Score• Appropriate weightages between Technical &

Commercial scores

Page 18: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Scope of IS Audit of e-Gov Projects• To audit the functionality

• Service Levels• Suitability• Accuracy• Interoperability

• To audit IT infrastructure• To audit Quality as per ISO 9126

• Reliability• Availability• Data Integrity • Efficiency/ Performance• Usability

• To Audit Security as per BS 7799/ ISO 17799

Page 19: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Issues in Project Managementfor e-Government

Page 20: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Issues in eGov Project Mgt.

Integration Management

Scope Management

Time Management

Cost Management

Quality Management

HR Management

Communications Management

Risk Management

Procurement Management

Scope is not preciseScope creeps

Lack of team spiritNo e-Champion

Delays in DecisionsDelays in sign-offs

Turnover of Key peopleLack of PM Skills

No FlexibilityDelays in payments

Too many meetingsToo few decisions

Risk AversionOne-sided contracts

Vagueness in specifying

requirements

Lack of Skills Lack of Institutional

approach to QM

e-Government delayedis

e-Government denied!

Page 21: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Improving Project Management

• Empowerment• Empowered Committee for Major Decisions• Project Implementation Committee for

operational decisions• Partial outsourcing of PM activities

• Select a Professional Organization as PMU• Capacity Building in PM skills

• Institutional Capacity • ‘Creating’ CIO & CTO• Sponsoring Key people for PMI

Certification

Page 22: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Conclusion e-Government requires

Systematic development of the concept into a Project

Systematic Management of the Project

Project Development & Project Management are both specialized jobs.

There is a continuous need to build capacities in Project Development & Project Management

Page 23: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

Thank [email protected]

Page 24: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

1. Conceptualization

• Develop a Vision• Bordering on the impossible !

• Define a Mission• A Slogan that motivates

• Spell-out Objectives• Benefits to ALL Stakeholders• Stakeholder consultation

• Define Services• Transformation

• Lay down Specific Outcomes• Measurable Parameters

Page 25: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

2. Architecture

• Meets the Objectives

• Is Sustainable

• Scales to handle future demand

• Accommodates future developments

Page 26: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

2. Architecture (contd)

• Process Architecture• Government Process Reengineering

• Technology Architecture• Consultative Approach – e.g eBiz

Architecture

• People Architecture• Policy Level, e-Gov Champions, CIOs, CTOs

Operational Level

• Resource Architecture• Business Model, Viability, Sustainability,

PPP, User Charges, SLA

Page 27: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

3. Development

• Functional Requirement Specification

• System Requirement Specification

• Coding

• Testing

• Deployment

• Documentation, Version Management, ALM

Spend Quality Time here

Page 28: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

4. Pilot

• Why Pilot?• A More thorough debugging• A more innovative product• Early course correction OR ‘Go-No-

GO’ decision• A more reliable Business Model

• Scope of the Pilot• Functionality• Geographical Coverage

Page 29: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

5. Rollout

• Phasing• Functionality• Geography

• Resource Planning• Financial• Managerial• People• PPP

• Stakeholder Consultation• Project Management

Page 30: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

6. Evaluate

• Service-Orientation• Efficiency• User-Convenience• Citizen-Centricity

• Technology• Architecture &

Standards• Security• Scalability• Reliability

• Sustainability• Organizational• Commercial• Legal

• Cost-effectiveness

• Replicability• Functional• Technological• Commercial

Page 31: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

SLA Metrics of a G2B project (1/3)

BaselineLower

performanceHigher

performance Breach

Service Metrics Parameters Metric Credit Metric Credit Metric Credit Metric

I- Service-related, Citizen-facing (65)            

1.Average wait-period at Service CentrePeak dates , Peak hours <15 min 15

15-25 min 10

 < 12 min 20 >30 min

2.Average wait-period at Service CentrePeak dates, Non-Peak hours

< 10 min 12

10 -15 min 8 < 8 min 16 >20 min

3.Average wait-period at Service CentreNon-Peak dates , Peak hours < 5 min 9

5-10 min 6 No additional credit

( No incentive)>10 min

4.Average wait-period at Service CentreNon-Peak dates , Non- Peak hours

No waiting 7

0 – 3 min 5

5.Average time for service at B1 Service

Counter -Peak dates, peak

hours <4 min 9 4-5 min 6  < 2 min 12  >6 min

Page 32: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

BaselineLower

performanceHigher

performance Breach

Service Metrics Parameters Metric Credit Metric Credit Metric Credit Metric

6.Average time for service at Service Counter -Peak dates, Non-peak hours

<2min 5 2-4 min 3< 1min 7 >5 min (-) 3

7.Availability of agreed services over the Internet 99.0% 5

99..0 to 98.0% 3

 No credit for

higher performance

  

<95.0% (-) 3

8.Average Portal page loading 7 sec 3

7 to 10 sec 1 >15 sec (-) 1

SLA Metrics of a G2B project (2/3)

Page 33: … Concept to Completion J Satyanarayana e-Government Project Life Cycle.

  Baseline Lower performanceHigher

performance Breach

Technology Metrics Parameters Metric Credit Metric Credit Metric Credit Metric Debit

II-Technological, performance-related(15)  

No toleration for lower performance. No credit will be given for performance below baseline.

No extra credit for higher performance. Baseline performance is mandatory.

   

9. Capacity of the Application Server

Equivalent of capacity to handle 10000 service transactions per hour 6

< 6000 transactions per hour (-) 6

10. Capacity of the Database Server

Equivalent of capacity to handle 10000 service transactions per hour 6

< 6000 transactions per hour (-) 6

 11. Concurrent connects to Application Server  >750  3  < 500   (-) 3

III-Technological, maintenance-related (20)      

 12. Uptime of Data Centre > 99% 8   < 96%  (-) 8

13. Uptime of Service Centre > 98% 4 < 95% (-) 4

14. Time to restore Data Centre from failure < 1 hour 5 < 3 hours (-) 5

15. Time to restore Service Centre from failure < 2 hours 3 < 5 hours (-) 3

SLA Metrics of a G2B project (3/3)