CHP Workshop Session 3: Gas Industry Activity Dr. Martin Wilmsmann E.ON Ruhrgas, Germany Paris, 29/30. May 2008
Jan 18, 2016
CHP Workshop Session 3: Gas Industry Activity
Dr. Martin WilmsmannE.ON Ruhrgas, Germany
Paris, 29/30. May 2008
E.ON Ruhrgas´ CHP strategy
Organisation/Coordination of CHP activities in E.ON group
Finished – ongoing – planned activities
Current situation in Germany
Content
Pipeline Sector Pipeline Sector Process & Service Facilities Sector Process & Service Facilities Sector Gas Measurement Gas Measurement Gas Utilization Gas Utilization Technical
Cooperation Technical Cooperation
Competence-Center
Competence-Center
Gas Competence-Center
Environment ProtectionviaSupport of Sustainable Technologies
Keeping / Enlarging of established and new Markets
Gas Heat Pumps
CHP devices
technology-open - no exclusive cooperation
no manufacturing activities – no R&D activities role as technology user
testing of a variety of pre-commercial systemsunder realistic conditions
practical experience as basisfor sound assessment of technology
transforming operation experience into forecastsas part of E.ON Energie‘s long term planning model
forecasting of future gas selling ratesas part of energy supply szenarios
assessment of grid implicationsregarding safety and grid issues (power and gas)
Key Elements of CHP-Strategy
Lab Prototype Pre-Commercials Series – Production
Process of Market Introduction
Labortestof Manufacturers
Prototyp-Testing
Fieldtrials
ERG KundenExample: Fuel CellG
ate
Market
AvaconHanse
How to support manufacturers on the way to market
introduction
Bayern
UK
Energie
DG recommended process
Lab Testsat E.ON Ruhrgas
Field Tests
Field Tests
Field Tests
In MUs under own responsibility
coordinated by CG
Lab Test facilities as centre of exellenceInformation exchange between MU
E.ON Energie
E.ON Ruhrgas
E.ON UK
Technology Tracking
PartnerIdentification
Technology-open approach
Other MU Field Tests
assessment expertise
Way of market introduction
Lab tests Field tests Commercial.
Field test experiences with CHP devices in Germany / UK
Established test facilities of ERG
for lab testing of domestic smale scale CHP
Outstanding Test rigAssessment of operability and operating performance
el and th as function of: - gas varieties (H-gas, L-gas, serveral test gases) - part load conditions - different pairs of water flow and return temperatures
emission measurement (hydrocarbons, CO, NOx)
Measurement of standard annual efficiency to German Nutzungsgrad standard procedure
Power quality
Noise
Vabration
Nutzungsgradmessung nach DIN 4702, Teil 8
0,00
2,00
4,00
6,00
8,00
10,00
12,00
EG-H Boost 55/45 EG-H Boost 46/39 EG-H Boost 42/36 EG-H Boost 37/32 EG-H Boost 27/25
Bel
astu
ng
/th
erm
. el
ektr
. L
eist
un
g i
n k
W
90
91
92
93
94
95
Nu
tzu
ng
sgra
d i
n %
PEM
SOFC
1995 2000 2005
PAFC
MCFC
Fuel Cell Activities
2005 2010
future activities
Continued lab and field trialswith all kinds of
mCHP technologies
Ongoing field trials
BAXI Fuel Cell
Operating time 2006-2008 Number of devices: 3
WhisperGen Stirling
Hexis Fuel Cell
Operating time 2007-2009 Number of devices: 7
Operating time 2006-2008 Number of devices: 1
CHP-Activities Two units are currently being installed on a commercial basis: Senertec: approx. 18,000 units sold sales rate about 2000 units/a
Price: €15,000 / €22,000
EcoPower:approx. 1000 units sold, 450 units sold in 2006, + 50% expected in the next 2 years.
Price: €18,000
Beside E.ON Ruhrgas / E.ON Energy a number of utilities are active in the field of mCHP-systems.
Following utilities are involved of testing mCHP-units: EWE - EnBW - MVV - Gasag - Gelsenwasser - RWE FC - Verbundnetz Gas (VNG)…..
Nationales Innovation Programm of German Government (NIP)
2008 - 2015
500 Mio. €Government
+ 500 Mio. €complementary capital from
industry
4 sectors of development Transportation (mobile application) Domestic (stationary application) Industry (stationary application) Specific markets
F & E - Projects Demo - Projects+
aimreliable, competitive + environmental friendly energy supply
essential keyelements H2- und fuel cell - technology
consortium
- volume of approx. 850 fuel cells between 2008 – 2015- approx. 60 Mio € (gross) for purchase, installation und operation
Overview German Lighthouse Project
Utilities manufacturer