© Blue Graphics Concept Sauer-Danfoss © Blue Graphics Concept Sauer-Danfoss 2007 BOL Projects review Giulio Mazzotti November 29 th 2007
7

© Blue Graphics Concept Sauer-Danfoss 2007 BOL Projects review Giulio Mazzotti November 29 th 2007.

Dec 18, 2015

Download

Documents

Lydia Floyd
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: © Blue Graphics Concept Sauer-Danfoss 2007 BOL Projects review Giulio Mazzotti November 29 th 2007.

© Blue Graphics Concept Sauer-Danfoss

© Blue Graphics Concept Sauer-Danfoss

2007 BOL Projects review

Giulio Mazzotti November 29 th 2007

Page 2: © Blue Graphics Concept Sauer-Danfoss 2007 BOL Projects review Giulio Mazzotti November 29 th 2007.

Know-How in Motion™ 2

Project Title

2007 BOL Project reviewSPC System - TAC Target Area Control

D

M

A

I

C

Team: Y.Bonfiglioli, N.Pulsoni, S.Bonacini,E.Succi, L.Bandiera (external supplier S.Panigalli – I.T.A.)

Project purpose: implement our system of data collecting and analysis related to the measurement done during the process referred to critical and key feature mentioned on the drawing

8.325,00 € per year

230 working hours per year

7000,00 €

Manual recording data from Tac (paper form) to Stastical data analysis Software

Before Tac Project

After Tac Project

Page 3: © Blue Graphics Concept Sauer-Danfoss 2007 BOL Projects review Giulio Mazzotti November 29 th 2007.

Know-How in Motion™ 3

Project Title

2007 BOL Project review

D

M

A

I

C

Identify process capability related to C or K characteristics mentioned on the drawing

SPC System - TAC Target Area Control

Page 4: © Blue Graphics Concept Sauer-Danfoss 2007 BOL Projects review Giulio Mazzotti November 29 th 2007.

Know-How in Motion™ 4

Project Title

2007 BOL Project review

D

M

A

I

C

SPC System - TAC Target Area Control

Page 5: © Blue Graphics Concept Sauer-Danfoss 2007 BOL Projects review Giulio Mazzotti November 29 th 2007.

Know-How in Motion™ 5

Project Title

2007 BOL Project review

D

M

A

I

C

SPC System - TAC Target Area Control

Task Title Responsible 0-25% 25%-50% 50%-75% 75%-100% End Data

1 Implement TAC on all key features (Increase # pc on the shop floor) Simone WK 52

2 Training to the operators Yuri WK 52

3 Data analysis Yuri, Nunzio WK50

4 Data analysis related to processes not aligned to Cpk required Yuri, Nunzio, Emanuele WK50

5 Evaluation improving process Nunzio, Emanuele WK 51

6 Print tolerance required review Yuri, Nunzio, Luca TBD

TAC ProjectTeam: Yuri, Nunzio, Simone, Emanuele, Luca

Page 6: © Blue Graphics Concept Sauer-Danfoss 2007 BOL Projects review Giulio Mazzotti November 29 th 2007.

Know-How in Motion™ 6

Project Title

2007 BOL Project review

D

M

A

I

C

SPC System - TAC Target Area Control

Required: Cpk=1,33

Cp =1,88

Page 7: © Blue Graphics Concept Sauer-Danfoss 2007 BOL Projects review Giulio Mazzotti November 29 th 2007.

Know-How in Motion™ 7

Project Title

2007 BOL Project review

D

M

A

I

C

Improve:

•Connection of the all machine to the system increasing the computers connected. Action: Implementation wireless connection on the shop-floor (action IT > Simone B.)

•Complete training to operatorsAction:Complete the training to the operator (Yuri B.)

•Connection between instrument utilized and software(planned for June ’08)

Action: Feedback from SD – Yuri B. and External Supplier /

I.T.A. - Stefano P.

SPC System - TAC Target Area Control