PT. FATA SARANA MAKMUR ( A Heat Exchanger and HVAC ) Jl. Inti 1 Blok C1 No 20 BIIE Lippo Cikarang Bekasi 17550 Indonesia Telp : (0210 89907565/70 Fax : (021) 89907569
PT. FATA SARANA MAKMUR( A Heat Exchanger and HVAC )
Jl. Inti 1 Blok C1 No 20 BIIE Lippo Cikarang
Bekasi 17550 Indonesia
Telp : (0210 89907565/70 Fax : (021) 89907569
Table of Content Page1. Company Rough Map ……………………………………………………………………………… 12. Overview of PT Fata Sarana Makmur ………………………………………………………. 2
‐ Company Information ………………………………………………………………………….. 2‐ Vision , Mission and Motto …………………………………………………………………… 3Organization Structure 4‐ Organization Structure …………………………………………………………………………. 4
3. Key Milestone …………………………………………………………………………………………. 5‐ Manufacturing …………..…………………………………………………………………………. 5‐ 5 S ………………………………………………………………………………………………………… 6‐ Training ………………………………………………………………………………………………… 10‐ Certification ………………………………………………………………………………………… 12
4. Operational System Standard ………………………………………………………………….. 14L O C 14‐ Lay Out Company ………………………………………………………………………………….. 14
‐ Process Lay Out…………………………………………………………………………………… .. 15‐ Key Company Product …………………………………………………………………………. 16‐Machine & Equipment 22Machine & Equipment ………………………………………………………………………….. 22‐ Production & Sales Result ……………………………………………………………………… 24
5. Key Project ……………………………………………………………………………………………… 266. Key Forward Project Plan ………………………………………………………………………. 34
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
7. Appendix ………………………………………………………………………………………………… 35
1. Company Rough Map1. Company Rough Map
PT Fata PT Fata SaranaSarana MakmurMakmurJl Inti 1 Blok C1 No. 20 BIIE Lippo Cikarang Bekasi 17550 IndonesiaLippo Cikarang Bekasi 17550 IndonesiaTelp : (021) 89907565/70Fax : (021) 89907569
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
2. Overview of PT Fata 2. Overview of PT Fata SaranaSarana MakmurMakmur Company InformationCompany Information
Company Name PT Fata Sarana Makmur
Business Manufacture Air Conditioning & Spare Prt
Address Jl Inti 1 Blok C1 No. 20 BIIE Lippo Cikarang Bekasipp g17550 IndonesiaTelp : (021) 89907565/70, Fax : (021) 89907569
Established April 2003, Initial Production : April 2003
Akta notaris AHU‐AH.01.10‐20270
SK Menhum & HAM AHU‐30609.AH01.02.Tahun 2008
IUI No. 503.15/127/BPPT/IUI‐01/XI/2010IUI No. 503.15/127/BPPT/IUI 01/XI/2010
SIUP No. 503.09/2‐610/BPPT/PM‐00/IX/2012
TDP No. 10071460517
PKP N PEM 00065/WPJ 22/KP0203/2007PKP No. PEM‐00065/WPJ.22/KP.0203/2007
NPWP No. 02.245.436.7‐431.000
Contact Person Albertus Rusenobanu
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
Employee 124 Person ( In August 2013 )
2. Overview of PT Fata 2. Overview of PT Fata SaranaSarana MakmurMakmur Vision , Mission and Motto of the CompanyVision , Mission and Motto of the Company
Vision of the companyVision of the companyWorld Leader Heat Exchanger & HVAC with the best PRESENT
Mission of the companyMission of the company1. Customer satisfaction2 P id di i f d2. Provide a diverse variety of products3. Innovative in product development4. Maintain a safe working environment.5 Improve the effectiveness of the Quality and Environmental5. Improve the effectiveness of the Quality and Environmental
Management system.6. Complying with government regulations7. Do not pollute the environment7. Do not pollute the environment
Motto of the companyMotto of the companyCommitted to customer satisfaction
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
2. Overview of PT Fata 2. Overview of PT Fata SaranaSarana MakmurMakmur Organization StructureOrganization Structure
Director( A.Rusenobanu)
Advisor( Yohanes)
General Mngrg( Akeng Lie)
Acc ‐ Finance( Griesce I)
I T(Edi Setiawan)
HRD‐GA(An An S.)
S & D(Rinda P.)
PE(Deffy S.A.)
Purchasing( Yuniharti)
QA(Agus Suroso)
Warehouse(Abdul R.)
Manufacturing(Hendrik)
PPIC(Dicky . NP)
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
3. Key Milestone3. Key Milestone Manufacturing & Management Manufacturing & Management 1. Incorporated in Indonesia in March 2003 2. Started HE business beside PT. Fata Metal3 Move to current facility in July 20043. Move to current facility in July 20044. Started customize HVAC business in January 20055. Started OEM HVAC business in 20066. Enlarge OEM HVAC in 20077. Re‐Lay Out Line Production & Office in 20108. Continue renovation building process
‐ Re‐lay out office room‐ Created wiring room g‐ Created canteen room‐ Replace & renovation pray room
9 I t ll it t b CCTV i 2012
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
9. Install security system by CCTV in 2012
3. Key Milestone3. Key Milestone 5 S5 S1. Improve and Re‐lay Out Warehouse
After ImprovementBefore Improvement
“Stock Card” for identification material not maximal yet Racking and stock card systemfollow with type of material
Placement of plateas create a space inKey and inventory stock
Pl t f l t i di t d ti
y
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
Placement of plate in direct production area
3. Key Milestone3. Key Milestone 5 S5 S2. Re‐lay out split duct (indoor) line
After ImprovementBefore Improvement
All base panel first title on the pallet so many area A d i fi i h d h th t fAnd semi finish‐goods when the component ofneed not completed
The process of assembly using a conveyor andstock material in a stacked panel the pallet before th bl
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
the assembly process
3. Key Milestone3. Key Milestone 5 S5 S3. Re‐Lay out control panel / wiring process
After ImprovementBefore Improvement
Produce control panel / wiring process in open areas (Join the assembly area) so risky
Produce control panel / wiring process in room area ( make the wiring room )areas (Join the assembly area) so risky
damage on electrical componentsarea ( make the wiring room )
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
3. Key Milestone3. Key Milestone 5 S5 S4. Re‐lay out office
After ImprovementBefore Improvement
Partition for every Dept.and arranged for fillingDocument system
messy office andthe documentlaying on the floor
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
3. Key Milestone3. Key Milestone TrainingTraining
No Type of Training Trainer Time
1 Awareness Quality Management System internal audit and problem solving
ProxisConsultant
2008audit and problem solving Consultant
2 Basic Industrial Safety Dyperma 2009
3 Technical & trouble shooting Danfoss 2008,2009
4 Awareness & Environmental Management Systeminclude internal audit
ProxisConsultant
2010
5 Johnson Control Manufacturing System JCI 2010
6 Emergency drill / fire fighting ProxisConsultant
2010
7 5 S / 5P Review In house FSM 2011
8 Emergency drill / fire fighting Pamas protex 2012
9 APQP , JIT & FMEA Training Mata Pro 2012
10 QCC T i i M t P 2012
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
10 QCC Training Mata Pro 2012
3. Key Milestone3. Key Milestone TrainingTraining
No Type of Training Trainer Time
11 Cardiopulmonary resuscitation (CPR) RS HosanaMedica
2012Medica
12 Compressor R‐410 characteristic &handling Emerson 2013
13 Electronic automation industry Cevest 2013
14 Awareness ISO 9001 & 14001 and refreshing andInternal audit
Prisma 2013
15 Practical recruitment system RSM 2013
16 Compressor R‐32 characteristic Danfoss 2013
17 Compressor R‐32 characteristic &handling( two time )
Emerson 2013( two time )
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
3. Key Milestone3. Key Milestone CertificationCertification
Quality Management SystemQuality Management SystemCertification 2008 Quality Management System
Certification 2010Environmental Management System
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
Environmental Management SystemCertification 2010
3. Key Milestone3. Key Milestone CertificationCertification
Drafting and signing of the Memorandum of Agreement (MOA) between the company and the Ministry of Environment
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard Lay Out of CompanyLay Out of Company
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard Process Lay Out Process Lay Out
Start 1 2 3 4 5 6
Coil & Header Process Coil & Header Process
PreparationPipe & end plate
Fin Press Insert pipe& End plate
Flaring & Expander
Bending coil( Outdoor Unit)
Brazing U‐Bend Piping &Brazing
7Coil Leaking test
(Indoor)
8FG Coil
Metal, Sub Metal, Sub AssyAssy & Assembly process& Assembly process,, yy y py p
Start
Metal Process
1
Powder Coating(S li )
2Prepation
Assy Process
3Comp. Assy( Sub Assy)
4Assembly unit
6Wiring process
7Leaking test(Outdoor)
(Supplier) Assy Process ( Sub Assy) ( )
789Finish
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
Running testPallet / PackingFG Unit
4. Operational System Standard Key Company ProductKey Company Product
Coil
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard Key Company ProductKey Company Product
Single Split DuctSB 40 ~ SB1000 (Capacity 40kBtuh ~ 1000kBtuh)Features :Features :
DX or Chilled Water System ESP up to 2”WG Double Skin Panel with PU Foam InjectionDouble Skin Panel with PU Foam Injection Aluminum frame with Nylon corner Optional with Internal Isolator(Vibration Damping) Slim or Sequential controller
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard Key Company ProductKey Company Product
Single Split DuctMAC 75 ~ MAC600 & YVC 75 ~ YVC 150(Capacity 75kBtuh ~ 600kBtuh)Features :Features :
DX System ESP up to 2”WG Single Skin Panel with Powder CoatingSingle Skin Panel with Powder Coating Scroll Compressor Aluminum frame with Nylon cornerSlim or Sequential controller
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard Key Company ProductKey Company Product
Si l S li C d i iSingle Split Condensing UnitCU 30 ~ 150(Cap. 30 kBtuh ~ 150 kBtuh)Features:
Horizontal Throw for CU 30 ~ CU 60 Convertible Horizontal or Vertical throwfor CU 75 ~ 150 Scroll Compressor Scroll Compressor Aluminum frame with Nylon corner
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard Key Company ProductKey Company Product
D Th h FCUDraw Through FCUCC 10 ~ CC 40 B
( Cap. 10 kbtuh ~ 40 kBtuh)ESP t 50 PESP up to 50 Pa
CC 10 ~ CC 60 C( Cap. 10 kbtuh ~ 60 kBtuh)ESP 200 PESP up to 200 PaDouble Drain pan
Blow Through FCUCW/CX 200 ~ 1200
Chilled Water or R‐22 systemCapacity 7 kBtuh ~ 40 kBtuhAirflow 200 ~ 1200 CFMESP 0, 30, 60 and 80 PaOption return plenum and filter
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
Available up to 3000 CFM
4. Operational System Standard Key Company ProductKey Company ProductAir Handling UnitModular Concept DesignSize: 24 Horizontal & 16 Vertical Unit Arrangement
Air Volume: 1200 to 69500 CMH (700 to 40800 CFM)
Total Static Pressure Up To 1500 Pa (6” W.G.)
Coil Face Area: 0.28 to 7.66 m²(3.0 to 82.5 ft²)
High Strength Extruded Aluminum Framework Double Skin PU Injected Insulation Panelj
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard Machine and EquipmentMachine and Equipment
1. Coil Lines: two line 3/8”, one line 1/2 “ ,one line 5/8”.
Key Production FacilitiesKey Production Facilities
2. Sheet Metal working Line : two shear , One corner notching, two CNC turret punch, two benders, One roller press orifice, three power press (hydraulic pneumatic and electronic) three welderpower press (hydraulic, pneumatic and electronic), three welder.
3. PU Lines : Two high pressure PU injection machine, One multi level foaming press.
4. Assembly lines : Split Duct line ( Indoor & Outdoor ), AHU Line, Customize line
5. Powder Coating line : Complete powder coating facilites available from PT Davy Prima Teknik Indonesia, PT Terra Megantara, PT LetrusOversees
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard Machine and EquipmentMachine and Equipment
No Name of Machine Qty
Supporting the production machineSupporting the production machine
1 Milling Machine 2 pcs
2 Lathe Machine 2 Pcs
3 Air Compressor 7 Pcs3 Air Compressor 7 Pcs
4 Vacuum 1 Pcs
5 Expander Machine 3 Pcs
6 Pipe Bender Machine 1 Pcs
7 Coil Bender Machine 1 Pcs
8 Bench Drilling 2 Pcsg
9 Straightened Machine 3 Pcs
10 Penta post blade saw Machine 3 Pcs
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
11 Roller Press Penta post 1 Pcs
4. Operational System Standard Production & Sales ResultProduction & Sales Result
5000 4221 41804504
HVAC PRODUCTION RESULT PERFORMANCEQ’ty / Unit
2000
3000
4000
2644
3615
2515
3613
0
1000
2000
2008 2009 2010 2011 2012 Jan‐Jul 2013 AVERAGE
2008 2009 2010 2011 2012 Jan‐Jul 2013 AVERAGE1 SPLIT DUCT / MAC 1420 1782 779 862 1403 845 12492 OUTDOOR / YVC 1680 2196 1087 1600
NO MODEL TYPEFISCAL YEAR
2 OUTDOOR / YVC 1680 2196 1087 16003 OUTDOOR / CU 439 362 209 4014 INDOOR / SB 403 328 263 6155 AHU 63 76 20 706 OTHERS 516 34 46 168 139 91 181
759
1295
524
1302
1062
1526
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4221 4180 2644 3615 4504 2515 3613TOTAL QTY PROD.
4. Operational System Standard Production & Sales ResultProduction & Sales Result
50,000,000,000
60,000,000,000
Sales Result ( IDR )
20,000,000,000
30,000,000,000
40,000,000,000
0
10,000,000,000
2008 2009 2010 2011 2012 Jan - Jul 2013
Average
Other Sales / Sparepart Sales Product HVAC / Unit Sales Product HE / Coil
2008 2009 2010 2011 2012 J J l 2013 AVERAGEMODEL TYPENO
FISCAL YEAR
2008 2009 2010 2011 2012 Jan-Jul 2013 AVERAGE
1 Sales Product HE / Coil 6,529,223,633 6,537,665,757 8,411,335,653 5,902,549,523 6,249,172,954 3,033,060,886 6,110,501,401
2 Sales Product HVAC / Unit 39,907,540,521 43,771,565,821 36,593,367,815 42,231,597,439 51,236,251,431 29,289,969,938 40,505,048,827
3 Other Sales / Sparepart 1 207 414 476 2 128 063 769 1 825 470 281 918 050 628 1 117 246 300 1 654 122 455 1 475 061 318
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
3 Other Sales / Sparepart 1,207,414,476 2,128,063,769 1,825,470,281 918,050,628 1,117,246,300 1,654,122,455 1,475,061,318
47,644,178,630 52,437,295,347 46,830,173,749 49,052,197,590 58,602,670,685 33,977,153,279 48,090,611,547Total Sales
5. Key Project HVAC Project References HVAC Project References C i l & Offi B ildiC i l & Offi B ildiNo Project Name Type of unit
1 Panakukang Mall, Sulawesi Ducted Split
Commercial & Office BuildingCommercial & Office Building
2 Jamsostek Building, Jakarta Ducted Split
3 Bakmi Japos Karawaci, Jakarta Ducted Split
4 Gedung Arsip Nasional, Jakarta Ducted Split
5 Ambarukmo Mall, Yogjakarta FCU
6 Artha Gading Mall, Jakarta FCU
7 Padang Mall, West Sumatra FCU
8 Pangrango Plaza, Jakarta FCU
9 Balikpapan Mall, East Kalimantan FCU
10 Department Perdagangan, Jakarta FCUp g g ,11 Manado Mall, Sulawesi FCU
12 Kooperasi Wahana Kalpika, Jakarta Barat FCU
13 Palembang Indah Mall, Palembang FCU
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
Palembang Indah Mall, Palembang14 Sawangan Town Square, Depok FCU
5. Key Project HVAC Project References HVAC Project References
No Project Name Type of unit
15 Bale Pakuan, Bandung FCU
16 Mall Mollies, Bandung FCUMall Mollies, Bandung17 XXI Bintaro, Jakarta Ducted Split
18 XXI Kalibata, Jakarta Ducted Split
19 XXI Kuningan Jakarta Ducted Split19 XXI Kuningan, Jakarta Ducted Split
20 XXI Rumah Tinggal, Jakarta Ducted Split
21 XXI Solo Paragon, Solo Ducted Split
22 D t d S lit22 XXI Bali, Bali Ducted Split
23 XXI Casablanca, Jakarta Ducted Split
24 XXI Gading Imax, Jakarta Ducted Split
25 XXI Bandung Indah Plaza, Bandung Ducted Split
26 XXI Bali Galeria, Ducted Split
27 XXI Molis Bandung, Bandung Ducted Split
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
g g28 XXI Cirebon, Cirebon Ducted Split
5. Key Project HVAC Project References HVAC Project References
No Project Name Type of unit
29 XXI Bali Galeria, Ducted Split
30 XXI Molis Bandung, Bandung Ducted Split
31 XXI Cirebon, Cirebon Ducted Split
32 XXI Jayapura, Papua Ducted Split
33 XXI Green Bay Jakarta Ducted SplitXXI Green Bay, Jakarta p
34 XXI Sumarecon, Bekasi Ducted Split
35 XXI Makasar, Sulawesi Ducted Split
36 XXI P l i M d M d Ducted Split36 XXI Polonia Medan, Medan Ducted Split
37 XXI Kelapa Gading, Jakarta Ducted Split
38 Universitas Indonesia (UI) AHU
39 Departement Agama, Jakarta AHU
40 MTC Manado, Sulawesi AHU
41 Lotte Mart, Jakarta AHU
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
42 Lotte Mart, Cibitung AHU
5. Key Project HVAC Project References HVAC Project References A d H lA d H lNo Project Name Type of unit
1 Apartment Bellagio Residency, Jakarta Multi split Condenser
Apartment and HotelsApartment and Hotels
2 Apartment Bellagio Mansion, Jakarta Multi split Condenser
3 Apartment Shangri La, Jakarta Multi split Condenser
4 Bali Cottage, Bali Multi split Condenser
5 Apartment Capital Residence, Jakarta AHU
6 Hotel Quality, Makassar Ducted Split
7 Hotel Grand Hyatt, Bali FCU
8 Hotel Kunir, Jakarta FCU
9 Hotel Novotel, Bandung AHU & FCU
10 Hotel Bumi Minang, Padang AHUg, g11 Hotel Nusa Dua Bali, Bali Ducted Split
12 Hotel Haris, Bandung AHU
13 Hotel Sahid Jaya, Cikarang AHU
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
Hotel Sahid Jaya, Cikarang14 Menara Era, Jakarta AHU
5. Key Project HVAC Project References HVAC Project References I d iI d iNo Project Name Type of unit
1 PT San Miguel, Cibitung Ducted Split
IndustriesIndustries
2 PT Central Agro Mima, Pegaden Ducted Split
3 Batik Semar, Solo Ducted Split
4 PT Mayora, Cibitung Condensing Unit
5 PT PLTU, Jambi AHU
6 PT Connocco, Jambi RoofT op Package
7 PT Bayu (Bio Farma FCU
8 PT Unilever, Cibitung FCU
9 PT Indofood, Jakarta FCU
10 PT Sakatama, Surabaya FCU, y11 PT Asaba, Jakarta FCU
12 PT Nestle Indonesia, Suraya FCU
13 PLN, Bojong FCU
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
PLN, Bojong14 Prospek Motor, Sunter FCU
5. Key Project HVAC Project References HVAC Project References
No Project Name Type of unit
15 PT Konimex, Solo AHU
16 PT Djarum Kudus AHU16 PT Djarum, Kudus AHU
17 PT Nestle Indonesia, Lampung AHU
18 PT Kalbe Farma, EJIP AHU
19 PT Indofarma Cibitung AHU19 PT Indofarma, Cibitung AHU
20 PT Ultra Sakti, Bandung AHU
21 PT Kraft, Bandung AHU
22 PT K ihi Cibit B k i AHU22 PT Keihin Cibitung, Bekasi AHU
23 PT Harco Magdu AHU
24 PT AQUA, Sukabumi AHU
25 AHU25 PT AQUA, Cianjur AHU
26 PT AQUA Pandaan, JATIM AHU
27 PT Kereta Api Indonesia, Jakarta AHU
28 AHU
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
28 PT Berdikari, Jakarta AHU
5. Key Project HVAC Project References HVAC Project References H i lH i lNo Project Name Type of unit
1 RS Pluit, Jakarta FCU
HospitalsHospitals
2 RS Surianti Suroso, Sunter FCU
3 RS Puri Kedoya, Jakarta FCU
4 RS Dharmais, Jakarta AHU
5 RS Fatmawati, Jakarta AHU
6 RS Adam Malik, Jakarta AHU
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
5. Key Project Heat ExchangerHeat Exchanger
No Project Name No Project Name
1 Hotel Omni Batavia, Jakarta 15 RS Husada, Jakarta
2 Hotel Palembang 16 PLTU Suralaya, Suralaya
3 Mall Gajah Mada, Jakarta 17 Hero Supermarket, Bekasi
4 Mall Pondok Indah, Jakarta 18 Diamond Dept Store, Makassar
5 Mall Ambassador, Jakarta 19 Pabrik Gula, Lampung
6 Mall Kelapa Gading Jakarta 20 TRS Radiator, Jakarta
7 Mall Panakukang Trade Center, 21 PT Mattel, Jababeka
8 Gedung Telkom, Jakarta 22 Hai Lai Ancol, Jakarta
9 Gedung BNI 46, Jakarta 23 PT Karwell, Cakung
10 Gedung BRI, Jakarta 24 PT Charoen Pokphand, Pegaden
11 Gedung Dirjen Pajak, Jakarta 25 PT Ceres Indonesia, Bandungg j j ,12 Gedung Dept Keuangan, Jakarta 26 Bank Indonesia, Bali
13 Gedung Jamsostek, Jakarta 27 DTE, Netherland
14 RS Cipto Mannungal, Jakarta 28
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
RS Cipto Mannungal, Jakarta
6. Key Forward Project Plan
1 T h l f f HCFC (R 22) HCFC1. Technology transfer process from HCFC (R‐22) to non HCFC (R‐32 Program Ministry of Environment & UNDP ) in 2013‐2014
2. Control & monitoring unit by online system in 20143. Additional Fin Press m/c for special R‐32 design in 20144. Epoxy flooring in 20145. Certification by OHSAS 2008 in 2016
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
7. Photo Gallery
Kick of ISO ISO 14001: 2004 (23 November 2009) JCMS ‐JCI Education Training (22‐26 January 2010)
Fire Drill Education training (19 June 2012) Medical Check Up ( 05 July 2012)
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
Visit of Environmental Ministry (27 February 2013) Work shop training at Ceves Kemenakertrans ( April 2013)
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)