– PS and Lin3 - LEIR are PS and Lin3 - LEIR are coupledcoupled– PS and LEIR share the same SC length PS and LEIR share the same SC length
2.2. MD Mode MD Mode – New MTG New MTG dedicateddedicated to this modeto this mode– PS and Lin3 - LEIR are PS and Lin3 - LEIR are decoupled. decoupled. LEIR is standaloneLEIR is standalone– LEIR SC length is arbitraryLEIR SC length is arbitrary
Fully integrated into CBCMFully integrated into CBCM– Standard facility – Relies on Supercycle Standard facility – Relies on Supercycle sequencesequence– Deployed @ SPS in 2004Deployed @ SPS in 2004– MTG Master/ Slave switching mechanism - Remote ctlMTG Master/ Slave switching mechanism - Remote ctl
A Free sample background from www.pptbackgrounds.fsnet.co.uk
Slide 22
General Services : MonitoringGeneral Services : Monitoring Requirements from May 2005Requirements from May 2005
– Interactive toolInteractive tool for operators: survey + remote reset of for operators: survey + remote reset of computerscomputers
– To be monitored:To be monitored: • All Front EndsAll Front Ends• All Back EndsAll Back Ends• All PLCs connected to the CO system All PLCs connected to the CO system (RF, vacuum,PC,…)(RF, vacuum,PC,…)
Requirements not specific . Fully addressed by the Requirements not specific . Fully addressed by the new Monitoring System provided by ABCOIN.new Monitoring System provided by ABCOIN.
A Free sample background from www.pptbackgrounds.fsnet.co.uk
Slide 23
General Services : OASISGeneral Services : OASIS Requirements from May 2005Requirements from May 2005
– Full nAos functionalityFull nAos functionality– High priority for machine physicistsHigh priority for machine physicists– 1 common triggering for Lin3-LEIR-PS 1 common triggering for Lin3-LEIR-PS
OASIS Mandate for OASIS Mandate for 20052005– OASIS deployment on OASIS deployment on allall machines machines – nAos phased out nAos phased out
Issues: missing staffIssues: missing staff– FE / Business Tier: 0.5 FTE FE / Business Tier: 0.5 FTE – GUI Application: 0.5 FTEGUI Application: 0.5 FTE – Project in standby nowProject in standby now
RecommandationsRecommandations– Prioritization of operational requirements (pre-requisite for staffing)Prioritization of operational requirements (pre-requisite for staffing)– Decision on staffing for GUI: mandatory for 1Decision on staffing for GUI: mandatory for 1stst April 2004 April 2004– Potential risk of having Potential risk of having NONO complete observation system complete observation system
A Free sample background from www.pptbackgrounds.fsnet.co.uk
Slide 24
General Services : AlarmsGeneral Services : Alarms Not possible today to foresee which Alarms system Not possible today to foresee which Alarms system
will be deployed for LEIR will be deployed for LEIR More accurate estimate by end of May 2004More accurate estimate by end of May 2004 2 possible solutions for LEIR commissioning 2 possible solutions for LEIR commissioning
A Free sample background from www.pptbackgrounds.fsnet.co.uk
Slide 27
General Services : AlarmsGeneral Services : Alarms Not possible today to foresee the Alarms system for Not possible today to foresee the Alarms system for
LEIR in 2005LEIR in 2005 More accurate estimate by end of May 2005More accurate estimate by end of May 2005 2 possible solutions 2 possible solutions
Whatever the solution, for new LEIR equipment : Whatever the solution, for new LEIR equipment :
Need of LASER source API integration into FESA Need of LASER source API integration into FESA frameworkframework
LEIR = test-bed for lots of new systemsLEIR = test-bed for lots of new systems– Timing Receiver CardsTiming Receiver Cards– Integration of DSP HWIntegration of DSP HW– FESA frameworkFESA framework– Console Manager + AP Framework Console Manager + AP Framework – LASERLASER– OASISOASIS– Monitoring System Monitoring System