General Notes: 1. All plant material shall be Florida No. 1 or better as given in the current Grades and Standards for Nursery Plants, 2nd Edition, February 1998, Florida Department of Agriculture and Consumer Services, Division of Plant Industry. Co-dominant trees and trees with bark inclusion will not be accepted. 2. All plant materials shall be subject to inspection and approval by the Landscape Architect at place of growth and upon delivery for conformity to specification. 3. All plants shall be true to species and variety and shall conform to measurements specified. 4. All plants shall be exceptionally heavy, symmetrical, tight knit and so trained in appearance as to be superior to form, branching and symmetry. 5. Contractor shall notify S.U.N.S.H.I.N.E. (1-800-432-4770) for locations of existing utility lines 48 hours prior to beginning work. Contractor shall verify location of all utility lines and easements prior to commencing any work. Excavation in the vicinity of underground utilities shall be undertaken with care and by hand, if necessary. The Contractor bears full responsibility for this work and disruption or damage to utilities shall be repaired immediately at no expense to the Owner. 6. *UDGH % $UVHQLF )UHH VKUHGGHG 0HODOHXFD RU (XFDO\SWXV PLQLPXP ´ GHHS VKDOO EH XVHG LQ DOO PDVV SODQWLQJ EHGV DQG IRU LQGLYLGXDO WUHH SLWV $OO WUHHV VKDOO KDYH D PXOFK ULQJ ZLWK D PLQLPXP GHSWK RI ´ DQG D GLDPHWHU RI DURXQG WKHLU EDVH $OO PXOFK VKDOO EH NHSW ´ IURP WKH EDVH RI DOO SODQW PDWHULDO 0XOFK EHGV VKDOO EH D PLQLPXP RI ´ ZLGHU WKDQ SODQWV PHDVXUHG IURP RXWVLGH edge of foliage. 7. Sod shall be St. Augustine 'Floratam' solid and free of weeds, insects, fungus and disease, laid with alternating and abutting joints. 8. All tree excavation pits shall be a minimum of 2 times the size of the rootball and planting soil must be clean. All trees and shrubs shall be backfilled with a suitable planting soil consisting of 50 percent sand and 50 percent approved compost. (Note: Field observation and soil analysis may require a different soil composition to be provided.) All plant materials shall be planted with a minimum of six to twelve inches of this planting soil around and beneath the root ball. Refer to planting details. Planting beds and planting soil shall be free from road, pea, egg, or colored rock, building materials, debris, weeds, noxious pests and disease. 9. $OO VRGGHG DUHDV WR KDYH D PLQLPXP RI ´ RI SODQWLQJ VRLO DV GHVFULEHG LQ QRWH 10. All trees shall be warranted by the Contractor and will be healthy and in flourishing condition of active growth on year from date of final acceptance. 11. All shrubs, groundcovers, vines and sod shall be fully warranted for 1 year under same condition as above. 12. All synthetic burlap, synthetic string or cords or wire baskets shall be removed before any trees are planted. All synthetic tape shall be removed from trunks, branches, eLI. before inspection. The top 1/3 of any natural burlap shall be removed or tucked into the planting hole before trees are backed filled. Planting soil to be backfilled into plant pits by washing in. 13. All trees, palms and other plants shall be planted with the top of their root balls no deeper than the final grade surrounding the planting area. Root balls may be planted up to 10% above grade. 14. In areas where paved surfaces abut sod or mulch, the final grade level of both surfaces should be even. 15. All planting shall be installed with fertilizer and/or fertilizer tablets at time of planting. 16. All planting shall be installed in a sound, workmanlike manner and according to good planting procedures. Installation shall include watering, weeding, fertilizing, mulching, selective pruning, and removal of refuse and debris on regular basis so as to present a neat and well kept appearance at all times. 17. All landscape and sod area shall have an automatic irrigation system installed. Coverage should be 100% overlap to all landscape and sod areas and spray onto hardscap is not permitted. Sodded areas and shrub/groundcover beds should be on separate irrigation zones for a more efficient system. Irrigation system shall be installed with a rainswiLIh device. 18. All landscape shall be installed in compliance with all local codes. 19. The plan shall take precedence over the plant list, should there be any discrepancy between the two. 20. Any plant subsitutions must be approved by the City prior to installation. APPROXIMATELY 9 MONTHS AFTER NOTE: ALL STAKING & GUYS SHALL BE REMOVED PLANTING OR AS DIRECTED BY LANDSCAPE ARCHITECT NOTE: NO WELLINGTON TAPE OR OTHER NON-BIODEGRADABLE MATERIALS SHALL COME INTO CONTACT WITH THE TREE. 2-STORY BUILDING #2 2-STORY BUILDING #1 OFFICE BUSINESS CHAPEL PROPOSED RESIDENCE CLOISTER PROPOSED PROPOSED PROPOSED PLAZA SHRINE EXISTING EXISTING EXISTING PROPOSED MUNUMENT SIGN EXISTING OVERHEAD UTILITY EXISTING PODOCARPUS HEDGE TO REMAIN EXISTING BLACK OLIVE TO REMAIN CG 2 CI 5 CG 2 CI 20 CI 24 QV 1 CG 4 CI 12 TH 5 QV 1 QV 1 MF 9 (2) EXISTING OAKS TO REMAIN (1) EXISTING OAK TO REMAIN (1) EXISTING MAHOGANY TO REMAIN MULCH SOD SOD TR 1 IV 54 MF 8 QV 1 CI 20 CI 9 TR 1 IV 60 MU 10 MU 10 EXISTING YELLOW TABEBUIA TO REMAIN QV 1 QV 1 EXISTING PODOCARPUS HEDGE TO REMAIN EXISTING PODOCARPUS HEDGE TO BE REMOVED FROM THIS SECTION LI 5 LI 4 EXISTING BLACK OLIVE TO REMAIN QV 1 QV 1 QV 1 MULCH MULCH IV 8 GG 16 BE 50 BE 50 BE 50 BE 50 VM 3 GG 2 FM 32 PM 30 SOD SOD SOD SOD SOD SOD IV 10 IV 24 WALK WALK WALK WALK WALK (1) EXISTING MAHOGANY TO REMAIN (4) IN EACH PLANTER CI 64 TH 5 SOD SOD SOD SOD SOD Lic. No. #LA0000952 Landscape Architecture Kimberly Moyer, RLA (954) 492-9609 NOTES: 1. SOD AND IRRIGATE TO EDGE OF ROAD. 2. TREE REMOVAL PERMIT IS REQUIRED BY CITY PRIOR TO REMOVAL OF ANY TREES ON SITE. 3. ALL MECHANICAL EQUIPMENT SHALL BE SCREENED FROM VIEW WITH APPROPRIATE SHRUB MATERIAL. Scale:1/16"=1'-00" North 0' 8' 16' 32' 48' 2NCP 4GXKUKQPU .Ä NEWCHAPELANDPARISHRECTORYFOR: NATIVITYCATHOLICCHURCH 5220JOHNSONSTREET HOLLYWOOD,FLORIDA33021 K.M. 6-2-16 ÄÄ -/ LANDSCAPEPLAN 2NCP 4GXKUKQPU ÄÄ -/ 2NCP 4GXKUKQPU ÄÄ -/