भारत सरकार Government of India केन्द्रीय विद्युत प्राविकरण
Central Electricity Authority
पश्चिम के्षत्रीय श्चिद्युत सश्चमश्चत Western Regional Power Committee
General Manager, NTPC, Mouda 07115-281221/281219 34. CLD TPC, Mumbai 022-25541908/67175385 35. Head (O), Dahanu TPS, Dahanu 02528-222039 36. Sr V P Reliance Transmission, Pune
30471555 Vice President (Generation), Torrent Power Ltd, Ahmedabad
0124-3917982/020-
079-27506679 37. Executive Director, Sugen CCPP, Torrent Power Ltd, Surat. 02621-661151 38. Vice President (O &M), APL Mundra , Gujarat 02838-266364 39. Head Operation CGPL Mundra 40. Vice President (Opn), Jindal Power Ltd.,Raigarh 07767-281993/281995 41. AGM(OS) NSPCL Delhi 011-26717363,26717366 42. GENERAL MANAGER ( POWER), RGPPL, Ratnagiri 02359-241071/ 241011 43. Member (Power), NCA, Indore 0731-2559888 44. Chief Engineer (PM & C), NHDC, Bhopal 0755 4030188/4030130 45. E. E. Elect. (Ponda), Goa 0832-2313780 46. Executive Engineer DD (UT), Daman 0260-/2230771/2250889/2230550 47. Executive Engineer DNH (UT), Silvassa 0260-2642338 48. Secretary, CERC, New Delhi 011-24360010/23753923 49. CEO, JSW Energy ltd. 011-46032343/26183546 50. VP-Power Infra-Essar Hazira Surat 0261-6688498/022-67082198 51. Chief Electrical Distribution Engineer CR 022-22621060 52. Vice President EPTCL Hazira Surat 0261-6682747 53. COO, Korba West Power Co. Ltd. Raigarh 54. VP(COMML) Essar Power MP Ltd MP 55. GM Torrent power grid ltd. Ahmedabad, Gujarat 56. Adani Power Maharashtra Ltd Tiroda 57. CGM, R K M Powergen Pvt Ltd 58. ED, Athena Chattishgarh Power Ltd. 59. Head(O&M) Dhariwal Infra Ltd C’pur 60. Head Operation Jaypee Nigrie STPP Singrauli. 61. VP(O&M), GCEL, Chhattishgarh 62. Head Operation DB Power, Chhattishgarh. 63. Head operation Hindustan Power, Anuppur MP 64. Head operation GMR, Warora Energy ltd. 65 Head O&M, Sterlite Grid Ltd Bhopal 66 Head Operation Balco, Chhattishgarh. 67 Head(O& M), SKS, SPGCL, Raigarh 68 AVP,O&M Electrical,RIPL,Amravati
Minutes of the 529th OCC Meeting held on 17.03.2019 held through VC Page 1
Minutes of 529th OCC, Sub-Committee meeting held on17.03.2020 (through Video Conferencing) at WRLDC
Mumbai
The 529th meeting of Operation & Co-ordination Sub-Committee(OCC) of Western Regional Power Committee (WRPC) was held on17th March 2020 through video conferencing at WRLDC,Mumbai. The list of participants is enclosed at Annexure-I.
Shri Satyanarayan S., Member Secretary, WRPC extended warmwelcome to all the participants of the 529th OCC meeting whoattended the meeting through V.C. from SLDC’s and WRLDC the VC atvarious SLDC’s and WRLDC. He stated that due to the presentcircumstances of spread of coronavirus and the advisory ofGovernment of India to minimize travel, the decision to hold themeeting through VC was taken.
He also stated that only limited and important Agenda items wouldbe taken up in this OCC for discussions but the minutes wouldinclude the routine data items.
After the opening remarks from Member Secretary a round ofintroduction of participants was followed and thereafter M.S.,WRPC took the item wise discussion of the limited agenda.
Item No. 1: Confirmation of the Minutes
Minutes of 528th meeting of Operation & Coordination Sub-Committee (OCC) of WRPC held on 9th March, 2020 at WRPC,Mumbai were issued vide letter No. WRPC/OPN/OCC-Minutes/2019-20/3376 dated 09.03.2020.
OCC Sub-Committee confirmed the Minutes of 528th OCC withoutany modification as there was no comments from any member.
The maintenance programme of generating units for themonths of March 2020 & April 2020 is given in Annex 3.1.
OCC Sub-Committee discussed and noted as above.
3.2 Outage programme of transmission lines/elements.
List of proposals for transmission elements outage to beavailed during the month of April 2020 is given Annex 3.2.
OCC Sub-Committee discussed and noted as above.
Minutes of the 529th OCC Meeting held on 17.03.2019 held through VC Page 2
Item no. 8: Miscellaneous Operational Items
8.1 Extension of time period for installation ofFGD based on Wet lime Stone basedTechnology at 2 x 660 MW Jaypee NigrieSuper Thermal Power Plant (JNSTPP) Nigrie(M.P.)
JPVL vide email dated 13.03.2020 has informed the following
JPVL Bina 2x250 MW :
2 x 250 MW Jaypee Bina Thermal Power Plant (JBTPP), Bina hasbeen originally considered as compliant based on the SO2 levelin the Ambient air. However, CEA has subsequently declaredJBTPP as non-compliant as new emission norms require SO2level to be measured at stack emission. JPVL pro-actively hasundertaken the implementation of FGD and has obtainedapproval of FR from CEA and clearance from State RegulatorMPERC in December 2019 and subsequently floated NIT onInternational Competitive Bidding process and the award isexpected by end of 1st quarter of 2020-21. Request for grant oftimeline for implementation of FGD preferably up to end of 2024.
JPVL Nigrie 2X660 MW :As per the phasing out plan given in the special TCC meeting ofWRPC held on 21.09.2017 at WRPC, Mumbai., the phasing outplan for implementation of FGD for Unit 1 & Unit 2 of JNSTPPNigrie was given as 30th June 2020 and 30th September 2020respectively. Till date (i.e.13.03.2020) FR has been cleared by CEA, in-principle approval fromMPERC received and NIT on International Competitive Biddingbasis issued with a timeline of placement of order by end of 1stquarter of2020-21. Request for extension of timeline for installation of FGDat JNSTPP Nigrie upto June 2024 for Unit 1 and December 2024for Unit 2 considering the timeline of 33 to 39 months being givenby prospective bidders. (Annexure 8.1)
Discussion:
GM,JPVL informed that 2 x 250 MW Jaypee Bina Thermal PowerPlant was not added in the list of plants to have FGD installationas the SOx levels were under permissible levels, but later CEAdeclared JBTPP as non-compliant as new emission normsrequire SO2 level to be measured at stack emission. Sincethen JPVL has proactively proceeded for FGD installation atJBTPP and obtained clearance from CEA and MPERC. He statedthat the award for FGD installation is expected by 1st quarter of2020-2021, hence he requested that time line for installation ofFGD for unit 1 be considered as September 2024 and Unit-2 Beconsidered as December 2024.
Minutes of the 529th OCC Meeting held on 17.03.2019 held through VC Page 3
For JPVL Nigrie 2X660 MW GM,JPVL informed that a per the phasingout plan implementation of FGD for Unit 1 & Unit 2 of JNSTPPNigrie was given as 30th June 2020 and 30th September2020 respectively. He requested for extension of the abovedates to June 2024 for Unit 1 and December 2024 for Unit 2.
MS, WRPC informed that the phasing out plan was discussedin a special TCC and in consultation with CEA and then thedates were finalized. OCC subcommittee is not the appropriateforum to give an extension on the finalized dates forimplementation of FGD. Further he stated that the OCCsubcommittee will note these dates inform in the forthcomingTCC/WRPC. Regarding Jaypee Bina Thermal Power plant, OCCnoted that the FGD plan as stated by JPVL, since this is thefirst time the same is coming. He requested the plantauthorities to take up the matter with CEA/MoP
CE,SLDC, Gujarat raised the issue that many IPPs in theirstate are behind schedule in implementation of FGD and thatneeds to be monitored as it’s a mandatory requirement.MS,WRPC informed that a separate meeting with all generatorsin Western Region shall be held separately to monitor theprogress of implementation of FGD. It not be discussed intoday’s short OCC.
OCC subcommittee noted the above
8.2 NTPC Gadarwara unit#1 CT PG
NTPC vide email dated 12.03.2020 has informed thatGadarwara unit#1 CT PG Test is planned to be conductedin 3rd week of April'2020. This test shall be done by a CTI,USA approved agency and will require about one week of unitoperation.Ensuring s c h e d u l e f o r unit#1 in April 3rd week willfacilitate completion of CT PG test activity, as agency is expectedto visit from USA.
Discussion:NTPC representative informed that the PG test for Gadarwaraunit#1 is planned in 3rd week of April 2020 and requestedbeneficiaries to give schedule for successful completion of thePG test.
CE,SLDC,Gujarat requested NTPC to inform about the trialrun of Khargone Unit 2.
NTPC representative informed that the trial run of Khargoneunit 2 would be carried from 21.03.2020
OCC subcommittee noted the above.
Minutes of the 529th OCC Meeting held on 17.03.2019 held through VC Page 4
9.1 Finalization of Methodology for Declaration ofpeak/off-peak hours during the day for everymonth from April’2020 onwards for Western Region
Regulation 42 of CERC (Terms and Conditions of Tariff)Regulations,2019, pertaining to computation and payment of capacitycharge for thermal generating stations, contains the followingprovisions.:
"The capacity charge shall be recovered under two segments of theyear, i.e. High Demand Season (period of three months) andLow Demand Season (period of remaining nine months), and withineach season in two parts viz., Capacity Charge for Peak Hours ofthe month and Capacity Charge for Off Peak Hours of the month…..”
"The number of hours of "Peak" and "Off-Peak "periods during a dayshall be four and twenty respectively. The hours of Peak and Off-Peak periods during a day shall be declared by the concerned RLDCat least a week in advance. The High Demand Season (period ofthree months, consecutive or otherwise) and Low Demand Season(period of remaining nine months, consecutive or otherwise) In aregion shall be declared by the concerned RLDC, at least sixmonths In advance.Provided that RLDC, after duly considering thecomments of the concerned stakeholders, shall declare peak Hoursand High Demand Season in such a way as to coincide with themajority of the Peak Hours and High Demand Season of the regionto the maximum extent possible…."
Accordingly, High Demand and Low demand season for2020-21 had been declared vide letter ref.WRLDC/RE&R/2019-20 dated 18-10-2019 withconsidering the comments received from stakeholdersand discussion in 524th OCC meeting.
Also, declaration of peak/off-peak hours is to be done onweek ahead basis for each month. An exercise has been doneto identify peak and off peak hours for the month ofApril,2020 of WR based on hourly demand data submitted bystates for April 2017, April 2018 and April 2019 to WRLDC.Each hour data is calculated as the average of thatparticular hour of total 30 days for the April month forthat year. Details of Demand of WR is shown below with top4 ranked hours highlighted in Yellow color-
WRLDC shall be declaring the peak/off-peak hours for themonth of April2020 on week ahead basis. The comments of the stakeholdersare invited before declaration of the same by WRLDC for April2020.
Also being a routine activity to be carried out every month, it isproposed to finalize the f o l l o w i n g methodology f o rdeclaration of t h e peak/off peak hours of the subsequentmonths. Proposed m e t h o d o l o g y for declaration of thepeak/off peak hours of the month:
1. The peak/off peak hours of the month shall be derivedbased on the cumulative demand of the western region forlast three years.
2. The cumulative demand s h a l l b e ca lculated b a s e do n hour l y demand data, which is being submitted by theSLDCs to WRLDC.
3. Top Four hours with maximum average demand shall bedeclared as peak hours for the month and rest will be offpeak hours.
OR
Top Four hours with maximum weighted average demandshall be declared as peak hours for the month. The weightagemay be taken as50%, 30% and 20% for proceeding three years with highestweightage to most recent year. The rest 20 hours will bedeclared as off peak hours.
Minutes of the 529th OCC Meeting held on 17.03.2019 held through VC Page 6
Forum may discuss the same and finalize themethodology for declaration of Peak/Off peak hours of themonth from April’2020 onwards for Western Region.
Discussion
1) MS, WRPC informed that this methodology is used for predicting the peak andoff peak hours on week ahead basis. Hence it should take more weightage forthe current month and year. There does not seem to be a need to include toomuch of past data. This Regulatory requirement may be worked out for twomonths only ( April 2020 and May 2020) on the basis suggested by WRLDC,giving more weightage to recent trend. Further research and discussion can betaken up after two months. He also requested SLDC’s to work on similar ordifferent lines and discus the same in the next OCC.
2) CE, SLDC, GETCO informed that the peak off peak hour is decided by them infine tuned way using demand forecasting methods. CE, SLDC, Chhattisgarh,informed that peak and off peak for them is different than that declared forWR, hence weighted average of individual demands should be considered. MS,WRPC informed that usually the demand matches with one or at most twolarge players. There is a diversity factor.
3) NTPC representative stated that the peak and off peak hours should becontiguous blocks to facilitate for machine operation facility. It was decidedthat being a regulatory requirement, the same may be worked out for twomonths only ( April 2020 and May 2020) on the basis suggested by WRLDC,giving more weightage to recent trend. Further research and discussion can betaken up after two months.
Item No. 10: Date and venue of the next OCC meeting
Depending on the situation, the same would becommunicated.
5 PLANNED OCC-529 GETCO HADALA - 400 kV - BUS 1 Daily Isolator Maintanance Work 01-Apr-20 8:00 01-Apr-20 18:006 PLANNED OCC-529 MP_SLDC 400KV-INDIRASAGAR-NAGDA-1 D For line maintenance work 01-Apr-20 8:00 01-Apr-20 18:007 PLANNED OCC-529 WRTS-I 765KV-SEONI-Wardha-2 D Line AMP - To liquidate the line defects 01-Apr-20 8:00 01-Apr-20 18:008
PLANNED OCC-529
POWERGRID_WR2
400KV-JABALPUR-ITARSI-1 D To apply insulation sleeve in TP towers byItarsi. A/R OFF of ckt-2 and dia to be keptopen at both ends.
01-Apr-20 8:00 01-Apr-20 18:00
9
PLANNED OCC-529
POWERGRID_WR2
765KV-BINA-JABALPUR-1 D For AMP Works/ attending the shut downnature defects. A/R OFF of ckt-2 and dia tobe kept open at both ends. By Damoh TLM.
01-Apr-20 8:00 01-Apr-20 18:00
10PLANNED OCC-529
POWERGRID_WR2
BHUJ - 765KV B/R 1 D FOR IPS CHANGING & RTV WORK. Dia to bekept open.
NSPCL TIE BAY - 400KV-NSPCL-RAIPUR-1 AND400KV-NSPCL-RAIPUR-2 at NSPCL - 400KV
Daily SAS Upgradation 01-Apr-20 9:00 01-Apr-20 17:00
13
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV/220KV BOISAR-ICT-1AND BOISAR - 220KV - BUS 1 at BOISAR -220KV
D BAY AMP. ICT will be in service through TBC. 01-Apr-20 9:00 01-Apr-20 17:30
14PLANNED OCC-529
POWERGRID_WR2
220KV-VAPI-GUJARAT-KAKRAPAR 1&2-1 D AMP of Bay & terminal equipments (VapiEnd). Line outage is required
01-Apr-20 9:00 01-Apr-20 17:30
15
PLANNED OCC-529
POWERGRID_WR1
765KV-AURANGABAD-PUNE-GIS L/R@AURANGABAD - 765KV
D For LR AMP works & Line will be in servicewithout line reactor during this period.
01-Apr-20 9:00 01-Apr-20 18:00
16
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-WARDHA-RAIPUR-PS(DURG)-3 AND WARDHA - 765KV - BUS 2 atWardha - 765KV
D For AMP Work 01-Apr-20 9:00 01-Apr-20 18:00
17PLANNED OCC-529
POWERGRID_WR1
PARLI - 400KV - BUS 1 D For AMP works 01-Apr-20 9:00 01-Apr-20 18:00
18
PLANNED OCC-529
POWERGRID_WR1
Main Bay - 400KV/220KV Solapur-ICT-3 ANDSolapur - 400KV - Bus 1 at Solapur - 400KV
D For AMP works 01-Apr-20 9:00 01-Apr-20 18:00
19
PLANNED OCC-529
POWERGRID_WR1
400KV-SIPAT-RANCHI-1 D For line AMP works & 400KV-SIPAT-RANCHI-2 AR to be keep in non auto mode for safetyprecautions.Dia may be kept open for SSAMP works
01-Apr-20 9:00 01-Apr-20 18:00
20PLANNED OCC-529
POWERGRID_WR1
765KV/400KV WARORA-PG-ICT-2 D AMP Work 01-Apr-20 9:00 01-Apr-20 18:00
21PLANNED OCC-529
POWERGRID_WR2
DEHGAM - 400KV - BUS 1 D AMP works 01-Apr-20 9:00 01-Apr-20 18:00
Transmission Element Outage for the Month of April 2020Name of
Requesting Line / ElementSr. NoRequestType
OCC Number
22
PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-JABALPUR-1 D AMP of line terminal equipment at Jabalpurand line AMP on opportunity. A/R OFF of ckt-2 and dia to be kept open at both ends. ByJabalpur.
01-Apr-20 9:00 01-Apr-20 18:00
23PLANNED OCC-529
POWERGRID_WR2
400KV/220KV KHANDWA-ICT-1 D AMP WORK. Dia to be kept open on bothsides.
01-Apr-20 9:00 01-Apr-20 18:00
24PLANNED OCC-529
POWERGRID_WR2
BANASKANTHA - 400KV - BUS 1 D 400kV Bay Construction work of VAV line 01-Apr-20 9:00 01-Apr-20 18:00
25
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 765KV/400KV BINA-ICT-2 ANDBINA - 400KV - BUS 2 at BINA - 400KV
D FOR TAKING R-PH IN SERVICE AFTER O-RING REPLACEMENT & TAKING SPAREREACTOR OUT, LINE OUTAGE REQUIREDDUE TO NON SWITCHABLE LINE REACTORAT DURG END FOR 15 MIN EACHOPERATION.
01-Apr-20 10:00 01-Apr-20 12:00
27PLANNED OCC-529
POWERGRID_WR1
765KV/400KV TAMNAR-ICT-4 D For AMP works. 01-Apr-20 10:00 01-Apr-20 17:00
28
PLANNED OCC-529
POWERGRID_WR2
220KV-NAVSARI-NAVSARI-GETCO-1 D For NHSRCL Diversion Work: Tower Erection.Simultaneous outage of 220kV Navsari-Navsari-1 and 220kV Navsari-Popada isrequired.
01-Apr-20 6:00 02-Apr-20 18:00
29
PLANNED OCC-529
POWERGRID_WR2
220KV-NAVSARI-POPADA D For NHSRCL Diversion Work: Tower Erection.Simultaneous outage of 220kV Navsari-Navsari-1 and 220kV Navsari-Popada isrequired.
01-Apr-20 6:00 02-Apr-20 18:00
30
PLANNED OCC-529
POWERGRID_WR1
400KV-WARDHA-AKOLA-1 D For pilot string replacement & 400KV-WARDHA-AKOLA-2 AR to be keep in non automode for safety precautions.Dia to be keptopen for SS AMP works
01-Apr-20 9:00 02-Apr-20 18:00
31PLANNED OCC-529
MSETCL 400KV-RGPPL-NAGOTHANE-1 Daily Cold washing, Routine maint. Work & Faultystring replacement Work
01-Apr-20 08:00 03-Apr-20 18:00
32
PLANNED OCC-529
MSETCL 400KV/220KV KARAD-ICT-2 Continuous Erection of new 400 KV PG isolator & relatedwork of Rapid restoration Scheme of ICTunder Scheme
01-Apr-20 08:00 03-Apr-20 18:00
33PLANNED OCC-529
NTPC 400KV/132KV MOUDA-ICT-3 C For attending OLTC Defect 01-Apr-20 8:00 03-Apr-20 18:00
34PLANNED OCC-529
KAPS-3&4 400kV KAPS-3&4-BUS-A1 D BUS DS PM checks and cleaning of BPI/HPIof BUS
01-Apr-20 9:00 03-Apr-20 19:00
35PLANNED OCC-529
SASAN_UMPP(SPL)
765KV/400KV SASAN-ICT-1 CONTINUOUS
ANNUAL MAINTENANCE 01-Apr-20 9:00 03-Apr-20 21:00
36
PLANNED OCC-529
SASAN_UMPP(SPL)
MAIN BAY - 765KV/400KV SASAN-ICT-1 ANDSASAN - 765KV - BUS 4 at SASAN - 765KV
MAIN BAY - 400KV-WARDHA-AKOLA-2 ANDAKOLA - 400KV - BUS 2 at Akola - 400KV
C For Replacement of BHEL CB with GE CB atAkola (MSETCL) end.
01-Apr-20 9:00 06-Apr-20 18:00
45
PLANNED OCC-529
MSETCL 400KV-KALWA-PADGHE-1 Daily PID Testing work for line Insulator strings atvarious locations. Auto-Reclose function to beout of service.
01-Apr-20 09:00 09-Apr-20 17:00
46 PLANNED OCC-529 MSETCL 400KV-BABLESHWAR-PADGHE-PG-1 Daily For Carrying out PID Work 01-Apr-20 08:00 10-Apr-20 18:0047 PLANNED OCC-529 MSETCL 400KV-KOYNA STAGE IV-LONIKHAND-1 Daily PID TESTING WORK 01-Apr-20 09:00 15-Apr-20 17:0048
PLANNED OCC-529POWERGRID_WR2
ITARSI - 400KV B/R 3 C For Overhauling works of Reactor. Dia to bekept open.
01-Apr-20 9:00 15-Apr-20 18:00
49 PLANNED OCC-529 MSETCL 220KV-WARDHA-PUSAD-1 Daily FOR PID WORK 01-Apr-20 07:00 30-Apr-20 17:0050
PLANNED OCC-529POWERGRID_WR2
765KV-SASAN-SATNA-1 D A/R OFF for Tower Strengthening works.Proposed by AM TL.
01-Apr-20 7:00 30-Apr-20 18:00
51PLANNED OCC-529
POWERGRID_WR2
765KV-SASAN-SATNA-2 D A/R OFF for Tower Strengthening works.Proposed by AM TL.
01-Apr-20 7:00 30-Apr-20 18:00
52PLANNED OCC-529
POWERGRID_WR2
765KV-BINA-GWALIOR-1 D A/R OFF for Tower Strengthening works.Proposed by AM TL.
01-Apr-20 7:00 30-Apr-20 18:00
53PLANNED OCC-529
POWERGRID_WR2
765KV-BINA-GWALIOR-2 D A/R OFF for Tower Strengthening works.Proposed by AM TL.
01-Apr-20 7:00 30-Apr-20 18:00
54PLANNED OCC-529
POWERGRID_WR2
765KV-BINA-GWALIOR-3 D A/R OFF for Tower Strengthening works.Proposed by AM TL.
01-Apr-20 7:00 30-Apr-20 18:00
55PLANNED OCC-529
POWERGRID_WR2
765KV-SEONI-BINA-1 D A/R OFF for Tower Strengthening works.Proposed by AM TL.
01-Apr-20 7:00 30-Apr-20 18:00
56PLANNED OCC-529
POWERGRID_WR2
765KV-BINA-INDORE-1 D A/R OFF for Tower Strengthening works.Proposed by AM TL.
01-Apr-20 7:00 30-Apr-20 18:00
57PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-SATNA-3 D A/R OFF for live line PID works. Proposed byAM TL.
01-Apr-20 7:00 30-Apr-20 18:00
58PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-SATNA-4 D A/R OFF for live line PID works. Proposed byAM TL.
01-Apr-20 7:00 30-Apr-20 18:00
59PLANNED OCC-529
POWERGRID_WR2
400KV-TARAPUR 3&4-PADGHE-1 D A/R OFF for live line OPGW Works by ULDC. 01-Apr-20 7:00 30-Apr-20 19:00
60PLANNED OCC-529
POWERGRID_WR2
400KV-TARAPUR 3&4-PADGHE-2 D A/R OFF for live line OPGW Works by ULDC. 01-Apr-20 7:00 30-Apr-20 19:00
61PLANNED OCC-529
POWERGRID_WR2
400KV-TARAPUR 3&4-BOISAR-1 D A/R OFF for live line OPGW Works by ULDC. 01-Apr-20 7:00 30-Apr-20 19:00
62PLANNED OCC-529
POWERGRID_WR2
400KV-TARAPUR 3&4-BOISAR-2 D A/R OFF for live line OPGW Works by ULDC. 01-Apr-20 7:00 30-Apr-20 19:00
63PLANNED OCC-529
POWERGRID_WR2
400KV-NAVSARI-DGEN-1 D A/R OFF for live line OPGW Works by ULDC. 01-Apr-20 7:00 30-Apr-20 19:00
64PLANNED OCC-529
POWERGRID_WR2
400KV-JABALPUR-PS-MB POWER-1 D A/R OFF for live line OPGW Works by ULDC. 01-Apr-20 7:00 30-Apr-20 19:00
65PLANNED OCC-529
POWERGRID_WR2
400KV-CGPL-JETPUR-1 D A/R OFF for live line OPGW Works by ULDC. 01-Apr-20 7:00 30-Apr-20 19:00
66PLANNED OCC-529
POWERGRID_WR2
765KV-SEONI-BINA-1 D A/R OFF for live line OPGW Works by ULDC. 01-Apr-20 7:00 30-Apr-20 19:00
67PLANNED OCC-529
POWERGRID_WR2
400KV-ESSAR-HAZARIA-GANDHAR-1 D A/R OFF for live line OPGW Works by ULDC. 01-Apr-20 7:00 30-Apr-20 19:00
68 PLANNED OCC-529 ACBIL 400KV-MCCPL-BILASPUR-1 D A/R Off for live line OPGW works 01-Apr-20 7:30 30-Apr-20 19:0069 PLANNED OCC-529 ACBIL 400KV-ACBIL-MCCPL-1 D A/R Off for live line OPGW works 01-Apr-20 7:30 30-Apr-20 19:0070 PLANNED OCC-529 ACBIL 400KV-ACBIL-BILASPUR-1 D A/R Off for live line OPGW works 01-Apr-20 7:30 30-Apr-20 19:0071
PLANNED OCC-529MSETCL 400KV-CHANDRAPU-II-NANDED-2 Daily For PID Work,Shifting of auto reclose switch
to non auto mode.01-Apr-20 08:00 30-Apr-20 17:00
72PLANNED OCC-529
MSETCL 400KV-CHANDRAPUR-GCR-PARLI-M-3 Daily For PID Work,Shifting of auto reclose switchto non auto mode.
01-Apr-20 08:00 30-Apr-20 17:00
73PLANNED OCC-529
MP_SLDC 400KV/220KV BHOPAL-MP-ICT-1 C Replacement of old Transformer with 315MVA new Transformer
MSETCL 400KV-KALWA-KHARGHAR-1 Daily PID Testing work for line Insulator strings atvarious locations. Auto-Reclose function to beout of service.
01-Apr-20 09:00 30-Apr-20 17:00
76PLANNED OCC-529
POWERGRID_WR1
765KV-WARDHA-RAIPUR-PS (DURG)-3 D Line AR to be keep in Non auto mode forinstallation of OPGW works.
01-Apr-20 9:00 30-Apr-20 18:00
77PLANNED OCC-529
POWERGRID_WR1
765KV-WARDHA-RAIPUR-PS (DURG)-4 D Line AR to be keep in Non auto mode forinstallation of OPGW works.
01-Apr-20 9:00 30-Apr-20 18:00
78PLANNED OCC-529
POWERGRID_WR2
AR2 BUSREACTOR AND RESPECTIVE BAY C RETRO FITMENT OF CIRCUIT BREAKERUNDER ADD CAP at vindhyachal S/S.
01-Apr-20 9:00 30-Apr-20 18:00
79PLANNED OCC-529
MSETCL 400KV-PARLI-M-LONIKHAND-II-1 Daily PID Testing work 01-Apr-20 10:00 30-Apr-20 18:00
80
PLANNED OCC-529
NRPC 765 KV ORAI-JABALPUR (PG) CKT-2 D For swapping of Rph Line reactor and tomake spare unit free at Jabalpur(P) end. andFor Replacement of porcelain insulator withPolymer insulator under Damoh Jurisdictionfrom loc: 411-440. A/R of ckt-1 to be kept off.Rewquested by WR2.
01-Apr-20 08:00 02-Apr-20 18:00
81PLANNED OCC-529
ERPC A/R OF 400KV Sundargarh-Raigarh Ckt#2&4
ODB For PID Testing of Porcelain Insulator. OnlyAuto reclose
01-Apr-20 08:00 15-Apr-20 18:00
82PLANNED OCC-529
ERPC 400KV Sundargarh-Raigarh Ckt #1&3 OCB Tower erection and stringing on diversionpart for OPGC MGR Railway
01-Apr-20 08:00 21-Apr-20 18:00
83PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-BINA-MP-BINA-2 ANDBINA - 400KV - BUS 1 at BINA - 400KV
D For AMP work. 01-Apr-20 9:15 01-Apr-20 18:00
84
PLANNED OCC-529
POWERGRID_WR1765KV-WARORA-PG-PARLI NEW-1 D For Replacing Drop Quad Jumpers to TwinJumpers for Line CVT & LA at New Parli &Line AMP works, 765KV-WARORA-PG-PARLINEW-2 AR to be keep in non auto mode forsafety precautions.Dia may be kept open forSS AMP works
02-Apr-20 9:00 02-Apr-20 18:00
85PLANNED OCC-529
POWERGRID_WR1
765KV/400KV PUNE-GIS-ICT-1 D For AMP works. 02-Apr-20 9:00 02-Apr-20 18:00
86PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV-SEONI-BINA-1 ANDFUTURE at SEONI - 765KV
D For AMP works 02-Apr-20 9:00 02-Apr-20 18:00
87
PLANNED OCC-529
POWERGRID_WR2
TIE BAY - INDORE - 765KV B/R 2 AND765KV-BHOPAL-INDORE-1 at INDORE -765KV
D AMP WORKS 02-Apr-20 9:00 02-Apr-20 18:00
88PLANNED OCC-529
POWERGRID_WR2
765KV-JABALPUR-ORAI-2 L/R@ JABALPUR -765KV
D For swapping of Line reactor and to makespare unit free at Jabalpur(P).
02-Apr-20 10:00 02-Apr-20 18:00
89
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-PUNE-GIS-PUNE-PG-3AND PUNE-PG - 400KV - BUS 2 at PUNE-PG -400KV
D For AMP works 02-Apr-20 9:00 02-Apr-20 18:00
90
PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV-JABALPUR-REWA-2 AND400KV/220KV REWA-ICT-3 at REWA - 400KV
C Checking of CB and timing for fine tuning ofCSD
02-Apr-20 10:00 03-Apr-20 18:00
91
PLANNED OCC-529
POWERGRID_WR2
765KV-JABALPUR-ORAI-2 D For swapping of Rph Line reactor and tomake spare unit free at Jabalpur(P) and ForReplacement of porcelain insulator with CLRPolymer insulator under Damoh Jurisdictionfrom loc: 411-440. A/R OFF of ckt-1 and diato be kept open at both ends
02-Apr-20 10:00 02-Apr-20 18:00
92PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 400KV-RAIGARH-RAIGARH-PS-2AND FUTURE at RAIGARH-PS - 400KV
NSPCL TIE BAY - 400KV-NSPCL-RAIPUR-1 AND400KV-NSPCL-RAIPUR-2 at NSPCL - 400KV
Daily SAS Upgradation 02-Apr-20 9:00 02-Apr-20 17:00
103
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 220KV-BOISAR-BOISAR-M-3AND BOISAR - 220KV - BUS 1 at BOISAR -220KV
D BAY AMP. Line will be in service throughTBC.
02-Apr-20 9:00 02-Apr-20 17:30
104PLANNED OCC-529
MSETCL 400KV-CHAKAN-PUNE-PG-1 Daily Half yearly testing and maintenanceactivities.
02-Apr-20 09:00 02-Apr-20 18:00
105
PLANNED OCC-529
POWERGRID_WR1
765KV-AURANGABAD-PUNE-GIS L/R@AURANGABAD - 765KV
D For LR CB AMP works & Line will be inservice without line reactor during thisperiod.
02-Apr-20 9:00 02-Apr-20 18:00
106
PLANNED OCC-529
POWERGRID_WR1
400KV-KORBA-NTPC-RAIPUR-4 D For APM works &400KV-KORBA-NTPC-RAIPUR-3 AR to be keep in non auto mode forsafety precautions.Dia may be kept open forSS AMP works
02-Apr-20 9:00 02-Apr-20 18:00
107
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 220KV-WARDHA-BADNERA-1AND WARDHA - 220KV - BUS 1 at Wardha -220KV
D For AMP Work 02-Apr-20 9:00 02-Apr-20 18:00
108PLANNED OCC-529
POWERGRID_WR1
765KV-Solapur-Raichur-2 L/R@ Solapur -765KV
D Reactor AMP works. 02-Apr-20 9:00 02-Apr-20 18:00
109
PLANNED OCC-529
POWERGRID_WR1
400KV-SIPAT-RANCHI-2 D For line AMP works & 400KV-SIPAT-RANCHI-1 AR to be keep in non auto mode for safetyprecautions.
02-Apr-20 9:00 02-Apr-20 18:00
110PLANNED OCC-529
POWERGRID_WR2
DEHGAM - 400KV - BUS 2 D AMP works 02-Apr-20 9:00 02-Apr-20 18:00
111PLANNED OCC-529
POWERGRID_WR2
220KV-VAPI-BHILOSA-DNH-1 C Bullet train Tower shifting work by Vapi TLM.Line shifting on ERS Tower.
02-Apr-20 9:00 02-Apr-20 18:00
112
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV/220KV BINA-ICT-1 ANDBINA - 400KV - BUS 2 at BINA - 400KV
D For AMP work. 02-Apr-20 9:15 02-Apr-20 18:00
113PLANNED OCC-529
POWERGRID_WR1
765KV/400KV RAIPUR-PS (DURG)-ICT-1 D B-PHASE MAIN TANK TOP - OIL LEAKAGEARREST WORK
02-Apr-20 10:00 02-Apr-20 12:00
114
PLANNED OCC-529
TPL-DGEN 400KV/22KV DGEN-GT-2 D Energization of the Transformer during RSDfor Station Aux Power and Routine.Transformer will remain in service.
02-Apr-20 10:00 02-Apr-20 15:00
115PLANNED OCC-529
POWERGRID_WR1
400KV-TARAPUR 3&4-PADGHE-2 D For AMP of Tarapur Padghe 2 Line CVT atMSETCL Padghe SS.
02-Apr-20 10:00 02-Apr-20 17:00
116PLANNED OCC-529
POWERGRID_WR2
220KV-GANDHAR-HALDARWA-2 D For Bay AMP works at GETCO haldarwa 02-Apr-20 10:00 02-Apr-20 18:00
WRTS-I Main Bay - 765KV-BILASPUR-DHARAMJAYGARH AND DHARAMJAYGARH -765KV - Bus 2
C For AMP Works 02-Apr-20 8:00 03-Apr-20 18:00
119PLANNED OCC-529
POWERGRID_WR1
A type Filter - Bipole 1 - Champa HVDC -HACQ31
C For AMP works. 02-Apr-20 9:00 03-Apr-20 18:00
120 PLANNED OCC-529 MP_SLDC 400KV/220KV BINA-MP-ICT-2 C For pre monsoon maintenance and testing work & isolator replacement/ alignment work02-Apr-20 8:00 04-Apr-20 17:00121
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-RAIGARH-PS-TAMNAR-2AND TAMNAR-PS - 765KV - BUS 2 atTAMNAR - 765KV
C Modification in 765 kV Siemens make CBguide valve arrangement and damperreplacement works
D Attending of Oil leakage in Y Ph PRD 03-Apr-20 9:00 03-Apr-20 17:30
123PLANNED OCC-529
POWERGRID_WR1
PARLI - 400KV - BUS 2 D For AMP works 03-Apr-20 9:00 03-Apr-20 18:00
124
PLANNED OCC-529
POWERGRID_WR1
765KV-WARORA-PG-PARLI NEW-2 D For Replacing Drop Quad Jumpers to TwinJumpers for Line CVT & LA at New Parli &Line AMP works, 765KV-WARORA-PG-PARLINEW-1 AR to be keep in non auto mode forsafety precautions.
03-Apr-20 9:00 03-Apr-20 18:00
125PLANNED OCC-529
POWERGRID_WR2
BANASKANTHA - 400KV - BUS 1 D 400kV Bay Construction work of VAV line 03-Apr-20 9:00 03-Apr-20 18:00
126
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 765KV-KHANDWA-INDORE-2AND INDORE - 765KV - BUS 1 at INDORE -765KV
D For taking CT Oil Sample of 716 Bay CT 03-Apr-20 11:00 03-Apr-20 13:00
127
PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 765KV - KHANDWA-INDORE -2AND 765KV-FUTURE BAY at INDORE -765KV
D For taking CT Oil Sample of 717 Bay CT 03-Apr-20 14:00 03-Apr-20 16:00
128
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV/220KV PUNE-PG-ICT-2AND PUNE-PG - 400KV - BUS 2 at PUNE-PG -400KV
D For AMP works & Replacement of Clamp &connectors
03-Apr-20 9:00 03-Apr-20 18:00
129
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV/400KV SEONI-ICT-3 ANDSEONI - 765KV - BUS 2 at SEONI - 765KV
C For AMP works 03-Apr-20 9:00 04-Apr-20 18:00
130
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-RAIGARH-RAIGARH-PS-2AND RAIGARH-PS - 400KV - BUS 4 atRAIGARH-PS - 400KV
D For AMP works. 03-Apr-20 6:00 03-Apr-20 14:00
131PLANNED OCC-529
GETCO VARSANA - 400 kV - BUS 1 Daily For 89A PG IsolatorFix contact replacementwork of Charanka line
NSPCL TIE BAY - 400KV/220KV NSPCL-ICT-1 AND400KV/220KV NSPCL-ICT-2 at NSPCL -400KV
Daily SAS Upgradation 03-Apr-20 9:00 03-Apr-20 17:00
142
PLANNED OCC-529
POWERGRID_WR2
BUS COUPLER BAY - BOISAR - 220KV - BUS1 AND BOISAR - 220KV - BUS 2 at BOISAR -220KV
D BAY AMP 03-Apr-20 9:00 03-Apr-20 17:30
143PLANNED OCC-529
MP_SLDC 400KV-Badnawar-PITHAMPUR-1 D For bay equipment maintenance and testingwork
03-Apr-20 9:00 03-Apr-20 18:00
144 PLANNED OCC-529 MP_SLDC 400KV-Damoh-KATNI-1 D For line maintenance work 03-Apr-20 9:00 03-Apr-20 18:00145
PLANNED OCC-529
POWERGRID_WR1
400KV-KORBA-NTPC-RAIPUR-3 D For APM works &400KV-KORBA-NTPC-RAIPUR-4 AR to be keep in non auto mode forsafety precautions.
03-Apr-20 9:00 03-Apr-20 18:00
146
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV-WARDHA-RAIPUR-PS(DURG)-4 AND 765KV-WARDHA-AURANGABAD-2 at Wardha - 765KV
D For AMP Work 03-Apr-20 9:00 03-Apr-20 18:00
147PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-PARLI-SOLAPUR-2 ANDPARLI - 400KV - BUS 2 at PARLI - 400KV
D For AMP works 03-Apr-20 9:00 03-Apr-20 18:00
148
PLANNED OCC-529
POWERGRID_WR1
Tie Bay - 400KV/220KV Solapur-ICT-3 AND400KV-Solapur-FUTURE-2 at Solapur -400KV
D For AMP works 03-Apr-20 9:00 03-Apr-20 18:00
149
PLANNED OCC-529
POWERGRID_WR1
400KV-KOLHAPUR GIS-MAPUSA-2 D For Line APM works & 400KV-KOLHAPURGIS-MAPUSA-1 AR to be keep in non automode for safety precautions.
03-Apr-20 9:00 03-Apr-20 18:00
150PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV-SOJA-DEHGAM-2 ANDFUTURE at DEHGAM - 400KV
D AMP works 03-Apr-20 9:00 03-Apr-20 18:00
151
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV/220KV INDORE-ICT-2AND INDORE - 220KV - BUS 1 at INDORE -220KV
D AMP WORKS. ICT will be in service throughTBC.
03-Apr-20 9:00 03-Apr-20 18:00
152
PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-JABALPUR-2 D AMP of line terminal equipment at Jabalpurand line AMP on opportunity. A/R OFF of ckt-1 and dia to be kept open at both ends. ByJabalpur.
03-Apr-20 9:00 03-Apr-20 18:00
153PLANNED OCC-529
POWERGRID_WR2
220KV-HOSHANGABAD-ITARSI-2 D For AMP of terminal equipments Works atItarsi. Line outage is required.
03-Apr-20 9:00 03-Apr-20 18:00
154
PLANNED OCC-529
POWERGRID_WR2
400KV-NAGDA-SHUJALPUR-2 D For fixing of Pilot insulator strings & lineAMP. A/R OFF of ckt-1 and dia to be keptopen at both ends. Proposed by AM TL.
D SELECTION OF SPARE REACTOR IN PLACEOF Y-PH FOR O-RING REPLACEMENTWORK, LINE OUTAGE REQUIRED DUE TONON SWITCHABLE LINE REACTOR AT DURGEND FOR 15 MIN EACH OPERATION.
03-Apr-20 10:00 03-Apr-20 12:00
156PLANNED OCC-529
POWERGRID_WR1
400KV-TARAPUR 3&4-PADGHE-1 D For AMP of Tarapur Padghe 1 Line CVT atMSETCL Padghe SS.
03-Apr-20 10:00 03-Apr-20 17:00
157PLANNED OCC-529
POWERGRID_WR2
400KV/220KV VADODARA-ICT-1 D CB & ICT AMP work. Dia will be open. 03-Apr-20 10:00 03-Apr-20 17:00
CGPL MAIN BAY - 400KV/26KV CGPL-GT-2 ANDCGPL - 400KV - BUS 1
D Breaker drive box painting 03-Apr-20 8:00 04-Apr-20 20:00
162PLANNED OCC-529
SLDC_CG 400KV-KIRNAPUR-BHILAI-1 Continous Replacement of Y-ph CVT with marshallingbox & Y&B-ph LA.
03-Apr-20 9:00 04-Apr-20 17:00
163
PLANNED OCC-529
POWERGRID_WR1
Main Bay - 765KV/400KV CHAMPA-ICT-1AND CHAMPA - 765KV - Bus 2 at CHAMPA -765KV
D For AMP works. 03-Apr-20 9:00 04-Apr-20 17:30
164
PLANNED OCC-529
POWERGRID_WR1
400KV-WARDHA-AKOLA-2 D for pilot string replacement & 400KV-WARDHA-AKOLA-1 AR to be keep in non automode for safety precautions.Dia may be keptopen for SS AMP works
03-Apr-20 9:00 04-Apr-20 18:00
165
PLANNED OCC-529
POWERGRID_WR2
400KV/220KV REWA-ICT-3 D FINE TUNING OF CSD. Dia to be kept openon both sides. ICT will be switched multipletimes to complete fine tuning works.
03-Apr-20 10:00 04-Apr-20 18:00
166PLANNED OCC-529
POWERGRID_WR2
220KV-VAPI-KHARADPADA-DNH-1 C Bullet train Tower shifting work by Vapi TLM. 03-Apr-20 9:00 12-Apr-20 18:00
POWERGRID_WR1765KV-Rajnandgaon-RRWTL-WARORA-PG-1 D For IPS replacement work at Warora end.Dia may be kept open for SS AMP works04-Apr-20 9:00 04-Apr-20 18:00
171
PLANNED OCC-529
GETCO SOJA - 400 kV - BUS 2 Daily Outage required for For taking outage of 50MVAR Reactor with out CSD Relay and PMMWork.
04-Apr-20 7:00 04-Apr-20 18:00
172
PLANNED OCC-529
GETCO SOJA - 400 kV -BUS COUPLER Daily Outage required for For taking outage of 50MVAR Reactor with out CSD Relay and PMMWork.
04-Apr-20 7:00 04-Apr-20 18:00
173PLANNED OCC-529
GETCO 50 MVAR Reactor 400 kV Soja Daily For taking DCRM , Tan delta test and PMMwork.
04-Apr-20 7:00 04-Apr-20 18:00
174
PLANNED OCC-529
POWERGRID_WR1
765KV-PUNE-GIS-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe Pune Line & 765KV-AURANGABAD-PADGHE-PG AR to be keep in non auto modefor safety precautions.Dia may be kept openfor SS AMP works
04-Apr-20 8:00 04-Apr-20 18:00
175PLANNED OCC-529
MSETCL JEJURI - 400KV - BUS 1 Daily Annual maintenance work & testing work. 04-Apr-20 09:00 04-Apr-20 18:00
176
PLANNED OCC-529
POWERGRID_WR1
765KV-SOLAPUR-PARLI NEW-1 D For Replacing Drop Quad Jumpers to TwinJumpers for Line CVT & LA at New Parli &Line AMP works, 765KV-SOLAPUR-PARLINEW-2 AR to be keep in non auto mode forsafety precautions.
04-Apr-20 9:00 04-Apr-20 18:00
177PLANNED OCC-529
POWERGRID_WR2
400KV/220KV KHANDWA-ICT-2 D AMP WORK. Dia to be kept open on bothsides.
04-Apr-20 9:00 04-Apr-20 18:00
178PLANNED OCC-529
POWERGRID_WR2
BANASKANTHA - 400KV - BUS 2 D 400kV Bay Construction work of VAV line 04-Apr-20 9:00 04-Apr-20 18:00
179
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-LONIKHAND-PUNE-PG-1AND PUNE-PG - 400KV - BUS 1 at PUNE-PG -400KV
NSPCL TIE BAY - 400KV/220KV NSPCL-ICT-1 AND400KV/220KV NSPCL-ICT-2 at NSPCL -400KV
Daily SAS Upgradation 04-Apr-20 9:00 04-Apr-20 17:00
189PLANNED OCC-529
MP_SLDC 400KV-Badnawar-PITHAMPUR-1 D For bay equipment maintenance and testingwork
04-Apr-20 9:00 04-Apr-20 18:00
190PLANNED OCC-529
POWERGRID_WR1
400KV-WARDHA-AURANGABAD-2 L/R@AURANGABAD - 400KV
D For AMP works. 04-Apr-20 9:00 04-Apr-20 18:00
191
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV-WARDHA-RAIPUR-PS(DURG)-3 AND 765KV-WARDHA-AURANGABAD-1 at Wardha - 765KV
D For AMP Work 04-Apr-20 9:00 04-Apr-20 18:00
192PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-PARLI-SOLAPUR-2 ANDPARLI - 400KV - BUS 2 at PARLI - 400KV
D For AMP works 04-Apr-20 9:00 04-Apr-20 18:00
193
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-RAIPUR-PS (DURG)-JHARSUGUDA-1 AND RAIPUR-PS (DURG) -765KV - BUS 1 at RAIPUR-PS (DURG)
D FOR AMP WORKS 04-Apr-20 9:00 04-Apr-20 18:00
194PLANNED OCC-529
POWERGRID_WR1
400KV-KORBA-NTPC-BHATAPARA-1 D For Line AMP works.Dia may be kept open forSS AMP works
04-Apr-20 9:00 04-Apr-20 18:00
195
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV/220KV INDORE-ICT-2AND INDORE - 220KV - BUS 1 at INDORE -220KV
D AMP WORKS. ICT will be in service throughTBC.
04-Apr-20 9:00 04-Apr-20 18:00
196PLANNED OCC-529
POWERGRID_WR2
400KV/220KV VADODARA-ICT-2 D CB & ICT AMP work. Dia will be open. 04-Apr-20 10:00 04-Apr-20 17:00
197PLANNED OCC-529
MSETCL 400KV-RGPPL-NAGOTHANE-2 Daily Cold washing, Routine maint. Work & Faultystring replacement Work
04-Apr-20 08:00 06-Apr-20 18:00
198
PLANNED OCC-529
MSETCL 400KV/220KV KARAD-ICT-1 Continuous Erection of New 400 KV PG isolator & relatedworks of Rapid Restoration Scheme underScheme
04-Apr-20 08:00 06-Apr-20 18:00
199
PLANNED OCC-529
POWERGRID_WR2
220KV-NAVSARI-NAVSARI-GETCO-1 C Simultaneous S/D for NHSRCL DiversionWork: Tower Erection & Stringing Work.Simultaneous outage of both 220kV Navsari-Navsari-1& 2 and 220kV Navsari-Talangore-Popada D/C is required.
04-Apr-20 6:00 12-Apr-20 18:00
200
PLANNED OCC-529
POWERGRID_WR2
220KV-NAVSARI-NAVSARI-GETCO-2 C Simultaneous S/D for NHSRCL DiversionWork: Tower Erection & Stringing Work.Simultaneous outage of both 220kV Navsari-Navsari-1& 2 and 220kV Navsari-Talangore-Popada D/C is required.
04-Apr-20 6:00 12-Apr-20 18:00
201
PLANNED OCC-529
POWERGRID_WR2
220KV-NAVSARI-TALANGPORE-POPADA-D/C C Simultaneous S/D for NHSRCL DiversionWork: Tower Erection & Stringing Work.Simultaneous outage of both 220kV Navsari-Navsari-1& 2 and 220kV Navsari-Talangore-Popada D/C is required.
04-Apr-20 6:00 12-Apr-20 18:00
202PLANNED OCC-529
POWERGRID_WR2
BHUJ - 765KV - BUS 1 D FOR JUMPER CONNECTION, TESTING &RTV COATING for Extension pkg
04-Apr-20 8:00 04-Apr-20 18:00
203
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 765KV/400KV GWALIOR-ICT-2AND GWALIOR - 765KV - BUS 2 at GWALIOR -765KV
D For LR CB AMP works & Line will be inservice without line reactor during thisperiod.
05-Apr-20 9:00 05-Apr-20 18:00
210PLANNED OCC-529
POWERGRID_WR1
WARORA-PG - 765KV - BUS 2 D AMP Work 05-Apr-20 9:00 05-Apr-20 18:00
211PLANNED OCC-529
POWERGRID_WR1
765KV/400KV PUNE-GIS-ICT-2 D For AMP works. 05-Apr-20 9:00 05-Apr-20 18:00
212PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV-BINA-MP-BINA-1 AND400KV/220KV ICT-1 - at BINA - 400KV
D For AMP work. 05-Apr-20 9:15 05-Apr-20 18:00
213 PLANNED OCC-529 MP_SLDC 220KV-ICT-1-at 220KV S/s Sukha-MP C For maintnance work. 05-Apr-20 9:00 06-Apr-20 17:00214
PLANNED OCC-529POWERGRID_WR2
400KV/220KV GWALIOR-ICT-2 D AMP Works. Dia to be kept open on bothsides.
05-Apr-20 8:00 05-Apr-20 17:30
215
PLANNED OCC-529
POWERGRID_WR1
765KV-AURANGABAD-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe-Aurangabad & 765KV-PUNE-GIS-PADGHE-PG AR to be keep in non auto modefor safety precautions.Dia may be kept openfor SS AMP works
05-Apr-20 8:00 05-Apr-20 18:00
216 PLANNED OCC-529 SSP 400KV/220KV SSP-ICT-2 Daily PREVENTIVE MAINTANENCE 05-Apr-20 8:00 05-Apr-20 18:00217 PLANNED OCC-529 MP_SLDC 220KV-GWALIOR-Malanpur-2 D For line maintenance work 05-Apr-20 9:00 05-Apr-20 17:00218
PLANNED OCC-529POWERGRID_WR2
BANASKANTHA - 400KV - BUS 2 D 400kV Bay Construction work of VAV line 05-Apr-20 9:00 05-Apr-20 18:00
219PLANNED OCC-529
POWERGRID_WR2
BINA - 765KV B/R 2 D For AMP work. Dia will be kept open. 05-Apr-20 9:15 05-Apr-20 18:00
220
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-KALWA-PUNE-PG-1 ANDPUNE-PG - 400KV - BUS 1 at PUNE-PG -400KV
POWERGRID_WR2GWALIOR-STATCOM - 32KV - BUS 1 STATCOM@GWALIOR-STATCOMD For Insulation coating on MV side and toattend interlock problem
05-Apr-20 8:00 10-Apr-20 17:30
226PLANNED OCC-529
POWERGRID_WR2
BHUJ - 220KV - BUS 1 D FOR JUMPER CONNECTION, TESTING &RTV COATING for Extension pkg
05-Apr-20 8:00 05-Apr-20 18:00
227
PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 765KV-GWALIOR-ORAI-1 AND765KV-BINA-GWALIOR-2 at GWALIOR -765KV
D AMP Works 05-Apr-20 8:00 05-Apr-20 17:30
228PLANNED OCC-529
POWERGRID_WR2
765KV-JABALPUR-BHOPAL-1 L/R@JABALPUR - 765KV
D To verify CSD setting as BR by onlineswitching operation testing
06-Apr-20 8:00 06-Apr-20 18:00
229PLANNED OCC-529
POWERGRID_WR2
BHUJ - 400KV - BUS 1 D FOR JUMPER CONNECTION, TESTING &RTV COATING for Extension pkg
06-Apr-20 8:00 06-Apr-20 18:00
230 PLANNED OCC-529 MP_SLDC 220KV-GWALIOR-Malanpur-1 D For line maintenance work 06-Apr-20 9:00 06-Apr-20 17:00
231
PLANNED OCC-529
POWERGRID_WR1
400KV-WARORA-PG-PARLI-1 D For Line AMP works & 400KV-WARORA-PG-PARLI-2 AR to be keep in non auto mode forsafety precautions.Dia may be kept open forSS AMP works
06-Apr-20 8:00 07-Apr-20 17:00
232
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 220KV-BOISAR-NALASOPARA-1AND BOISAR - 220KV - BUS 1 at BOISAR -220KV
D BAY AMP. Line will be in service throughTBC.
06-Apr-20 9:00 06-Apr-20 17:30
233
PLANNED OCC-529
POWERGRID_WR1
765KV-PUNE-GIS-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe Pune Line & 765KV-AURANGABAD-PADGHE-PG AR to be keep in non auto modefor safety precautions. Dia may be kept openfor SS AMP works
06-Apr-20 8:00 06-Apr-20 18:00
234
PLANNED OCC-529
WR-II/RENEWPOWER
220KV-BHUVAD-BACHAU-1 daily For 220KV D/C Line Maintenance 06-Apr-20 5:45 06-Apr-20 10:00
235
PLANNED OCC-529
WR-II/RENEWPOWER
220KV-BHUVAD-BACHAU-2 daily For 220KV D/C Line Maintenance 06-Apr-20 5:45 06-Apr-20 10:00
236
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-RAIGARH-RAIGARH-PS-1AND RAIGARH-PS - 400KV - BUS 2 atRAIGARH-PS - 400KV
D For AMP works. 06-Apr-20 6:00 06-Apr-20 14:00
237 PLANNED OCC-529 GETCO 400 kV-AMRELI-JETPUR-1 Daily For repairing of Bus-II Conductor 06-Apr-20 7:00 06-Apr-20 13:00238
PLANNED OCC-529GETCO 400 kV VADAVI-KANSARI Daily For Bay PMM & Condition monitoring work 06-Apr-20 7:00 06-Apr-20 18:00
239 PLANNED OCC-529 GETCO JETPUR - 400 kV - BUS 2 Daily For repairing of Bus-II Conductor 06-Apr-20 7:00 06-Apr-20 18:00240 PLANNED OCC-529 GETCO HADALA - 400 kV - Transfer bus Daily Isolator Maintanance Work 06-Apr-20 8:00 06-Apr-20 18:00241 PLANNED OCC-529 NSPCL NSPCL - 220KV - TRANSFER BUS 1 Daily SAS Upgradation 06-Apr-20 9:00 06-Apr-20 17:00242
PLANNED OCC-529GETCO 400 kV-ASOJ-KOSAMBA-1 Daily For Yearly PMM work & Testing. 06-Apr-20 9:00 06-Apr-20 18:00
243
PLANNED OCC-529
POWERGRID_WR1
400KV-AURANGABAD-M (WALUJ)-PUNE-GIS-1 LR @ WALUJ
D For AMP works. Line outage required forisolation of non switchable line reactor atWaluj end, take out/take in each operation15 min.
06-Apr-20 9:00 06-Apr-20 18:00
244
PLANNED OCC-529
POWERGRID_WR1
400KV-RAIGARH-RAIPUR-1 D Line AR to be keep in non auto mode forsafety precautions to rectify EARTHWIRE andCOPPER BOND DEFECTS.
06-Apr-20 9:00 06-Apr-20 18:00
245
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-RAIPUR-WARDHA-2 ANDWARDHA - 400KV - BUS 2 at Wardha -400KV
D For AMP Work 06-Apr-20 9:00 06-Apr-20 18:00
246PLANNED OCC-529
POWERGRID_WR1
PARLI - 220KV - BUS 1 D For AMP works 06-Apr-20 9:00 06-Apr-20 18:00
247
PLANNED OCC-529
POWERGRID_WR1
765KV-SOLAPUR-PARLI NEW-2 D For Replacing Drop Quad Jumpers to TwinJumpers for Line CVT & LA at New Parli &Line AMP works, 765KV-SOLAPUR-PARLINEW-1 AR to be keep in non auto mode forsafety precautions.
06-Apr-20 9:00 06-Apr-20 18:00
248
PLANNED OCC-529
POWERGRID_WR1
400KV-SIPAT-RAIPUR-1 D For line AMP works & 400KV-SIPAT-RAIPUR-2 AR to be keep in non auto mode for safetyprecautions.
06-Apr-20 9:00 06-Apr-20 18:00
249PLANNED OCC-529
POWERGRID_WR1
WARORA-PG - 765KV B/R 1 D AMP Work 06-Apr-20 9:00 06-Apr-20 18:00
250
PLANNED OCC-529
POWERGRID_WR1
400KV-PUNE-GIS-PARLI-1 D For AMP works, Dia to be open at Pune-GISend & 400KV-PARLI-PUNE-GIS-2 AR to bekeep in non auto mode for safetyprecautions.Dia may be kept open for SSAMP works
06-Apr-20 9:00 06-Apr-20 18:00
251PLANNED OCC-529
POWERGRID_WR2
765KV-BHUJ-BANASKANTHA-2 L/R@BANASKANTHA - 765KV
D To take Spare line reactor out of service atBanaskantha.
06-Apr-20 9:00 06-Apr-20 18:00
252PLANNED OCC-529
POWERGRID_WR2
765KV/400KV VADODARA-ICT-1 D Spare ICT changeover with R phase. Dia willbe open on both sides.
06-Apr-20 10:00 06-Apr-20 13:00
253 PLANNED OCC-529 MSETCL ALKUD - 400KV - BUS 1 Daily Quarterly Maint. Work 06-Apr-20 10:00 06-Apr-20 17:30254 PLANNED OCC-529 GETCO 400 kV-AMRELI-JETPUR-2 Daily For repairing of Bus-II Conductor 06-Apr-20 13:00 06-Apr-20 18:00255
PLANNED OCC-529
WRTS-I Main Bay - 400KV-PARLI-Solapur-2 ANDSolapur - 400KV - Bus 1 at Solapur - 400KV
D To change Bph CT bellow due to low oil level. 06-Apr-20 13:00 06-Apr-20 18:00
256
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - PUNE-PG - 400KV B/R 1 ANDPUNE-PG - 400KV - BUS 2 at PUNE-PG -400KV
D For AMP works & Replacement of Clamp &connectors
06-Apr-20 9:00 06-Apr-20 18:00
257PLANNED OCC-529
WRTS-I DHARAMJAYGARH-765KV-BUS 4 C Tmanar 1/2 Bay Extension ConstructionWorks - Bus 4 Extension
06-Apr-20 8:00 07-Apr-20 18:00
258
PLANNED OCC-529
POWERGRID_WR1
Main Bay - 765KV/400KV CHAMPA-ICT-3AND CHAMPA - 765KV - Bus 2 at CHAMPA -765KV
D For AMP works. 06-Apr-20 9:00 07-Apr-20 17:30
259
PLANNED OCC-529
POWERGRID_WR1
Tie Bay - 765KV/400KV BILASPUR-ICT-3AND 765KV-BILASPUR-DHARAMJAYGARH-1at BILASPUR - 765KV
765KV-AURANGABAD-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe-Aurangabad & 765KV-PUNE-GIS-PADGHE-PG AR to be keep in non auto modefor safety precautions.Dia may be kept openfor SS AMP works
07-Apr-20 8:00 07-Apr-20 18:00
276
PLANNED OCC-529
WRTS-I TIE BAY - 400KV-PARLI-SOLAPUR-1 AND400KV-ALKUD-SOLAPUR-1 at Solapur -400KV
D To change Bph CT bellow due to low oil level. 07-Apr-20 9:00 07-Apr-20 13:00
277PLANNED OCC-529
MSETCL 400KV-ALKUD-SOLAPUR-1 Daily Quarterly Maint. Work & Diagnostic TestingWork
07-Apr-20 10:00 07-Apr-20 17:30
278
PLANNED OCC-529
MSETCL MAIN BAY - 400KV-ALKUD-SOLAPUR-1 ANDALKUD - 400KV - BUS 1 at ALKUD - 400KV
Daily Quarterly Maint. Work & Diagnostic TestingWork
07-Apr-20 10:00 07-Apr-20 17:30
279
PLANNED OCC-529
MSETCL TIE BAY - 400KV-ALKUD-SOLAPUR-1 AND400KV/220KV ALKUD-ICT-2 at ALKUD -400KV
Daily Quarterly Maint. Work & Diagnostic TestingWork
07-Apr-20 10:00 07-Apr-20 17:30
280
PLANNED OCC-529
WR-II/RENEWPOWER
220KV-BHUVAD-BACHAU-1 daily For 220KV D/C Line Maintenance 07-Apr-20 5:45 07-Apr-20 10:00
281
PLANNED OCC-529
WR-II/RENEWPOWER
220KV-BHUVAD-BACHAU-2 daily For 220KV D/C Line Maintenance 07-Apr-20 5:45 07-Apr-20 10:00
282
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 400KV-RAIGARH-RAIGARH-PS-1AND 400KV-RAIGARH-PS-RKM-2 at RAIGARH-PS - 400KV
MAIN BAY - 400KV-CGPL-BACHAU-3 ANDBACHAU - 400KV - BUS 1 at BACHAU -400KV
D For CB Testing purpose 07-Apr-20 8:00 07-Apr-20 18:00
288 PLANNED OCC-529 MP_SLDC 220KV-GWALIOR-MAHALGAON-1 D For line maintenance work 07-Apr-20 9:00 07-Apr-20 17:00289
PLANNED OCC-529POWERGRID_WR2
TBC BAY - BOISAR - 220KV - BUS 1 ANDFUTURE at BOISAR - 220KV
D BAY AMP 07-Apr-20 9:00 07-Apr-20 17:30
290
PLANNED OCC-529
POWERGRID_WR1
400KV-RAIGARH-RAIPUR-2 D Line AR to be keep in non auto mode forsafety precautions to rectify EARTHWIRE andCOPPER BOND DEFECTS.
07-Apr-20 9:00 07-Apr-20 18:00
291PLANNED OCC-529
POWERGRID_WR1
PARLI - 220KV - BUS 2 D For AMP works 07-Apr-20 9:00 07-Apr-20 18:00
292PLANNED OCC-529
POWERGRID_WR1
765KV/400KV PARLI NEW-ICT-2 C For AMP works 07-Apr-20 9:00 07-Apr-20 18:00
293
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 220KV-DAMOH-DAMOH-MP-2AND DAMOH - 220KV - BUS 1 at Damoh -220KV
D For AMP works. Line will be in servicethrough TBC.
07-Apr-20 9:00 07-Apr-20 18:00
294PLANNED OCC-529
POWERGRID_WR2
220KV-DEHGAM-RANASAN-1 D AMP works in Line Terminal Equipments.Line outage is required.
07-Apr-20 9:00 07-Apr-20 18:00
295PLANNED OCC-529
POWERGRID_WR2
BANASKANTHA - 765KV - BUS 2 D For AMP Works 07-Apr-20 9:00 07-Apr-20 18:00
296PLANNED OCC-529
POWERGRID_WR2
400KV-NAVSARI-KAKRAPAR 3&4-1 D For bay AMP works at Navsari GIS SS 07-Apr-20 9:00 07-Apr-20 18:00
297 PLANNED OCC-529 BDTCL 765KV-VADODARA-DHULE-1 D For AMP works 07-Apr-20 9:30 07-Apr-20 17:30298
PLANNED OCC-529
TPL-DGEN 400KV-NAVSARI-DGEN-1 D Online SF6 Gas filling at remote end ( NavsariSS) for 400KV DGEN Navsari line 1 bay 409
07-Apr-20 10:00 07-Apr-20 15:00
299PLANNED OCC-529
MSETCL MAIN BAY - 400KV-KUDUS-FUTURE-1 ANDKUDUS - 400KV - BUS 2 at KUDUS - 400KV
Daily Maintenance of bays equipment &Diagnostics Testing Work
07-Apr-20 10:00 07-Apr-20 17:00
300
PLANNED OCC-529
TPL-DGEN 400KV-DGEN-VAGHODIYA-1 D testing and Change over of 400 kv busisolators.400 KV BUS-1 isolator closing and thenopening operation.400 KV BUS-2 isolator closing and thenopening operations.400 KV Line side isolatioe Closing and thenopening operation.
07-Apr-20 10:00 07-Apr-20 18:00
301
PLANNED OCC-529
TPL-DGEN 400KV-DGEN-VAGHODIYA-2 D testing and Change over of 400 kv busisolators.400 KV BUS-1 isolator closing and thenopening operation.400 KV BUS-2 isolator closing and thenopening operations.400 KV Line side isolatioe Closing and thenopening operation.
07-Apr-20 10:00 07-Apr-20 18:00
302
PLANNED OCC-529
TPL-DGEN 400KV-NAVSARI-DGEN-1 D testing and Change over of 400 kv busisolators.400 KV BUS-2 isolator closing and thenfinally 400 kv Bus-1 isolator OpeningOperation.
07-Apr-20 10:00 07-Apr-20 18:00
303
PLANNED OCC-529
TPL-DGEN 400KV-NAVSARI-DGEN-2 D testing and Change over of 400 kv busisolators.400 KV BUS-1 isolator closing and thenfinally 400 kv Bus-2 isolator OpeningOperation.
07-Apr-20 10:00 07-Apr-20 18:00
304
PLANNED OCC-529
TPL-DGEN DGEN - 400KV B/R 1 D testing and Change over of 400 kv busisolators.400 KV BUS-1 isolator closing and thenfinally 400 kv Bus-2 isolator OpeningOperation.
07-Apr-20 10:00 07-Apr-20 18:00
305
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV/220KV PUNE-PG-ICT-3AND PUNE-PG - 400KV - BUS 2 at PUNE-PG -400KV
D For AMP works & Replacement of Clamp &connectors
MSETCL 220KV-NASIK-NAVSARI-1 Daily For replacement of old disk insulator byporcelain long rod, Dignostictesting,broken/flash over string replacementfound during monkey patrolling,signatureanalysis,TLS fixing if issued.
MAIN BAY - 400KV-AKOLA-AURANGABAD-2AND AKOLA - 400KV - BUS 1 at Akola -400KV
C For Replacement of BHEL CB with GE CB. 07-Apr-20 9:00 12-Apr-20 18:00
315 PLANNED OCC-529 ERPC 765KV Raipur ckt-2 along with its LR ODB Isolator allignment ,Relay Testing & AMP 07-Apr-20 9:00 07-Apr-20 18:00316
PLANNED OCC-529POWERGRID_WR2
400KV/220KV ITARSI-ICT-2 D AMP Works. Dia to be kept open on bothsides.
08-Apr-20 9:00 08-Apr-20 18:00
317
PLANNED OCC-529
POWERGRID_WR1
400KV-WARORA-PG-PARLI-2 D For Line AMP works & 400KV-WARORA-PG-PARLI-1 AR to be keep in non auto mode forsafety precautions.Dia may be kept open forSS AMP works
GETCO 400 kV-KASOR-CHORANIA-1 Daily Line Maintenance work 08-Apr-20 8:00 08-Apr-20 18:00
320
PLANNED OCC-529
POWERGRID_WR1
765KV-PUNE-GIS-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe Pune Line & 765KV-AURANGABAD-PADGHE-PG AR to be keep in non auto modefor safety precautions.
08-Apr-20 8:00 08-Apr-20 18:00
321PLANNED OCC-529
POWERGRID_WR2
BHUJ - 220KV - BUS 2 D FOR JUMPER CONNECTION, TESTING &RTV COATING for Extension pkg
MAIN BAY - 400KV/220KV PUNE-PG-ICT-1AND PUNE-PG - 220KV - BUS 1 at PUNE-PG -220KV
D For AMP works & Replacement of Clamp &connectors
08-Apr-20 9:00 08-Apr-20 18:00
351PLANNED OCC-529
WRTS-I DHARAMJAYGARH-765KV-BUS 3 C Tmanar 1/2 Bay Extension ConstructionWorks - Bus 3 Extension
08-Apr-20 8:00 09-Apr-20 18:00
352
PLANNED OCC-529
POWERGRID_WR2
765KV/400KV BHUJ-ICT-1 D FOR CSD FINE TUNNING. Dia to be keptopen on both sides and ICT will be switchedmultiple times to complete CSD fine tuningworks.
08-Apr-20 8:00 09-Apr-20 18:00
353
PLANNED OCC-529
POWERGRID_WR1
Tie Bay - 765KV-RAIGARH-PS-CHAMPA-1AND 765KV/400KV CHAMPA-ICT-5 atCHAMPA - 765KV
D For AMP works. 08-Apr-20 9:00 09-Apr-20 17:30
354PLANNED OCC-529
MP_SLDC 400KV-Mainbus-1-at 400KV S/s Indore C For 400KV Main Bus-I maintainance work 08-Apr-20 9:00 09-Apr-20 18:00
355PLANNED OCC-529
POWERGRID_WR1
Tie Bay - 765KV/400KV BILASPUR-ICT-2AND FUTURE at BILASPUR - 765KV
C For attending CB SF6 gas Leakage 08-Apr-20 9:00 09-Apr-20 18:00
356PLANNED OCC-529
POWERGRID_WR1
400KV-SIPAT-RAIPUR-3 D For Line AMP works.Dia may be kept open forSS AMP works
08-Apr-20 9:00 09-Apr-20 18:00
357
PLANNED OCC-529
NTPC 400KV-SOLAPUR-SOLAPUR-NTPC-1 C Preventative Maintenance availing by NTPC.Opportunity outage code to be issued toPOWERGRID_WR1 along with 400KV-SOLAPUR-SOLAPUR-NTPC-2 AR to be keep innon auto mode for safety precautions.
08-Apr-20 9:00 09-Apr-20 18:00
358 PLANNED OCC-529 RUMS RAMNAGAR PAHAD - 220KV - TRANSFER BUS 1C Scheduled maintenance 08-Apr-20 18:00 09-Apr-20 5:00359
PLANNED OCC-529POWERGRID_WR2
MAIN BAY - 400KV/220KV VAPI-ICT-2 ANDVAPI - 400KV - BUS 2 at VAPI - 400KV
C CB pole overhauling for SF6 gas leakageattending work
09-Apr-20 9:00 10-Apr-20 18:00
360
PLANNED OCC-529
POWERGRID_WR2
400KV-BHOPAL-MP-DAMOH-1 D For AMP works of terminal equipments andline reactor at MPPTCL bhopal end by Itarsiand line AMP on opportunity. A/R OFF of ckt-2 and dia to be kept open at both ends.
09-Apr-20 9:00 09-Apr-20 18:00
361PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-BHOPAL-MP-DAMOH-1AND BHOPAL-MP - 400KV - BUS 2
D For rectification of B-ph isolator towards busside at MPPTCL Bhopal S/S by Itarsi.
PLANNED OCC-529GETCO 400 kV-MANSAR-CHORANIA Daily BAY cold line water washing work and relay
testing work at Mansar end.09-Apr-20 8:00 09-Apr-20 18:00
364
PLANNED OCC-529
POWERGRID_WR1
765KV-AURANGABAD-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe-Aurangabad & 765KV-PUNE-GIS-PADGHE-PG AR to be keep in non auto modefor safety precautions.
09-Apr-20 8:00 09-Apr-20 18:00
365
PLANNED OCC-529
POWERGRID_WR1
Main Bay - 765KV-WARORA-PG-PARLI NEW-1 AND WARORA-PG - 765KV - Bus 2 at PARLINEW - 765KV
D AMP Work 09-Apr-20 9:00 09-Apr-20 18:00
366PLANNED OCC-529
POWERGRID_WR2
400KV-NAVSARI-KAKRAPAR 3&4-2 D For bay AMP works at Navsari GIS SS 09-Apr-20 9:00 09-Apr-20 18:00
367 PLANNED OCC-529 MP_SLDC 220KV-ICT-2-at 220KV S/s Sukha-MP C For maintnance work. 09-Apr-20 9:00 10-Apr-20 17:00368
PLANNED OCC-529
WR-II/RENEWPOWER
220KV-BHUVAD-BACHAU-1 daily For 220KV D/C Line Maintenance 09-Apr-20 5:45 09-Apr-20 10:00
369
PLANNED OCC-529
WR-II/RENEWPOWER
220KV-BHUVAD-BACHAU-2 daily For 220KV D/C Line Maintenance 09-Apr-20 5:45 09-Apr-20 10:00
370
PLANNED OCC-529
POWERGRID_WR1MAIN BAY - 400KV-RAIGARH-PS-ATHENA-2AND RAIGARH-PS - 400KV - BUS 3 atRAIGARH-PS - 400KV
400KV-SATNA-BINA-1 D For replacement of procelain insulator stringswith polymer CLR insulators. A/R OFF of ckt-2 and dia to be kept open at both ends.Proposed by AM TL.
10-Apr-20 9:00 11-Apr-20 18:00
393PLANNED OCC-529
POWERGRID_WR1
765KV/400KV WARORA-PG-ICT-1 D AMP Work 10-Apr-20 9:00 10-Apr-20 18:00
394
PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 765KV/400KV INDORE-ICT-2 AND765KV-BINA-INDORE-1 at INDORE - 765KV
D AMP WORKS 10-Apr-20 9:00 10-Apr-20 18:00
395PLANNED OCC-529
POWERGRID_WR2
JABALPUR - 765KV - BUS 2 D AMP WORK 10-Apr-20 10:00 10-Apr-20 18:00
396
PLANNED OCC-529
SASAN_UMPP(SPL)
MAIN BAY - 765KV/400KV SASAN-ICT-2 ANDSASAN - 765KV - BUS 4 at SASAN - 765KV
CONTINUOUS
ANNUAL MAINTENANCE 10-Apr-20 9:00 12-Apr-20 21:00
397
PLANNED OCC-529
SASAN_UMPP(SPL)
TIE BAY - 765KV/22KV SASAN-GT-6 AND765KV/400KV SASAN-ICT-2 at SASAN -765KV
CONTINUOUS
ANNUAL MAINTENANCE 10-Apr-20 9:00 12-Apr-20 21:00
398
PLANNED OCC-529
SASAN_UMPP(SPL)
MAIN BAY - 765KV/400KV SASAN-ICT-2 ANDSASAN - 400KV - BUS 2 at SASAN - 400KV
CONTINUOUS
ANNUAL MAINTENANCE 10-Apr-20 9:00 12-Apr-20 21:00
399
PLANNED OCC-529
SASAN_UMPP(SPL)
TIE BAY - 765KV/400KV SASAN-ICT-1 AND765KV/400KV SASAN-ICT-2 at SASAN -400KV
CONTINUOUS
ANNUAL MAINTENANCE 10-Apr-20 9:00 12-Apr-20 21:00
400PLANNED OCC-529
POWERGRID_WR2
220KV-DEHGAM-RANASAN-2 D AMP works in Line Terminal Equipments.Line outage is required.
10-Apr-20 9:00 10-Apr-20 18:00
401
PLANNED OCC-529
POWERGRID_WR2
400KV-BHOPAL-MP-DAMOH-2 D For AMP works of terminal equipments andline reactor at MPPTCL bhopal end by Itarsiand line AMP on opportunity. A/R OFF of ckt-1 and dia to be kept open at both ends.
10-Apr-20 9:00 10-Apr-20 18:00
402
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 765KV SATNA VINDHYACHAL-1AND SATNA - 765KV - BUS 1 at SATNA -765KV
765KV-PUNE-GIS-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe Pune Line & 765KV-AURANGABAD-PADGHE-PG AR to be keep in non auto modefor safety precautions.
10-Apr-20 8:00 10-Apr-20 18:00
405 PLANNED OCC-529 MP_SLDC 220KV-GWALIOR-MAHALGAON-2 D For line maintenance work 10-Apr-20 9:00 10-Apr-20 17:00406 PLANNED OCC-529 DD 220KV-MAGARWADA-MAGARWADA-DD-1 C Relay Testing Work 10-Apr-20 9:00 10-Apr-20 17:00407
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV/400KV PARLI NEW-ICT-1AND PARLI NEW - 765KV B/R 1 at PARLINEW - 765KV
C For AMP works 10-Apr-20 9:00 10-Apr-20 18:00
408PLANNED OCC-529
GETCO 220 kV-VYANKATPURA-VADODARA-2 Daily DCRM of Breaker & CT/CVT Tan deltatesting at Vpura end.
765KV/400KV BHUJ-ICT-2 D FOR CSD FINE TUNNING. Dia to be keptopen on both sides and ICT will be switchedmultiple times to complete CSD fine tuningworks.
D AMP WORK of reactor 11-Apr-20 10:00 11-Apr-20 18:00
430
PLANNED OCC-529
POWERGRID_WR2
765KV-VINDHYACHAL(PS)-JABALPUR-1 D AMP WORK of reactor at Jabalpur(P) andline AMP on opportunity. A/R OFF of ckt-2and dia to be kept open at both ends.
11-Apr-20 10:00 11-Apr-20 18:00
431PLANNED OCC-529
POWERGRID_WR2
765KV-INDORE-KHANDWA-1 D Integration of Spare Reactor. Dia to be keptopen.
11-Apr-20 9:00 12-Apr-20 18:00
432PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV/220KV VAPI-ICT-1 ANDVAPI - 400KV - BUS 2 at VAPI - 400KV
C CB pole overhauling for SF6 gas leakageattending work
11-Apr-20 9:00 12-Apr-20 18:00
433
PLANNED OCC-529
POWERGRID_WR1
765KV-AURANGABAD-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe-Aurangabad & 765KV-PUNE-GIS-PADGHE-PG AR to be keep in non auto modefor safety precautions.
NRPC 765 KV ORAI-SATNA (PG) CKT-1 D AMP of Main Bay and Tie Bay at OraiSubstation.
11-Apr-20 08:00 11-Apr-20 18:00
453PLANNED OCC-529
POWERGRID_WR1
WARDHA - 765KV - BUS 2 D For AMP work. 12-Apr-20 9:00 12-Apr-20 18:00
454 PLANNED OCC-529 DD 220KV-VAPI-MAGARWADA-1 C Relay Testing Work 12-Apr-20 9:00 12-Apr-20 17:00455
PLANNED OCC-529POWERGRID_WR2
765KV-BHUJ-BANASKANTHA-1 L/R@BANASKANTHA - 765KV
D For Switching with spare line reactor 12-Apr-20 9:00 12-Apr-20 18:00
456PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV-SATNA-BINA-3 AND BINA -400KV SHUJALPUR-1 at BINA - 400KV
D For AMP work. 12-Apr-20 9:15 12-Apr-20 18:00
457
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 765KV-DHARAMJAYGARH-JABALPUR-3 AND JABALPUR - 765KV - BUS2 at JABALPUR - 765KV
D AMP WORK 12-Apr-20 10:00 12-Apr-20 18:00
458
PLANNED OCC-529
POWERGRID_WR2
765KV-SASAN-SATNA-2 C For Power line crossing works of 765kVVindhyachal-Varanasi line by VindhyachalTLC -Vindhyanagar.
12-Apr-20 8:00 13-Apr-20 18:00
459
PLANNED OCC-529
POWERGRID_WR1
765KV-PUNE-GIS-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe Pune Line & 765KV-AURANGABAD-PADGHE-PG AR to be keep in non auto modefor safety precautions.
12-Apr-20 8:00 12-Apr-20 18:00
460PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV-BHUJ-CGPL-1 ANDFUTURE at Bhuj - 400KV
765KV-AURANGABAD-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe-Aurangabad & 765KV-PUNE-GIS-PADGHE-PG AR to be keep in non auto modefor safety precautions.
13-Apr-20 8:00 13-Apr-20 18:00
472
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-RAIGARH-PS-ATHENA-1AND RAIGARH-PS - 400KV - BUS 3 atRAIGARH-PS - 400KV
D For AMP works. 13-Apr-20 6:00 13-Apr-20 14:00
473PLANNED OCC-529
POWERGRID_WR2
400KV-GWALIOR-MORENA-1 D AMP Works. Dia to be kept open. 13-Apr-20 8:00 13-Apr-20 17:30
474
PLANNED OCC-529
POWERGRID_WR2
VARSANA - 400KV - BUS 1 D For RTV Coating work @ Varsana. Outage of400KV-BACHAU-VARSANA-1 is also required.By Bhachau.
MAIN BAY - 220KV-BHILAD-VAPI-2 AND VAPI- 220KV - BUS 1 at VAPI - 220KV
D CB Timing testing. Line will be in servicethrough TBC.
13-Apr-20 9:00 13-Apr-20 17:00
477
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV/220KV BOISAR-ICT-2AND BOISAR - 220KV - BUS 1 at BOISAR -220KV
D BAY AMP. ICT will be in service through TBC. 13-Apr-20 9:00 13-Apr-20 17:30
478PLANNED OCC-529
POWERGRID_WR1
AURANGABAD - 400KV B/R 1 D For AMP works. 13-Apr-20 9:00 13-Apr-20 18:00
479
PLANNED OCC-529
POWERGRID_WR1
Main Bay - 400KV-ESSAR MAHAN-BILASPUR-1 AND BILASPUR - 400KV - Bus 2 atBILASPUR - 400KV
D For AMP works. 13-Apr-20 9:00 13-Apr-20 18:00
480PLANNED OCC-529
POWERGRID_WR1
WARDHA - 220KV - BUS 1 D For AMP Work 13-Apr-20 9:00 13-Apr-20 18:00
481
PLANNED OCC-529
POWERGRID_WR1MAIN BAY - 765KV/400KV PARLI NEW-ICT-1AND PARLI NEW - 765KV - BUS 1 at PARLINEW - 765KV
C For AMP works 13-Apr-20 9:00 13-Apr-20 18:00
482
PLANNED OCC-529
WRTS-I 400KV-BHADRAWATI-PARLI-1 D Replacement of BHEL make pilot insulators.AR to be kept in non Auto mode for ckt BVT-Dhariwal and Dhariwal Parli
13-Apr-20 9:00 13-Apr-20 18:00
483PLANNED OCC-529
POWERGRID_WR2
400KV/220KV DAMOH-ICT-1 D For AMP works. Dia to be kept open on bothsides.
13-Apr-20 9:00 13-Apr-20 18:00
484
PLANNED OCC-529
POWERGRID_WR2
400KV-SOJA-DEHGAM-1 D AMP works in Line Terminal Equipments.Line outage is required. Dia to be kept open.
13-Apr-20 9:00 13-Apr-20 18:00
485PLANNED OCC-529
POWERGRID_WR2
BANASKANTHA - 400KV - BUS 2 D 400kV Bay Construction work of VAV line 13-Apr-20 9:00 13-Apr-20 18:00
486
PLANNED OCC-529
WRTS-I 765KV-DHARAMJAYGARH-Jharsuguda-1 D Tmanar 1/2 Bay Extension ConstructionWorks - Feeder Gantry Erection & 765KV-DHARAMJAYGARH-Jharsuguda-2 AR to bekeep in non auto mode for safety precautions.
13-Apr-20 9:00 13-Apr-20 19:00
487PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-SATNA-BINA-1 AND BINA -400KV - BUS 1 at BINA - 400KV
D For AMP work. 13-Apr-20 9:15 13-Apr-20 18:00
488
PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 765KV-JABALPUR-GADARWARA-1AND 765KV-BINA-JABALPUR-3 at JABALPUR- 765KV
D AMP WORK 13-Apr-20 10:00 13-Apr-20 18:00
489PLANNED OCC-529
POWERGRID_WR1
TBC BAY - PUNE-PG - 220KV - BUS 1 ANDFUTURE at PUNE-PG - 220KV
D For AMP works & Replacement of Clamp &connectors
13-Apr-20 9:00 13-Apr-20 18:00
490
PLANNED OCC-529
POWERGRID_WR2
400KV/220KV BHUJ-ICT-4 D FOR CSD FINE TUNNING. Dia to be keptopen on both sides and ICT will be switchedmultiple times to complete CSD fine tuningworks.
13-Apr-20 8:00 14-Apr-20 18:00
491
PLANNED OCC-529
POWERGRID_WR1
Main Bay - 765KV/400KV CHAMPA-ICT-5AND CHAMPA - 765KV - Bus 2 at CHAMPA -765KV
D For AMP works. 13-Apr-20 9:00 14-Apr-20 17:30
492
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV/400KV SEONI-ICT-3 AND765KV-BILASPUR-SEONI-2 at SEONI -765KV
C For AMP works 13-Apr-20 9:00 14-Apr-20 18:00
493
PLANNED OCC-529
POWERGRID_WR1
Main Bay - 765KV/400KV Solapur-ICT-1 ANDSolapur - 765KV - Bus 2 at Solapur - 400KV
C 765kV Siemens make CB Guiding valvereplacement works.
13-Apr-20 7:00 15-Apr-20 18:00
494
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-RAIGARH-PS-TAMNAR-1AND TAMNAR - 765KV - BUS 2 at TAMNAR -765KV
C Modification in 765 kV Siemens make CBguide valve arrangement and damperreplacement works
400KV-BACHAU-VARSANA-1 D For RTV Coating work @ Varsana, Relayretrofitment work at both ends andreplacemnt of IGR of Pilot String & Tensionstring of Main Bus & Jack Bus at Bhachauend. 400KV BUS-1&2 at Varsana is alsorequired on 13& 14/04/2020 and 400KVBUS-1&2 at Bhachau is also required on 15& 16/04/2020. A/R OFF of ckt-2 and dia tobe kept open at both ends.
13-Apr-20 8:00 16-Apr-20 18:00
497
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-AURANGABAD-M(WALUJ)-AURANGABAD-1 ANDAURANGABAD-M (WALUJ) - 400KV - BUS 1at Aurangabad-M (Waluj) - 400KV
C For replacement of old BHEL CB with new GECB & Line shall be shifted on to TBC duringthe period
13-Apr-20 9:00 18-Apr-20 18:00
498PLANNED OCC-529
POWERGRID_WR2
220KV-KAKRAPAR 1&2-VAPI-1 C Bullet train Tower shifting work by Vapi TLM. 13-Apr-20 8:00 21-Apr-20 18:00
499PLANNED OCC-529
POWERGRID_WR2
220KV-KAKRAPAR 1&2-VAPI-2 C Bullet train Tower shifting work by Vapi TLM. 13-Apr-20 8:00 21-Apr-20 18:00
500PLANNED OCC-529
MSETCL TBC @ KORADI-1 Continuous CB pole and mechanism Overhauling &testing
13-Apr-20 08:00 26-Apr-20 18:00
501
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 765KV-GWALIOR-AGRA-2 ANDGWALIOR - 765KV - BUS 1 at GWALIOR -765KV
TIE BAY - 400KV-WARDHA-AKOLA-2 ANDWARDHA - 400KV B/R 1 at Wardha - 400KV
D For AMP Work 14-Apr-20 9:00 14-Apr-20 18:00
505
PLANNED OCC-529
POWERGRID_WR1
765KV-PUNE-GIS-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe Pune Line & 765KV-AURANGABAD-PADGHE-PG AR to be keep in non auto modefor safety precautions.
14-Apr-20 8:00 14-Apr-20 18:00
506 PLANNED OCC-529 MP_SLDC 220KV-Sabalgarh-Morena D For line maintenance work 14-Apr-20 9:00 14-Apr-20 17:00507
PLANNED OCC-529
POWERGRID_WR1
Main Bay - 765KV-GADARWARA-WARORA-PG-2 AND WARORA-PG - 765KV - Bus 1 atPARLI NEW - 765KV
D Relay testing work 14-Apr-20 9:00 14-Apr-20 18:00
508
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 400KV-DB POWER-RAIGARH-PS-2AND 400KV-RAIGARH-PS-ATHENA-1 atRAIGARH-PS - 400KV
D For AMP works. 14-Apr-20 6:00 14-Apr-20 14:00
509PLANNED OCC-529
POWERGRID_WR2
400KV-GWALIOR-MORENA-2 D AMP Works. Dia to be kept open. 14-Apr-20 8:00 14-Apr-20 17:30
510 PLANNED OCC-529 WRTS-I 765KV-DHARAMJAYGARH-RANCHI-2 D AMP works Line 14-Apr-20 8:00 14-Apr-20 18:00511
PLANNED OCC-529
POWERGRID_WR2
VARSANA - 400KV - BUS 2 D For RTV Coating work @ Varsana. Outage of400KV-BACHAU-VARSANA-1 is also required.By Bhachau.
14-Apr-20 8:00 14-Apr-20 18:00
512
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-WARDHA-AURANGABAD-2 AND AURANGABAD - 765KV - BUS 2 atAURANGABAD - 765KV
D For AMP works. 14-Apr-20 9:00 14-Apr-20 18:00
513
PLANNED OCC-529
WRTS-I 400kV DHARIWAL TPP-PARLI II D Replacement of BHEL make pilot insulators.AR to be kept in non Auto mode for BVT-Parli-I
14-Apr-20 9:00 14-Apr-20 18:00
514
PLANNED OCC-529
POWERGRID_WR2
400KV-DEHGAM-WANAKBORI-1 D AMP works in Line Terminal Equipments.Line outage is required. Dia to be kept open.
14-Apr-20 9:00 14-Apr-20 18:00
515PLANNED OCC-529
POWERGRID_WR2
BANASKANTHA - 400KV - BUS 2 D 400kV Bay Construction work of VAV line 14-Apr-20 9:00 14-Apr-20 18:00
516
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 765KV-JABALPUR-GADARWARA-1 AND JABALPUR - 765KV - BUS 2 atJABALPUR - 765KV
D AMP WORK 14-Apr-20 10:00 14-Apr-20 18:00
517
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 220KV-TALEGAON-PUNE-PG-2AND PUNE-PG - 220KV - BUS 1 at PUNE-PG -220KV
D For AMP works & Replacement of Clamp &connectors
14-Apr-20 9:00 14-Apr-20 18:00
518
PLANNED OCC-529
POWERGRID_WR2
220KV-KAWAS-VAV-1 D For NHSRCL Diversion Work: Tower Erectionand Bus Isolator replacement work in KawasVav #1 bay, Bay AMP works at GETCO vavend
MAIN BAY - 400KV-SATNA-VINDHYACHAL-4AND SATNA - 400KV - BUS 2 at SATNA -400KV
D AMP work 15-Apr-20 9:00 15-Apr-20 18:00
529PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-VAPI-BOISAR-1 AND VAPI- 400KV - BUS 1 at VAPI - 400KV
C CB pole overhauling for SF6 gas leakageattending work
15-Apr-20 8:30 16-Apr-20 18:00
530
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-AKOLA-AURANGABAD-1AND AKOLA - 400KV - BUS 1 at Akola -400KV
C For Replacement of BHEL CB with GE CB. 15-Apr-20 9:00 19-Apr-20 18:00
531
PLANNED OCC-529
POWERGRID_WR1
765KV-AURANGABAD-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe-Aurangabad & 765KV-PUNE-GIS-PADGHE-PG AR to be keep in non auto modefor safety precautions.
15-Apr-20 8:00 15-Apr-20 18:00
532PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV-WARORA-PG-PARLI NEW-2AND FUTURE at PARLI NEW - 765KV
GETCO 400 kV Veloda-Zerda Line Daily FOR CT TAN DELTA WORK 15-Apr-20 8:00 15-Apr-20 17:00
535
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV/400KV RAIGARH-PS-ICT-1AND 400KV-DB POWER-RAIGARH-PS-1 atRAIGARH-PS - 400KV
D For AMP works. 15-Apr-20 6:00 15-Apr-20 14:00
536PLANNED OCC-529
MSETCL Main Bay (428) of 400 KV Warora Ckt-I @Chandrapur - 2
Daily Diagnostic Testing Work 15-Apr-20 06:00 15-Apr-20 14:00
537PLANNED OCC-529
MSETCL 400KV-RGPPL-NAGOTHANE-1 Daily Emergency tree cutting work 15-Apr-20 08:00 15-Apr-20 17:00
538
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-GWALIOR-MORENA-2AND GWALIOR - 400KV - BUS 2 at GWALIOR -400KV
D AMP Works 15-Apr-20 8:00 15-Apr-20 17:30
539 PLANNED OCC-529 MP_SLDC 220KV-BHANPURA-Ranpur-1 D For line maintenance work 15-Apr-20 8:00 15-Apr-20 18:00540 PLANNED OCC-529 MP_SLDC 220KV-INDORE-INDORE-MP-1 D For line maintenance work 15-Apr-20 8:00 15-Apr-20 18:00541
PLANNED OCC-529WRTS-I 765KV/400KV DHARAMJAYGARH-ICT-1 D Spare ICT Rotation works 15-Apr-20 8:00 15-Apr-20 18:00
542
PLANNED OCC-529
POWERGRID_WR2
BACHAU - 400KV - BUS 1 D For replacemnt of IGR of Pilot String &Tension string of Main Bus & Jack Bus atBhachau end. Outage of 400KV-BACHAU-VARSANA-1 and 400KV-VADINAR-BACHAU-2is also required.
15-Apr-20 8:00 15-Apr-20 18:00
543
PLANNED OCC-529
MSETCL TIE BAY - 400KV-WARDHA-WARORA-1 ANDFUTURE at WARORA - 400KV
Daily Routine maintainance and DCRM/CRM/CBTimings Testing works and isolatermaintainance work .
15-Apr-20 09:00 15-Apr-20 17:00
544 PLANNED OCC-529 MP_SLDC 400KV-Bhopal-MP-Itarsi-1 D For line maintenance work 15-Apr-20 9:00 15-Apr-20 17:00545 PLANNED OCC-529 MP_SLDC 220KV-Malanpur-Auriya-1 D For line maintenance work 15-Apr-20 9:00 15-Apr-20 17:00546
PLANNED OCC-529POWERGRID_WR2
TBC BAY - VAPI - 220KV - BUS 1 ANDFUTURE at VAPI - 220KV
D AMP Works 15-Apr-20 9:00 15-Apr-20 17:00
547PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV-MAGARWADA-BOISAR-2AND FUTURE at BOISAR - 400KV
D BAY AMP 15-Apr-20 9:00 15-Apr-20 17:30
548
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 400KV-BHADRAWATI-RAIPUR-1AND BHADRAWATI - 400KV B/R 2 atBHADRAWATI - 400KV
D For AMP works. 15-Apr-20 9:00 15-Apr-20 18:00
549
PLANNED OCC-529
POWERGRID_WR1
Main Bay - 400KV-ACBIL-BILASPUR-1 ANDBILASPUR - 400KV - Bus 1 at BILASPUR -400KV
D For AMP works. 15-Apr-20 9:00 15-Apr-20 18:00
550
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV/400KV WARDHA-ICT-2AND 765KV-WARDHA-NIZAMABAD-2 atWardha - 765KV
D For AMP Work 15-Apr-20 9:00 15-Apr-20 18:00
551PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-PARLI-M-PARLI-1 ANDPARLI - 400KV - BUS 2 at PARLI - 400KV
D For AMP works 15-Apr-20 9:00 15-Apr-20 18:00
552
PLANNED OCC-529
WRTS-I 400KV-BHADRAWATI-PARLI-1 D Replacement of BHEL make pilot insulators.AR to be kept in non Auto mode for ckt BVT-Dhariwal and Dhariwal Parli
15-Apr-20 9:00 15-Apr-20 18:00
553PLANNED OCC-529
POWERGRID_WR2
400KV/220KV DAMOH-ICT-2 D For AMP works. Dia to be kept open on bothsides.
15-Apr-20 9:00 15-Apr-20 18:00
554
PLANNED OCC-529
POWERGRID_WR2
400KV-DEHGAM-SAMI-2 D AMP works in Line Terminal Equipments.Line outage is required. Dia to be kept open.
15-Apr-20 9:00 15-Apr-20 18:00
555
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 220KV-INDORE-UJJAIN-2 ANDINDORE - 220KV - BUS 1 at INDORE - 220KV
D AMP WORKS. Line will be in service throughTBC.
15-Apr-20 9:00 15-Apr-20 18:00
556PLANNED OCC-529
POWERGRID_WR2
BANASKANTHA - 400KV - BUS 2 D 400kV Bay Construction work of VAV line 15-Apr-20 9:00 15-Apr-20 18:00
PLANNED OCC-529MP_SLDC 220KV Khandwa (PGCIL)-Chhegaon 400-II D For bay equipment maintenance and testing
work15-Apr-20 10:00 15-Apr-20 18:00
561
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 220KV-URSE-PUNE-PG-2 ANDPUNE-PG - 220KV - BUS 1 at PUNE-PG -220KV
D For AMP works 15-Apr-20 9:00 15-Apr-20 18:00
562PLANNED OCC-529
GETCO 220 kV-DEHGAM-KHANPUR-2 Daily FOR BAY MAINTENANCE/CONDITIONINGMONITORING
15-Apr-20 8:00 16-Apr-20 18:00
563 PLANNED OCC-529 POWERGRID_WR2400KV-VADINAR-BACHAU-2 D For replacemnt of IGR of Pilot String & Tension string of Jack Bus. Dia to be kept open. Outage of 400KV BUS-1 &2 at Bhachau is also required on 15 & 16/04/2020.15-Apr-20 8:00 16-Apr-20 18:00564
PLANNED OCC-529
POWERGRID_WR2
400KV/220KV BHUJ-ICT-5 D FOR CSD FINE TUNNING. Dia to be keptopen on both sides and ICT will be switchedmultiple times to complete CSD fine tuningworks.
15-Apr-20 8:00 16-Apr-20 18:00
565PLANNED OCC-529
POWERGRID_WR1
A type Filter - Bipole 2 - Champa HVDC -HACQ61
C For AMP works. 15-Apr-20 9:00 16-Apr-20 18:00
566PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-SEONI-WARDHA-2 ANDSEONI - 765KV - BUS 2 at SEONI - 765KV
C For AMP works 15-Apr-20 9:00 16-Apr-20 18:00
567PLANNED OCC-529
RUMS 220KV-REWA-BARSAITA DESH-1 Daily Isolator maintenance which are common forboth line (Line bay-01 & 02)
15-Apr-20 18:00 17-Apr-20 4:00
568PLANNED OCC-529
RUMS 220KV-REWA-BARSAITA DESH-2 Daily Isolator maintenance which are common forboth line (Line bay-01 & 02)
15-Apr-20 18:00 17-Apr-20 4:00
569PLANNED OCC-529
POWERGRID_WR2
400KV-RANCHODPURA-CHORANIA-2 C FOR CB OVERHAULING WORK by Pirana.Line will be in service through TBC.
D Pre-Summer maintenance work eg.Tighteningof loose condutor VD, Corona ring, arcinghorn, jumper, string Hook etc.A/R OFF of ckt-2 and dia to be kept open at both ends. S/Drequest by WR-II
MSETCL 400KV-EKTUNI-BABLESHWAR-1 Daily Quarterly Maintenance work & RelayTesting,PG Isolator works
16-Apr-20 09:00 16-Apr-20 17:00
574
PLANNED OCC-529
MSETCL 400KV-EKTUNI-BABLESHWAR-1 Daily Disc insulators replacement at variouslocations Tightening Of Jumper Nut Bolts &Routine Maintenance work
16-Apr-20 09:00 16-Apr-20 18:00
575
PLANNED OCC-529
POWERGRID_WR1
Tie Bay - 765KV-GADARWARA-WARORA-PG-2 AND 765KV-WARORA-PG-PARLI NEW-1 atPARLI NEW - 765KV
D Relay testing work 16-Apr-20 9:00 16-Apr-20 18:00
576
PLANNED OCC-529
POWERGRID_WR1
765KV-PUNE-GIS-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe Pune Line & 765KV-AURANGABAD-PADGHE-PG AR to be keep in non auto modefor safety precautions.
16-Apr-20 8:00 16-Apr-20 18:00
577PLANNED OCC-529
POWERGRID_WR2
400KV/220KV KHANDWA-ICT-3 D AMP WORK. Dia to be kept open on bothsides.
16-Apr-20 9:00 16-Apr-20 18:00
578
PLANNED OCC-529
POWERGRID_WR2
765KV-BANASKANTHA-CHITTORGARH-1 D For AMP/Rectification of shut down naturedefects. A/R OFF of ckt-2 and dia to be keptopen at both ends. Proposed by AM TL.
16-Apr-20 9:00 17-Apr-20 18:00
579
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV/400KV RAIGARH-PS-ICT-1 AND RAIGARH-PS - 400KV - BUS 4 atRAIGARH-PS - 400KV
D For AMP works. 16-Apr-20 6:00 16-Apr-20 14:00
580PLANNED OCC-529
POWERGRID_WR1
RAIPUR - 400KV B/R 2 D AMP works at Raipur SS 16-Apr-20 6:00 16-Apr-20 16:00
581PLANNED OCC-529
MSETCL 400KV-RGPPL-NAGOTHANE-2 Daily Emergency tree cutting work 16-Apr-20 08:00 16-Apr-20 17:00
582PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV-GWALIOR-MORENA-2 ANDFUTURE at GWALIOR - 400KV
D AMP Works 16-Apr-20 8:00 16-Apr-20 17:30
583
PLANNED OCC-529
MSETCL 400KV-LONIKHAND-CHAKAN-1 Daily Half yearly testing and maintenanceactivities. Line Maintenance & RoutineDiagnostic testing work
16-Apr-20 08:00 16-Apr-20 18:00
584 PLANNED OCC-529 MP_SLDC 400KV-SSP-RAJGARH-1 D For line maintenance work 16-Apr-20 8:00 16-Apr-20 18:00585 PLANNED OCC-529 MP_SLDC 220KV-INDORE-INDORE-MP-1 D For line maintenance work 16-Apr-20 8:00 16-Apr-20 18:00586
PLANNED OCC-529
POWERGRID_WR2
BACHAU - 400KV - BUS 2 D For replacemnt of IGR of Pilot String &Tension string of Main Bus & Jack Bus atBhachau end. Outage of 400KV-BACHAU-VARSANA-1 and 400KV-VADINAR-BACHAU-2is also required.
16-Apr-20 8:00 16-Apr-20 18:00
587PLANNED OCC-529
POWERGRID_WR2
400KV-JABALPUR-ITARSI-4 D For taking line reactor out of service forOverhauling works of Reactor at Itarsi.
589 PLANNED OCC-529 MP_SLDC 400KV-Bhopal-MP-Itarsi-2 D For line maintenance work 16-Apr-20 9:00 16-Apr-20 17:00590
PLANNED OCC-529POWERGRID_WR2
BUS COUPLER BAY - VAPI - 220KV - BUS 1AND VAPI - 220KV - BUS 2 at VAPI - 220KV
D AMP Works 16-Apr-20 9:00 16-Apr-20 17:00
591
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-MAGARWADA-BOISAR-2AND BOISAR - 400KV - BUS 1 at BOISAR -400KV
D BAY AMP 16-Apr-20 9:00 16-Apr-20 17:30
592
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-VINDHYANCHAL-IV-VINDHYACHAL(PS)-2 AND VINDHYACHAL(PS)- 400KV - BUS 2 at Vindhyachal(PS) - 400KV
D For AMP Works, at Vindhyachal (P) 16-Apr-20 9:00 16-Apr-20 17:30
593PLANNED OCC-529
MSETCL JEJURI - 400KV - BUS 2 Daily Annual maintenance work & testing work. 16-Apr-20 09:00 16-Apr-20 18:00
594 PLANNED OCC-529 MP_SLDC 400KV-Bhilai-Kirnapur-MP D For line maintenance work 16-Apr-20 9:00 16-Apr-20 18:00595
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 400KV-CHANDRAPUR-BHADRAWATI-4 AND 400KV-BHADRAWATI-RAIPUR-2 at BHADRAWATI - 400KV
D For AMP works. 16-Apr-20 9:00 16-Apr-20 18:00
596
PLANNED OCC-529
POWERGRID_WR1
400KV-AKOLA-AURANGABAD-1 L/R@ AKOLA- 400KV
D For AMP Work, Line outage required forisolation of non switchable line reactor atAkola end, take out/in 15 min eachoperaation.
16-Apr-20 9:00 16-Apr-20 18:00
597PLANNED OCC-529
POWERGRID_WR1
WARORA-PG - 765KV - BUS 1 D AMP Work 16-Apr-20 9:00 16-Apr-20 18:00
598
PLANNED OCC-529
WRTS-I 400kV DHARIWAL TPP-PARLI II D Replacement of BHEL make pilot insulators.AR to be kept in non Auto mode for BVT-Parli-I
16-Apr-20 9:00 16-Apr-20 18:00
599PLANNED OCC-529
POWERGRID_WR2
DAMOH - 400KV B/R 2 D For AMP works. Dia to be kept open. 16-Apr-20 9:00 16-Apr-20 18:00
600
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-DEHGAM-RANCHODPURA-2 AND DEHGAM - 400KV -BUS 2 at DEHGAM - 400KV
D AMP works 16-Apr-20 9:00 16-Apr-20 18:00
601
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 220KV-INDORE-UJJAIN-1 ANDINDORE - 220KV - BUS 1 at INDORE - 220KV
D AMP WORKS. Line will be in service throughTBC.
16-Apr-20 9:00 16-Apr-20 18:00
602PLANNED OCC-529
POWERGRID_WR2
KHANDWA - 400KV B/R 1 D AMP WORK. Dia to be kept open. 16-Apr-20 9:00 16-Apr-20 18:00
603PLANNED OCC-529
POWERGRID_WR2
VADODARA - 400KV B/R 1 D CB & Bus Reactor AMP work. Dia will beopen.
16-Apr-20 10:00 16-Apr-20 17:00
604
PLANNED OCC-529
POWERGRID_WR2
SHUJALPUR - 400KV B/R 1 D OIL CONSERVATOR PRIGMATIC GAUGERECTIFICATION WORK. Dia to be kept open.
16-Apr-20 10:00 16-Apr-20 18:00
605
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 220KV-CHAKAN-PUNE-PG-1 ANDPUNE-PG - 220KV - BUS 1 at PUNE-PG -220KV
D For AMP works 16-Apr-20 9:00 16-Apr-20 18:00
606PLANNED OCC-529
POWERGRID_WR1
Tie Bay - CHAMPA - 765KV B/R 2 ANDFUTURE at CHAMPA - 765KV
D For AMP works. 16-Apr-20 9:00 17-Apr-20 17:30
607
PLANNED OCC-529
POWERGRID_WR1
Main Bay - 765KV/400KV Solapur-ICT-2 ANDSolapur - 765KV - Bus 2 at Solapur - 400KV
C 765kV Siemens make CB Guiding valvereplacement works.
16-Apr-20 7:00 18-Apr-20 18:00
608
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV/400KV TAMNAR-ICT-1 AND765KV-RAIGARH-PS-TAMNAR-2 at TAMNAR -765KV
C Modification in 765 kV Siemens make CBguide valve arrangement and damperreplacement works
16-Apr-20 9:30 18-Apr-20 17:30
609
PLANNED OCC-529
POWERGRID_WR2
220KV-KAWAS-VAV-1 C Simultaneous S/D for NHSRCL DiversionWork: Tower Erection & Stringing Work.Simultaneous outage of both 220kV Kawas-Vav-1 & 2 is required.
16-Apr-20 6:00 22-Apr-20 18:00
610
PLANNED OCC-529
POWERGRID_WR2
220KV-KAWAS-VAV-2 C Simultaneous S/D for NHSRCL DiversionWork: Tower Erection & Stringing Work.Simultaneous outage of both 220kV Kawas-Vav-1 & 2 is required.
16-Apr-20 6:00 22-Apr-20 18:00
611PLANNED OCC-529
POWERGRID_WR2
400KV-JABALPUR-ITARSI-4 L/R@ ITARSI -400KV
C For Overhauling works of Reactor. 16-Apr-20 9:00 30-Apr-20 18:00
ODB For PID Testing of Porcelain Insulator. OnlyAuto reclose
16-Apr-20 08:00 30-Apr-20 18:00
614
PLANNED OCC-529
MSETCL 400KV-EKTUNI-BABLESHWAR-2 Daily Quarterly Maintenance work & RelayTesting,PG Isolator works
17-Apr-20 09:00 17-Apr-20 17:00
615
PLANNED OCC-529
MSETCL 400KV-EKTUNI-BABLESHWAR-2 Daily Disc insulators replacement at variouslocations Tightening Of Jumper Nut Bolts &Routine Maintenance Work
17-Apr-20 09:00 17-Apr-20 18:00
616PLANNED OCC-529
POWERGRID_WR2
INDORE - 765KV B/R 2 D Tie Bay CSD Trobleshooting works, Dia to bekept open
17-Apr-20 9:00 18-Apr-20 18:00
617
PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV- SATNA-BINA-4 AND SATNA-400KV -VINDHYACHAL-4 at SATNA -400KV
D AMP work 17-Apr-20 9:00 17-Apr-20 18:00
618
PLANNED OCC-529
POWERGRID_WR1
Main Bay - 765KV-WARORA-PG-PARLI NEW-2 AND WARORA-PG - 765KV - Bus 2 atPARLI NEW - 765KV
D Relay testing work 17-Apr-20 9:00 17-Apr-20 18:00
619
PLANNED OCC-529
POWERGRID_WR2
765KV-SASAN-SATNA-1 C For Power line crossing works of 765kVVindhyachal-Varanasi line by VindhyachalTLC -Vindhyanagar.
17-Apr-20 8:00 18-Apr-20 18:00
620
PLANNED OCC-529
MP_SLDC 400KV-BHOPAL-MP-BINA-MP-2 C For pre monsoon maintenance and testingwork & isolator replacement/ alignment work
17-Apr-20 8:00 19-Apr-20 17:00
621
PLANNED OCC-529
POWERGRID_WR1
765KV-AURANGABAD-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe-Aurangabad & 765KV-PUNE-GIS-PADGHE-PG AR to be keep in non auto modefor safety precautions.
17-Apr-20 8:00 17-Apr-20 18:00
622
PLANNED OCC-529
POWERGRID_WR2
765KV-BINA-JABALPUR-2 D For AMP Works/to attend shutdown naturedefects. A/R OFF of ckt-1 and dia to be keptopen at both ends.
PLANNED OCC-529MP_SLDC 220KV-KHANDWA-CHHANERA-1 D For bay equipment maintenance and testing
work17-Apr-20 10:00 17-Apr-20 18:00
643PLANNED OCC-529
POWERGRID_WR2
400KV-BINA-SHUJALPUR-1 D AMP WORK 17-Apr-20 10:00 17-Apr-20 18:00
644
PLANNED OCC-529
POWERGRID_WR2
400KV-JABALPUR-JABALPUR-PS-1 D For AMP of terminal equipment atJabalpur(P) and line AMP on opportunity.A/R OFF of ckt-2 and dia to be kept open atboth ends.
17-Apr-20 10:00 17-Apr-20 18:00
645PLANNED OCC-529
CGPL MAIN BAY - 400KV/26KV CGPL-GT-5 ANDCGPL - 400KV - BUS 1
D Breaker drive box painting 17-Apr-20 8:00 18-Apr-20 20:00
646
PLANNED OCC-529
POWERGRID_WR1
400KV-RAIPUR-WARDHA-2 D for rectification of defects & 400KV-WARDHA-RAIPUR-1 AR to be keep in non auto mode forsafety precautions.Dia may be kept open forSS AMP works
17-Apr-20 9:00 18-Apr-20 18:00
647
PLANNED OCC-529
KAPS-3&4 400kV KAPS-3&4-Vapi-Circuit-1 tie CB D Tie CB (CB-08) PM Checks (Line will remainin charged condition through Bus CB)
17-Apr-20 9:00 18-Apr-20 19:00
648
PLANNED OCC-529
POWERGRID_WR2
400KV-BACHAU-VARSANA-2 D For RTV Coating work @ Varsana, Relayretrofitment work at both ends andreplacemnt of IGR of Pilot String & Tensionstring of Main Bus & Jack Bus at Bhachauend. Outage of 400KV BUS-1&2 at Varsana isalso required on 17 & 18/04/2020 and400KV BUS-1 & 2 at Bhachau is alsorequired on 19 & 20/04/2020. A/R OFF ofckt-1 and dia to be kept open at both ends.
17-Apr-20 8:00 20-Apr-20 18:00
649
PLANNED OCC-529
NRPC 765 KV CHITTORGARH-BANASKANTHA (PG)CKT-2
D Pre-Summer maintenance work eg.Tighteningof loose condutor VD, Corona ring, arcinghorn, jumper, string Hook etc.A/R OFF of ckt-2 and dia to be kept open at both ends.S/Drequest by WR-II
17-Apr-20 08:00 18-Apr-20 18:00
650PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-SATNA-BINA-2 AND BINA -400KV - BUS 1 at BINA - 400KV
D For AMP work. 18-Apr-20 9:15 18-Apr-20 18:00
651
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-WARORA-PG-PARLI NEW-2 AND PARLI NEW - 765KV - BUS 1 at PARLINEW - 765KV
C For AMP works 18-Apr-20 9:00 18-Apr-20 18:00
652PLANNED OCC-529
GETCO 400 kV-MANSAR-BACHAU Daily Conditioning monitoring of Bay equipment 18-Apr-20 8:00 18-Apr-20 18:00
653PLANNED OCC-529
JTCL 765KV-DHARAMJAYGARH-JABALPUR-3 C Bent Leg & bracing rectification at loc-101/10due to land slide
18-Apr-20 9:00 19-Apr-20 18:00
654PLANNED OCC-529
JTCL 765KV-DHARAMJAYGARH-JABALPUR-4 C Bent Leg & bracing rectification at loc-101/10due to land slide
18-Apr-20 9:00 19-Apr-20 18:00
655PLANNED OCC-529
GETCO 400 kV-APL-MUNDRA-HADALA-1 Daily Spacer providing work in line 18-Apr-20 6:00 20-Apr-20 15:00
656
PLANNED OCC-529
POWERGRID_WR1
765KV-PUNE-GIS-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe Pune Line & 765KV-AURANGABAD-PADGHE-PG AR to be keep in non auto modefor safety precautions.
18-Apr-20 8:00 18-Apr-20 18:00
657PLANNED OCC-529
POWERGRID_WR2
BHUJ - 765KV - BUS 1 D FOR JUMPER CONNECTION, TESTING &RTV COATING for Extension pkg
18-Apr-20 8:00 19-Apr-20 18:00
658PLANNED OCC-529
MP_SLDC 400KV-INDORE-PITHAMPUR-2 D For bay equipment maintenance and testingwork
18-Apr-20 8:00 18-Apr-20 17:00
659
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - GWALIOR - 765KV B/R 1 ANDGWALIOR - 765KV - BUS 2 at GWALIOR -765KV
D AMP Works 18-Apr-20 8:00 18-Apr-20 17:30
660 PLANNED OCC-529 MP_SLDC 220KV-INDORE-INDORE-MP-2 D For line maintenance work 18-Apr-20 8:00 18-Apr-20 18:00661
PLANNED OCC-529
POWERGRID_WR2
VARSANA - 400KV - BUS 2 D For RTV Coating work @ Varsana. Outage of400KV-BACHAU-VARSANA-2 is also required.By Bhachau.
18-Apr-20 8:00 18-Apr-20 18:00
662PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-KALA-VAPI-1 AND VAPI -400KV - BUS 2 at VAPI - 400KV
D CT Tan Delta repeat testing as increase fromlast test.
18-Apr-20 9:00 18-Apr-20 13:00
663 PLANNED OCC-529 MP_SLDC 220KV-Morena-MP-Morena D For line maintenance work 18-Apr-20 9:00 18-Apr-20 17:00664
PLANNED OCC-529POWERGRID_WR2
TIE BAY - 400KV-MAGARWADA-BOISAR-1AND FUTURE at BOISAR - 400KV
D BAY AMP 18-Apr-20 9:00 18-Apr-20 17:30
665 PLANNED OCC-529 MP_SLDC 220KV-Pandhurna-MP-Kamleshwar D For line maintenance work 18-Apr-20 9:00 18-Apr-20 18:00666
PLANNED OCC-529
POWERGRID_WR1
400KV-SIPAT-RAIPUR-2-AR-off D Line AR to be keep in non auto mode forsafety precautions to rectify EARTHWIRE andCOPPER BOND DEFECTS.Dia may be keptopen for SS AMP works
18-Apr-20 9:00 18-Apr-20 18:00
667PLANNED OCC-529
POWERGRID_WR1
400KV-KORADI-SATPURA D For line side equipment AMP Worka at Koradi(MSETCL) end.
18-Apr-20 9:00 18-Apr-20 18:00
668PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - PARLI - 400KV B/R 1 AND PARLI- 400KV - BUS 1 at PARLI - 400KV
D For AMP works 18-Apr-20 9:00 18-Apr-20 18:00
669
PLANNED OCC-529
WRTS-I 400kV DHARIWAL TPP-PARLI II D Replacement of BHEL make pilot insulators.AR to be kept in non Auto mode for BVT-Parli-I
18-Apr-20 9:00 18-Apr-20 18:00
670
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 220KV-INDORE-INDORE-MP-1AND INDORE - 220KV - BUS 1 at INDORE -220KV
D AMP WORKS. Line will be in service throughTBC.
18-Apr-20 9:00 18-Apr-20 18:00
671
PLANNED OCC-529
POWERGRID_WR2
400KV-JABALPUR-JABALPUR-PS-2 D For AMP of terminal equipment atJabalpur(P) and line AMP on opportunity.A/R OFF of ckt-1 and dia to be kept open atboth ends.
18-Apr-20 10:00 18-Apr-20 18:00
672
PLANNED OCC-529
POWERGRID_WR1
CHANDRAPUR - 400KV - BUS 2 D For Replacement of Bus isolators(Pantograph) of PGCIL#1 & 2 at 400kVChandrapur (MSETCL)
765KV-INDORE-VADODARA-1 D CB & Reactor AMP work at Vadodara and lineAMP on opportunity. Dia will be kept open atboth ends.
19-Apr-20 10:00 19-Apr-20 17:00
675PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 765KV SATNA BINA-1 ANDSATNA - 765KV - BUS 2 at SATNA - 765KV
D AMP work 19-Apr-20 9:00 19-Apr-20 18:00
676
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-WARORA-PG-PARLI NEW-1 AND PARLI NEW - 765KV - BUS 1 at PARLINEW - 765KV
C For AMP works 19-Apr-20 9:00 19-Apr-20 18:00
677PLANNED OCC-529
POWERGRID_WR1
765KV-PUNE-GIS-AURANGABAD D For AMP works of line equipments at Pune-GIS end,main&tie bays to be open.
19-Apr-20 9:00 19-Apr-20 18:00
678
PLANNED OCC-529
POWERGRID_WR2
765KV-SATNA-VINDHYACHAL(PS)-1 D LINE AMP/TO ATTEND SHUTDOWN NATUREDEFECTS by Rewa TLM. Dia to be kept openat both ends.
19-Apr-20 10:00 19-Apr-20 18:00
679
PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV-DEHGAM-RANCHODPURA-1 AND DEHGAM - 400KV B/R 2 at DEHGAM -400KV
D AMP works 19-Apr-20 9:00 19-Apr-20 18:00
680PLANNED OCC-529
POWERGRID_WR2MAIN BAY - 765KV BUS REACTOR-2 ANDSATNA - 765KV - BUS 2 at SATNA - 765KV
D AMP work 19-Apr-20 9:00 20-Apr-20 18:00
681
PLANNED OCC-529
POWERGRID_WR1
765KV-AURANGABAD-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe-Aurangabad & 765KV-PUNE-GIS-PADGHE-PG AR to be keep in non auto modefor safety precautions.
BACHAU - 400KV - BUS 1 D For replacemnt of IGR of Pilot String &Tension string of Main Bus & Jack Bus atBhachau end. Outage of 400KV-BACHAU-VARSANA-2 and 400KV-VADINAR-BACHAU-1is also required.
19-Apr-20 8:00 19-Apr-20 18:00
684
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - WARDHA - 765KV B/R 2 ANDWARDHA - 765KV - BUS 2 at Wardha -765KV
400KV-VADINAR-BACHAU-1 D For replacemnt of IGR of Pilot String &Tension string of Jack Bus. Outage of 400KVBUS-1 &2 at Bhachau is also required on 19& 20/04/2020. Dia to be kept open.
19-Apr-20 8:00 20-Apr-20 18:00
687
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-WARDHA-AKOLA-1 ANDAKOLA - 400KV - BUS 2 at Akola - 400KV
C For Replacement of BHEL CB with GE CB. 19-Apr-20 9:00 24-Apr-20 18:00
688
PLANNED OCC-529
POWERGRID_WR1
CHANDRAPUR - 400KV - BUS 1 D For Replacement of Bus isolators(Pantograph) of PGCIL#1 & 2 at 400kVChandrapur (MSETCL)
19-Apr-20 9:00 19-Apr-20 18:00
689PLANNED OCC-529
POWERGRID_WR1
400KV-KHARGHAR-PUNE-PG-1 D For AMP works & Replacement of Clamp &connectors at Pune-Talegaon
19-Apr-20 9:00 19-Apr-20 18:00
690PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-SATNA-BINA-3 AND BINA -400KV - BUS 1 at BINA - 400KV
D For AMP work. 20-Apr-20 9:15 20-Apr-20 18:00
691
PLANNED OCC-529
MSETCL HVDC 500KV CHANDRAPUR HVDC POLE 1 Continuous Stringing from loc no 278 to 294 of 500KVChandrapur-Padghe HVDC Line Pole I due toconstruction of Kochi-Ambezari Dam underORC scheme.
20-Apr-20 06:00 27-Apr-20 18:00
692
PLANNED OCC-529
POWERGRID_WR2
VINDHYACHAL(PS) - 400KV - BUS 1 D Vindhyachal#4 Main Bay Bus#1 B – PhJumper seems to be of more length, whichmay cause fault during high wind condition.Suitable measures are to be adopted forreducing its length
20-Apr-20 9:00 20-Apr-20 17:30
693
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV-SOLAPUR-PARLI NEW-2AND 765KV-WARORA-PG-PARLI NEW-1 atPARLI NEW - 765KV
C For AMP works 20-Apr-20 9:00 20-Apr-20 18:00
694PLANNED OCC-529
POWERGRID_WR1
AURANGABAD - 220KV - BUS 2 D For AMP works. 20-Apr-20 9:00 20-Apr-20 18:00
695
PLANNED OCC-529
POWERGRID_WR1
765KV-PUNE-GIS-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe Pune Line & 765KV-AURANGABAD-PADGHE-PG AR to be keep in non auto modefor safety precautions.
20-Apr-20 8:00 20-Apr-20 18:00
696PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV-BHUJ-CGPL-2 ANDFUTURE at Bhuj - 400KV
D AMP WORK 20-Apr-20 8:00 20-Apr-20 18:00
697
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - RAIGARH-PS - 400KV B/R 1 AND765KV/400KV RAIGARH-PS-ICT-2 atRAIGARH-PS - 400KV
D For AMP works. 20-Apr-20 6:00 20-Apr-20 14:00
698
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-KORBA-NTPC-RAIPUR-3AND RAIPUR - 400KV - BUS 4 at RAIPUR -400KV
D AMP works at Raipur SS 20-Apr-20 6:00 20-Apr-20 16:00
699PLANNED OCC-529
MP_SLDC 400KV-MALWA-PITHAMPUR-2 D For bay equipment maintenance and testingwork
20-Apr-20 8:00 20-Apr-20 17:00
700 PLANNED OCC-529 GETCO 220 kV-HALVAD-BHIMASAR-1 Daily For routine bay maint. Work 20-Apr-20 8:00 20-Apr-20 18:00701 PLANNED OCC-529 MP_SLDC 220KV-INDORE-UJJAIN-1 D For line maintenance work 20-Apr-20 8:00 20-Apr-20 18:00702
PLANNED OCC-529
POWERGRID_WR2
BACHAU - 400KV - BUS 2 D For replacemnt of IGR of Pilot String &Tension string of Main Bus & Jack Bus atBhachau end. Outage of 400KV-BACHAU-VARSANA-2 and 400KV-VADINAR-BACHAU-1is also required.
20-Apr-20 8:00 20-Apr-20 18:00
703PLANNED OCC-529
MSETCL TIE BAY - 400KV-WARDHA-AKOLA-1 AND400KV-BHUSAWAL-AKOLA-1
Daily Routine Maintenance & Testing Work 20-Apr-20 09:00 20-Apr-20 16:00
704
PLANNED OCC-529
POWERGRID_WR2
VAPI - 220KV - BUS 1 D AMP of 220KV Bus-1. For bus isolatormaintenance of the connected bays, thecorresponding bay elements shall be shiftedonto TBC one after another for a duration of1hr.
20-Apr-20 9:00 20-Apr-20 17:00
705PLANNED OCC-529
MP_SLDC 400KV-Badnawar-PITHAMPUR-2 D For bay equipment maintenance and testingwork
20-Apr-20 9:00 20-Apr-20 18:00
706PLANNED OCC-529
POWERGRID_WR1
AURANGABAD-STATCOM - 38.5KV - BUS 1MSC@AURANGABAD-STATCOM
D For AMP works. 20-Apr-20 9:00 20-Apr-20 18:00
707
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY-400KV-BILASPUR-LANCO-1 ANDBILASPUR-400KV-BUS-1 at BILASPUR -400KV
D For AMP works. 20-Apr-20 9:00 20-Apr-20 18:00
708
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV/400KV WARDHA-ICT-3AND WARDHA - 765KV - BUS 2 at Wardha -765KV
D For AMP Work 20-Apr-20 9:00 20-Apr-20 18:00
709
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 400KV-PARLI-SOLAPUR-1 AND400KV-BHADRAWATI-PARLI-1 at PARLI -400KV
D For AMP works 20-Apr-20 9:00 20-Apr-20 18:00
710
PLANNED OCC-529
POWERGRID_WR1
400KV-PUNE-GIS-PUNE-PG-3 D For AMP works of line equipments at Pune-GIS end & 400KV-PUNE-GIS-PUNE-PG-1, 2 &4 AR to be keep in non auto mode for safetyprecautions.
20-Apr-20 9:00 20-Apr-20 18:00
711
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-SEONI-PG-SATPURA-1AND SEONI-PG - 400KV - BUS 2 at SEONI-PG- 400KV
D For AMP works 20-Apr-20 9:00 20-Apr-20 18:00
712
PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV-DAMOH-KATNI-1 AND400KV/220KV DAMOH-ICT-2 at Damoh -400KV
D For AMP works. 20-Apr-20 9:00 20-Apr-20 18:00
713PLANNED OCC-529
POWERGRID_WR2
400KV/220KV DEHGAM-ICT-3 D AMP works. Dia to be kept open on bothsides.
20-Apr-20 9:00 20-Apr-20 18:00
714PLANNED OCC-529
POWERGRID_WR2
400KV-NAGDA-SHUJALPUR-1 L/R@ NAGDA -400KV
D AMP WORKS by Indore. 20-Apr-20 9:00 20-Apr-20 18:00
715
PLANNED OCC-529
POWERGRID_WR2
400KV-JABALPUR-ITARSI-3 D To attend shutdown nature defects byJabalpur. A/R OFF of ckt-4 and dia to bekept open at both ends.
20-Apr-20 9:00 20-Apr-20 18:00
716PLANNED OCC-529
POWERGRID_WR2
BANASKANTHA - 400KV - BUS 1 D CT oil sampling-after 1 year of first charging 20-Apr-20 9:00 20-Apr-20 18:00
717PLANNED OCC-529
POWERGRID_WR2
400KV-MAGARWADA-NAVSARI-1 D B phase HMB drive replacement work atNavsari GIS SS
20-Apr-20 9:00 20-Apr-20 18:00
718
PLANNED OCC-529
POWERGRID_WR2
765KV-BINA-JABALPUR-1 L/R@ BINA -765KV
D For AMP work. 20-Apr-20 9:15 20-Apr-20 18:00
719PLANNED OCC-529
CWRTL MAIN BAY - 765KV-SASAN-VINDHYACHAL-2AT 765kV SASAN END
Daily Maintenance of Bay Equipments 20-Apr-20 9:30 20-Apr-20 18:00
D SELECTION OF SPARE REACTOR IN PLACEOF B-PH FOR O-RING REPLACEMENT WORK
20-Apr-20 10:00 20-Apr-20 12:00
721
PLANNED OCC-529
POWERGRID_WR2
400KV-INDORE-MP-ASOJ-1 D For AMP/ Rectification of Earth wire deadend at loc:631 by Vadodara. Dia to be keptopen at both ends.
20-Apr-20 10:00 20-Apr-20 17:00
722PLANNED OCC-529
MP_SLDC 220KV-KHANDWA-CHHANERA-2 D For bay equipment maintenance and testingwork
20-Apr-20 10:00 20-Apr-20 18:00
723
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV/220KV REWA-ICT-1 ANDREWA - 400KV - BUS 1 at REWA - 400KV
D Checking of CB and timing for fine tuning ofCSD
20-Apr-20 10:00 20-Apr-20 18:00
724PLANNED OCC-529
POWERGRID_WR2
400KV/220KV SHUJALPUR-ICT-1 D AMP WORK. Dia to be kept open on bothsides.
20-Apr-20 10:00 20-Apr-20 18:00
725PLANNED OCC-529
GETCO 400 kV-DEHGAM-RANCHODPURA-1 Daily For Providing opened spacer cum damper online and PMM Work.
20-Apr-20 7:00 21-Apr-20 18:00
726PLANNED OCC-529
POWERGRID_WR2
BHUJ - 765KV - BUS 2 D FOR JUMPER CONNECTION, TESTING &RTV COATING for Extension pkg
20-Apr-20 8:00 21-Apr-20 18:00
727PLANNED OCC-529
SLDC_CG 400KV-MARWA-BHILAI-1 Continous Replacement of main bay 400 KV CT (Y&B)with marshalling box.
20-Apr-20 9:00 21-Apr-20 17:00
728
PLANNED OCC-529
POWERGRID_WR1
Main Bay - CHAMPA - 765KV B/R 2 ANDCHAMPA - 765KV - Bus 4 at CHAMPA -765KV
D For AMP works. 20-Apr-20 9:00 21-Apr-20 17:30
729
PLANNED OCC-529
POWERGRID_WR1
Tie Bay - 765KV/400KV Solapur-ICT-1 AND765KV-Solapur-PARLI NEW-2 at Solapur -765KV
C 765kV Siemens make CB Guiding valvereplacement works.
20-Apr-20 7:00 22-Apr-20 18:00
730
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV-RAIGARH-PS-TAMNAR-1AND 765KV/400KV TAMNAR-ICT-2 atTAMNAR - 765KV
C Modification in 765 kV Siemens make CBguide valve arrangement and damperreplacement works
20-Apr-20 9:30 22-Apr-20 17:30
731
PLANNED OCC-529
MSETCL 400KV-KALWA-PUNE-PG-1 Daily PID Testing work for line Insulator strings atvarious locations. Auto-Reclose function to beout of service.
20-Apr-20 09:00 25-Apr-20 17:00
732
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-AURANGABAD-M(WALUJ)-AURANGABAD-2 ANDAURANGABAD-M (WALUJ) - 400KV - BUS 1at Aurangabad-M (Waluj) - 400KV
C For replacement of old BHEL CB with new GECB & Line shall be shifted on to TBC duringthe period
20-Apr-20 9:00 25-Apr-20 18:00
733
PLANNED OCC-529
POWERGRID_WR1
Main Bay - 400KV-PADGHE-BOISAR-1 ANDPADGHE - 400KV - Bus 1 at PADGHE -400KV
C Retrofitting of old BHEL make CB with NewGE make CB for 400 KV Boisar Line Bay atPadghe MSETCL. Line to be taken on TBC CBat Padghe MSETCL.
20-Apr-20 10:00 29-Apr-20 17:00
734
PLANNED OCC-529
MSETCL 400KV-KHARGHAR-PUNE-PG-1 Daily PID Testing work for line Insulator strings atvarious locations. Auto-Reclose function to beout of service.
20-Apr-20 09:00 30-Apr-20 17:00
735PLANNED OCC-529
POWERGRID_WR2
Block#1 NORTH SIDE FILTER BANK B1Z12 BAY AT VINDHYACHALHVDCC RETRO FITMENT OF CIRCUIT BREAKERUNDER ADD CAP at vindhyachal S/S.
20-Apr-20 9:00 20-May-20 18:00
736PLANNED OCC-529
POWERGRID_WR2
Block#2 NORTH SIDE FILTER BANK B2Z12BAY AT VINDHYACHALHVDC
C RETRO FITMENT OF CIRCUIT BREAKERUNDER ADD CAP at vindhyachal S/S.
20-Apr-20 9:00 20-May-20 18:00
737PLANNED OCC-529
GETCO 400 kV-CHARANKA-VARSANA-1 Daily For 89B PG IsolatorFix contact replacementwork.
21-Apr-20 8:00 21-Apr-20 18:00
738PLANNED OCC-529
GETCO VARSANA - 400 kV - BUS 2 Daily For 89B PG IsolatorFix contact replacementwork of Hadala line.
21-Apr-20 8:00 21-Apr-20 18:00
739PLANNED OCC-529
POWERGRID_WR1
AURANGABAD - 400KV - BUS 1 D For AMP works. 21-Apr-20 9:00 21-Apr-20 18:00
740
PLANNED OCC-529
POWERGRID_WR2
400KV-BHUJ-CGPL-1 D For AMP/Rectification of shut down naturedefects. A/R OFF of ckt-2 and dia to be keptopen at both ends. Proposed by AM TL.
21-Apr-20 9:00 21-Apr-20 18:00
741
PLANNED OCC-529
POWERGRID_WR1
765KV-WARORA-PG-PARLI NEW-2 D For line AMP works & 765KV-WARORA-PG-PARLI NEW-1 AR to be keep in non automode for safety precautions.
21-Apr-20 9:00 21-Apr-20 18:00
742
PLANNED OCC-529
POWERGRID_WR1
765KV-AURANGABAD-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe-Aurangabad & 765KV-PUNE-GIS-PADGHE-PG AR to be keep in non auto modefor safety precautions.
21-Apr-20 8:00 21-Apr-20 18:00
743
PLANNED OCC-529
POWERGRID_WR2
400KV-JABALPUR-ITARSI-4 D For replacement of Bushing Turret gasketsunder overhauling works of line Reactor atItarsi S/S. Line AMP on opportunity. A/ROFF of CKT-3 and dia to be kept open at bothends.
21-Apr-20 9:00 21-Apr-20 18:00
744PLANNED OCC-529
POWERGRID_WR1
400KV-KALWA-PUNE-PG-1 D For AMP works & Replacement of Clamp &connectors at Pune-Talegaon
21-Apr-20 9:00 21-Apr-20 18:00
745
PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL(PS)-SASAN-1 D For fixng of Grading Ring in SuspensionInsulators (Polymer) installed in 400kVSasan#1 Line Main / Tie Bay T Point.
21-Apr-20 9:00 22-Apr-20 17:30
746
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - RAIGARH-PS - 400KV B/R 1 ANDRAIGARH-PS - 400KV - BUS 4 at RAIGARH-PS - 400KV
D For AMP works. 21-Apr-20 6:00 21-Apr-20 14:00
747
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV/220KV RAIPUR-ICT-1AND RAIPUR - 400KV - BUS 1 at RAIPUR -400KV
D AMP works at Raipur SS 21-Apr-20 6:00 21-Apr-20 16:00
PLANNED OCC-529MP_SLDC 400KV-MALWA-PITHAMPUR-3 D For bay equipment maintenance and testing
work21-Apr-20 8:00 21-Apr-20 17:00
750 PLANNED OCC-529 GETCO 220 kV-HALVAD-BHIMASAR-2 Daily For routine bay maint. Work 21-Apr-20 8:00 21-Apr-20 18:00751 PLANNED OCC-529 GETCO ASOJ - 400 kV - BUS 1 Daily Condition Monitoring of Bus -I CVT 21-Apr-20 8:00 21-Apr-20 18:00752 PLANNED OCC-529 GETCO ASOJ - 400 kV - BUS COUPLER Daily Condition Monitoring of Bus Coupler 21-Apr-20 8:00 21-Apr-20 18:00753
PLANNED OCC-529MP_SLDC 400KV-Bhopal-BDTCL-1-Bay D For bay equipment maintenance and testing
work21-Apr-20 8:00 21-Apr-20 18:00
754 PLANNED OCC-529 MP_SLDC 400KV-Badnawar-RAJGARH-2 D For line maintenance work 21-Apr-20 8:00 21-Apr-20 18:00755 PLANNED OCC-529 MP_SLDC 220KV-INDORE-UJJAIN-1 D For line maintenance work 21-Apr-20 8:00 21-Apr-20 18:00756
PLANNED OCC-529
POWERGRID_WR2
VAPI - 220KV - BUS 2 D AMP of 220KV Bus-1. For bus isolatormaintenance of the connected bays, thecorresponding bay elements shall be shiftedonto TBC one after another for a duration of1hr.
21-Apr-20 9:00 21-Apr-20 17:00
757 PLANNED OCC-529 NHPTL 200 MVA, 220/132/11 kV, 3 Phase, Auto Transformer.D Testing 21-Apr-20 9:00 23-Apr-20 17:00758 PLANNED OCC-529 MP_SLDC 400KV-SEONI-Kirnapur-1 D For line maintenance work 21-Apr-20 9:00 21-Apr-20 18:00759
PLANNED OCC-529MP_SLDC 400KV-Badnawar-PITHAMPUR-2 D For bay equipment maintenance and testing
work21-Apr-20 9:00 21-Apr-20 18:00
760PLANNED OCC-529
POWERGRID_WR1
AURANGABAD-STATCOM - 38.5KV - BUS 1MSR 1@AURANGABAD-STATCOM
D For AMP works. 21-Apr-20 9:00 21-Apr-20 18:00
761
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV/400KV SEONI-ICT-2 AND400KV-SEONI-PG-KHANDWA-1 at SEONI-PG -400KV
D For AMP works 21-Apr-20 9:00 21-Apr-20 18:00
762PLANNED OCC-529
POWERGRID_WR2
TBC BAY - INDORE - 220KV - BUS 1 ANDFUTURE at INDORE - 220KV
D AMP WORKS 21-Apr-20 9:00 21-Apr-20 18:00
763PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 220KV- SATNA-MAIHAR ANDSATNA -KATNI at SATNA -220KV
D AMP work 21-Apr-20 9:00 21-Apr-20 18:00
764
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV/220KV REWA-ICT-2 ANDREWA - 400KV - BUS 1 at REWA - 400KV
C AMP Works & LA base Replacement works 21-Apr-20 8:00 22-Apr-20 18:00
766
PLANNED OCC-529
POWERGRID_WR2
400KV/220KV NAVSARI-ICT-3 C For attending oil leakages, oil filtration/replacment of OLTC section and bay AMPworks at Navsari GIS SS
21-Apr-20 9:00 22-Apr-20 18:00
767
PLANNED OCC-529
NPCIL 220KV-TARAPUR 3&4-BOISAR-1 C S/D REQUESTED BY TARAPUR3&4/ NPCIL -CB, ES, DS, LA, CT, LA, WT, CVT Annual PM
21-Apr-20 9:00 23-Apr-20 18:00
768 PLANNED OCC-529 MSETCL 400KV-BABLESHWAR-PADGHE-PG-2 Daily For Carrying PID Work 21-Apr-20 08:00 30-Apr-20 18:00769
PLANNED OCC-529GETCO VARSANA - 400 kV - BUS 2 Daily For 89B PG IsolatorFix contact replacement
work of Hadala line22-Apr-20 8:00 22-Apr-20 18:00
770PLANNED OCC-529
GETCO 400 kV-HADALA-VARSANA-1 Daily For 89B PG IsolatorFix contact replacementwork of Hadala line
22-Apr-20 8:00 22-Apr-20 18:00
771
PLANNED OCC-529
POWERGRID_WR2
765KV-BANASKANTHA-CHITTORGARH-2 D For AMP/Rectification of shut down naturedefects. A/R OFF of ckt-1 and dia to be keptopen at both ends. Proposed by AM TL.
22-Apr-20 9:00 23-Apr-20 18:00
772
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-SOLAPUR-PARLI NEW-2AND PARLI NEW - 765KV - BUS 2 at PARLINEW - 765KV
C For AMP works 22-Apr-20 9:00 22-Apr-20 18:00
773
PLANNED OCC-529
POWERGRID_WR1
765KV-PUNE-GIS-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe Pune Line & 765KV-AURANGABAD-PADGHE-PG AR to be keep in non auto modefor safety precautions.
22-Apr-20 8:00 22-Apr-20 18:00
774
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-BHOPAL-MP-DAMOH-2AND DAMOH - 400KV - BUS 1 at Damoh -400KV
D For AMP works. 22-Apr-20 9:00 22-Apr-20 18:00
775PLANNED OCC-529
CWRTL TIE BAY - 765KV-SASAN-VINDHYACHAL-2 AT765kV SASAN END
Daily Maintenance of Bus Equipments 22-Apr-20 9:30 22-Apr-20 18:00
776
PLANNED OCC-529
POWERGRID_WR2
400KV-SEONI-PG-KHANDWA-2 C Replacement work of Non switchable LineReactor Isolator (43089R) at Khandwa. LineAMP on opportunity. A/R OFF of ckt-1 anddia to be kept open at both ends.
22-Apr-20 9:00 23-Apr-20 18:00
777
PLANNED OCC-529
POWERGRID_WR1
BUS SECTIONALIZER BAY - RAIGARH-PS -400KV - BUS 1 AND RAIGARH-PS - 400KV -BUS 3 at RAIGARH-PS - 400KV
D For AMP works. 22-Apr-20 6:00 22-Apr-20 14:00
778PLANNED OCC-529
MSETCL 400KV-RGPPL-NAGOTHANE-1 Daily Emergency tree cutting work 22-Apr-20 08:00 22-Apr-20 17:00
779PLANNED OCC-529
MP_SLDC 400KV-MALWA-PITHAMPUR-4 D For bay equipment maintenance and testingwork
22-Apr-20 8:00 22-Apr-20 17:00
780 PLANNED OCC-529 MP_SLDC 220KV Khandwa (PGCIL)-Chhegaon 400-I D For line maintenance work 22-Apr-20 8:00 22-Apr-20 18:00781
PLANNED OCC-529
POWERGRID_WR2
400KV-BACHAU-CHORANIA-1 D For rectification of Open line spacer damper.A/R OFF of 400kV Bhachau-Mansar and400kV Mansar-Chorania. Dia to be kept openat both ends.
22-Apr-20 8:00 22-Apr-20 18:00
782PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-SATNA-2 D To isolate L/R at Satna for AMP works 22-Apr-20 9:00 22-Apr-20 9:30
400KV-RAIPUR-RAIPUR-PS (DURG)-2 D For APM works & 400KV-RAIPUR-RAIPUR-PS(DURG)-1 AR to be keep in non auto mode forsafety precautions.
22-Apr-20 9:00 22-Apr-20 18:00
787
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-WARDHA-RAIPUR-PS(DURG)-1 AND WARDHA - 765KV - BUS 2 atWardha - 765KV
D For AMP Work 22-Apr-20 9:00 22-Apr-20 18:00
788PLANNED OCC-529
POWERGRID_WR1
PARLI NEW - 400KV - BUS 1 C For AMP works 22-Apr-20 9:00 22-Apr-20 18:00
789
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-SEONI-PG-KHANDWA-2AND SEONI-PG - 400KV - BUS 2 at SEONI-PG- 400KV
D For AMP works 22-Apr-20 9:00 22-Apr-20 18:00
790PLANNED OCC-529
POWERGRID_WR2
400KV-NAGDA-SHUJALPUR-2 L/R@ NAGDA -400KV
D AMP WORKS by Indore. 22-Apr-20 9:00 22-Apr-20 18:00
791PLANNED OCC-529
POWERGRID_WR2
220KV-VAPI-KHARADPADA-DNH-1 D Bullet train Tower shifting work by Vapi TLM.Line shifting on ERS Tower.
22-Apr-20 9:00 22-Apr-20 18:00
792PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-SATNA-2 L/R @SATNA- 400KV
D AMP work 22-Apr-20 9:00 22-Apr-20 18:00
793
PLANNED OCC-529
POWERGRID_ER1
400KV-SIPAT-RANCHI-2 D For AMP works, TWFL relay installation &FSC CAPTHOR CHANGING WORK at Ranchiend & 400KV-SIPAT-RANCHI-1 AR to be keepin non auto mode for safety precautions.
22-Apr-20 9:30 22-Apr-20 17:00
794PLANNED OCC-529
MP_SLDC 220KV-KHANDWA-NEPANAGAR-1 D For bay equipment maintenance and testingwork
22-Apr-20 10:00 22-Apr-20 18:00
795PLANNED OCC-529
POWERGRID_WR2
400KV/220KV SHUJALPUR-ICT-2 D AMP WORK. Dia to be kept open on bothsides.
220KV-VAPI-MAGARWADA-1 C Bullet train Tower shifting work by Vapi TLM. 22-Apr-20 13:00 22-Apr-20 18:00
799PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-SATNA-2 D To take L/R into service at Satna after AMPworks
22-Apr-20 17:30 22-Apr-20 18:00
800PLANNED OCC-529
POWERGRID_WR1
400KV-PUNE-GIS-PUNE-PG-3 D For AMP works & Replacement of Clamp &connectors
22-Apr-20 9:00 22-Apr-20 18:00
801PLANNED OCC-529
POWERGRID_WR2
400KV-GANDHAR-NAVSARI-2 D For AMP Works/ to attend shut down naturedefects.
22-Apr-20 6:00 23-Apr-20 18:00
802PLANNED OCC-529
GETCO 400 kV-DEHGAM-RANCHODPURA-2 Daily For Providing opened spacer cum damper online and PMM Work.
22-Apr-20 7:00 23-Apr-20 18:00
803PLANNED OCC-529
POWERGRID_WR2
BHUJ - 400KV - BUS 1 D FOR JUMPER CONNECTION, TESTING &RTV COATING for Extension pkg
22-Apr-20 8:00 23-Apr-20 18:00
804PLANNED OCC-529
POWERGRID_WR1
C type Filter - Bipole 2 - Champa HVDC -HACQ62
C For AMP works. 22-Apr-20 9:00 23-Apr-20 18:00
805
PLANNED OCC-529
NTPC 400KV-SOLAPUR-SOLAPUR-NTPC-2 C Preventative Maintenance availing by NTPC.Opportunity outage code to be issued toPOWERGRID_WR1 along with 400KV-SOLAPUR-SOLAPUR-NTPC-1 AR to be keep innon auto mode for safety precautions.
22-Apr-20 9:00 23-Apr-20 18:00
806
PLANNED OCC-529
TPL-DGEN 400KV/220KV DGEN-ICT-3 C ICT routine energisation testing during RSDand shutdown for energy conservation afterone day energization
22-Apr-20 10:00 23-Apr-20 15:00
807
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-DEHGAM-PIRANA-1 ANDDEHGAM - 400KV - BUS 1 at DEHGAM -400KV
C CB Over Hauling Works 22-Apr-20 9:00 27-Apr-20 18:00
808PLANNED OCC-529
POWERGRID_WR2
220KV-VAPI-MAGARWADA-2 C Bullet train line shifting work by Vapi TLM 22-Apr-20 9:00 30-Apr-20 18:00
809PLANNED OCC-529
POWERGRID_WR2
220KV-VAPI-BHILOSA-DNH-1 C Bullet train Tower shifting work by Vapi TLM. 22-Apr-20 13:00 30-Apr-20 18:00
ERPC A/R OF 400 kv Ranchi Sipat-1 ODB TO FACILITATE THE S/D OF OTHER CKT ONTHE SAME TOWER
22-Apr-20 9:30 22-Apr-20 17:00
812
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-SOLAPUR-PARLI NEW-1AND PARLI NEW - 765KV - BUS 2 at PARLINEW - 765KV
C For AMP works 23-Apr-20 9:00 23-Apr-20 18:00
813PLANNED OCC-529
GETCO 400 kV-APL-MUNDRA-VARSANA-1 Daily For 89A PG IsolatorFix contact replacementwork.
23-Apr-20 8:00 23-Apr-20 18:00
814PLANNED OCC-529
GETCO VARSANA - 400 kV - BUS 1 Daily For 89A PG IsolatorFix contact replacementwork of APL-1 line
23-Apr-20 8:00 23-Apr-20 18:00
815PLANNED OCC-529
POWERGRID_WR1
400KV-LONIKHAND-PUNE-PG-1 D For AMP works & Replacement of Clamp &connectors at Pune-Talegaon
23-Apr-20 9:00 23-Apr-20 18:00
816
PLANNED OCC-529
MSETCL 220KV-NASIK-NAVSARI-2 Daily For replacement of old disk insulator byporcelain long rod, Dignostictesting,broken/flash over string replacementfound during monkey patrolling,signatureanalysis,TLS fixing if issued.
23-Apr-20 09:00 25-Apr-20 18:00
817PLANNED OCC-529
MP_SLDC 400KV-Bhopal-BDTCL-2-Bay D For bay equipment maintenance and testingwork
23-Apr-20 8:00 23-Apr-20 18:00
818
PLANNED OCC-529
POWERGRID_WR1
765KV-AURANGABAD-PADGHE-PG D Replacement of Glass insulator of 765 KVPadghe-Aurangabad & 765KV-PUNE-GIS-PADGHE-PG AR to be keep in non auto modefor safety precautions.
23-Apr-20 8:00 23-Apr-20 18:00
819PLANNED OCC-529
POWERGRID_WR2
VINDHYACHAL(PS) - 400KV - BUS 2 D For AMP Works, at Vindhyachal (P) 23-Apr-20 9:00 23-Apr-20 17:30
820
PLANNED OCC-529
POWERGRID_WR1
BUS SECTIONALIZER BAY - RAIGARH-PS -400KV - BUS 2 AND RAIGARH-PS - 400KV -BUS 4 at RAIGARH-PS - 400KV
D For AMP works. 23-Apr-20 6:00 23-Apr-20 14:00
821PLANNED OCC-529
MSETCL 400KV-RGPPL-NAGOTHANE-2 Daily Emergency tree cutting work 23-Apr-20 08:00 23-Apr-20 17:00
822 PLANNED OCC-529 MP_SLDC 220KV-INDORE-UJJAIN-2 D For line maintenance work 23-Apr-20 8:00 23-Apr-20 18:00823
PLANNED OCC-529
POWERGRID_WR1
400KV-SIPAT-RAIPUR-3 D Autoreclosure retrofitting works at Raipur &for line AMP works SIPAT-NTPC may issueline NBFC.
23-Apr-20 8:00 23-Apr-20 18:00
824
PLANNED OCC-529
MSETCL TIE BAY - 400KV-WARDHA-AKOLA-2 AND400KV-AKOLA-NANDGAONPETH-1 at AKOLA -400KV
Daily Routine maintenance and tedting work 23-Apr-20 09:00 23-Apr-20 16:00
825
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV/400KV CHAMPA-ICT-1AND CHAMPA - 400KV - BUS2 at CHAMPA -400KV
AURANGABAD-STATCOM - 38.5KV - BUS 1STATCOM 1@AURANGABAD-STATCOM
D For AMP works. 23-Apr-20 9:00 23-Apr-20 18:00
828PLANNED OCC-529
POWERGRID_WR1
WARDHA - 400KV - BUS 1 D For AMP Work 23-Apr-20 9:00 23-Apr-20 18:00
829PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV/400KV SEONI-PG-ICT-3AND FUTURE at SEONI-PG - 400KV
D For AMP works 23-Apr-20 9:00 23-Apr-20 18:00
830
PLANNED OCC-529
POWERGRID_WR2
BUS COUPLER BAY - INDORE - 220KV - BUS1 AND INDORE - 220KV - BUS 2 at INDORE -220KV
D AMP WORKS 23-Apr-20 9:00 23-Apr-20 18:00
831
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 220KV-SATNA-MP-SATNA-1 ANDSATNA - 220KV - BUS 2 at SATNA - 220KV
D AMP work 23-Apr-20 9:00 23-Apr-20 18:00
832
PLANNED OCC-529
POWERGRID_ER1
400KV-SIPAT-RANCHI-1 D For AMP & FSC CAPTHOR CHANGING WORKat Ranchi end & 400KV-SIPAT-RANCHI-2 ARto be keep in non auto mode for safetyprecautions.
23-Apr-20 9:30 23-Apr-20 17:00
833
PLANNED OCC-529
POWERGRID_WR1
400KV-KOLHAPUR-MS-KOLHAPUR GIS-1 D Line AMP works, Dia should be kept open &400KV-KOLHAPUR-MS-KOLHAPUR GIS-2 ARto be keet in Non-auto mode for safetyprecautions.
23-Apr-20 10:00 23-Apr-20 18:00
834
PLANNED OCC-529
SLDC_CG 400KV-BHILAI-RAITA-1 Continous Replacement of 1 No.Tie CT (B-phase) & 1 No.marshalling box and Annual MaintenanceProgramme work.
23-Apr-20 9:00 24-Apr-20 17:00
835PLANNED OCC-529
POWERGRID_WR1
Tie Bay - 765KV-Solapur-Raichur-2 ANDFUTURE at Solapur - 765KV
C 765kV Siemens make CB Guiding valvereplacement works.
23-Apr-20 7:00 25-Apr-20 18:00
836PLANNED OCC-529
KAPS-3&4 400kV KAPS-3&4-Vapi-Circuit-1 D Line outage required for PM checks on LineDS and CT
23-Apr-20 9:00 25-Apr-20 19:00
837
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV/400KV TAMNAR-ICT-2AND TAMNAR - 765KV - BUS 1 at TAMNAR -765KV
C Modification in 765 kV Siemens make CBguide valve arrangement and damperreplacement works
C Installation of parallel NGR 24-Apr-20 10:00 26-Apr-20 18:00
845
PLANNED OCC-529
POWERGRID_WR2
765KV-DHARAMJAYGARH-JABALPUR-2 C For installation of parallel NGR at JABALPURand line AMP on opportunity. A/R OFF of ckt-1 and dia to be kept open at both ends.
24-Apr-20 10:00 26-Apr-20 18:00
846
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - PARLI NEW - 765KV B/R 1 ANDPARLI NEW - 765KV - BUS 2 at PARLI NEW -765KV
C For AMP works 24-Apr-20 9:00 24-Apr-20 18:00
847
PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-JABALPUR-1 C For Power line crossing works of 765kVVindhyachal-Varanasi line by VindhyachalTLC -Vindhyanagar. Outage of both 400kVVindhyachal-Jabalpur-1 & 2 requiredsimultaneously
24-Apr-20 8:00 25-Apr-20 18:00
848
PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-JABALPUR-2 C For Power line crossing works of 765kVVindhyachal-Varanasi line by VindhyachalTLC -Vindhyanagar. Outage of both 400kVVindhyachal-Jabalpur-1 & 2 requiredsimultaneously
765KV/400KV WARDHA-ICT-3 D For New BHEL make Spare ICT unit to beconnected with Existing ICT's.
24-Apr-20 9:00 24-Apr-20 18:00
861
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-NAGDA-DEHGAM-2 ANDNAGDA - 400KV - BUS 2 at NAGDA - 400KV
D AMP WORKS by Indore. 24-Apr-20 9:00 24-Apr-20 18:00
862
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-BINA-SHUJALPUR-1 ANDBINA - 400KV - BUS 2 at BINA - 400KV
D For AMP work. 24-Apr-20 9:15 24-Apr-20 18:00
863
PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 765KV/400KV BANASKANTHA-ICT-2 AND 400KV-BANASKANTHA-VELODA-2 atBanaskantha - 400KV
D CT oil sampling-after 1 year of first charging 24-Apr-20 14:00 24-Apr-20 18:00
864PLANNED OCC-529
POWERGRID_WR2
BHUJ - 400KV - BUS 2 D FOR JUMPER CONNECTION, TESTING &RTV COATING for Extension pkg
24-Apr-20 8:00 25-Apr-20 18:00
865
PLANNED OCC-529
NRPC 765/400 KV 1500 MVA ICT 1 AT AGRA(PG) D For enabling M2 LBB function of main bay(703) and checking tripping on LBB operationof Main & Tie Bays. After enabling, wiring ,testng of LBB function in Main-2 relay. Thetrip test of connected tie CB, Direct trip /Inter trip send shall be actually verified.
24-Apr-20 09:00 24-Apr-20 15:00
866
PLANNED OCC-529
MSETCL 400KV/220KV CHANDRAPUR-ICT-2 Continuous 1) For replacement of old damaged quadraplebus conductor of Main Bus-I in ICT- II and400KV Bus Coupler bay section span.2)Tightening of nut bolts & hardware of MainBus-I.
25-Apr-20 05:00 26-Apr-20 18:00
867
PLANNED OCC-529
MSETCL CHANDRAPU-II - 400KV - BUS 1 Continuous 1) For replacement of old damaged quadraplebus conductor of Main Bus-I in ICT- II and400KV Bus Coupler bay section span.2)Tightening of nut bolts & hardware of MainBus-I.
25-Apr-20 05:00 26-Apr-20 18:00
868
PLANNED OCC-529
MSETCL BUS COUPLER BAY - CHANDRAPUR - 400KV- BUS 1 AND CHANDRAPUR - 400KV - BUS 2at CHANDRAPUR - 400KV
Continuous 1) For replacement of old damaged quadraplebus conductor of Main Bus-I in ICT- II and400KV Bus Coupler bay section span.2)Tightening of nut bolts & hardware of MainBus-I.
25-Apr-20 05:00 26-Apr-20 18:00
869
PLANNED OCC-529
POWERGRID_WR1
Tie Bay - WARORA-PG - 765KV B/R 1 AND765KV-WARORA-PG-PARLI NEW-2 at PARLINEW - 765KV
D AMP Work 25-Apr-20 9:00 25-Apr-20 18:00
870PLANNED OCC-529
POWERGRID_WR2
BANASKANTHA - 400KV - BUS 2 D CT oil sampling-after 1 year of first charging 25-Apr-20 9:00 25-Apr-20 18:00
871
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-WARDHA-AURANGABAD-1 AND WARDHA - 765KV - BUS 1 at Wardha -765KV
D For AMP Work 25-Apr-20 9:00 25-Apr-20 18:00
872PLANNED OCC-529
POWERGRID_WR2
400KV-VAV-NAVSARI D For AMP Works/ to attend shut down naturedefects.
TIE BAY - 400KV-AKOLA-AURANGABAD-2AND AKOLA - 400KV - BUS 1 at Akola -400KV
C For Replacement of BHEL CB with GE CB. 25-Apr-20 9:00 30-Apr-20 18:00
888
PLANNED OCC-529
NRPC 765/400 KV 1500 MVA ICT 2 AT AGRA(PG) D For enabling M2 LBB function of main bay(706) and checking tripping on LBB operationof Main & Tie Bays at Agra S/S. Afterenabling, wiring , testng of LBB function inMain-2 relay. The trip test of connected tieCB, Direct trip / Inter trip send shall beactually verified.
25-Apr-20 09:00 25-Apr-20 15:00
889PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-SATNA-BINA-4 AND BINA -400KV - BUS 1 at BINA - 400KV
D For AMP work. 26-Apr-20 9:15 26-Apr-20 18:00
890
PLANNED OCC-529
POWERGRID_WR2
400KV-SATNA-BINA-4 D For replacement of procelain insulator stringswith polymer CLR insulators. A/R OFF of ckt-3 and dia to be kept open at both ends.Proposed by AM TL.
26-Apr-20 9:00 27-Apr-20 18:00
891PLANNED OCC-529
GETCO 400 kV-HADALA-VARSANA-1 Daily Spacer providing work in line 26-Apr-20 6:00 27-Apr-20 15:00
892
PLANNED OCC-529
POWERGRID_WR1
Tie Bay - 765KV-GADARWARA-WARORA-PG-2 AND 765KV-WARORA-PG-PARLI NEW-1 atPARLI NEW - 765KV
D AMP Work 26-Apr-20 9:00 26-Apr-20 18:00
893PLANNED OCC-529
POWERGRID_WR2
BANASKANTHA - 765KV - BUS 1 D CT oil sampling-after 1 year of first charging 26-Apr-20 9:00 26-Apr-20 18:00
894
PLANNED OCC-529
POWERGRID_WR2
765KV-SASAN-VINDHYACHAL(PS)-1 C For Installation of Differential Relay in 765kV Sasan 1 Line. Dia to be kept open at bothends.
26-Apr-20 9:00 28-Apr-20 17:30
895PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-SATNA-1 D To isolate L/R at Satna for AMP works 26-Apr-20 9:00 26-Apr-20 9:30
896PLANNED OCC-529
POWERGRID_WR1
PARLI NEW - 765KV - BUS 1 C For AMP works 26-Apr-20 9:00 26-Apr-20 18:00
897PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-SATNA-1 L/R @SATNA-400KV
D AMP work 26-Apr-20 9:00 26-Apr-20 18:00
898PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-SATNA-1 D To take L/R into service at Satna after AMPworks
26-Apr-20 17:30 26-Apr-20 18:00
899
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-WARDHA-RAIPUR-PS(DURG)-4 AND WARDHA - 765KV - BUS 2 atWardha - 765KV
C For Installation of parallel NGR 27-Apr-20 10:00 29-Apr-20 18:00
904
PLANNED OCC-529
POWERGRID_WR2
765KV-DHARAMJAYGARH-JABALPUR-1 C For installation of parallel NGR at JABALPURand line AMP on opportunity. A/R OFF of ckt-2 and dia to be kept open at both ends.
27-Apr-20 10:00 29-Apr-20 18:00
905PLANNED OCC-529
POWERGRID_WR1
PARLI NEW - 765KV - BUS 2 C For AMP works 27-Apr-20 9:00 27-Apr-20 18:00
906
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV-SEONI-WARDHA-1 ANDWARDHA - 765KV - BUS 1 at Wardha -765KV
D For AMP Work 27-Apr-20 9:00 27-Apr-20 18:00
907PLANNED OCC-529
GETCO 400 kV-ASOJ-CHORANIA-2 Daily Conditioning monitoring of Bay equipment 27-Apr-20 8:00 27-Apr-20 18:00
908PLANNED OCC-529
MSETCL NAGOTHANE - 400KV - BUS 1 Daily Quarterly maintenance work 27-Apr-20 08:00 27-Apr-20 17:00
MAIN BAY - 400KV/220KV WARDHA-ICT-2AND WARDHA - 400KV - BUS 2 at Wardha -400KV
D For AMP Work 27-Apr-20 9:00 27-Apr-20 18:00
915
PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV-NAGDA-SHUJALPUR-2 ANDNAGDA -DEHGAM-2 at NAGDA - 400KV
D AMP WORKS by Indore. 27-Apr-20 9:00 27-Apr-20 18:00
916PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-BINA-MP-BINA-3 ANDBINA - 400KV - BUS 1 at BINA - 400KV
D For AMP work. 27-Apr-20 9:15 27-Apr-20 18:00
917PLANNED OCC-529
GETCO 400 kV-DEHGAM-RANCHODPURA-1 Daily For fixing of missing spacer cum damper 27-Apr-20 7:00 28-Apr-20 18:00
918PLANNED OCC-529
POWERGRID_WR2
BHUJ - 220KV - BUS 1 D FOR JUMPER CONNECTION, TESTING &RTV COATING for Extension pkg
27-Apr-20 8:00 28-Apr-20 18:00
919PLANNED OCC-529
SLDC_CG 400KV/220KV BHILAI-ICT-3 Continous Replacement of main bay 400 KV CT (R,Y,B)& LA (R,Y,B).
27-Apr-20 9:00 28-Apr-20 17:00
920
PLANNED OCC-529
POWERGRID_WR1
Tie Bay - 765KV-AURANGABAD-Solapur-2AND 765KV-PUNE-PG-Solapur-1 at Solapur -765KV
C 765kV Siemens make CB Guiding valvereplacement works.
27-Apr-20 7:00 29-Apr-20 18:00
921
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - TAMNAR - 765KV B/R 1 ANDTAMNAR - 765KV - BUS 2 at TAMNAR -765KV
C Modification in 765 kV Siemens make CBguide valve arrangement and damperreplacement works
27-Apr-20 9:30 29-Apr-20 17:30
922
PLANNED OCC-529
ATIL 400KV-APL-MUNDRA-SAMI-1 Daily Outage for proposed for SRI Replacementwork at transmission tower and RTV coatingon high level BPI of FSC-1 Bus at Sami SS
27-Apr-20 8:00 30-Apr-20 19:00
923
PLANNED OCC-529
ATIL 400KV-APL-MUNDRA-SAMI-2 Daily A/R mode to be kept Off- for SRIReplacement work in 400 kV Mundra-SamiLine-2
27-Apr-20 8:00 30-Apr-20 19:00
924
PLANNED OCC-529
MSETCL 400KV-KORADI-BHUSAWAL-1 Continuous CB pole and mechanism Overhauling &testing
27-Apr-20 09:00 09-May-20 18:00
925
PLANNED OCC-529
POWERGRID_WR2
400KV-SATNA-BINA-2 D For replacement of procelain insulator stringswith polymer CLR insulators. A/R OFF of ckt-1 and dia to be kept open at both ends.Proposed by AM TL.
28-Apr-20 9:00 29-Apr-20 18:00
926
PLANNED OCC-529
POWERGRID_WR1
400KV-AURANGABAD-M (WALUJ)-PUNE-GIS-1
D For AMP works, Dia to be open at Pune-GISend & 400KV-AURANGABAD-M (WALUJ)-PUNE-GIS-2 AR to be keep in non auto modefor safety precautions.
28-Apr-20 9:00 28-Apr-20 18:00
927PLANNED OCC-529
MSETCL AKOLA - 400KV - BUS 2 Daily Routine Maintenance & Testing Work 28-Apr-20 08:00 28-Apr-20 18:00
928
PLANNED OCC-529
POWERGRID_WR2
765KV-BHUJ-BANASKANTHA-2 D For AMP/Rectification of shut down naturedefects. A/R OFF of ckt-1 and dia to be keptopen at both ends. Proposed by AM TL.
28-Apr-20 9:00 28-Apr-20 18:00
929PLANNED OCC-529
MSETCL 400KV-PARLI-M-LONIKHAND-II-1 Daily Line Maintenance & Routine Diagnostictesting work.
28-Apr-20 08:00 28-Apr-20 18:00
930PLANNED OCC-529
MSETCL TIE BAY -412 OF PARALI CKT-1 @ LONIKAND2
Daily Half yearly maintenance and diagnostictesting.
28-Apr-20 09:00 28-Apr-20 18:00
931PLANNED OCC-529
MSETCL MAIN BAY -413 OF PARALI CKT-1 @LONIKAND 2
Daily Half yearly maintenance and diagnostictesting.
28-Apr-20 09:00 28-Apr-20 18:00
932
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 765KV-BINA-GWALIOR-3 ANDGWALIOR - 765KV - BUS 2 at GWALIOR -765KV
C AMP Works & Guide Valve Replacement Work 28-Apr-20 8:00 30-Apr-20 17:30
933PLANNED OCC-529
POWERGRID_WR1
PARLI NEW - 765KV B/R 1 C For AMP works 28-Apr-20 9:00 28-Apr-20 18:00
934
PLANNED OCC-529
POWERGRID_WR1
TIE BAY - 765KV/400KV SEONI-ICT-1 AND765KV-BILASPUR-SEONI-1 at SEONI -765KV
D For AMP works 28-Apr-20 9:00 28-Apr-20 18:00
935PLANNED OCC-529
POWERGRID_WR2
765KV-GWALIOR-JAIPUR-1 L/R@ GWALIOR -765KV
C AMP Works & Guide Valve Replacement Work 28-Apr-20 8:00 29-Apr-20 17:30
936PLANNED OCC-529
GETCO 400 kV-ASOJ-CHORANIA-2 Daily Line maintenance work 28-Apr-20 8:00 28-Apr-20 18:00
937PLANNED OCC-529
MSETCL NAGOTHANE - 400KV - BUS 2 Daily Quarterly maintenance work 28-Apr-20 08:00 28-Apr-20 17:00
938 PLANNED OCC-529 MP_SLDC 400KV-Badnawar-RAJGARH-1 D For line maintenance work 28-Apr-20 8:00 28-Apr-20 18:00939
PLANNED OCC-529POWERGRID_WR2
400KV-VINDHYACHAL-SATNA-3 D To isolate L/R at Satna for AMP works 28-Apr-20 9:00 28-Apr-20 9:30
940PLANNED OCC-529
EPTCL 400KV-ESSAR MAHAN-BILASPUR-1 Daily Isolation of 50 MVAR line reactor-1 formaintenance
28-Apr-20 9:00 28-Apr-20 13:00
941
PLANNED OCC-529
MSETCL MAIN BAY - 400KV-WARDHA-KORADI-II-1AND WARDHA - 400KV - BUS 1 at Wardha -400KV
765KV/400KV VINDHYACHAL(PS)-ICT-3 D For ICT #3 AMP work, dia to be kept open onboth sides.
28-Apr-20 9:00 28-Apr-20 17:30
943
PLANNED OCC-529
POWERGRID_WR1
400KV-DHULE-KHANDWA-2 L/R@ DHULE -400KV
D For AMP works. Line outage required forisolation of non switchable line reactor atDhule end, take out/take in each operation15 min.
28-Apr-20 9:00 28-Apr-20 18:00
944
PLANNED OCC-529
POWERGRID_WR1
400KV-RAIGARH-RAIPUR-3 D For APM works & 400KV-RAIGARH-RAIPUR-4AR to be keep in non auto mode for safetyprecautions.
28-Apr-20 9:00 28-Apr-20 18:00
945PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-SATNA-3 L/R @SATNA- 400KV
D AMP work 28-Apr-20 9:00 28-Apr-20 18:00
946PLANNED OCC-529
POWERGRID_WR2
TIE BAY - 400KV-BINA-MP-BINA-3 AND765KV/400KV BINA-ICT-2 at BINA - 400KV
D For AMP work. 28-Apr-20 9:15 28-Apr-20 18:00
947
PLANNED OCC-529
POWERGRID_WR1
400KV-KOLHAPUR-MS-KOLHAPUR GIS-2 D Line AMP works, Dia should be kept open &400KV-KOLHAPUR-MS-KOLHAPUR GIS-1 ARto be keet in Non-auto mode for safetyprecautions.
28-Apr-20 10:00 28-Apr-20 18:00
948
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 765KV-BINA-JABALPUR-3 ANDJABALPUR - 765KV - BUS 1 at JABALPUR -765KV
D AMP WORK 28-Apr-20 10:00 28-Apr-20 18:00
949PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-SATNA-3 D To take L/R into service at Satna after AMPworks
28-Apr-20 17:30 28-Apr-20 18:00
950 PLANNED OCC-529 BDTCL 765KV/400KV BHOPAL-BDTCL-ICT-1 D For 400KV LA Base Insulators change 28-Apr-20 8:00 29-Apr-20 18:00951
PLANNED OCC-529
POWERGRID_WR2
400KV-REWA-SASAN-1 C For Power line crossing works of 765kVVindhyachal-Varanasi line by VindhyachalTLC -Vindhyanagar. Outage of both 400kVRewa-Sasan and 400kV Vindhyachal-Sasanrequired simultaneously.
28-Apr-20 8:00 29-Apr-20 18:00
952
PLANNED OCC-529
POWERGRID_WR2
400KV-VINDHYACHAL-SASAN-1 C For Power line crossing works of 765kVVindhyachal-Varanasi line by VindhyachalTLC -Vindhyanagar. Outage of both 400kVRewa-Sasan and 400kV Vindhyachal-Sasanrequired simultaneously.
28-Apr-20 8:00 29-Apr-20 18:00
953
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 765KV/400KV SEONI-ICT-1 ANDSEONI - 765KV - BUS 2 at SEONI - 765KV
765KV-SASAN-SATNA-1 D For DTCP commissioning work at both endsby Vindhyachal. Dia to be kept open at bothends.
29-Apr-20 9:00 29-Apr-20 17:30
972PLANNED OCC-529
POWERGRID_WR1
ACF1 Main bay - Champa HVDC - 457 Bay D For AMP works. 29-Apr-20 9:00 29-Apr-20 18:00
973
PLANNED OCC-529
POWERGRID_WR1
400KV-RAIGARH-RAIPUR-4 D For APM works & 400KV-RAIGARH-RAIPUR-3AR to be keep in non auto mode for safetyprecautions.
29-Apr-20 9:00 29-Apr-20 18:00
974
PLANNED OCC-529
POWERGRID_WR1
MAIN BAY - 400KV-WARDHA-AKOLA-2 ANDWARDHA - 400KV - BUS 1 at Wardha -400KV
D For AMP Work 29-Apr-20 9:00 29-Apr-20 18:00
975
PLANNED OCC-529
POWERGRID_WR1
765KV-WARORA-PG-PARLI NEW-1 L/R@PARLI NEW - 765KV
C For AMP works, due to non switchable linereactor at New Parli line outage required fortake out/in each operation 15 min.
29-Apr-20 9:00 29-Apr-20 18:00
976
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 400KV-NAGDA-SHUJALPUR-2AND NAGDA - 400KV - BUS 1 at NAGDA -400KV
D AMP WORKS by Indore. 29-Apr-20 9:00 29-Apr-20 18:00
977PLANNED OCC-529
POWERGRID_WR2
BANASKANTHA - 400KV - BUS 1 D 400kV Bay Construction work of VAV line 29-Apr-20 9:00 29-Apr-20 18:00
978PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 765/400KV ICT-1 AND SATNA -400KV - BUS 2 at SATNA - 400KV
D AMP work 29-Apr-20 9:00 29-Apr-20 18:00
979PLANNED OCC-529
MSETCL 400KV-SOLAPUR-M-SOLAPUR-1 Daily Diagnostic Testing work 29-Apr-20 10:00 29-Apr-20 18:00
980
PLANNED OCC-529
POWERGRID_WR2
MAIN BAY - 765KV-BINA-JABALPUR-2 ANDJABALPUR - 765KV - BUS 2 at JABALPUR -765KV
D AMP WORK 29-Apr-20 10:00 29-Apr-20 18:00
981PLANNED OCC-529
GETCO 400 kV-DEHGAM-RANCHODPURA-2 Daily For fixing of missing spacer cum damper 29-Apr-20 7:00 30-Apr-20 18:00
982PLANNED OCC-529
POWERGRID_WR2
BHUJ - 220KV - BUS 2 D FOR JUMPER CONNECTION, TESTING &RTV COATING for Extension pkg
29-Apr-20 8:00 30-Apr-20 18:00
983
PLANNED OCC-529
POWERGRID_WR2
400KV-SATNA-BINA-3 D For replacement of procelain insulator stringswith polymer CLR insulators. A/R OFF of ckt-4 and dia to be kept open at both ends.Proposed by AM TL.
30-Apr-20 9:00 01-May-20 18:00
984PLANNED OCC-529
POWERGRID_WR1
PUNE-PG - 400KV - BUS 2 D For AMP works & Replacement of Clamp &connectors
30-Apr-20 9:00 30-Apr-20 18:00
985PLANNED OCC-529
POWERGRID_WR2
765KV-BINA-JABALPUR-3 D For AMP of line Terminal Equipment andreactor at Bina end. Dia to be kept open.
WTPL 400KV-PUNE-GIS-PUNE-PG-3 Daily A/R mode to be kept OFF - for Annualmaitenance work in 400kV Pune (GIS) - Pune -IV
02-May-20 9:00 02-May-20 17:00
Sr. No
RequestType
OCC NumberName of
Requesting Agency
Line / Element D reason
From
time
to Time
AD1
PLANNED OCC_529 POWERGRID_WR1
RAIGARH-PS - 400KV - BUS 2A C 400KV BUS -2A (means Bus-2 as per WRLDC) at Kotra, for extending the existing 400kV BUS2A to 400kV GIS-2, for Stability Checks , Bus bar integration, tapping/ Jumpering with the Existing Jack bus under HVDC Construction. Note: All elements will be inservice condition through BUS-1A during this period.01-Apr-20 6:00 02-Apr-20 20:00
AD2
PLANNED OCC_529 POWERGRID_WR1
400KV-KOLHAPUR GIS-MAPUSA-1 D For Replacement of Polymer Insulators by Glass Insulators in view of Alage disposition on Polymer Insulators.AR to be kept in non Auto mode for Ckt201-Apr-20 8:00 01-Apr-20 20:00
AD3
PLANNED OCC_529 NTPC MAIN BAY 400/132kV ICT#3 BAY ATVSTPS STAGE-3
C Annual Bay Maintenance and Testing and 132kV Cable jointing01-Apr-20 8:00 08-Apr-20 18:00
AD4
PLANNED OCC_529 NTPC 400KV/132KV VINDHYACHAL-ICT-3 C Annual Bay Maintenance and Testing and 132kV Cable jointing01-Apr-20 8:00 08-Apr-20 18:00
AD5
PLANNED OCC_529 NTPCSIPAT
TIE BAY - 400KV/132KV SIPAT-IBT-3AND 400KV/132KV SIPAT-IBT-2 at SIPAT- 400KV
C Installation(live line) of OPGW cable 01-Apr-20 9:00 31-May-20 18:00
AD8
PLANNED OCC_529 POWERGRID_WR1
400KV-KOLHAPUR GIS-MAPUSA-2 D For Replacement of Polymer Insulators by Glass Insulators in view of Alage disposition on Polymer Insulators. AR to be kept in no Auto mode for Ckt-I02-Apr-20 8:00 02-Apr-20 20:00
AD9
PLANNED OCC_529 POWERGRID_WR1
RAIGARH-PS - 400KV - BUS 1A &RAIGARH-PS - 400KV - BUS 2A
C 400KV BUS -1A (means Bus-1 as per WRLDC) 400KV BUS -2A (means Bus-2 as per WRLDC) at Kotra, for extending the existing 400kV BUS-1A & BUS-2A to 400kV GIS-2, for Stability Checks , Bus bar integration, tapping/ Jumpering with the Existing Jack bus under HVDC Construction. Note: Due to in same Dia future bays and there is no elements existing, hence the following elements will be out of service during both Buses outage:1. 400kV LARA-KOTRA-22. 400kV KOTRA-REGL-13. 400kV SKS-KOTRA-24. 765/400kV ICT-3 at KOTRA-PS.5. 400kV BR-2.Following elements will be in service through Tie bay:1. 400kV LARA-KOTRA-1 & 400kV REGL-KOTRA-2(by directly connected through tie bay at Kotra end.2. 400kV SKS-KOTRA-1 & 765/400kV ICT-4 (by directly connected through tie bay at Kotra end.03-Apr-20 6:00 04-Apr-20 20:00
AD10
PLANNED OCC_529 POWERGRID_WR1
400KV-KOLHAPUR GIS-MAPUSA-1 D For Replacement of Polymer Insulators by Glass Insulators in view of Alage disposition on Polymer Insulators.AR to be kept in non Auto mode for Ckt203-Apr-20 8:00 03-Apr-20 20:00
AD11
PLANNED OCC_529 MEGPTCL/ADANI
MAIN BAY - 400kV KORADI-III-KORADI-II-LINE - 1 AND 400KV BUS-2 at KORADI- III -400 KV
Daily Bay Maintenance Activities 03-Apr-20 9:00 03-Apr-20 18:00
AD12
PLANNED OCC_529 POWERGRID_WR1
400KV-KOLHAPUR GIS-MAPUSA-2 D For Replacement of Polymer Insulators by Glass Insulators in view of Alage disposition on Polymer Insulators. AR to be kept in no Auto mode for Ckt-I04-Apr-20 8:00 04-Apr-20 20:00
AD13
PLANNED OCC_529 POWERGRID_WR1
400KV-KOLHAPUR GIS-MAPUSA-1 D For Replacement of Polymer Insulators by Glass Insulators in view of Alage disposition on Polymer Insulators.AR to be kept in non Auto mode for Ckt205-Apr-20 8:00 05-Apr-20 20:00
AD14
PLANNED OCC_529 POWERGRID_WR1
400KV-KOLHAPUR GIS-MAPUSA-2 D For Replacement of Polymer Insulators by Glass Insulators in view of Alage disposition on Polymer Insulators. AR to be kept in no Auto mode for Ckt-I06-Apr-20 8:00 06-Apr-20 20:00
AD15
PLANNED OCC_529 NTPCSIPAT
MAIN BAY - 400KV-SIPAT-RAIPUR-2 ANDSIPAT - 400KV - BUS 2 at SIPAT - 400KV
C For PM 06-Apr-20 8:00 07-Apr-20 18:00
AD16
PLANNED OCC_529 MEGPTCL/ADANI
MAIN BAY - 765KV/400KV KORADI-III-ICT-1 AND KORADI-III - 400KV - BUS 1at KORADI-III - 400KV
Daily Bay Maintenance Activities 06-Apr-20 9:00 06-Apr-20 18:00
AD17
PLANNED OCC_529 POWERGRID_WR1
400KV-KOLHAPUR GIS-MAPUSA-1 D For Replacement of Polymer Insulators by Glass Insulators in view of Alage disposition on Polymer Insulators.AR to be kept in non Auto mode for Ckt207-Apr-20 8:00 07-Apr-20 20:00
AD18
PLANNED OCC_529 NTPC 400KV BUS COUPLER-1at Korba C Bay PM 07-Apr-20 8:00 07-Apr-20 18:30
AD19
PLANNED OCC_529 MEGPTCL/ADANI
TIE BAY - 765KV/400KV KORADI-III-ICT-1 AND FUTURE LINE-4 at KORADI-III -400KV
Daily Bay Maintenance Activities 07-Apr-20 9:00 07-Apr-20 18:00
AD20
PLANNED OCC_529 POWERGRID_WR1
400KV-KOLHAPUR GIS-MAPUSA-2 D For Replacement of Polymer Insulators by Glass Insulators in view of Alage disposition on Polymer Insulators. AR to be kept in no Auto mode for Ckt-I08-Apr-20 8:00 08-Apr-20 20:00
AD21
PLANNED OCC_529 NTPCSIPAT
TIE BAY - 765KV/400KV SIPAT-ICT-2AND FUTURE at SIPAT - 400KV
C For PM 08-Apr-20 8:00 09-Apr-20 18:00
AD22
PLANNED OCC_529 MEGPTCL/ADANI
765KV/400KV TIRODA-ICT-1 Daily Maintenance of ICT 08-Apr-20 9:00 08-Apr-20 18:00
AD23
PLANNED OCC_529 POWERGRID_WR1
400KV-KOLHAPUR GIS-MAPUSA-1 D For Replacement of Polymer Insulators by Glass Insulators in view of Alage disposition on Polymer Insulators.AR to be kept in non Auto mode for Ckt209-Apr-20 8:00 09-Apr-20 20:00
AD24
PLANNED OCC_529 NTPC 400KV-VINDHYACHAL-JABALPUR-1 C Annual Bay Maintenance of 400kV Vindhyachal -Jabalpur#1 Line Bay at VSTPS end09-Apr-20 8:00 10-Apr-20 18:00
AD25
PLANNED OCC_529 NTPC MAIN BAY - 400KV-VINDHYACHAL-JABALPUR-1 AND VINDHYACHAL -400KV - BUS 1 at VINDHYACHAL -400KV
C Annual Bay Maintenance and Testing.09-Apr-20 8:00 10-Apr-20 18:00
400KV-KOLHAPUR GIS-MAPUSA-2 D For Replacement of Polymer Insulators by Glass Insulators in view of Alage disposition on Polymer Insulators. AR to be kept in no Auto mode for Ckt-I10-Apr-20 8:00 10-Apr-20 20:00
AD31
PLANNED OCC_529 NTPCSIPAT
MAIN BAY - 400KV-SIPAT-RAIPUR-1 ANDSIPAT - 400KV - BUS 1 at SIPAT - 400KV
C For PM 10-Apr-20 8:00 11-Apr-20 18:00
AD32
PLANNED OCC_529 POWERGRID_WR1
400KV-KOLHAPUR GIS-MAPUSA-2 D For Replacement of Polymer Insulators by Glass Insulators in view of Alage disposition on Polymer Insulators. AR to be kept in no Auto mode for Ckt-I11-Apr-20 8:00 11-Apr-20 20:00
AD33
PLANNED OCC_529 NR-3 765KV-SATNA-ORAI-1 D S/D REQUESTED BY NR-3, AMP of Main Bay and Tie Bay at Orai Substation. A/R OFF OF CKT-2. DIA WILL BE KEPT OPEN.11-Apr-20 8:00 11-Apr-20 18:00
PLANNED OCC_529 NTPC 132kV VINDHYACHAL -WAIDHAN#2 LINE C Annual Bay Maintenance of 132kV Vindhyachal -Waidhan#2 Line Bay at VSTPS end14-Apr-20 8:00 15-Apr-20 18:00
AD36
PLANNED OCC_529 NTPC 132kV VINDHYACHAL -WAIDHAN#2 BAY C Annual Bay Maintenance and Testing.14-Apr-20 8:00 15-Apr-20 18:00
AD37
PLANNED OCC_529 NTPCSIPAT
400KV-SIPAT-RANCHI-2 C For PM 15-Apr-20 8:00 17-Apr-20 18:00
AD38
PLANNED OCC_529 POWERGRID_WR2
765KV-BINA-INDORE-1 D For strengthening of tower from above waist level on urgent basis. Dia to be kept open at both ends.16-Apr-20 8:00 22-Apr-20 18:00
AD39
PLANNED OCC_529 POWERGRID_WR2
765KV-SEONI-BINA-1 D For strengthening of tower from above waist level on urgent basis. Dia to be kept open at both ends.16-Apr-20 8:00 22-Apr-20 0:00
AD40
PLANNED OCC_529 NTPC VINDHYACHAL - 400KV - BUS 3 C Alignment/ Hotspot Rectification of Bus#3 Pantograph Isolator (89A)of Unit#1 ( Bay No. 15)17-Apr-20 8:00 17-Apr-20 18:00
AD41
PLANNED OCC_529 NTPC VINDHYACHAL - 400KV - BUS 4 Alignment & Testing of Bus#4 Pantograph Isolator (89B)of Unit#1 ( Bay No. 15)21-Apr-20 8:00 21-Apr-20 18:00
AD42
PLANNED OCC_529 NTPC 400KV-KORBA-NTPC-VINDHYACHAL-2 C Annual Bay Maintenance of 400kV Vindhyachal -Korba #2 Line Bay at VSTPS end23-Apr-20 8:00 24-Apr-20 18:00
AD43
PLANNED OCC_529 NTPC MAIN BAY - 400KV-VINDHYACHAL-KORBA#2 LINE BAY at VINDHYACHAL -400KV
C Annual Bay Maintenance and Testing.23-Apr-20 8:00 24-Apr-20 18:00
C Annual Bay Maintenance and Testing.24-Apr-20 9:00 25-Apr-20 19:00
AD45
PLANNED OCC_529 SKSPOWER
414 BAY,Tie Bay - 400KV-SKS-RAIGARH-PS-2 AND FUTURE at RAIGARH-PS -400KV
D AMP WORKS 27-Apr-20 9:00 27-Apr-20 18:00
AD46
PLANNED OCC_529 NR-1 765KV-GWALIOR-JAIPUR-1 D S/D REQUSETED BY NR-1, A TYPE DELTA TOWER STRENGTHENING WORK. A/R OFF OF CKT-2 AND DIA TO BE KEPT OPEN.28-Apr-20 8:00 30-Apr-20 18:00
AD47
PLANNED OCC_529 SKSPOWER
415 BAY,Main Bay - 400KV-SKS-RAIGARH-PS-2 AND RAIGARH-PS -400KV - Bus 2 at RAIGARH-PS - 400KV
D AMP WORKS 28-Apr-20 9:00 28-Apr-20 18:00
AD48
PLANNED OCC_529 SKSPOWER
416 BAY,Main Bay - 400KV-SKS-RAIGARH-PS-1 AND RAIGARH-PS -400KV - Bus 1 at RAIGARH-PS - 400KV
D AMP WORKS 29-Apr-20 9:00 29-Apr-20 18:00
AD49
PLANNED OCC_529 POWERGRID_WR2
400KV-VINDHYACHAL-SATNA-4 D To take L/R into service at Satna after AMP works30-Apr-20 17:30 30-Apr-20 18:00
Sub. : Agenda Point for consideration in next CCC meeting of WRPC regardingextension of time period for installation of FGD based on Wet lime Stonebased Technology at 2 x 660 MW Jaypee Nigrie Super Thermal PowerPlant (JNSTPP) Nigrie (M.P.) - A Unit of Jaiprakash Power Ventures Ltd.(JPVL)
Sir,
Please find enclosed Agenda Point on the above subject with a request forconsideration in the next OCC meeting of WRPC.
It is requested that after necessary approval at your end, we may be informedin order to enable us to attend the meeting.