Transcript

KENYA: Electricity Expansion Project (P103037)

(Draft) Environmental and Social Impact Assessment

Athi River Export Processing Zone Medium Speed Diesel Power Plant

January 2010

ANNEXES

1. Proposed Land Subdivision Plan – 18 Plots...............................................................................2

2. Proposed MSD Plant Site Layout Plans.....................................................................................3

3. Copy of Lease Agreement.........................................................................................................4

4. Baseline Soil Test Results.........................................................................................................7

5. Baseline Air Quality Test Results............................................................................................17

6. Baseline Noise Survey Results................................................................................................22

7. Public Consultation Forms......................................................................................................29

RP883

V6

Annex I: Proposed Land Subdivision – 18 Plots

Annex 2: Site Plans

Site Plan 1

Site Plan 2

Annex 3: Lease Agreement

Annex 4:

Annex 5: Air Quality Final Report – Plant Number 1

Annex 6:

Annex 7: Public Consultation Forms

Form 1

Form 2