Wesco Offi ce Building OVERALL• Two-story core and shell offi ce building • Steel structure with a concrete footing and grade beam foundation• Exterior materials: chopped and smooth stone, glass, stucco• Exterior building elements: canopy at main entry, solar shading devices at openings, balconies with canopy cover on southeast and southwest corners• Proposed Building Design: o Total building GSF: 22,349 SF (11,175 SF / level) o 75’ x 140’ structural grid = +/- 78’ x 143’ general building footprint o Building height: 33’-0” (max. allowable: 44’-0”) o Floor-to-fl oor height: 14’-0”
SITE• 4’ high perimeter fencing at grade change on south, east, and west sides o Wrought iron and steel • Patios on southeast and southwest corners of the building• City of Austin parking ratios o Commercial professional offi ce required parking: 1 parking space / 275 SF o 82 spots required / 90 spots provided• Transformer pad on south east corner in existing site cut-out • Multiple telecom services and connections providing internet redundancy• Water meter and connection south of building• Monument sign at entrance on Highway 71• Building-mounted and parking illumination• Dumpster enclosure located on north side near main entry
ACCESS• Northwest main entry with lobby o Monumental stairs and elevator in double height space• Exterior stairs for fi re code on east side of building• Service entry on east side adjacent to exterior stairs for fi rst fl oor use• Entry on the northeast corner for future tenant space on fi rst fl oor o Allow for fl exibility of fi rst fl oor tenants to have direct access from the exterior• Roof access via ladder on exterior stair landing
ROOF• Flat roof with parapet, internal main and overfl ow roof drains• Variable refrigerant fl ow (VRF) mechanical systems planned with space and structural capacity allocated• Vents & intakes• Provisions for future solar panels and rack supports
BUILDING INFRASTRUCTURE• Elevator: 3,000 lbs elevator – machine roomless (MRL), o basis-of-design: ThyssenKrupp• Interior program: o Electrical room o Fire riser room o Telecom room o Janitor’s closet o Vertical chases o Entry lobby with mailslot, monumental stair, and elevator o Circulation o First fl oor men’s and women’s restrooms • Three water closets for female • Two water closets and one urinal for male • Two lavatories for each gender • Drinking fountain • One shower for each gender o Second fl oor restrooms are planned and stacked vertically with fi rst fl oor restrooms o Shell space for future offi ce tenants
NEXT STEPS• Commercial building permit approval pending• General contractor selection and contract negotiation• Construction commencement anticipated on December 1, 2018
Programming 2
Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.
Aust in , TexasNovember 9, 2018
WESCO OFFICE BUILDING | IMPERVIOUS COVER 3
RAMP1:12
RAMP
1:12 RAMP
1:12
RAMP
VANIMPERVIOUS COVER
Site Plan
9,590 sf
34,169 s f
6 ,608 sf
50,367 s f
BUILDING COVERAGE
PAVING
SIDEWALK
TOTAL
Proposed Design
12 ,026 SF
27,893 SF
2,606 SF
42,525 SF
Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.
Aust in , TexasNovember 9, 2018
WESCO OFFICE BUILDING | ARCHITECTURAL SITE PLAN 4
VAN
11047 SFGROSS BUILDING
DUMPSTER LOCATION
LEVEL 1 1 1 ,047 SF
LEVEL 2 1 1 ,302 SF
TOTAL 22,349 SF
GROSS BUILDING CALCULATIONS PARKING CALCULATIONS
Required Proposed82 spots 90 spots
Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.
Aust in , TexasNovember 9, 2018
WESCO OFFICE BUILDING | FLOOR PLAN
LEVEL 1
5
CIRCULATION 666 SF
LEASABLE 8 ,962 SF
LOBBY 599 SF
RESTROOMS 524 SF
SUPPORT 134 SF
TOTAL 10,885 SF
AREA PLAN CALCULATIONS
2
4
6
A B C D E G
599 SFLOBBY
3745 SFSUITE 100
524 SFRESTROOMS
666 SFCORRIDOR
15' - 0" 15' - 0" 20' - 0" 30' - 0" 30' - 0" 15' - 0" 6' - 0" 9' - 0"
1
F
5
3
6' -
0"
30' -
0"
7' -
6"
17' -
6"
20' -
0"
1412 SFSUITE 110
2.7
1627 SFSUITE 120
2178 SFSUITE 130
A.5 E.7
48 SFSUPPORT
40 SFSUPPORT
140' - 0"
81' -
0"
46 SFFIRE RISER
2
4
6
A B C D E G
LOBBY
SUITE 100
RESTROOMS
CORRIDOR
1
F
5
3
SUITE 110
2.7
SUITE 120
SUITE 130
A.5 E.7
SUPPORT
SUPPORT
FIRE RISER
Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.
Aust in , TexasNovember 9, 2018
WESCO OFFICE BUILDING | SPEC. TENANT IMPROVEMENT PLAN
CONFERENCE
OFFICE OFFICE
CONFERENCE
BREAKAREA
OPENOFFICE
CONFERENCE
OFFICE OFFICE
OFFICE
OFFICE
CONFERENCE
BREAKAREA
OPENOFFICE
BREAKAREA
OFFICEOFFICE
19' - 3" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 16' - 6" 14' - 1 1/2"
81' - 4 1/2" 11' - 6" 10' - 0" 38' - 4 1/2"
37' -
8 1
/2"
12' -
0"
12' -
0"
14' -
6 1
/2"
17' - 1 11/16" 14' - 0"
30' -
0 1
/2"
19' -
9"
ENTRY/RECEPTION
OPENOFFICE
BREAKAREA
OPENOFFICE
ENTRY/RECEPTION
4' -
0 5
/8"
STORAV24x30
AV
24x3
0
LEVEL 1
CONFERENCE
OFFICE OFFICE
CONFERENCE
BREAKAREA
OPENOFFICE
CONFERENCE
OFFICE OFFICE
OFFICE
OFFICE
CONFERENCE
BREAKAREA
OPENOFFICE
BREAKAREA
OFFICEOFFICE
ENTRY/RECEPTION
OPENOFFICE
BREAKAREA
OPENOFFICE
ENTRY/RECEPTION
STOR
6
MEETING 807 SF
OFFICE 1 ,627 SF
OFFICE SUPPORT 1 ,01 1 SF
OPEN AREA 5,478 SF
TOTAL 8,923 SF
AREA PLAN CALCULATIONS
2
4
6
A B C D E G
LOBBY
SUITE 100
RESTROOMS
CORRIDOR
1
F
5
3
SUITE 110
2.7
SUITE 120
SUITE 130
A.5 E.7
SUPPORT
SUPPORT
FIRE RISER
Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.
Aust in , TexasNovember 9, 2018
WESCO OFFICE BUILDING | ROOF PLAN
S2
4
6
A B C D E G
1
F
5
3
2.7
A.5 E.7
15' - 0" 15' - 0" 20' - 0" 30' - 0" 30' - 0" 15' - 0" 6' - 0" 9' - 0"
6' -
0"
21' -
0"
9' -
0"
7' -
6"
17' -
6"
20' -
0"
26' -
0"
31' - 6"
AREA RESERVED FOR FUTURE SOLAR PANEL
ARRAY
ROOF PLAN
7
SOLAR ARRAY 7,423 SF
AREA PLAN CALCULATIONS
Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.
Aust in , TexasNovember 9, 2018
WESCO OFFICE BUILDING | SOLAR STUDY
SUMMER
9:00 AM
WINTER
12:00 PM
SOUTHEAST CORNER
8
Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.
Aust in , TexasNovember 9, 2018
WESCO OFFICE BUILDING | SOLAR STUDY
SUMMER WINTER
3:00 PM
SOUTHEAST CORNER
6:00 PM
9
Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.
Aust in , TexasNovember 9, 2018
WESCO OFFICE BUILDING | SOLAR STUDY
SUMMER SOLSTICE 9:00AMSOUTHWEST VIEW
NORTHWEST VIEW
SOUTHEAST VIEW
NORTHEAST VIEW
10
N
Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.
Aust in , TexasNovember 9, 2018
WESCO OFFICE BUILDING | EXTERIOR ELEVATIONS
NORTH ELEVATION
SOUTH ELEVATION
11
Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.
Aust in , TexasNovember 9, 2018
WESCO OFFICE BUILDING | EXTERIOR ELEVATIONS
EAST ELEVATION
WEST ELEVATION
12
Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.
Aust in , TexasNovember 9, 2018
WESCO OFFICE BUILDING | INTERIOR LOBBY RENDERING 13
Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.
Aust in , TexasNovember 9, 2018
WESCO OFFICE BUILDING | PERSPECTIVE
NORTH
NORTHWEST
WEST
VIEWS FROM LEVEL 2
NORTHWEST CORNER
14
Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.
Aust in , TexasNovember 9, 2018
WESCO OFFICE BUILDING | PERSPECTIVE
VIEWS FROM LEVEL 2
SOUTH
SOUTHEAST
EAST
SOUTHEAST CORNER
15
top related