Web viewElectronic and Tender box Submissions. Electronic application documents are to be submitted via the phoenix route: Please note that SAASTA is introducing
Post on 05-Mar-2018
214 Views
Preview:
Transcript
INVITATION TO SUBMIT PROPOSALS (SBD 1)
YOU ARE HEREBY INVITED TO SUBMIT A FUNDING PROPOSAL FOR THE FOLLOWING SPECIFIED SUPPLY REQUIREMENTS
BID NUMBER: NRF/SAASTA 07/2014-15 CLOSING
DATE: 20 August 2014 CLOSING TIME
11:00(11am)
TO APPOINT A NUMBER OF SERVICE PROVIDERS FROM
Higher Education Institutions (HEIs) NRF Facilities and
Other interested organisations
TO OFFER A SERIES OF ACTIVITIES TO UNDERGRADUATE STUDENTS IN PHYSICS
Bidders are required to fill in and sign the written offer form (SBD7 Contract Form – Part 1) in this Invitation
Electronic and Tender box Submissions
Electronic application documents are to be submitted via the phoenix route:
Please note that SAASTA is introducing an electronic grant management system. We would like to encourage you to utilise this tool
for your grant application submissions.
For online submissions, go to http://grants.saasta.ac.za, where you will be able to register and apply online in response to this
particular call/invitation to bid. Select the name of the phoenix form (Undergraduate Support Programme) in order to apply for the
correct bid and attach all necessary documents. Please ensure that you complete all steps or fields and save the application such that
it reflects a completed status on the system before the closing date of 20 August 2014 and time of 11:00 am. You are welcome to send
us an e-mail or call whenever you are experiencing problems with the system. Please direct your enquiries in this regard to
maphefo@saasta.ac.za or call 012 392 9300.
Applicants should timeously submit their applications to the correct email address (http://grants.saasta.ac.za ) . If the application is received late, it will not be considered.
All applications must be submitted on the official forms in this invitation – (not to be re-typed)
This application is subject to the preferential procurement policy framework act and the preferential procurement regulations, 2011, the
general conditions of contract and special conditions of contract as stipulated in this invitation.
Submissions to TENDER BOX
Page 1 of 37
You may also submit an original application to the tender box at SAASTA or courier your original application to the tender box with the
necessary information on the envelope addressed to SAASTA as stipulated below.
EITHER PHYSICALLY OR BY COURIER ENVELOPE ADDRESSING
TENDER BOX: 211 Nana Sita Street Pretoria 0001
Bid Number and Name,Postal Address, Contact Name,Telephone number and email address on the envelope
Page 2 of 37
THE FOLLOWING PARTICULARS MUST BE FURNISHED AS LEAD PAGE OF THE BID RESPONSE
BID NUMBE
R:NRF/SAASTA 07/2014-15 CLOSING
DATE: 20 August 2014 CLOSING TIME
11:00(11am)
NAME OF BIDDER
REPRESENTED BY
POSTAL ADDRESS
PHYSICAL ADDRESS
TELEPHONE NUMBER CODE NUMBER
CELL PHONE NUMBER CODE NUMBER
FACSIMILE NUMBER CODE NUMBER
E-MAIL ADDRESS
VAT REGISTRATION NUMBER (if applicable)
HAS AN ORIGINAL AND VALID TAX CLEARANCE CERTIFICATE OR A LETTER FROM SARS THAT THE TAX AFFAIRS ARE IN ORDER BEEN SUBMITTED?
YES or NO
HAS A PREFERENCE CLAIM FORM BEEN SUBMITTED? (SBD 6.1) YES or NO
(A B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE MUST SUPPORT PREFERENCE POINTS CLAIMED SMALL ORGANISATIONS WHOSE TURNOVER IS LESS THAN R 5 MILLION AUTOMATICALLY OBTAINS A LEVEL 4, AND WHERE ITS SHAREHOLDING IS 50% OR MORE LEVEL 3, ON SUBMISSION OF A LETTER FROM THEIR ACCOUNTANTS OR AUDITORS).
IF YES, WHO WAS THE B-BBEE CERTIFICATE ISSUED BY
AN ACCOUNTING OFFICER AS CONTEMPLATED IN THE CLOSE CORPORATION ACT (CCA)
A VERIFICATION AGENCY ACCREDITED BY THE SOUTH AFRICAN ACCREDITATION SYSTEM (SANAS); OR
A REGISTERED AUDITOR
[Tick Applicable Box]
Page 3 of 37
ARE YOU THE ACCREDITED REPRESENTATIVE IN SOUTH AFRICA FOR THE GOODS/SERVICES/WORKS OFFERED?
YES or NO
IF YES ENCLOSE PROOF
SIGNATURE OF APPLICANT
NAME of APPLICANT
DATE
CAPACITY UNDER WHICH THIS BID IS SIGNED
ANY ENQUIRIES REGARDING TECHNICAL INFORMATION TO BE DIRECTED TO:
Contact Person: Ms Zinzi Madiope, Administrative Assistant
Tel: (012) 392 9345
E-mail: zinzi@saasta.ac.za
Contact Person: Mrs Erna Taljaard, Project Coordinator
Tel: (012) 392 9300 or Fax (012) 320 7803
E-mail: etaljaard@saasta.ac.za
ANY ENQUIRIES REGARDING THE BIDDING PROCEDURE TO BE DIRECTED TO :
Contact Person: Ms Maphefo ChaukeSCM Process Assistant
Tel: +27 (0)12 392 9300
E-mail: maphefo@saasta.ac.za
BID RESPONSE SUBMISSION FORMAT / CHECKLIST
Page 4 of 37
PROPOSAL INDEX
Lead Page (page 3 of the Invitation) completed and signed Yes/ No
Proposal – The completed specification schedule where stipulated Yes/ No
Proposal – Quotation Schedules completed on the Price Template
The cost schedules clearly stipulate costs by type and breakdown together with all the relevant assumptions and information as outlined in this section of the bid invitation
Signed Preference claim form (SBD 6.1)
Yes/ No
Bidder Due Diligence:
Signed Declaration of Bidder’s Past Supply Chain Management Practices.(SBD 8)
Signed confirmation that no National Treasury restrictions (both restricted supplier and tender defaulter on the National Treasury Website www.treasury.gov.za) exist on the bidder or on the bidder’s shareholders and management.
Signed Declaration of Interest (SBD 4)
Signed Competitive bidding declaration (SBD 9)
Yes/ No
Written Offer - Contract Form – Standard Bidding Document 7 Part 1. Yes/ No
SUPPLIER ACCREDITATION Applicants are encouraged to be registered as service providers with the NRF\SAASTA. Supplier registration forms can be requested or downloaded from www.nrf.ac.za\bids \call for bids through clicking on the “bid documents” link.
An up to date and original tax clearance certificate issued by SARS for the current year Yes/ No
Certified copies of certificate of incorporation (as per entity type) Yes/ No
B-BEE transformation level certificate for the current year Yes/ No
Page 5 of 37
1. Background to the National Research FoundationThe National Research Foundation (“NRF”) is a juristic person established in terms of section 2 of the National Research Foundation Act, Act 23 of 1998. The NRF supports and promotes research and human capital development through funding, the provision of National Research Facilities and science outreach platforms and programs to the broader community in all fields of science and technology, including natural science , engineering, social science and humanities.
2. Background to the South African Agency for Science and Technology Advancement The South African Agency for Science and Technology Advancement (SAASTA) is a business unit of the National Research Foundation (NRF) with the mandate to advance public awareness, appreciation and engagement of science, engineering and technology (SET) in South Africa.
3. Background to the Undergraduate Support Programme
The rapid advancement in Computer Science and Information Technology has brought the added need
and challenge for qualified personnel such as engineers, technicians, physicist , scientists, radiological
technicians and other related professionals in order to cope with and address the needs of every nation, in
particular South Africa. It is thus fitting that the school education system and the Higher Education Sector
should be in a position to prepare our youth, especially in scientific and technological fields.
South Africa’s Human Resource in Science, Engineering and Technology (SET) is facing a great
challenge. Among others, the following are some of the major challenges:
Shortage of Human Resource skills in Science, Engineering and Technology to service a
population of over 48 million citizens,
Human Resources in Science, Engineering and Technology which is not adequately renewed
(currently about 50% of scientific output is due to scientists over the age of 50.)
There are very few females professionals in SET fields. Thus lack of appropriate female role
models that the female learner can emulate.
A skewed distribution of skills in SET careers along racial lines. While Black Africans constitute
approximately 80% of the country’s population, their out-put in terms of skills in SET careers is
alarmingly low,
High drop-out rates at Higher Education Institutions.
The remedy for this state of affairs depends on:
Increasing the number of undergraduate students, particularly the number of Black Africans and
young women enrolled in Physics;
Exposing undergraduate students in Physics to career opportunities in Physics; through interacting
with appropriate role models, visiting of science councils, research facilities and industries.
The Undergraduate Support Programme for undergraduate students is a programme initiated by SAASTA
towards increasing the SET human capital in the country.
6
4. Purpose of this Invitation/CallThe objective is to appoint a number of HEIs, NRF Facilities and other interested organisations in any province to conduct activities to encourage 2nd, 3rd and 4th year students (including Honours students) to follow a career in Physics.
5. Timelines
Closing date 20 August 2014 at 11:00 am.
6. Scope of Work
The aim of this project is informed by the objective of the Undergraduate Support Programme, which is to
create an awareness of SET careers with a focus in Physics amongst undergraduate science students
and thus increase the SET work force.
6.1 Objectives6.1.1 To expose undergraduate students to career opportunities in Physics through undertaking field
trips to research facilities, science councils and industries which currently employ Physicists and
other scientists;
6.1.2 Expose and promote interaction with appropriate role models, in particular Physicists; and
6.1.3 Identify and nurture talent towards SET careers, in particular a career in Physics.
6.2 TARGET AUDIENCE
This intervention will target the following groups:
6.2.1 Undergraduate students in their 2nd, 3rd and 4th year (including honours students) from Universities
or Universities of Technology, who are enrolled for Physics.
6.2.2 A minimum of 30 students and 2 lecturers must be involved in the activities. The maximum
number of students will depend on the planned activities and corresponding budget.
7. Detail Specifications and Quotation Template
7.1. General
The South African Agency for Science and Technology Advancement (SAASTA) has earmarked an
amount of funds to support projects with activities to be implemented by various Higher Education
Institutions, NRF facilities and other interested organisations around South Africa. SAASTA is hereby
inviting you to submit a creative/innovative proposal for organizing field trips during the
September/October 2014 university holidays up to January 2015 for undergraduate students in Physics to
expose them to career opportunities in Physics.
Applicants are encouraged to organize multiple activities. These activities do not have to be on consecutive days.
7
Applicants could seek guidance from SAASTA on how they could go about putting together their proposals. (Refer to the project coordinator on page 4 of this document)
7.2. General Submission RequirementsPrice is fully inclusive of all costs; value added tax and other taxes.
Proposal price in South African currency, foreign exchange risk is for the account of the service provider.
Detailed proposal including detailed calculations must be submitted on the prescribed template.
Any deviation from the framework must be approved by SAASTA in writing.
7.3. Proposal Quotation Template (SBD 3)
Applicants are required to submit their proposal on the standard template set out below.
The SBD3 template allows for fair, transparent and efficient evaluation of proposals received.
Applicants are encouraged to be registered as service providers with the NRF\SAASTA on the database. Forms will be attached to the email. Invitations as well as be placed on the SAASTA and NRF websites.
8
Activities to undergraduate students
Application and Submission of Proposal Form (SBD 3)
For SAASTA office use only
Project: SAASTA Ref Number: Closing Date:
Please complete all fields of this form, stating N/A (not applicable) where appropriate. Additional information is provided at the end of the document.
SECTION A: ORGANISATION PROFILE
A1. Organisations’ Background Information
Name of Organization / Institution
Type of Organisation / Institution
(Example: Higher Education Institute. Science Council, etc.)
Organisation’s Reference / Registration / VAT Number
Province where the Organisation / Institution is located
District Municipality where the Organisation / Institution is located
Physical Address for courier purposes
(Please complete if different from the Project Leader)
Postal Address of Organisation / Institution
Organizations’ Contact Details
(Please supply both landline and Cellular Number)
Organizations’ / Institution’s Fax Number
Organizations’ / Institution’s e-mail address
9
A3. Organisation / Institution Banking Details
Name of account holder
Type of account
Name of Bank
Branch
Bank Branch Code
Bank Account Number
A4. Organisation / Institution Business Profile
Number of Employees
Organisation Management(Example: CEO, Director, HOD, partners etc.)
Name Position
Nature of Core Business
Indicate Financial Controls in Place
Date of Last Audited Annual Financial Statement
Name and Address of Auditors
A2. General Project Administration Information
Authorized Signatory for Organisation / Institution
Name Position
Name and designation of Project Financial Administrator
Name Position
Alternative Contact Person if Project Leader is Unable to Complete Obligations
Name Position
10
A5. Details of Project Leader
Title and Surname
Full Names
Nationality
Identity Number
Current Position in the Organisation / Institution
Similar Projects Undertaken Previously
Contact Number (Landline and Cellular Phone)
Fax Number
E-mail Address
Physical Address
Highest Academic Qualifications
Summary of Relevant Experience
Brief Career History
Recent Publications
(Maximum 5 lines)
SECTION B: PROJECT DETAILS
B1. Project Overview
Briefly summarize your project in a reader-friendly manner, covering amongst others, the following headings:
1.1.Site(s) where activities will take place.
_______________________________________________________________________________________
_______________________________________________________________________________________
1.2.Target participants including projected numbers to be reached.
_______________________________________________________________________________________
_______________________________________________________________________________________
1.3.Mode or method to be used (e.g. role models, lab/site exposure, field trips, etc.)
11
_________________________________________________________________________________________
___________________________________________________________________________________
1.4.How your project will address the objectives of the Undergraduate Support Programme. Your activities must
address at least one of objectives below. (Maximum 1 Page)
Objective One – To expose undergraduate students to career opportunities in Physics through undertaking field
trips to research facilities, science councils and industries which currently employ Physicists and other scientists;
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
Objective Two – To expose and promote interaction with appropriate role models, in particular Physicists
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
Objective Three – Identify and nurture talent towards SET careers, in particular a career in Physics
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
12
B2. Project Duration
Indicate when your activities will be conducted.
Project Duration
(No of Days)
Starting Day Last Day Project location
(Province/District Municipality/ Place name/ Sites)
B3. Project Implementation Plan
Use a table to present your work plan against which implementation of your project will be measured. Insert as many rows as you need.
Activity/Milestone Target Date Progress Indicator Means of verification
B4. Project Activities
Describe each of your activities per the template below. This means that you have to duplicate the template for each of the activities you wish to host. Kindly do not use any other format.
Activity 1
Topic: ___________________________________
Detailed content: _______________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
Duration of the activity: (e.g. 30 minutes, 1 hour) ___________________________________________________
Target number: _______________________________________
Place where activity will be conducted: ____________________________________________________
13
Activity 2
Topic: ___________________________________
Detailed content: _______________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
Duration of the activity: (e.g. 30 minutes, 1 hour) ___________________________________________________
Target number: _______________________________________
Place where activity will be conducted: ____________________________________________________
Activity 3 etc. (please copy and paste the template above for each of your activities)
14
SECTION C: PROJECT BUDGET
Detailed budgets that include VAT must be submitted in the range as stipulated in the call depending on the capacity of the organization and intended reach of project. Please provide full details of all expected costs for the project (list separately under the main headings) as outlined in the table below and refer to footnote regarding capital equipment1.
Description of Budget Item Please indicate in the left column how each amount was calculated Do not add any other headings Cost (Rand)
1. Travel & Subsistence (e.g. accommodation if applicable)
1.11.2 etc.
R
2. Transport
2.12.2 etc.
R
3. Event costs (e.g. catering, CD with photos, entry fees if applicable)
3.13.2 etc.
R
4. Administrative costs
4.14.2 etc.
R
Subtotal
5. Project Management Costs (indicate the % you are charging on the subtotal – maximum 10% allowed)
R
Amount requested Total R
Other funding sources (Source & Purpose) R
Capital equipment: SAASTA does not fund the purchase of fixed assets. Travel and subsistence rates: Rates used must adhere to NRF policies, specifically: Accommodation costs are limited to a maximum of R900.00 for Bed and Breakfast; Daily allowance/subsistence costs of R250 for full 24 hours away or R10.41 per an hour for incomplete day up to
a maximum of R250 per day; Maximum rate for use of privately owned motor vehicles is: R3.24 per km.
7.4. Award CapInstitutions are able to submit more than one proposal, each proposal capped to a maximum amount of between R30 000.00 - R70 000.00.
If an institution or individual wishes to be considered for more than one proposal, each proposal will need to be submitted as a separate proposal with clear details of how the proposal differs from any other proposal submitted.
Each activity proposed must include, with the costing, the expected number of people it will reach.
115
7.5. Rates to be adhered to in calculating the proposal’s cost7.5.1 Travel costs for private vehicle and/or institution owned vehicle to be charged up to a maximum
of R3.24 per km.
7.5.2 If catering is needed, a maximum rate of R45 per person per meal will be allowed.
7.5.3 Accommodation – maximum of R900.00 for Bed and Breakfast.
7.5.4 A management fee of up to a maximum of 10% will be allowed. This fee is to be calculated by
adding up all expenses and indicating the subtotal. The management fee is a percentage of
this sub-total and the amount indicated separately. Add both totals to get the final total for the
amount applied for. Indicate the percentage you are charging.
7.5.5 CD with photos – maximum of R250 allowed
No promotional items will be funded.
7.6. Expected outcome and Deliverables
7.6.1 Reach as many participants as possible within your set of resources with a relevant budget.
7.6.2 Indicate if any part of your proposal will be outsourced to a third party. If so, third party profile and terms and conditions between the provider and third party must be attached. Also indicate on the SBD6.1 Preference Claim form fields where part of your proposal is outsourced and provide a BBBEE certificate of the third party.
7.6.3 Hold activities as per your approved proposal and subsequent contract.
7.6.4 If required, you are expected to apply in writing via email for approval to make any line item
changes after the contract has been signed as per the deadline, which will be communicated to
you in due course.
7.6.5 Submit a narrative and financial report after the project roll-out as per the deadline in your
contract. A template for both reports will be provided in due course. The reports are
compulsory.
7.6.6 The service provider will be expected to deal with any queries within 72 hours.
7.6.7 Provide SAASTA with a CD with photos of the event. A maximum amount of R250 is allowed.
(Professional photographers are not needed)
7.6.8 Provide a name list as well as contact details, i.e. a contact number and email address per student.
7.6.9 Provide registers (i.e. original signed register).
7.6.10 Service providers, who will develop any resources please be advised that resources will be
property of SAASTA. SAASTA will review resources to ensure that the correct branding has
been done properly. Service providers who develop resources are encouraged to share their
resources by uploading them to www.saasta.ac.za/resources (resources extranet).
8. Invoice Submission and Payment thereofNRF/SAASTA requires that the Performance Monitoring Narrative Report, Financial report, Attendance
16
registers and CD with photos are provided with the invoices to enable NRF/SAASTA to validate the delivery of the goods and/or services as stipulated in the contract.
NRF/SAASTA undertakes to pay validated invoices in full within 30 (thirty) days from date of validation provided that all the necessary documents were submitted, i.e. (1) proof of expenditure as well as (2) proof of payment per item claimed.
9. Contract PeriodThe contract is signed from receipt of your acknowledgement and acceptance of the letter of award issued and will continue until the deadline as stipulated in your contract.
10. Cash flow SupportWe shall support you by making available a deposit equal to 80% of the awarded amount. This is not a pre-payment of your final invoices.Please note that no payment is made for outstanding deliverables or for any unproductive or duplicated time spent by the service provider.
11. Final and Best Offer and Revision of ProposalsA large number of proposals are expected. Evaluation of costing may require service providers, upon feedback from the Evaluation Committee, to reassess their proposals and submit revised final and best offers enabling as many activities as possible, to be put into play.
12. Selection of Proposals ReceivedProposals received are evaluated on the elements listed below against the specifications given. Qualifying service providers, those that have indicated all points as GO below, proceed to the next stage.
NO. ELEMENTSCORE
(Delete which is not applicable)
1 Relevance and inclusion of target audiences as outlined in this document GO / NO GO
2 Clear timelines indicated – Only to be implemented during the stipulated time frame. GO / NO GO
3 Proposed pricing within limit as per award cap of R30 000.00 - R70 000.00 GO / NO GO
4 All rates adhered to as specified in section 7.5 and the budget template GO / NO GO
13. Qualifying Thresholds for Functional EvaluationProposals scoring less than the minimum threshold of 70% will not be awarded. All proposals are evaluated against the criteria set out using the ratings set out below:
17
0 1 2 3 4
No Information to make assessment Poor Average Meets
RequirementsExceeds
Requirements
Total Evaluation Score. = [Score x weighting x No. of Evaluators]/ [Maximum Score x 100 x No. of Evaluators]
14. Awarding of Proposals ReceivedAll proposals are evaluated on a fair comparable basis with the cost effective proposals being considered against their proposed coverage / reach.All proposals that qualify under this evaluation and which in aggregate are within the funding assigned will be evaluated on preference.SAASTA reserves the right to reduce the award from what the respondent proposed (refer here to the SBD7 – contract form which forms part of the specification) and that the respondent has the right to accept or not.NRF/SAASTA reserves the right to communicate recommendations/queries and the right to request the service provider to provide a revision of their original proposal in terms of such recommendations / queries only. The Evaluation Criteria for Awarding of Proposals are
NO. ELEMENTWEIGHT
INGSCORE
ACTIVITIES PROPOSED 100
1 Quality of activities 25
2 Relevance of activities 25
3 Innovativeness and creativity of approach 10
4 Range of industry exposure 15
5 Cost-effectiveness of the project and cost per declared coverage / reach 25
15. Special Conditions to this ProposalNO ATTACHMENTS ARE ALLOWED All information is to be provided under the headings within the proposal template (SBD3) and only the completed template is submitted together with the SBD forms. RIGHT OF VALIDATIONThe NRF/SAASTA has the right to have any documentation submitted by the service providers inspected by another technical body or organization
18
CANCELLATION OF THIS CALL / BID INVITATIONThe NRF/SAASTA reserves the right to withdraw and cancel the proposal.
LATE PROPOSALSThe NRF/SAASTA does not consider late proposals. Closing time is at 11am. Proposals have to be submitted.
REQUEST FOR FINAL OFFER AND FINAL NEGOTIATION
The NRF/SAASTA reserves the right to award the proposal based on demonstrated value for money (price/value comparable) INCLUDING PROPOSED COVERAGE
NRF/SAASTA reserves the right to provide provisional acceptance of the proposal based on the recommended changes to be actioned. Should the recommendations not be adhered to the grant will not be awarded.
NRF/SAASTA reserves the right to call for additional information and request a final offer. NRF/SAASTA has the right to decide on the final number of service providers, which will be based
on the scores attained. The successful service provider is informed through a written letter of acceptance/award WHICH
WITH THIS document becomes the contract. NRF/SAASTA has the right to clarify expectations in the letter of award. Successful service providers are required to sign a contract, which will be sent together with a
letter of award. The NRF/SAASTA draws the service provider’s attention to aspects of the contract in the letter of
award such as specifying the work and deliverables/outputs, the required timelines, quality standards expected, measurement of performance, agreed levels of performance and acceptance of any special conditions of contract proposed by the service provider.
CONFIDENTIALITYThe NRF/SAASTA expects the successful service provider to sign a general confidentiality agreement with the NRF.
INSPECTION AND MONITORINGNRF/SAASTA staff reserves the right to attend and monitor any of these activities at any time.
COST OF PREPARATION FOR THE SERVICE PROVIDER’S ACCOUNTNRF/SAASTA is not liable for any cost incurred by a service provider in the process of responding to this proposal.
DISQUALIFICATION ON GROUNDS OF INTENDED COLLUSION, INFLUENCE OR CORRUPTIONAny effort by a service provider to influence proposal evaluation, proposal comparisons or proposal award decisions in any manner, may result in rejection of the proposal concerned.
VALIDITY PERIOD OF THE PROPOSALThe proposal has a validity period of 150 days from date of closure of the call / proposal.
CAPITAL EQUIPMENT
The service provider agrees that no part of this award may be used to purchase any capital equipment.
19
THIRD PARTY CONFIRMATION
The service provider assures SAASTA that in the event of being unable to carry out the project that DST is
funding, the project will go ahead under the leadership of the third party specified to SAASTA or that the
award will be returned. To this end, the service provider includes the confirmation from the selected third
party that the project and reporting requirements will be carried out should the service provider be unable
to complete these or that the award will be returned.
16. General Conditions of Contract The National Treasury General Conditions of Contract apply to this contract and a copy can be found on the SAASTA website www.saasta.ac.za – Invitations and calls for proposals.
You are required to print the contract, initial each and every page, sign the last page in full and submit with your proposal.
17. Intellectual PropertyAll the information contained in this document is intended solely for the purposes of assisting service providers to prepare their proposals. Any use of the information contained herein for other purpose than those stated in this document is prohibited.
The ownership and intellectual property rights of all designs, specifications, programming code and all other documentation provided by the NRF/SAASTA to the service provider, both successful and unsuccessful, remains the property of the NRF/SAASTA.
20
18. SBD 7
CONTRACT FORM - PURCHASE OF GOODS/WORKSTHIS FORM MUST BE FILLED IN DUPLICATE BY BOTH THE SUCCESSFUL SERVICE PROVIDER (PART 1) AND
THE NATIONAL RESEARCH FOUNDATION AS THE PURCHASER (PART 2). BOTH FORMS MUST BE SIGNED IN
THE ORIGINAL SO THAT THE SUCCESSFUL SERVICE PROVIDER AND THE PURCHASER WOULD BE IN
POSSESSION OF ORIGINALLY SIGNED CONTRACTS FOR THEIR RESPECTIVE RECORDS.
PART 1 (TO BE FILLED IN BY THE SERVICE PROVIDER)
1. I hereby undertake to supply all or any of the goods and/or works described in the attached proposal ding
documents to NATIONAL RESEARCH FOUNDATION in accordance with the requirements and specifications
stipulated in proposal number NRF/SAASTA 07/2013-14 at the price/s quoted. My offer/s remains binding
upon me and open for acceptance by the purchaser during the validity period indicated and calculated from the
closing time of proposal.
2. The following documents shall be deemed to form and be read and construed as part of this agreement:
(i) Proposal documents, viz
- Invitation to proposal;
- Tax clearance certificate;
- Pricing schedule(s);
- Technical Specification(s);
- Preference claims for Broad Based Black Economic Empowerment Status Level of
Contribution in terms of the Preferential Procurement Regulations 2011;
- Declaration of interest;
- Declaration of service provider’s past SCM practices;
- Certificate of Independent Proposal Determination
- Special Conditions of Contract;
(ii) General Conditions of Contract; and
(iii) Other (specify)
3. I confirm that I have satisfied myself as to the correctness and validity of my proposal; that the price(s) and
rate(s) quoted cover all the goods and/or works specified in the proposal documents; that the price(s) and
rate(s) cover all my obligations and I accept that any mistakes regarding price(s) and rate(s) and calculations
will be at my own risk.
4. I accept full responsibility for the proper execution and fulfilment of all obligations and conditions devolving on
me under this agreement as the principal liable for the due fulfilment of this contract.
5. I declare that I have no participation in any collusive practices with any service provider or any other person
regarding this or any other proposal.
6. I confirm that I am duly authorised to sign this contract.
NAME (PRINT) ………………………………………….
CAPACITY ………………………………………….
SIGNATURE ………………………………………….
NAME OF FIRM ………………………………………….
DATE …………………………………………..
Page 22 of 37
WITNESSES
1 …….……………
SBD 7.1
CONTRACT FORM - PURCHASE OF GOODS/WORKSPART 2 - LETTER OF AWARD AND GRANT CONDITIONS
(TO BE ISSUED BY THE NATIONAL RESEARCH FOUNDATION)
NRF\SAASTA issues a Letter of award and Grant Conditions specifying the amount allocated to service provider.
23
19. SUPPLIER DUE DILIGENCE
o DECLARATION OF INTEREST (STANDARD BIDDING DOCUMENT 4)
1. Any legal person, including persons employed by the state¹, or persons having a kinship with persons employed by the
state, including a blood relationship, may make an offer or offers in terms of this invitation to bid (includes an advertised
competitive bid, a limited bid, a proposal or written price quotation). In view of possible allegations of favouritism,
should the resulting bid, or part thereof, be awarded to persons employed by the state, or to persons connected with or
related to them, it is required that the bidder or his/her authorised representative declare his/her position in relation to
the evaluating/adjudicating authority where-
the bidder is employed by the state; and/or
the legal person on whose behalf the bidding document is signed, has a relationship with persons/a person who
are/is involved in the evaluation and or adjudication of the bid(s), or where it is known that such a relationship
exists between the person or persons for or on whose behalf the declarant acts and persons who are involved with
the evaluation and or adjudication of the bid.
2. In order to give effect to the above, the following questionnaire must be completed and submitted with this bid.
2.1 Full Name of bidder or his or her representative:
2.2 Identity Number:
¹“State” means – (a) any national or provincial department, national or provincial public entity or constitutional institution within the
meaning of the Public Finance Management Act, 1999 (Act No. 1 of 1999);(b) any municipality or municipal entity;(c) provincial legislature;(d) national Assembly or the national Council of provinces; or(e) Parliament...
²”Shareholder” means a person who owns shares in the company and is actively involved in the management of the enterprise or business and exercises control over the enterprise.
2.3 Position occupied in the Company (director, trustee, shareholder², member):
2.4 Registration number of company, enterprise, close corporation, partnership agreement or trust:
2.5 Tax Reference Number:
Page 24 of 37
2.6 VAT Registration Number:
2.6.1 The names of all directors/trustees/shareholders/members, their individual identity numbers, tax reference
numbers and, if applicable, employee/PERSAL numbers must be indicated in paragraph 3 below.
2.7 Are you or any person connected with the bidder presently employed by the state? YES/NO
2.7.1 If so, furnish the following particulars:
Name of person/director/trustee/shareholder/member:
Name of state institution at which you or the person connected to the bidder is employed
Position occupied in the state institution:
Any other particulars:
2.7.2If you are presently employed by the state, did you obtain the appropriate authority to undertake remunerative work outside employment in the public sector? YES/NO
2.7.2.
1If yes, did you attach proof of such authority to the bid document? YES/NO
(Note: Failure to submit proof of such authority, where applicable, may result in the disqualification of the bid.)
2.7.2.
2If no, furnish reasons for non-submission of such proof:
2.8Did you or your spouse, or any of the company’s directors/ Trustees /shareholders /members or their spouses conduct business with the state in the previous twelve months? YES/NO
Page 25 of 37
2.8.1 If so, furnish particulars:
2.9Do you, or any person connected with the bidder, have any relationship (family, friend, other) with a person employed by the state and who may be involved with the evaluation and or adjudication of this bid?
YES/NO
2.9.1 2.9.1 If so, furnish particulars.
2.10Are you, or any person connected with the bidder, aware of any relationship (family, friend, other) between any other bidder and any person employed by the state who may be involved with the evaluation and or adjudication of this bid?
YES/NO
2.10.1 If so, furnish particulars:
2.11Do you or any of the directors/trustees/shareholders/members of the company have any interest in any other related companies whether or not they are bidding for this contract? YES/NO
2.11.1 If so, furnish particulars:
3. Full details of directors/trustees/members/shareholders.
Full Name Identity Number Personal Income Tax
Reference Number
State Employee
Number/ Payroll
(Persal) Number
Page 26 of 37
Schedule attached with the above details for all directors / members / shareholders YES NO
DECLARATION
I, THE UNDERSIGNED (NAME
CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 2 and 3 ABOVE IS CORRECT.
I ACCEPT THAT THE STATE MAY REJECT THE BID OR ACT AGAINST ME SHOULD THIS DECLARATION
PROVE TO BE FALSE.
Signature Date
Position Name of bidder
Page 27 of 37
o DECLARATION OF BIDDER’S PAST SUPPLY CHAIN MANAGEMENT PRACTICES (STANDARD BIDDING DOCUMENT 8)
1 This Standard Bidding Document must form part of all bids invited
2 It serves as a declaration used by institutions in ensuring that when goods and services are being procured, all
reasonable steps are taken to combat the abuse of the supply chain management system.
3 The bid of any bidder may be disregarded if that bidder, or any of its directors have-
a. abused the institution’s supply chain management system;
b. committed fraud or any other improper conduct in relation to such system; or
c. failed to perform on any previous contract.
4 In order to give effect to the above, the following questionnaire must be completed and submitted with the bid
Item Question Yes No
4.1 Is the bidder or any of its directors listed on the National Treasury’s Database of Restricted Suppliers as
companies or persons prohibited from doing business with the public sector?
(Companies or persons who are listed on this Database were informed in writing of this restriction by
the Accounting Officer/Authority of the institution that imposed the restriction after the audi alteram partem rule was applied).
The Database of Restricted Suppliers now resides on the National Treasury’s website
(www.treasury.gov.za) and can be accessed by clicking on its link at the bottom of the home page.
Yes No
4.1.1 If so, furnish particulars:
4.2 Is the bidder or any of its directors listed on the Register for Tender Defaulters in terms of section 29 of
the Prevention and Combating of Corrupt Activities Act (No 12 of 2004)?
The Register for Tender Defaulters can be accessed on the National Treasury’s website
(www.treasury.gov.za) by clicking on its link at the bottom of the home page.
Yes No
4.2.1 If so, furnish particulars:
Page 28 of 37
4.3 Was the bidder or any of its directors convicted by a court of law (including a court outside of the
Republic of South Africa) for fraud or corruption during the past five years?
Yes No
4.3.1 If so, furnish particulars:
4.4 Was any contract between the bidder and any organ of state terminated during the past five years on
account of failure to perform on or comply with the contract?
Yes No
4.4.1 If so, furnish particulars:
CERTIFICATION
I, THE UNDERSIGNED (FULL NAME)………………………………………………..........................................................…
CERTIFY THAT THE INFORMATION FURNISHED ON THIS DECLARATION FORM IS TRUE AND CORRECT.
I ACCEPT THAT, IN ADDITION TO CANCELLATION OF A CONTRACT, ACTION MAY BE TAKEN AGAINST ME SHOULD THIS
DECLARATION PROVE TO BE FALSE.
………………………………………... …………………………..
Signature Date
………………………………………. …………………………..
Position Name of Bidder
CERTIFICATE OF INDEPENDENT BID DETERMINATION (STANDARD BIDDING DOCUMENT 9)
1 This Standard Bidding Document (SBD) must form part of all bids including price quotations, advertised competitive bids,
limited bids and proposals invited.
Page 29 of 37
2 Section 4 (1) (b) (iii) of the Competition Act No. 89 of 1998, as amended, prohibits an agreement between, or concerted
practice by, firms, or a decision by an association of firms, if it is between parties in a horizontal relationship and if it involves
collusive bidding (or bid rigging).
Collusive bidding is a pe se prohibition meaning that it cannot be justified under any grounds. Bid rigging (or collusive bidding)
occurs when businesses, that would otherwise be expected to compete, secretly conspire to raise prices or lower the quality
of goods and / or services for purchasers who wish to acquire goods and / or services through a bidding process. Bid rigging
is, therefore, an agreement between competitors not to compete.
3 Treasury Regulation 16A9 prescribes that accounting officers and accounting authorities must take all reasonable steps to
prevent abuse of the supply chain management system and authorizes accounting officers and accounting authorities to:
a. disregard the bid of any bidder if that bidder, or any of its directors have abused the institution’s supply chain
management system and or committed fraud or any other improper conduct in relation to such system.
b. cancels a contract awarded to a supplier of goods and services if the supplier committed any corrupt or fraudulent
act during the bidding process or the execution of that contract.
4 This SBD serves as a certificate of declaration that would be used by institutions to ensure that, when bids are considered,
reasonable steps are taken to prevent any form of bid-rigging.
5 In order to give effect to the above, the attached Certificate of Bid Determination (SBD 9) must be completed and submitted
with the bid:
CERTIFICATE OF INDEPENDENT BID DETERMINATION
I, the undersigned, in submitting the accompanying bid:
_____________________________________________________________________________________________________
(Bid Number and Description)
In response to the invitation for the bid made by NATIONAL RESEARCH FOUNDATION do hereby make the following statements
that I certify to be true and complete in every respect:
I certify, on behalf of: ________________________________________________________________________________that:
(Name of Bidder)
1. I have read and I understand the contents of this Certificate;
2. I understand that the accompanying bid will be disqualified if this Certificate is found not to be true and complete in every
respect;
3. I am authorized by the bidder to sign this Certificate, and to submit the accompanying bid, on behalf of the bidder;
Page 30 of 37
4. Each person whose signature appears on the accompanying bid has been authorized by the bidder to determine the terms of,
and to sign the bid, on behalf of the bidder;
5. For the purposes of this Certificate and the accompanying bid, I understand that the word “competitor” shall include any
individual or organization, other than the bidder, whether or not affiliated with the bidder, who:
(a) has been requested to submit a bid in response to this bid invitation;
(b) could potentially submit a bid in response to this bid invitation, based on their qualifications, abilities or
experience; and
(c) Provides the same goods and services as the bidder and/or is in the same line of business as the bidder
6. The bidder has arrived at the accompanying bid independently from, and without consultation, communication, agreement or
arrangement with any competitor. However communication between partners in a joint venture or consortium³ will not be
construed as collusive bidding.
³ Joint venture or Consortium means an association of persons for the purpose of combining their expertise, property, capital,
efforts, skill and knowledge in an activity for the execution of a contract.
7. In particular, without limiting the generality of paragraphs 6 above, there has been no consultation, communication,
agreement or arrangement with any competitor regarding:
(a) prices;
(b) geographical area where product or service will be rendered (market allocation)
(c) methods, factors or formulas used to calculate prices;
(d) the intention or decision to submit or not to submit, a bid;
(e) the submission of a bid which does not meet the specifications and conditions of the bid; or
(f) bidding with the intention not to win the bid.
8. In addition, there have been no consultations, communications, agreements or arrangements with any competitor regarding
the quality, quantity, specifications and conditions or delivery particulars of the products or services to which this bid invitation
relates.
9. The terms of the accompanying bid have not been, and will not be, disclosed by the bidder, directly or indirectly, to any
competitor, prior to the date and time of the official bid opening or of the awarding of the contract.
10. I am aware that, in addition and without prejudice to any other remedy provided to combat any restrictive practices related to
bids and contracts, bids that are suspicious will be reported to the Competition Commission for investigation and possible
imposition of administrative penalties in terms of section 59 of the Competition Act No 89 of 1998 and or may be reported to
the National Prosecuting Authority (NPA) for criminal investigation and or may be restricted from conducting business with
the public sector for a period not exceeding ten (10) years in terms of the Prevention and Combating of Corrupt Activities Act
No 12 of 2004 or any other applicable legislation
Page 31 of 37
………………………………………………… …………………………………
Signature Date
…………………………………………………. …………………………………
Position Name of Bidder
Page 32 of 37
20. PREFERENCE POINTS CLAIM FORM (STANDARD BIDDING DOCUMENT 6.1)
NB: This preference form must form part of all bids invited. It contains general information and serves as a claim form for preference points for Broad-Based Black Economic Empowerment (B-BBEE) Status Level of Contribution.
Before completing this form, bidders must study the general conditions, definitions and directives applicable in respect of B-BBEE, as prescribed in the Preferential Procurement Regulations, 2011
1. GENERAL CONDITIONS1.1 The following preference point systems are applicable to all bids:
- the 80/20 system for requirements with a Rand value of up to R1 000 000 (all applicable taxes included); and
- the 90/10 system for requirements with a Rand value above R1 000 000 (all applicable taxes included).
1.2 The value of this bid is estimated to exceed/not exceed R1 000 000 (all applicable taxes included) and therefore
the……………………system shall be applicable.
1.3 Preference points for this bid shall be awarded for:
(a) Price; and
(b) B-BBEE Status Level of Contribution.
1.3.1 The maximum points for this bid are allocated as follows:
POINTS
1.3.1.1 PRICE
1.3.1.2 B-BBEE STATUS LEVEL OF CONTRIBUTION
Total points for Price and B-BBEE must not exceed 100
1.4 Failure on the part of a bidder to fill in and/or to sign this form and submit a B-BBEE Verification Certificate from a Verification
Agency accredited by the South African Accreditation System (SANAS) or a Registered Auditor approved by the Independent
Regulatory Board of Auditors (IRBA) or an Accounting Officer as contemplated in the Close Corporation Act (CCA) together
with the bid, will be interpreted to mean that preference points for B-BBEE status level of contribution are not claimed.
1.5 The purchaser reserves the right to require of a bidder, either before a bid is adjudicated or at any time subsequently, to
substantiate any claim in regard to preferences, in any manner required by the purchaser.
2. DEFINITIONS2..1 “all applicable taxes” includes value-added tax, pay as you earn, income tax, unemployment insurance fund contributions
and skills development levies;
2.2 “B-BBEE” means broad-based black economic empowerment as defined in section 1 of the Broad -Based Black Economic
Empowerment Act;
2.3 “B-BBEE status level of contributor” means the B-BBEE status received by a measured entity based on its overall
performance using the relevant scorecard contained in the Codes of Good Practice on Black Economic Empowerment, issued
in terms of section 9(1) of the Broad-Based Black Economic Empowerment Act;
2.4 “bid” means a written offer in a prescribed or stipulated form in response to an invitation by an organ of state for the provision
of services, works or goods, through price quotations, advertised competitive bidding processes or proposals;
2.5 “Broad-Based Black Economic Empowerment Act” means the Broad-Based Black Economic Empowerment Act, 2003
(Act No. 53 of 2003);
2.6 “comparative price” means the price after the factors of a non-firm price and all unconditional discounts that can be utilized
have been taken into consideration;
2.7 “consortium or joint venture” means an association of persons for the purpose of combining their expertise, property, Page 33 of 37
capital, efforts, skill and knowledge in an activity for the execution of a contract;
2.8 “contract” means the agreement that results from the acceptance of a bid by an organ of state;
2.9 “EME” means any enterprise with an annual total revenue of R5 million or less.
2.10 “Firm price” means the price that is only subject to adjustments in accordance with the actual increase or decrease resulting
from the change, imposition, or abolition of customs or excise duty and any other duty, levy, or tax, which, in terms of the law
or regulation, is binding on the contractor and demonstrably has an influence on the price of any supplies, or the rendering
costs of any service, for the execution of the contract;
2.11 “functionality” means the measurement according to predetermined norms, as set out in the bid documents, of a service or
commodity that is designed to be practical and useful, working or operating, taking into account, among other factors, the
quality, reliability, viability and durability of a service and the technical capacity and ability of a bidder;
2.12 “non-firm prices” means all prices other than “firm” prices;
2.13 “person” includes a juristic person;
2.14 “rand value” means the total estimated value of a contract in South African currency, calculated at the time of bid invitations,
and includes all applicable taxes and excise duties;
2.15 “sub-contract” means the primary contractor’s assigning, leasing, making out work to, or employing, another person to
support such primary contractor in the execution of part of a project in terms of the contract;
2.16 “total revenue” bears the same meaning assigned to this expression in the Codes of Good Practice on Black Economic
Empowerment, issued in terms of section 9(1) of the Broad-Based Black Economic Empowerment Act and promulgated in the
Government Gazette on 9 February 2007;
2.17 “trust” means the arrangement through which the property of one person is made over or bequeathed to a trustee to
administer such property for the benefit of another person; and
2.18 “trustee” means any person, including the founder of a trust, to whom property is bequeathed in order for such property to be
administered for the benefit of another person.
3. ADJUDICATION USING A POINT SYSTEM3.1 The bidder obtaining the highest number of total points will be awarded the contract.
3.2 Preference points shall be calculated after prices have been brought to a comparative basis taking into account all factors of
non-firm prices and all unconditional discounts;.
3.3 Points scored must be rounded off to the nearest 2 decimal places.
3.4 In the event that two or more bids have scored equal total points, the successful bid must be the one scoring the highest
number of preference points for B-BBEE.
3.5 However, when functionality is part of the evaluation process and two or more bids have scored equal points including equal
preference points for B-BBEE, the successful bid must be the one scoring the highest score for functionality.
3.6 Should two or more bids be equal in all respects, the award shall be decided by the drawing of lots.
4. POINTS AWARDED FOR PRICE4.1 THE 80/20 OR 90/10 PREFERENCE POINT SYSTEMS
A maximum of 80 or 90 points is allocated for price on the following basis:
80/20 or 90/10
Ps=80(1− Pt−PminPmin )Or
Ps=90(1−Pt−PminPmin )Where
Page 34 of 37
Ps = Points scored for comparative price of bid under consideration
Pt = Comparative price of bid under consideration
Pmin = Comparative price of lowest acceptable bid
1. POINTS AWARDED FOR B-BBEE STATUS LEVEL OF CONTRIBUTION5.1 In terms of Regulation 5 (2) and 6 (2) of the Preferential Procurement Regulations, preference points must be awarded to a
bidder for attaining the B-BBEE status level of contribution in accordance with the table below:
B-BBEE Status Level of Contributor
Number of points(90/10 system)
Number of points(80/20 system)
1 10 202 9 183 8 164 5 125 4 86 3 67 2 48 1 2
Non-compliant contributor 0 05.2 Bidders who qualify as EMEs in terms of the B-BBEE Act must submit a certificate issued by an Accounting Officer as
contemplated in the CCA or a Verification Agency accredited by SANAS or a Registered Auditor. Registered auditors do not
need to meet the prerequisite for IRBA’s approval for the purpose of conducting verification and issuing EMEs with B-BBEE
Status Level Certificates.
5.3 Bidders other than EMEs must submit their original and valid B-BBEE status level verification certificate or a certified copy
thereof, substantiating their B-BBEE rating issued by a Registered Auditor approved by IRBA or a Verification Agency
accredited by SANAS.
5.4 A trust, consortium or joint venture, will qualify for points for their B-BBEE status level as a legal entity, provided that the
entity submits their B-BBEE status level certificate.
5.5 A trust, consortium or joint venture will qualify for points for their B-BBEE status level as an unincorporated entity, provided
that the entity submits their consolidated B-BBEE scorecard as if they were a group structure and that such a consolidated B-
BBEE scorecard is prepared for every separate bid.
5.6 Tertiary institutions and public entities will be required to submit their B-BBEE status level certificates in terms of the
specialized scorecard contained in the B-BBEE Codes of Good Practice.
5.7 A person will not be awarded points for B-BBEE status level if it is indicated in the bid documents that such a bidder intends
sub-contracting more than 25% of the value of the contract to any other enterprise that does not qualify for at least the points
that such a bidder qualifies for, unless the intended sub-contractor is an EME that has the capability and ability to execute the
sub-contract.
5.8 A person awarded a contract may not sub-contract more than 25% of the value of the contract to any other enterprise that
does not have an equal or higher B-BBEE status level than the person concerned, unless the contract is sub-contracted to an
EME that has the capability and ability to execute the sub-contract.
6. BID DECLARATION6.1 Bidders who claim points in respect of B-BBEE Status Level of Contribution must complete 7.1 below:
7 B-BBEE STATUS LEVEL OF CONTRIBUTION CLAIMED IN TERMS OF PARAGRAPHS 1 AND 5 7.1 B-BBEE Status Level of Contribution: …………. = …………… (maximum of 10 or 20 points)
(Points claimed in respect of paragraph 7.1 must be in accordance with the table reflected in paragraph 5.1 and must be
substantiated by means of a B-BBEE certificate issued by a Verification Agency accredited by SANAS or a Registered Auditor
Page 35 of 37
approved by IRBA or an Accounting Officer as contemplated in the CCA).
8 SUB-CONTRACTING8.1 Will any portion of the contract be sub-contracted? YES / NO
(delete which is not applicable)
8.1.1 If yes, indicate:
(i) what percentage of the contract will be subcontracted? ..................................……………….…%
(ii) the name of the sub-contractor? ……………………………………………………………………………..
(iii) the B-BBEE status level of the sub-contractor? ……………..
(iv) whether the sub-contractor is an EME? YES / NO
(delete which is not applicable)
9 DECLARATION WITH REGARD TO COMPANY/FIRM9.1 Name of company/firm …………………………………………….................................................................................
9.2 VAT registration number: ……………………………………………..................................................................................
9.3 Company registration number ……………………………………………....................................................
9.4 TYPE OF COMPANY/ FIRM
Partnership/Joint Venture / Consortium One person business/sole propriety Close corporation Company (Pty) Limited
[Tick applicable box]
9.5 DESCRIBE PRINCIPAL BUSINESS ACTIVITIES
………….......................................................................................................................................................................................................
......................................................................................................................................................................................................................
......................................................................................................................................................................................................................
......................................................................................................................................................................................................................
...........................................................................................................................................................................................
9.6 COMPANY CLASSIFICATION
Manufacturer Supplier Professional service provider Other service providers, e.g. transporter, etc.
[Tick applicable box]
9.7 Total number of years the company/firm has been in business? …………………………………………………….……………
9.8 I/we, the undersigned, who is / are duly authorised to do so on behalf of the company/firm, certify that the points claimed,
based on the B-BBE status level of contribution indicated in paragraph 7 of the foregoing certificate, qualifies the company/
firm for the preference(s) shown and I / we acknowledge that:
(i) The information furnished is true and correct;
(ii) The preference points claimed are in accordance with the General Conditions as indicated in paragraph 1 of this
form.
(iii) In the event of a contract being awarded as a result of points claimed as shown in paragraph 7, the contractor may
be required to furnish documentary proof to the satisfaction of the purchaser that the claims are correct;
(iv) If the B-BBEE status level of contribution has been claimed or obtained on a fraudulent basis or any of the conditions
Page 36 of 37
of contract have not been fulfilled, the purchaser may, in addition to any other remedy it may have –
(a) disqualify the person from the bidding process;
(b) recover costs, losses or damages it has incurred or suffered as a result of that person’s conduct;
(c) cancel the contract and claim any damages which it has suffered as a result of having to make less
favourable arrangements due to such cancellation;
(d) restrict the bidder or contractor, its shareholders and directors, or only the shareholders and directors who
acted on a fraudulent basis, from obtaining business from any organ of state for a period not exceeding 10
years, after the audi alteram partem (hear the other side) rule has been applied; and
(e) forward the matter for criminal prosecution
WITNESSES:1.
SIGNATURE(S) OF BIDDER(S)
2.
DATE
ADDRESS
Page 37 of 37
top related