Project Readiness Package Rev 7/22/11
Page 1 of 7
ADMINISTRATIVE+INFORMATION:+!
• Project!Name!
(tentative):!
Vortex!Induced!Vibration!Energy!Collection!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
• Project!Number,!if!known:! !
!
• Preferred!Start/End!Quarter!in!Senior!Design:!2013! !
!
!
• Faculty!Champion:!!
! !
Name! Dept.! Email! Phone!
! ! ! !!
!• Other!Support,!if!known:!!
! !
Name! Dept.! Email! Phone!
! ! ! !
! ! ! !
!
• Project!“Guide”!if!known:!!
!
• Primary!Customer,!if!known!(name,!phone,!email):!!
!
• Sponsor(s):!!
!
Name/Organization! Contact!Info.! Type!&!Amount!of!Support!
Committed!
! ! !
! ! !
!
!
!
Fall/Winter!
!
Fall/Spring!
!
Winter/Spring!
Project Readiness Package Rev 7/22/11
Page 2 of 7
+PROJECT+OVERVIEW:++!! Vortex!induced!vibration!as!means!of!energy!collection!in!water!has!several!advantages!over!
other!water! energy! collection! systems.! The! design! is! a! simple!mass,! spring,! damper! system! (see!
Figure!1)!with!the!damper!being!the!energy!takeoff!device.!More!specifically,!the!damper!is!a!linear!
generator.!The!simplistic!design!allows!for!a!modular!system—the!bluff!body!(mass)!used!to!cause!
vortices! to!shed!and! induce!vibrations!could!be!exchanged!with!a!different!geometry! to!optimize!
vibrations! and! the! spring! and! the! damper! could! be! scaled! accordingly! to! maximize! energy!
collection.!The!modularity!of!the!system!also!allows!the!system!to!be!portable!for!the!end!user.!The!
small!size!of!this!system!is!an!advantage!towards!the!aquatic!life;!the!goal!is!to!keep!the!ecosystem!
intact.! Overall,! the! system! should! be! able! to! be! scaled! for! multiple! river! velocities,! multiple!
locations,!and!be!modular.!
!
A!full[sized!prototype!should!be!built!to!perform!theoretical!and!experimental!analysis.!The!
theoretical! analysis! should! be!modeled! so! that!multiple! river! velocities,! river! temperatures,! and!
system!parameters!can!be!analyzed!and!compared!to!experimental!results.!Because!a!river!with!the!
target! flow!velocity!may!not!be!available,!experimental! testing!may!have! to!be!done!using!a! flow!
table.!This!is!crucial!to!avoid!damage!from!debris!in!water!and!freezing!temperatures!in!the!winter.!
Legal!permission!and!access!to!an!ideal!river!may!also!be!difficult!to!obtain.!Initial!testing!should!be!
done!in!a!flow!table,!but!eventually!the!system!should!be!tested!outdoors,!in!a!“real[life”!situation.!
!
The!goal!of!this!project!is!to!build!a!vortex!induced!vibration!energy!collector!prototype!that!
can! be! placed! in! a! flow! tank,! river! or! stream.! The! system! should! only! oscillate! vertically!
(constrained!along! the!y[axis),!and!be!optimized!so! the!system!doesn’t!vibrate!out!of!control!and!
the! amount! of! energy! collected! is! maximized.! The! system! should! also! interface! with! the! MSD!
P12402!Battery!Bank.!The!experimental!results!from!a!flow!tank!or!stream!will!be!compared!to!the!
theoretical! results! obtained! through! simulation.! This! system! model! should! be! analyzed! using!
MATLAB!and!Simulink.!
!
!
!
Figure!1.
Project Readiness Package Rev 7/22/11
Page 3 of 7
!DETAILED'PROJECT'DESCRIPTION:!
• CUSTOMER!NEEDS!AND!OBJECTIVES:!
!!
!• Functional!Decomposition:!
Project Readiness Package Rev 7/22/11
Page 4 of 7
• Potential)Concepts:")o The)geometry)of)the)bluff)body)(mass))should)be)such)that)maximum)vorticy)
shedding)occurs.)A)“golf)ball”)shape)could)be)used,)but)would)be)difficult)to)fabricate.)o A)nozzle)could)be)placed)in)front)of)the)bluff)body)to)speed)up)flow)to)maximize)
vibrations.)May)be)unnecessary)because)this)technology)can)exist)in)low)flows,)and)high)flow)velocities)may)cause)system)to)vibrate)out)of)control.)
o Multiple)of)these)devices)could)be)implemented)into)a)stream)to)generate)more)energy,)but)the)proximity)of)one)device)to)another)will)have)to)be)explored)so)the)shedded)vortices)of)one)do)not)affect)the)other.)
o Adjusting)the)spring)constant)or)using)multiple)springs)could)also)help)maximize)energy)collection.)Modeling)the)system)analytically)will)verify)this.)
o Testing)should)be)done)in)a)flow)tank)if)possible)to)avoid)high)flow)rates,)water)debris,)and)freezing)temperatures)if)testing)done)in)the)winter.)
)• Specifications)(or)Engineering/Functional)Requirements):))
))
Note:)Several)parameters)depend)on)the)model’s)geometric)scaling.))• Constraints:))
o If)testing)is)conducted)in)an)indoor)facility,)written)permission)must)be)obtained.)o If)testing)requires)the)collaboration)between)another)MSD)team,)communication)and)
citations)must)be)clearly)defined)and)recorded.)o Outdoors)testing)must)be)conducted)in)a)safe)and)predictable)setting.)
))• Project)Deliverables:))
• Complete)Set)of)Technical)Information:))
Project Readiness Package Rev 7/22/11
Page 5 of 7
o Documented)set)of)theoretical)calculations)and)simulations)for)device)o Complete)drawing)package)of)overall)assembly)and)each)component,)as)well)as)the)
CAD)solid)models)o Complete)instructions)for)assembly)and)disassembly.)o Complete)set)of)experimental)results)o Comparison)of)analytical)and)experimental)results)o Cost)analysis,)and)suggestions)for)future)cost)reduction)o Suggestions)for)future)product)improvement)
)• )An)intuitive)operation)manual)including)device)transportRsetupRdisassembly,)device)
maintenance,)microcontroller)use,)and)adjustment)of)device)oscillations.)Key)contacts,)if)needed,)should)be)provided)for)the)endRuser.))
• Team)will)present)a)summary)report)on)assigned)and)assimilated)benchmarking)activities)sometime)during)weeks)3R5.))Successful)completion)of)this)project)requires)a)solid)understanding)of)the)basic)operational)characteristics)of)fluid)mechanics,)similitude,)and)vortex)induced)vibration)to)an)extent.)Students)will)acquire)this)knowledge)via)lecture,)reading)and)conduction)of)several)experiments.))
• Team)will)conduct)(2))Project)Reviews)during)MSD)1.))A)system)level)review)will)be)held)sometime)during)weeks)4R6.))A)detailed)design)review)will)be)held)sometime)during)weeks)7R9.))
• Team)will)conduct)a)final)week)11)review)with)their)Guide.))
• Team)members)will)supply)Peer)Evaluations)at)the)end)of)weeks)3,)6,)9)per)guide’s)direction.)))• Budget)Estimate:)$2000)
)• Intellectual)Property)(IP))considerations:)
)As)a)federally)funded)project,)any)IP)generated)as)a)result)of)this)project)should)belong)to)RIT)but)the)project)champion)should)check)the)details.)))
• Other)Information:))
• Continuation)Project)Information,)if)appropriate:)Include"prior"project(s)"information,"and"how"prior"project(s)"relate"to"the"proposed"project.)
!!!!!!!STUDENT!STAFFING:!)
Project Readiness Package Rev 7/22/11
Page 6 of 7
• Skills)Checklist:))
))
• Anticipated)Staffing)Levels)by)Discipline:))
Discipline)How)
Many?)Anticipated)Skills)Needed)(concise"descriptions))
EE) )
2) EE1:)Speed)controls)engineer—responsible)for)controller)selection,)
possible)feedback)design)for)device)control,)work)with)modeling)team)
to)properly)protect)and)house)any)submerged)electrical)components.))
EE2:)Power)storage)engineer—responsible)for)linear)generator)
selection,)connection)from)generator)to)Battery)Bank,)proper)safety)of)electrical)devices.)
ME) )
3) ME1:)Foundation)designer—responsible)for)design)of)support)system)
including)frame)design,)design)for)assembly,)disassembly)and)transportation)of)the)system.)Design)for)possible)nozzle)in)front)of)
device.))
ME2:)Collection)designer—responsible)for)design)of)mass,)spring)
damper)system,)possibility)the)components)will)be)exchanged)for)others.)
)ME3:)Collection)designer/simulation)engineer—responsible)for)
creating)theoretical)model)of)system)and)optimizing)system.)
Responsible)for)design)of)mass,)spring)damper)system,)possibility)the)components)will)be)exchanged)for)others.)
ISE) )1) ISE1:)Ergonomics,)design)for)simple)assembly)and)disassembly,)
usability,)design)of)experiments)and)manufacturing)
)
)
OTHER!RESOURCES!ANTICIPATED:!"
Project Readiness Package Rev 7/22/11
Page 7 of 7
Category! Description! Resource!Available?!
Faculty! ! !
! ! !
! ! !
Environment! MSD!Design!Center! !
! EE!Senior!Design!Lab! !
! Machine!Shop,!Brinkman!Lab! !
Equipment! ! !
! ! !
! ! !
Materials! ! !
! ! !
! ! !
Other! ! !
! ! !
! ! !
"""")Prepared)by:) Katelyn)Cerankosky) ) Date:)))) 11/16/2011))