Key issues in Managing a Global
Software Outsourcing
relationship between a Norwegian
and Russian firm: Some Practical
Implications
Vegar Imsland, Sundeep Sahay and Yvonne Wartiainen
April 9th 2003
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
2
Agenda
• The context of the research
• Methodology
• Discuss 3 key issues that influenced the relationship, and suggest some points of action:
• Knowledge sharing• Estimation
• Project Management
• Communication
• Discussion
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
3
The context of the research
• NorSys: The Norwegian customer
• RussCo: The Russian developer
• Relationship started in 1999
• Possible future projects
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
4
The context of the research – compared with IN364 issues
• Theoretical foundations• Research methodology
• Illustrating complexity• Structuration theory: Understanding culture
• Organizational complexity• Geographical distance
• Context specific knowledge
• Language
• GSO vs. Participatory Design
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
5
MethodologyData collection:• 12 interviews in Norway and 14 interviews at RussCo in St.
Petersburg.• Reading project documents. • Analyzing tools used in the project.• Discussions.
Other:• Feedback to the Norwegian project staff – used by the project-
members to justify their actions.• We felt moral obligations to give something back to the
companies. • The Norwegian company sponsored our trip to Russia.
• …but never instructed us what to write. • Our engagement in the project has had practical implications which
we consider positive.• We believe we could not have collected our data being less involved
in the project.• We were asked for advice during the project.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
6
Knowledge sharing
• Definition: Concerns the various processes through which information and knowledge is acquired, shared and integrated.
• Various forms of knowledge: the Norwegian tax- and salary rules, about developing estimates, about SalarySystem, TestTool, and Delphi.
• Various mechanisms: face-to-face meetings, written documents, e-mails, telephone-conversations and ICQ-chats, project-reports and bug-reports.
• Local knowledge: Knowledge which could not be transferred, which was in the heads of people and embedded in work practices.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
7
Knowledge sharing
• Problem 1: Lack of domain knowledge
• Problem 2: Inadequate efforts to transfer knowledge• Estimation
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
8
Knowledge sharing
Lack of domain knowledge• NorSys was supposed to have complete
knowledge of SalarySystem• SalarySystem is very context specific
• Little written documentation
• RussCo was believed to have established procedures and understanding of how outsourcing should be done
• Redesign projects are different from ”new” projects
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
9
Knowledge sharing
Inadequate efforts to transfer knowledge
• Knowledgeable RussCo people spent time on other projects
• Language problems
• Positive: TestTool and the test cases improved the knowledge sharing
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
10
Knowledge sharing
Estimation• Technical focus
• Top-down approach
• RussCo wanted the contract → made low estimates
• No negotiation process
• No overall evaluation; interconnected modules
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
11
Knowledge sharing
Suggested points of action:• Earlier and regular face-to-face meetings • Encourage more communication channels to be used• Videoconferencing• Closer control over movement of personnel• Language and cultural training
Estimation:• Take the GSO nature of the project into consideration• Do not make estimates unless the understanding of the
system is appropriate • Emphasize the need to develop “correct” rather than “low”
estimates
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
12
Project management
Within the issue of project management, we include the formal (and also informal) routines and procedures for application of knowledge, management of skills, use of tools and techniques for project activities in order to meet the common aim of the partners to successfully complete the project.
We first discuss some project management related problems and then discuss some suggested points of action.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
13
Project Management
• Problem 1: The role and movement of key people
• Problem 2: Project Reporting
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
14
Project Management
The role and movement of key people
Key people: those people that because of their role, knowledge, and work-tasks are important to the project
Organizational structure: the information-processing network in the organization including points of team members’ power
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
15
Project Management
The role and movement of key people
• No formal demand related to the team members skills and experience was made.
• The challenge of language led to bigger workload on two people (the Russian speaking developer on the Norwegian side, and the Russian project leader on the Russian side) than originally intended.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
16
Project Management
The role and movement of key people
• Too much information is routed through one person, increasing the risk for overload – and “person dependent”. The result of overload is often selection, which again might lead to ignorance of important issues.
• The organizational structure of the Russian company prevents the project leader from taking important decisions based on the knowledge he/she’s gained – “responsibility without authority”.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
17
Project Management
Project reporting• Testers are pressurized due to lack of time
to close and report a build as verified (successfully fixed), before they are satisfied with the corrections made.
• Both the companies lacked the appropriate level of understanding about the project status in the beginning of the project due to general reports, and that no checks were made to verify the status.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
18
Project Management
Project reporting• The programmer on the Norwegian side has
no formal responsibility to report his progress on the calculation engine, complicating the parallel programming and integration process.
• Detailed reports are good for the project members closely involved in the project, but more high-level and general reports should be made for the upper-management.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
19
Project Management
Suggested points of action:• Make it a contractual obligation for the
vendor to provide the buyer with CVs from project members, and report shifts of people and get approvals from NorSys.
• Allow more direct communication lines to:1. spread knowledge among people.
2. reduce risk of overload on one person.
3. make cross-site problem solving more efficient.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
20
Project Management
Suggested points of action:• Decrease the consequences of shift in
personnel by introducing shadowing/buffering – let one extra person follow the project so that if one leaves, this one can step in on short notice.
• CMM : establish routines, procedures, and make documentation about the project more available.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
21
Project Management
Suggested points of action:• Reexamining the relationship between
testers and developers to find answers to whether closing builds premature creates new bugs and will result in further delays in the long run. Release build every second week instead of every week? When 80% of bugs are fixed.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
22
Project Management
Suggested points of action:• Generate more general and less-detailed
report for the overall management of the project – for top management.
• Introduce another level of management that reports to the project leader from the testers and programmers.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
23
Communication
Definition: describes the transmission and receiving of information, and the feelings and attitudes of the people involved with the overall purpose of having it understood and producing a response.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
24
Communication
• Problem 1: Content of communication.
• Problem 2: Channels of communication.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
25
Communication
Content of communication• Issues of high and low context
communication: Norwegian expect direct communication, while Russians has a more indirect communication style.
• Concepts are not universal so that even if you could translate the word “bilgodtgjørelse” to English or Russian, you need to fill in with an explanation of the actual meaning.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
26
Communication
Content of communication• Due to English language limitations
Russian team members seems reluctant to write to the e-mail list because it is to serve as formal documentation. Explaining technical issues, and concepts that are local to Norway was further complicated by the limitation of language.
• Black-box communication.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
27
Communication
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
28
Communication
Channels of communicationDifferent channels have different characteristics
which makes their use more, or less, critical at different stages in the project:
• Face-to-face: in this project these meetings have been too few, to late, and with not enough people attending.
• E-mail: result of the e-mail list: team members reluctant to use it due to visibility to management. Led to use of informal channels and more work for the Russian project leader.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
29
Communication
Channels of communication• ICQ: has encouraged its own use because it allowed for
informal, invisible communication in Russian between the two sites. Was removed for security reasons.
• TestTool: made monitoring of bugs efficiently, made customer input on bugs possible, increase the customers sense of control.
• Telephone: due to costs and lack of shared language this has not been used, but for those speaking Russian it would have been preferred.
• Video conferencing: provide similar opportunities to face-to-face meetings, but is not used in this project.
• Fax: not used in this project.
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
30
Communication
Suggested points of action:• Explore additional channels
• Increase amount of face-to-face meetings
• Consider the use of videoconference as a complement to face-to-face meetings
• Sort out the technical problems with NetMeeting because it will provide the capabilities of ICQ and the visual dimension
• Encourage more direct channels of communication
• Introduce language and cultural training
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
31
Communication
Ve
ga
r Im
sla
nd
, S
un
de
ep
Sa
ha
y, a
nd
Yvo
nn
e W
art
iain
en
De
pa
rtm
en
t o
f in
form
atic
s, U
niv
ers
ity o
f O
slo
Ap
ril 9
th 2
00
3
32
Discussion
• Methodology
• Problems
• Suggested action
• Questions