Utah EWP Work. April, 2005 Visual Progress Report. Early survey work and estimates completed in record time. Lots of debris in major channels. Debris was widespread. Tributaries sustained damage. Roads were damaged. Bridges were damaged. Enterprise Dam continues to feel the pressure. - PowerPoint PPT Presentation

Transcript

Utah EWP WorkUtah EWP WorkApril, 2005April, 2005

Visual Progress ReportVisual Progress Report

Early survey work and Early survey work and estimates completed in record estimates completed in record

timetime

Lots of debris in major Lots of debris in major channelschannels

Debris was widespreadDebris was widespread

Tributaries sustained Tributaries sustained damagedamage

Roads were damagedRoads were damaged

Bridges were damagedBridges were damaged

Enterprise Dam continues to Enterprise Dam continues to feel the pressurefeel the pressure

30 miles of stream corridors 30 miles of stream corridors sustained damagesustained damage

Off-site rock being loadedOff-site rock being loaded

Unloading rock on-siteUnloading rock on-site

Channel extended beyond Channel extended beyond damaged homesdamaged homes

Streambank protectedStreambank protected

Lots of coordination Lots of coordination requiredrequired

Quality construction Quality construction materialmaterial

Lots of work remainingLots of work remaining

Utah NRCS EWP Contacts:Utah NRCS EWP Contacts: Sylvia Gillen, State ConservationistSylvia Gillen, State Conservationist Vane Campbell, Area ConservationistVane Campbell, Area Conservationist Blake Walbeck, On-site ManagerBlake Walbeck, On-site Manager Eric Fleming, State EngineerEric Fleming, State Engineer Ron Francis, Public AffairsRon Francis, Public Affairs