US ARMY CORPS OF ENGINEERS SACRAMENTO ...samesacramento.org/calendar/2017smf/09-USACE-SPK-John...217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135
Post on 09-Jul-2020
4 Views
Preview:
Transcript
217
217
217
200
200
200
255
255
255
0
0
0
163
163
163
131
132
122
239
65
53
110
135
120
112
92
56
62
102
130
102
56
48
130
120
111
237
237
237
80
119
27
252
174
.59
“The views, opinions and findings contained in this report are
those of the authors(s) and should not be construed as an
official Department of the Army position, policy or decision,
unless so designated by other official documentation.”
1
US ARMY CORPS OF ENGINEERSSACRAMENTO DISTRICTJULY 27, 2017
SOCIETY OF AMERICAN MILITARY ENGINEERS2017 SUSTAINING MEMBERS FORUM
LTC JOHN LORY, PMPDEPUTY DISTRICT COMMANDER
FOR INFORMATIONAL PURPOSES ONLY
ALL INFORMATION SUBJECT TO CHANGE
SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES
2
FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov
QuarterAdvertise
Construction A-E Environmental
Unrestricted Small Bus TBD Unrestricted Small Bus Unrestricted Small Bus
4QFY17
~$12.67M
1QFY18
~$375M ~$45.5M ~$3M ~$9M ~$7.5M
2QFY18
~$237.5M ~$138M ~$105M ~$50M
3Q-4QFY18
~$215.5M ~$28M
TBD ~$125M ~$2.5M
SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES - 4Q FY17
3
FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov
Construction – Small Business Design Build Remove/Replace Gate Houses
106DDJC Tracy Between $100K - $250K
Repair Floors at Warehouses 15, 17-22, and
28 DDJC Tracy Between $1M-$5M
Terminal 2 Bridge Repairs MOTCO Between $5M-$10M
Design Bid Build Renovate Cafeteria - Bldg 16 DDJC Tracy Between $1M-$5M
SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES - 1Q FY18
4
FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov
Construction – UnrestrictedCalifornia Central Valley Levee Improvement
Construction MATOC BaseNatomas, CA Between $250M - $500M
Access Control Point (ACP) -1 MOTCO >$10M
ARCF Reach D Sacramento, CA Between $10M - $25M
FY19-23 Habitat Restoration /Biomonitoring
IDIQ Former Fort Ord Between $5M-$10M
Design Bid Build Access Control Point 5 MOTCO Between $5M-$10M
Design Bid Build Composite Aircraft Antenna
Calibration FacilityHill AFB Between $5M-$10M
Design Build Gas Line and Fuel Swap Tooele Army Depot Between $5M-$10M
East Gate Canopy and Inspection Facility Hill AFBBetween $1M-$5M
Construction – Small Business
SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES - 1Q FY18
5
FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov
A-E – Small Business
Master Planning-GIS (Small Business) SPD - Division $9M capacity
FY19-23 Habitat Restoration /Biomonitoring
IDIQ Former Fort Ord Between $5M-$10M
Environmental – Small Business
Construction – TBD
Design Build Radiant Heating System
Replacement at Bldgs 102 and 103Fort Douglas Between $1M-$5M
SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES - 2Q FY18
6
FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov
Construction – Unrestricted
VA Reno Main Bldgs Reno, NV Between $100M - $250M
VA Alameda Phase I Alameda CA Between $25M - $100M
MOTCO Paving & Utilities MATOC Base MOTCO Between $25M - $100M
Utah Design-Build MATOC Base Utah Between $25M - $100M
Recreation Maintenance MATOC Base Various Between $5M-$10M
Design Build Secondary Wastewater
Treatment Facility Fort Hunter Liggett Between $1M-$5M
Munitions/Admin Warehouse Beale AFB Between $1M-$5M
Construction – Small Business
SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES - 2Q FY18
7
FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov
Construction – TBD
MATOC IDIQ Design Build Underground
Utilities SPD - Division Between $25M - $100M
Design Bid Build Marysville Ring Levee Phase
2A Civil Construction South Yuba County, CA Between $10M - $25M
Design Bid Build Replace POL Pump House Hill AFB Between $10M - $25M
MOTCO Bridge T-1/ -4/ -5/ -6/ -7/ -10
Renovation MOTCO Between $5M-$10M
A-E - Unrestricted
Master Planning-GIS (Unrestricted) SPD - Division $50M capacity
SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES - 3Q-4Q FY18
8
FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov
Construction – Unrestricted
Consolidated Mission Control Center Hill AFB Between $25M - $100M
Solar Photovoltaic 2MW Dugway Proving Grounds Between $5M-$10M
Solar Photovoltaic 2MW Dugway Proving Grounds Between $1M-$5M
Energy Resilience Microgrid Hill AFB Between $5M-$10M
Repair Steam Condensate System B260/1590 Hill AFB Between $1M-$5M
Construction – Small Business
SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES – FY18ADVERTISE DATE TBD
9
FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov
Construction – Unrestricted
American River Watershed Folsom Dam Raise Folsom, CA Between $25M - $100M
American River Watershed Natomas Basin Natomas, CA Between $25M - $100M
Install New PCC Apron Hill AFB Between $5M-$10M
Construction – Small Business
217
217
217
200
200
200
255
255
255
0
0
0
163
163
163
131
132
122
239
65
53
110
135
120
112
92
56
62
102
130
102
56
48
130
120
111
237
237
237
80
119
27
252
174
.59
SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES
10
FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov
QUESTIONS?
http://www.spk.usace.army.mil/
top related