University of Alabama Formula SAE 2005 ME490 Senior Design Status March 2 nd, 2005.
Post on 17-Jan-2016
216 Views
Preview:
Transcript
March 2nd ME490 Status Report
– Clutch/Shifting, Engine Development & Suspension
– Team Captain, Business Lead & Drivetrain
– Controls Lead & Engine Cooling
– Engine Development & Body/Composites
March 2nd ME490 Status Report
– Dimensions (60in WB, track restriction)– 20mm Engine Restriction– Safety Req’ts– Time Constraints
– Students– University
March 2nd ME490 Status Report
Intake Manifold
Differential Carrier
Anti-Roll BarsECU – Engine Control Unit
Shocks/RockersHalfshafts/CV Joints
March 2nd ME490 Status Report
– Final Intake Manifold Constructed– Exhaust Header Constructed– ECU Wiring Finished– Coolant System Designed/Assembled– Dyno Testing Completed– Fuel Tanks Constructed
March 2nd ME490 Status Report
– Shifter/Clutch Concept Simplified– Shifter/Clutch Constructed– New Dash Constructed
– Side Panels Constructed– Nose Mold in Processing
March 2nd ME490 Status Report
– Halfshafts Installed– CV Joints Broken
March 2nd ME490 Status Report
– SAE Presentation Award– Cost Report Submitted
• $19,068.35 Vehicle Cost
March 2nd ME490 Status Report
Area Totals Sub-Total Jig Time
Labor for Assembly to
Vehicle Total
Brake System $ 767.50 $ - $ 26.10 $ 793.60
Engine & Drivetrain 8,006.98 87.00 34.80 8,093.98
Frame & Body 931.89 104.40 69.60 1,105.89
Instruments & Wiring 1,700.66 - 52.20 1,752.86
Miscellaneous, Fit & Finish 753.92 - 26.10 780.02
Steering System 645.29 - 26.10 671.39
Suspension & Shocks 4,087.16 - 52.20 4,139.36
Wheels & Tires 1,713.84 - 17.40 1,731.24
Total Vehicle $ 18,607.25 $ 191.40 $ 304.50 $ 19,068.35
March 2nd ME490 Status Report
– Vendor Delays• Throttle Body• Sprockets• Steel
– Time Constraints• Spring Break• Other Classes
March 2nd ME490 Status Report
– Anti-Roll Bars (Davis)– Rear Rocker/Mount Refinement (Moody/Davis)
– Muffler Installation (Davis)– Wiring Clean-up (Thors)– Tuning/Refinement (Thors)
– Differential Carrier Re-Design (Moody)
March 2nd ME490 Status Report
– Shifter/Clutch Refinement (Davis)– Steering Column Support (Moody)
– Finalize Nose Mold/Lay Nose (Thors)– Install Body Panels (Thors)– Firewall Construction (Stephens)
March 2nd ME490 Status Report
11
/29
/04
12
/6/0
4
12
/13
/04
12
/20
/04
12
/27
/04
1/3
/05
1/1
0/0
5
1/1
7/0
5
1/2
4/0
5
1/3
1/0
5
2/7
/05
2/1
4/0
5
2/2
1/0
5
2/2
8/0
5
3/7
/05
3/1
4/0
5
3/2
1/0
5
3/2
8/0
5
4/4
/05
4/1
1/0
5
4/1
8/0
5
4/2
5/0
5
5/2
/05
5/9
/05
5/1
6/0
5
5/2
3/0
5
5/3
0/0
5
Planning Meetings
Submit Proposal
Slack
Engine Testing Setup
Controls
Drivetrain
Engine Development
Vehicle Engine Support
Bodywork/Exterior
Static Events
Testing Structure
Revisions and Optimizations
Driver Training Program
Competition in Michigan
Driving Date (03/25/05)
Critical Path
March 2nd ME490 Status Report
11
/29
/04
12
/6/0
4
12
/13
/04
12
/20
/04
12
/27
/04
1/3
/05
1/1
0/0
5
1/1
7/0
5
1/2
4/0
5
1/3
1/0
5
2/7
/05
2/1
4/0
5
2/2
1/0
5
2/2
8/0
5
3/7
/05
3/1
4/0
5
3/2
1/0
5
3/2
8/0
5
4/4
/05
4/1
1/0
5
4/1
8/0
5
4/2
5/0
5
5/2
/05
5/9
/05
5/1
6/0
5
5/2
3/0
5
5/3
0/0
5
Planning Meetings
Submit Proposal
Slack
Engine Testing Setup
Controls
Drivetrain
Engine Development
Vehicle Engine Support
Bodywork/Exterior
Static Events
Testing Structure
Revisions and Optimizations
Driver Training Program
Competition in Michigan
Driving Date (03/30/05)
Critical Path
Ship Out Date
March 2nd ME490 Status Report