IEC 61850 BasicsAnoop A Parapurath IDC\PT 6th May 2014
IEC 61850 Basics
Part 1
Utility, Substation & Substation automation function
IEC & IEC 61850
IEC 61850 Data Model
Commonly used services of IEC 61850 (GOOSE, MMS)
Performance requirement
IEC 61850 basic engineering concept & Demo using PCM600
Part 2
ACSI & SCSM
The Goal of the IEC 61850 standard
Conformance testing handling & Tissues
IEC 61850 Ed 2.0 A quick glance
IEC 61850 parts of the standard
Conformance documents
Content
Month DD, Year | Slide 2 ABB Group
IEC 61850 Basics
Month DD, Year | Slide 3 ABB Group
Part 1
Secondarysubstation
Distributionsubstation
400 kV
66 / 33 kV
132/110 kV
24kV 12kV
Transmissionsubstation
Main substation
400 V
Transformer
Utility - Overview
36kV -
An electrical substation is a subsidiary station of an electricity generation,transmission and distribution system where voltage is transformed from high to lowor the reverse using transformers. Electric power may flow through severalsubstations between generating plant and consumer, and may be changed involtage in several steps.
Substation
ABB GroupMay 12, 2015 | Slide 5
Substation Continued
ABB GroupMay 12, 2015 | Slide 6
ABB GroupMay 12, 2015 | Slide 7
Substation Continued
IECIEC 61850
Month DD, Year | Slide 8 ABB Group
The International Electrotechnical Commission (IEC) is the worldsleading organization that prepares and publishes International Standardsfor all electrical, electronic and related technologies
IEC 61850 Ed 1.0 => Communication networks and systems in substations
IEC 61850 Ed 2.0 => Communication networks and systems for power utilityautomation
Protection
Earth fault, Over current, Distance etc
Control
Operation of switches (Circuit breaker, Isolators etc)
Monitoring
The position of switches
Current , Voltage, Power etc.
Warning & Alarming events
Substation automation functions
ABB GroupMay 12, 2015 | Slide 9
Note: Only the basic functions and services are covered in this session
single-line diagram (SLD) is a simplified notation for representing a three-phase power system
ABB GroupMay 12, 2015 | Slide 10
Single Line Diagram
Bay
Substation automation functionsProtection
ABB GroupMay 12, 2015 | Slide 11
Transformer
CT -> Current TransformerVT -> Voltage Transformer
Line to transmitPower
Protection IED
Protection IED
Substation automation functionsProtection Continued.
ABB GroupMay 12, 2015 | Slide 12
Transformer
CT -> Current TransformerVT -> Voltage Transformer
Line to transmitPower
Protection IED
Protection IED
Fault
Blockinginformation
Fault current
Fault current
Substation automation functionsProtection Continued.
ABB GroupMay 12, 2015 | Slide 13
Transformer
CT -> Current TransformerVT -> Voltage Transformer
Line to transmitPower
Protection IED
Protection IED
Substation automation functionsControl
ABB GroupMay 12, 2015 | Slide 14
Operation of
Circuit breaker
Isolators
Earth switch
Station HMI
Substation automation functionsControl Continued.
ABB GroupMay 12, 2015 | Slide 15
Transformer
CT -> Current TransformerVT -> Voltage Transformer
Line to transmitPower
Protection & Control IED
Protection & Control IED
Substation automation functionsControl Continued.
ABB GroupMay 12, 2015 | Slide 16
Transformer
CT -> Current TransformerVT -> Voltage Transformer
Line to transmitPower
Protection IED
Protection IED
Substation automation functionsMonitoring
ABB GroupMay 12, 2015 | Slide 17
Switch position
Current, Voltage, power
Alarming conditions
Station HMI
Substation automation functionsSummary
ABB GroupMay 12, 2015 | Slide 18
Transformer
CT -> Current TransformerVT -> Voltage Transformer
Line to transmitPower
Protection IED
Protection IED
Control
Monitoring
Protection
*Apart from Station HMI, control and monitoringis possible locally at the IED or Switchgear
*Arrow marks are shown only for explaining theThe functionality
Station HMI
Substation automation functionLevels
ABB GroupMay 12, 2015 | Slide 19
Process level Bay level Station level
GO
OS
E
REPORTBay 1
Bay 2
IEC 61850 8-1 Station bus
CONTROL
MMS
Substation automation functionLevels
ABB GroupMay 12, 2015 | Slide 20
Process level Bay level Station level
GO
OS
E
REPORTBay 1
Bay 2
IEC 61850 8-1 Station bus
CONTROLIE
C61
850
9-2
Pro
cess
Bus
MU Merging Unit
MMS
Substation automation functionLevels
ABB GroupMay 12, 2015 | Slide 21
Substation automationData Exchange
Month DD, Year | Slide 22 ABB Group
IEC 61850Station bus
ABB GroupMay 12, 2015 | Slide 23
Data is transferred mainly according IEC 61850-8-1:
Control serviceCommands
Report serviceIndications to IEC 61850 clients
GOOSE serviceIndication and information exchange between bay level IEDs
File transfer serviceTransmission of disturbance records
Note: Only commonly used services are mentioned. For more details on services refer IEC61850 7-2 and IEC 61850 8-1
IEC 61850Data model - Logical Node (LN)
Definition
An object which represent a specific function in a domain e.gSubstation automation, Hydro Power plant etc
A named grouping of data and associated services that is logicallyrelated to a function.
Smallest part of a function that exchanges data.
Logical node classes are defined in IEC 61850 7-4
4 letters are used for defining the logical node class e.g. STMP, XCBR
First letter represents the function group which belongs to e.g. in STMP, Sdenote is logical node for a supervising function
A logical node type is created out of classes by adding prefix andinstance number as suffix e.g CNSCSTMP1
ABB GroupMay 12, 2015 | Slide 24
IEC 61850Data model - Logical Node
ABB GroupMay 12, 2015 | Slide 25
Information from IEC61850 7-4 Ed (2.0)
LN class name
DO name
Description
IEC 61850Data model - Logical Node Type
ABB GroupMay 12, 2015 | Slide 26
Information from IEC61850 7-4 Ed (2.0)
LN Type from LN Class
CNCSTMP1AlmTrip
Allows inclusion of vendor specific DOs while creating a LN type. Refer the MICS document
IEC 61850Data model Common Data Class
ABB GroupMay 12, 2015 | Slide 27
Information from IEC61850 7-4 Ed (2.0)
IEC 61850Data model Common Data Class
ABB GroupMay 12, 2015 | Slide 28
Information from IEC61850 7-3 Ed (2.0)
IEC 61850Data attribute - quality
ABB GroupMay 12, 2015 | Slide 29
IEC 61850Data reference From LN level
ABB GroupMay 12, 2015 | Slide 30
CNCSTMP1/Alm/stVal
CNCSTMP1/Alm/q
CNCSTMP1/Alm/t
IEC 61850Logical Device (LD)
ABB GroupMay 12, 2015 | Slide 31
Entity that represents a set of typical automation, protection or otherfunctions
It is a meaningful collection of LNs for performing a common actione.g. Monitoring, Protection , Control etc
Physical device
Logical devices
IEC 61850 View
IED Name(Technical Key)
IEC 61850Data reference from communication interface
ABB GroupMay 12, 2015 | Slide 32
CNSCSTMP1AlmTrip
IECV1208a/CNC_1/CNSCSTMP1/Alm/stVal
IEC 61850Data Model
ABB GroupMay 12, 2015 | Slide 33
Substation automation functionMonitoring Report Service
ABB GroupMay 12, 2015 | Slide 34
Process level Bay level Station level
REPORTBay 1
Bay 2
IEC 61850 8-1 Station bus
MU Merging Unit
IEC 61850Report Service
ABB GroupMay 12, 2015 | Slide 35
Dataset
CNC_1\CNCSTMP1\Alm (FC=ST)CNC_1\CNCSTMP2\Alm (FC=ST)CNC_1\CNCSTMP2\Alm (FC=ST)
FCDA => Used to group commonly used data attributes for easy retrieval
Report Control block
Collection
Attributes forData exchange
Two Party Association => Client Server based
IEC 61850Report Service
ABB GroupMay 12, 2015 | Slide 36
DatasetCNC_1\CNCSTMP1\Alm (FC=ST)CNC_1\CNCSTMP2\Alm (FC=ST)CNC_1\CNCSTMP2\Alm (FC=ST)
Report Control block
Triggeroption
Data change (DChg )Quality change (QChg)Data update (Dupd)
Type ofReporting
BufferedUn-buffered
Integrity (Cyclic)
Buffer Time (BufTm)
General interrogationCyclic time
IEC 61850Report Service
ABB GroupMay 12, 2015 | Slide 37
BRCB Buffered Report Control BlockInternal events (caused by trigger options data-change, quality-change,and data-update) issue immediate sending of reports orbuffer theevents (to some practical limit) for transmission, such that values ofdata object are not lost due to transport flow control constraints or lossof connection. BRCB provides the sequence-of-events (SOE)functionality;
IEC 61850Report Service
ABB GroupMay 12, 2015 | Slide 38
URCB Un-buffered Report Control BlockInternal events (caused by trigger options data-change, quality-change,and data-update) issue immediate sending of reports. If no associationexists, or if the transport data flow is not fast enough to support it, eventsmay be lost.
IEC 61850GOOSE
ABB GroupMay 12, 2015 | Slide 39
Dataset
CNC_1\CNCSTMP1\Alm .stValCNC_1\CNCSTMP2\Alm.q
GOOSE Control block
Collection
Attributes forData exchange
Generic Object Oriented Substation Event Multicast Fast transfer
IEC 61850GOOSE
ABB GroupMay 12, 2015 | Slide 40
Dataset
CNC_1\CNCSTMP1\Alm .stValCNC_1\CNCSTMP2\Alm.q
GOOSE Control Block
APP-IDVLAN-IDVLAN-PRIORITYMinTimeMiaxTime
IEC 61850GOOSE
T0 retransmission in stable conditions (no event for a long time).(T0) retransmission in stable conditions may be shortened by anevent.T1 shortest retransmission time after the event.T2, T3 retransmission times until achieving the stable conditions time.
ABB GroupMay 12, 2015 | Slide 41
MinTime MaxTime
IEC 61850Performance requirement
ABB GroupMay 12, 2015 | Slide 42
IEC 61850Performance requirement Continued
ABB GroupMay 12, 2015 | Slide 43
IEC 61850Performance requirement Continued
ABB GroupMay 12, 2015 | Slide 44
Type 1A TripThe trip is the most important fast message in the substation. Therefore, thismessage has more demanding requirements compared to all other fastmessages. Same performance may be requested for interlocking, intertrips andlogic discrimination between protection functions.
IEC 61850Performance requirement Continued
ABB GroupMay 12, 2015 | Slide 45
Type 1B OthersAll other fast messages are important for the interaction of the automationsystem with the process but have less demanding requirements compared tothe trip. The performance for automation functions are typically between theresponse time of operators (order of 1 000 ms) and of protection (order of 10ms). This performance is also valid for such messages between a substationsautomation systems and other local systems.
IEC 61850 Ed 1.0Engineering - SCL
Month DD, Year | Slide 46 ABB Group
Engineering information exchange is done using Substation ConfigurationLanguage (SCL)
XML format
ICD, SCD,SSD are the file types used during engineering and are based onSCL
ICD IED Capability Description
SCD System Configuration Description
SSD System Specification Description
Note: IEC 61850 Ed 2.0 uses two more file types IID and SED for engineering
SED System Exchange Description
IID Instantiated IED Description
IEC 61850 Ed 1.0Engineering workflow
Month DD, Year | Slide 47 ABB Group
ICD
SCD
IEC 61850IED Configurator
Month DD, Year | Slide 48 ABB Group
Create the ICD file, To modify the data model, parameter and configuration values either for a new
ICD file IED configurator is responsible for binding incoming data from other IEDs as
defined within an imported SCD file to internal signals, e.g. by means of theSCL Input section, and for generating and loading the IED instance specificconfiguration data, which a CID file could be a part of.
Write the Configuration into IED
PCM600
IEC 61850System Configurator
Month DD, Year | Slide 49 ABB Group
Create IED instances Engineer the data flow between the IEDs, give addresses to them
Note: For the detailed capability of System Configurator, refer IEC 61850-6 Ed2.0 Page 109
PCM600
IEC 61850System Configurator Continued
Month DD, Year | Slide 50 ABB Group
Create IED instances from IED templates Engineer the data flow between the IEDs, give addresses to them Bind the logical nodes to the primary system
Note: For the detailed capability of System Configurator, refer IEC 61850-6 Ed 2.0 Page 109
IET600
IEC 61850 Ed 1.0Engineering workflow
Month DD, Year | Slide 51 ABB Group
IED Configurator
SystemConfigurator
Instantiation of 2 REC650 IEDs
Creation of Dataset for GOOSE service
Creation of GOOSE control block
Connecting to GOOSE data to subscribing IED
Creation of Dataset for Report service
Creation of Report control block
Generation of SCD file and quick walk through
IEC 61850 Basics
Month DD, Year | Slide 52 ABB Group
Part 2
IEC 61850ACSI Abstract Communication Service Interface
Month DD, Year | Slide 53 ABB Group
Reference : IEC 61850 -7-2 Ed 2.0
ACSI defines A hierarchical class model of all information that can be accessed via a
communication network E.g. get the list of Logical nodes under an LD
Services that operate on these classes E.g. Control services like operate
Parameters associated with each service E.g. Control value (ctlVal) carries the value whether to open or close the switch
IEC 61850SCSM Specific Communication Service Mapping
Month DD, Year | Slide 54 ABB Group
It specifies the mapping of the objects and services of the ACSI (AbstractCommunication Service Interface, IEC 61850-7-2) to MMS (ManufacturingMessage Specification, ISO 9506)and ISO/IEC 8802-3 frames.
SCSM
IEC 61850SCSM Specific Communication Service Mapping Continued..
Month DD, Year | Slide 55 ABB Group
Reference : IEC 61850 -8-1 Ed 2.0
IEC 61850SCSM Specific Communication Service Mapping Continued..
Month DD, Year | Slide 56 ABB Group
Reference : http://blog.iec61850.com/2010/08/many-abstract-and-concrete-layers-in.html
SCSM
IEC 61850Long term stability
Month DD, Year | Slide 57 ABB Group
ApplicationDomainSubstation
ApplicationObjectsServices
Mapping
7654321
ISO/OSIseven layer stack
CommunicationTechnology
Abstract Interface
Stack Interface
Approach ofIEC61850
Adaptationper selected stack
Long-term definitionSafe-guarding investments
Stack selectionfollowing state-of-artCommunication technology
Slow
Fast
MMS
TCP/IP
Ethernet
IEC 61850
ABB GroupMay 12, 2015 | Slide 58
A view of Data model and services
IEC 61850The goal of the IEC 61850 standard
Month DD, Year | Slide 59 ABB Group
Interoperability The ability for IEDs from one or several manufacturerto exchange information and use the information for thetheir own functions.
Long Term Stability The standard shall be future proof, i.e. it must be ableto follow the progress in communication technology aswell as evolving system requirements.
Free Configuration The standard shall support different philosophies andallow a free allocation of functions e.g. Can work in acentralized architecture as well as distributedarchitecture
IEC 61850Interoperability
Month DD, Year | Slide 60 ABB Group
ABB SIEMENS ALSTOM
ABB SIEMENS
IEC 61850
What is needed for interoperability: Common standardized data model
Common standardized service model
Common standardized protocol
Common standardized communication architecture
Common standardized engineering data exchange
Common standardized conformance tests
Interoperability Continued..
Month DD, Year | Slide 61 ABB Group
IEC 61850 - 7-2, 8-1IEC 61850 - 7-2, 8-1
IEC 61850 -7 -3, 7-4IEC 61850 -7 -3, 7-4
IEC 61850 - 6IEC 61850 - 6
IEC 61850 - 10IEC 61850 - 10
IEC 61850Free configuration
Month DD, Year | Slide 62 ABB Group
Reference : IEC 61850 -5 Ed 2.0
IEC 61850Long term stability
Month DD, Year | Slide 63 ABB Group
ApplicationDomainSubstation
ApplicationObjectsServices
Mapping
7654321
ISO/OSIseven layer stack
CommunicationTechnology
Abstract Interface
Stack Interface
Approach ofIEC61850
Adaptationper selected stack
Long-term definitionSafe-guarding investments
Stack selectionfollowing state-of-artCommunication technology
Slow
Fast
MMS
TCP/IP
Ethernet
IEC 61850Standardised conformance test
Month DD, Year | Slide 64 ABB Group
IEC 61850 - 10IEC 61850 - 10
UCA international user group (ucaiug) Manages Quality program
IEC 61850 Testing sub committee Set-up and maintain test procedures Accreditation procedures for test labs
Sharepoint with documents, minutes of meeting andcertificates
http://www.ucaiug.org/
IEC 61850Standardised conformance test
Month DD, Year | Slide 65 ABB Group
IEC 61850 - 10IEC 61850 - 10
Vendor independent Testing agency
Link for presentation from KEMA
Link to the IEC 61850 conformance certificate of products
IEC 61850Tissues
Month DD, Year | Slide 66 ABB Group
Technical Issues in the released standard
http://tissues.iec61850.com/default.mspx
*This site has no search unfortunately. However, you can search itusing Google search, with the following search string:
site:http://www.tissues.iec61850.com what-I-look-forExample:site:http://www.tissues.iec61850.com maxAttributes
* Information from IEC61850 group in Yammer
IEC 61850 Ed 2.0Communication networks and systems for power utility automation
Month DD, Year | Slide 67 ABB Group
IEC 61850 Ed 2.0Extended Data Exchange
Month DD, Year | Slide 68 ABB Group
IEC 61850 Ed 2.0Engineering
Month DD, Year | Slide 69 ABB Group
IEC 61850 Ed 2.0Parts of the standard
Month DD, Year | Slide 70 ABB Group
Reference : IEC 61850- 5 Ed 2.0
New documents in IEC 61850 Ed 2.0
IEC 61850Conformance documents
Month DD, Year | Slide 71 ABB Group
MICS
Model Information Conformity Statement
PICS
Protocol Information Conformity Statement
PIXIT
Protocol Implementation Extra information
TICS
Technical Issue Conformance Statement
IEC 61850Useful Links
Month DD, Year | Slide 72 ABB Group
Yammer IEC61850 Group
LinkedIn 61850 Group
IEC61850 Blog
top related