Typical project status of an embedded systems client cmmi l3

Post on 30-Jul-2015

73 Views

Category:

Business

0 Downloads

Preview:

Click to see full reader

Transcript

Sl. No Project Name Initiation % Plan % Execution % QC % Total %

1 802.11 ac MAC 100 14 76 16 51.5

2 802.11 ac PHY 80 39 86 32 59.25

3 802.11 b 97 12 84 0 48.25

4 DLH264 100 40 100 0 60

5 Doc Signer Service 0 44 100 52 49

6 DOSEEMCS - Phase 1 100 88 100 100 97

7 eSign Emcee 1.8 0 36 88 100 56

8 pDoc Signer 2.1 0 44 84 100 57

9 RVDT 100 54 100 100 88.5

10 SDR 100 40 52 0 48

11 SELDON 100 24 84 100 77

12 TDMA 0 6 84 0 22.5

0

20

40

60

80

100

120

Compliance_All Projects in %

Total %

0

20

40

60

80

100

120

Initiation %

Plan %

Execution %

QC %

Project Name Initiation % Total % Plan Total % Execution Total % QC Total %

802.11ac MAC 25 25 50 7 0 7 19 19 38 8 0 8

25 25 50 0 7 7 19 19 38 0 8 8

802.11ac PHY 20 20 40 11 5 16 21 21 42 13 0 13

20 20 40 5 18 23 19 25 44 0 19 19

802.11b 22 25 47 3 3 6 21 21 42 0 0 0

25 25 50 3 3 6 21 21 42 0 0 0

DLH264 25 25 50 10 10 20 25 25 50 0 0 0

25 25 50 10 10 20 25 25 50 0 0 0

Doc Signer Service 0 0 0 11 11 22 25 25 50 13 13 26

0 0 0 11 11 22 25 25 50 13 13 26

DOSEEMCS 25 25 50 22 22 44 25 25 50 25 25 50

25 25 50 22 22 44 25 25 50 25 25 50

eSign Emcee 1.8 0 0 0 9 9 18 22 22 44 25 25 50

0 0 0 9 9 18 22 22 44 25 25 50

pDoc Signer 2.1 0 0 0 11 11 22 21 21 42 25 25 50

0 0 0 11 11 22 21 21 42 25 25 50

RVDT 25 25 50 13 13 26 25 25 50 25 25 50

25 25 50 13 15 28 25 25 50 25 25 50

SDR 25 25 50 10 10 20 13 13 26 0 0 0

25 25 50 10 10 20 13 13 26 0 0 0

SELDON 25 25 50 6 6 12 21 21 42 25 25 50

25 25 50 6 6 12 21 21 42 25 25 50

TDMA 0 0 0 6 0 6 21 21 42 0 0 0

0 0 0 0 0 0 21 21 42 0 0 0

Praveen Kumar Kambhampati The data presented here represents the status of a client assignment during

the implementation of CMMI L3 processes for an organization engaged in Embedded systems, towards SCAMPI assessment.