8/8/2019 Transporting Concrete
1/23
TRAN SPO RTIN GCONCRETE
Arch. SERGE T. CHUA, Jr., fuap, Sr (M RIA)Master in Architecture, Construction Technolo!
Manae"ent
8/8/2019 Transporting Concrete
2/23
Transporting Concrete (Truck M ixer)
Rea#! "i$e# concrete can often %e place# inits &nal location %! #irect chute #ischare
fro" a truc' "i$er.
8/8/2019 Transporting Concrete
3/23
Transporting Concrete (Truck M ixer)
ersatile poer %u! can "o*e allt!pes of
concrete o*er short #istances.
8/8/2019 Transporting Concrete
4/23
Transporting Concrete (Truck M ixer)
In co"parison to con*entional rear+#ischaretruc's, front+#ischare truc' "i$ers pro*i#e the #ri*er
ith
"ore "o%ilit! an# control for #irect #ischare intoplace.
8/8/2019 Transporting Concrete
5/23
Transporting Concrete (Bucket & Crane)
Concrete is easil! lifte#to its &nal location %!%uc'et an# crane.
8/8/2019 Transporting Concrete
6/23
Transporting Concrete (To er Crane &Bucket)
The toer crane an# %uc'et caneasil! han#le concrete for tall+
%uil#in construction.
8/8/2019 Transporting Concrete
7/23
Transporting Concrete
The con*e!or %elt is an ecient, porta%le "etho# ofhan#lin concrete. A #rop chute pre*ents concrete
fro" sereatin as it lea*es the %elt- a scraper
pre*ents loss of "ortar. Con*e!or %elts can %eo erate# in series an# on e$ten#a%le %oo"s of
8/8/2019 Transporting Concrete
8/23
Transporting Concrete (! ose & Pipe)
A truc'+"ounte# pu"p an# %oo" can con*enientl!"o*e concrete *erticall! or horiontall! to the #esire#
location. (/eft) ie of concrete #ischarin fro"0e$i%le hose connecte# to rii# pipeline lea#in fro"the pu"p. Rii# pipe is use# in pu"p %oo"s an# in
pipelines to "o*e concrete o*er relati*el! lon#istances. Up to 1 " (23 ft) of 0e$i%le hose "a! %e
8/8/2019 Transporting Concrete
9/23
Transporting Concrete (Con"e#or Be$t)
A con*e!or %elt "ounte# on a truc' "i$er placesconcrete up to a%out 42 "eters (56 feet) ithout the
nee# for a##itional han#lin e7uip"ent.
8/8/2019 Transporting Concrete
10/23
Transporting Concrete (Scre Sprea%er)
The scre sprea#er 7uic'l! sprea#s concrete o*er ai#e area to a unifor" #epth. Scre sprea#ers are
use# pri"aril! in pa*e"ent construction.
8/8/2019 Transporting Concrete
11/23
Transporting Concrete (Air'it)
8or or' a%o*eroun#or at inaccessi%le sites,
a concrete %uc'et can %e
lifte# %! helicopter.(Source9 :aschal)
8/8/2019 Transporting Concrete
12/23
Transporting Concrete (Boo & M ast)
A pu"p %oo" "ounte# on a "ast an# locate#near the center of a structure can fre7uentl! reachall points of place"ent. It is especiall! applica%le
to tall %uil#ins here toer cranes cannot %e tie#up ith placin concrete. Concrete is supplie# to
the %oo" throuh a pipeline fro" a roun#+le*elu" . Concrete can %e u" e# hun#re#s of
8/8/2019 Transporting Concrete
13/23
Transporting Concrete
Choosin the ;est Metho# The frst thing to look at is the type o job, its physicalsize, the total amount o concrete to be placed, andthe time schedule. Studying the job details urther willtell how much o the work is below, at, or above ground
level. This aids in choosing the concrete handlingequipment necessary or placing concrete at therequired levels.oncrete must be moved rom the mi!er to the point oplacement as rapidly as possible without segregation
or loss o ingredients. The transporting and handlingequipment must have the capacity to move su"cientconcrete so that cold joints are eliminated.
8/8/2019 Transporting Concrete
14/23
Transporting Concrete
8/8/2019 Transporting Concrete
15/23
Transporting Concrete
(ossibly the concrete can be chuted directlyrom the
truck mi!er to the point needed. hutes shouldbe metal
or metal lined. They must not slope greaterthan ) vertical
to * horizontal or less than ) vertical to +horizontal. ong
chutes, over - meters */ t0, or those notmeeting slopestandards must discharge into a hopper beore
distribution
to point o need.<ernativel , a concrete um can move the
8/8/2019 Transporting Concrete
16/23
Transporting Concrete
The loss o slump caused by pressure thatorces mi! water into the aggregates as themi! travels rom pump hopper to discharge
at the end o the pipeline must be minimal$not greater than 1/ mm * in0.
The air content generally should not bereduced by more than * percentage points
during pumping. &ir loss greater than thismay be caused by a boom confguration thatallows the concrete to all e!cessively. 2nview o this, Specifcations or both slump
and air content should be met at the
8/8/2019 Transporting Concrete
17/23
Transporting Concrete
4elt conveyors are very useul or worknear ground level. Since placing concretebelow ground is requently a matter o
horizontal movement assisted by gravity,lightweight portable conveyors can be usedor high output at relatively low cost.
8/8/2019 Transporting Concrete
18/23
Transporting Concrete
8/8/2019 Transporting Concrete
19/23
Transporting Concrete
8/8/2019 Transporting Concrete
20/23
Transporting Concrete
8/8/2019 Transporting Concrete
21/23
Transporting Concrete
8/8/2019 Transporting Concrete
22/23
Transporting Concrete
8/8/2019 Transporting Concrete
23/23
Transporting Concrete