Three green schoolsThree green schoolsWhat can be done by Stow?What can be done by Stow?

By Norm Farris & Ellen SturgisBy Norm Farris & Ellen Sturgis27 November 200627 November 2006

Dedham Middle SchoolDedham Middle School

►Built 2005Built 2005►Capacity ~750; already have 750Capacity ~750; already have 750►$26 million$26 million►$800,000 in green grants, aid$800,000 in green grants, aid►Replaces outdated 1920 schoolReplaces outdated 1920 school►Add/reno for 1920 school deemed too Add/reno for 1920 school deemed too

costlycostly►MTC, etc refund; 100% reimbursement MTC, etc refund; 100% reimbursement

for green innovationsfor green innovations

Green innovationsGreen innovations

► PhotovoltaicsPhotovoltaics► Rainwater collection systemRainwater collection system

50K cistern and 3000 gallon tank inside50K cistern and 3000 gallon tank inside Used for all toilets/urinalsUsed for all toilets/urinals

► Photo-sensor controlled lightsPhoto-sensor controlled lights►DaylightingDaylighting► Low VOC tiles/materialsLow VOC tiles/materials► Recycled building materialsRecycled building materials► State of the art HVAC systems with monitoringState of the art HVAC systems with monitoring

Super-efficient high efficiency condensing boiler

Entryway: maximize natural light

Hallways use skylights for natural lighting

Classrooms have light-sensitive controls on overhead lights

Not a green feature! But this is a common solution to a full size gym needed for multiple classrooms

Carlton Elementary, Salem - Carlton Elementary, Salem - 20042004

► New construction on existing site; Replaced New construction on existing site; Replaced outdated poorly-constructed/designed 1952 outdated poorly-constructed/designed 1952 schoolschool

► Capacity: 300Capacity: 300► K-Grade 5 plus pre-school (Headstart)K-Grade 5 plus pre-school (Headstart)► Enrollment: 300 kids (150 are city Headstart)Enrollment: 300 kids (150 are city Headstart)► Construction cost: $10 millionConstruction cost: $10 million► Significant tie in of green construction to Significant tie in of green construction to

curriculumcurriculum

Green innovationsGreen innovations

► Photosensor lightsPhotosensor lights► Light collecting skylightsLight collecting skylights►Double-glazed windowsDouble-glazed windows► PhotovoltaicsPhotovoltaics►Wind turbineWind turbine► Recyclable lunch materialsRecyclable lunch materials►MTC fundingMTC funding► SBA refund – 90% of construction costSBA refund – 90% of construction cost

Carleton-Science roomNatural light; efficient electric lights

GreenhouseGreenhouse

► Photovoltaics on Photovoltaics on roof glazingroof glazing

►Main banks on roofMain banks on roof

GymnasiumGymnasium► Illuminated by natural Illuminated by natural

lightlight► Prismatic skylights Prismatic skylights

capture ambient lightcapture ambient light► No lights on!No lights on!

Light-collecting skylights for gymAlso note roof white to limit heat

absorption

Natural light in cafetorium

Centerville Elementary, Beverly Centerville Elementary, Beverly 20022002

►Add/reno of 1964 schoolAdd/reno of 1964 school► Town didn’t want cost of new Town didn’t want cost of new

schoolschool► Capacity: 300Capacity: 300►K- Grade 5 K- Grade 5 ► Enrollment: 300 kids Enrollment: 300 kids ► Construction cost: $9 millionConstruction cost: $9 million►New wing built, gutted restored old New wing built, gutted restored old

wingwing►Done in one year kids moved to Done in one year kids moved to

another schoolanother school

Green innovationsGreen innovations

►Motion detector controlled lights Motion detector controlled lights ►Ambient light compensating lightsAmbient light compensating lights►Clerestory in new wingClerestory in new wing►Double-glazed windowsDouble-glazed windows►PhotovoltaicsPhotovoltaics►Wind turbineWind turbine

Green innovations, cont.Green innovations, cont.

► Photovoltaics – supply part of power Photovoltaics – supply part of power (enough for lights)(enough for lights)

►Wind turbine – in wrong location; doesn’t Wind turbine – in wrong location; doesn’t supply powersupply power

►MTC fundingMTC funding► SBA refund – 85% of construction costSBA refund – 85% of construction cost

Solar panels on new wing with clerestory underneathCenterville/Beverly

Clerestory in new wing halls

Library w/ reading nook on left Library w/ reading nook on left created out of former created out of former

courtyardcourtyard

Reading centerReading centersimilar to Center Schoolsimilar to Center School

From Greening America’s Schools reportFrom Greening America’s Schools report

Another example of a clerestory – not from this school

Green innovations to Green innovations to considerconsider

►Daylighting (Daylighting (skylights, clerestory, interior, skylights, clerestory, interior, siting, etcsiting, etc))

►High efficiency lighting systemsHigh efficiency lighting systems► Efficient building shellEfficient building shell► High efficiency HVAC systemsHigh efficiency HVAC systems► Non-toxic, recycled and locally produced Non-toxic, recycled and locally produced

building materialsbuilding materials► Water saving/recycling/groundwater systemsWater saving/recycling/groundwater systems► Renewable energy systems (Renewable energy systems (solar, wind and solar, wind and

geothermalgeothermal))

Advantage - SavingsAdvantage - Savings

►Schools report substantial cost savings Schools report substantial cost savings in utilities cost in utilities cost

►MTC funding allowed payback in ~3 MTC funding allowed payback in ~3 yearsyears

►Absent MTC funding? Absent MTC funding?

In the case of Salem school 7 In the case of Salem school 7 yearsyears

Advantage – Environmental Advantage – Environmental qualityquality

►Air circulation reduces bad air, Air circulation reduces bad air, asthma, absenteeismasthma, absenteeism

►Daylighting improves attendance, Daylighting improves attendance, learning scores, absenteeismlearning scores, absenteeism

► Improved teacher satisfaction, Improved teacher satisfaction, retentionretention

From Greening America’s Schools; Kats October 2006

Questions?Questions?

►Who pays for it? Who pays for it? No current MTC fundingNo current MTC funding Municipal utility not currently involved in MTC Municipal utility not currently involved in MTC

programsprograms► Too complex a building process? Adding layers Too complex a building process? Adding layers

of coord., design and oversight could increase of coord., design and oversight could increase riskrisk

►Was it built right? Commissioning advisedWas it built right? Commissioning advised► Is the building too complex to run? What Is the building too complex to run? What

additional training/maintenance is needed to additional training/maintenance is needed to run a green building?run a green building?

►Will it push back our timeline?Will it push back our timeline?► Capital vs operating costs/savingsCapital vs operating costs/savings

ResourcesResources

►NEEP - NEEP - www.neep.orgwww.neep.org►MTC – MTC –

www.masstech.org/Renewable Energy/www.masstech.org/Renewable Energy/green_schools.htmgreen_schools.htm

►Daylighting in Schools – Daylighting in Schools – www.h-m-g.comwww.h-m-g.com

►High performance schools: Affordable High performance schools: Affordable Green Design for K-12 Schools – Green Design for K-12 Schools – www.nrel.gov/docs/fy04osti/34967.pdfwww.nrel.gov/docs/fy04osti/34967.pdf