© Turner & Townsend plc December 11making the difference

The Information Manager & PAS 1192

CITA, Dublin 17th June 2015

making the difference

Tom Oulton

BIM Manager

3

The Information Manager & PAS 1192

■ BIM: What? Why? How?

■ PAS 1192-3:2014

■ PAS 1192-2:2013

■ CIC BIM Protocol & Scope of Service

■ PAS 91

■ The Common Data Environment (CDE)

■ PAS 1192-5:2015

4

The Information Manager & PAS 1192

■ Digital

representation

■ Physical and

functional

characteristics

■ Shared knowledge

■ Decision making

platform

■ Whole life basis

■ Build

■ Operate

■ Dispose

Image ©Autodesk

5

The Information Manager & PAS 1192

■ BIM (Building Information Modelling) ‘level two’ which is defined by

PAS 1192-2:2013 as the “Process of designing, constructing or

operating a building or infrastructure asset using electronic object

oriented information”.

6

We can build the building on the

computer before we build it in real life & we can test

everything in advance

The Information Manager & PAS 1192

8

Level 0•Working with 2D drawings•Other project information in written documents

The Information Manager & PAS 1192

9

Level 1•May still be using CAD, some 3D drawings / simple models•Introducing structured project information•Introducing structured co-ordination processes

The Information Manager & PAS 1192

10

Level 2•Shift to 3D model with integrated attribute information•Separate model files for architecture, structural, M&E etc•Much project information now embedded in the model•Structured processes for co-ordination essential

The Information Manager & PAS 1192

11

Level 3•Single shared model across project team•Single version of the truth•Structured process to manage co-ordination of information•Integration project insurance, fully collaborative

The Information Manager & PAS 1192

12

Level 3

Industry capability

The Information Manager & PAS 1192

13

The Information Manager & PAS 1192

14

RIBA Plan of Work 2013

The Information Manager & PAS 1192

15

The Information Manager & PAS 1192

16

The Information Manager & PAS 1192

17

The Information Manager & PAS 1192

18

The Information Manager & PAS 1192

OIR

AIR

EIR

Organisational Information Requirements:Data and information required to achieve the organisation’s objectives

Asset Information Requirements:Data and information requirements of the organisation in relation to the asset(s) it is responsible for

Employer’s Information Requirements:Pre-tender document setting out the information to be delivered, and the standards and processes to be adopted by the supplier as part of the project delivery process

19

The Information Manager & PAS 1192

20

The Information Manager & PAS 1192

Information management

■ Levels of detail

■ Training requirements

■ Planning of work & data segregation

■ Co-ordination & clash detection

■ Collaboration process

■ H&S / CDM

■ Data security (PAS 1192-5:2015)

■ Specific data inclusion/exclusion

■ Compliance plan

■ Coordinate origin/system

■ Software schedule

Commercial management

■ Exchange of information

■ Client’s strategic purposes

■ Software schedule

■ Responsibility matrix

■ Standards & protocols

■ Contractual anomalies

Competence assessment

■ Details of assessment

■ Changes to documentation

■ BIM tender assessment

21

■ Likely to be performed either by the Design

Lead or the Project Lead

■ In some circumstances the Employer may

appoint a stand alone Information Manager

■ No design related duties

“The Protocol requires the Employerto appoint a party to undertake the Information Management Role”

CIC BIM Protocol

The Information Manager & PAS 1192

22

Role of the Information Manager

The principal responsibilities of the

Information Manager

■ Managing the processes and procedures for information exchange on projects

■ Initiating and implementing the Project Information Plan (PIP) and Asset Information Plan

■ Assisting in the preparation of Project Outputs, such as data drops/Information exchange

■ Implementation of the BIM Protocol, including the updating of the Model Production and Delivery Table (MPDT)

23

The Information Manager & PAS 1192

Information management

■ Levels of detail

■ Training requirements

■ Planning of work & data segregation

■ Co-ordination & clash detection

■ Collaboration process

■ H&S / CDM

■ Data security (PAS 1192-5:2015)

■ Specific data inclusion/exclusion

■ Compliance plan

■ Coordinate origin/system

■ Software schedule

Commercial management

■ Exchange of information

■ Client’s strategic purposes

■ Software schedule

■ Responsibility matrix

■ Standards & protocols

■ Contractual anomalies

Competence assessment

■ Details of assessment

■ Changes to documentation

■ BIM tender assessment

Information management

■ Levels of detail

■ Training requirements

■ Planning of work & data segregation

■ Co-ordination & clash detection

■ Collaboration process

■ H&S / CDM

■ Data security (PAS 1192-5:2015)

■ Specific data inclusion/exclusion

■ Compliance plan

■ Coordinate origin/system

■ Software schedule

Commercial management

■ Exchange of information

■ Client’s strategic purposes

■ Software schedule

■ Responsibility matrix

■ Standards & protocols

■ Contractual anomalies

Competence assessment

■ Details of assessment

■ Changes to documentation

■ BIM tender assessment

24

The Information Manager & PAS 1192

Outline scope of services for the role of

information management

■ To describe the role of Information Management

■ To describe a range of activities that is

consistent and in accordance with PAS1192-2

■ To motivate the development of Information

Management skills

25

The Information Manager & PAS 1192

Common Data Environment Management

■ Establish the Common Data Environment (CDE)

■ Establish, agree and implement the information

structure

■ Receive information into the Information Model

■ Maintain the Information Model

■ Manage the Common Data Environment

26

■ Initiate, agree and implement the Project

Information Plan (PIP) and Asset Information

Plan covering

■ Information structure

■ Provision of information

■ Level of detail of information

■ Incorporating as-constructed, testing

validating and commissioning

■ Enable integration of information within the

Project Team and co-ordination of information

by Design Lead

■ Agree formats for Project Outputs

■ Assist Project Team Members in assembling

information for Project Outputs

The Information Manager & PAS 1192

Project Information Management

27

The Information Manager & PAS 1192

Collaborative working, information exchange

and project team management

■ Support the implementation of the Project BIM

protocol

■ Liaise with and co-operate with Project Team

Members and the Employer

■ Assist the Project Team Members in establishing

information exchange processes

■ Participate in and comply with project team

management procedures and processes

28

The Information Manager & PAS 1192

29

Common Data Environment (CDE)

■ “Single source of information for any

given project, used to collect, manage

and disseminate all relevant approved

project documents for multi-disciplinary

teams in a managed process”

■ May use

■ an extranet

■ a file-based retrieval system or

■ other suitable toolset

The Information Manager & PAS 1192

30

■ A means of providing a collaborative

environment for sharing work

■ Ownership of information remains

with the originator

■ Shared information reduces the time

and cost in producing coordinated

information

■ Documents can be generated from

various combinations of model files

■ Used for version control and audit

trails

Image ©Mervyn Richards

Common Data Environment

The Information Manager & PAS 1192

31

■ Documentation

■ 2D drawings

■ Assessments

■ Schedules

■ Reports

■ Non-graphical data

■ COBie

■ Quantity take off

■ Graphical Models

■ Architectural

■ Structural

■ MEP

■ Point cloud

■ Note, the stage at which information

exchanges are required should be specified

in the EIR by reference to the agreed

stage and gate names

Image ©CIOB

Information Exchange

The Information Manager & PAS 1192

32

BIM Execution Plan (BEP)

The Information Manager & PAS 1192

■ Plan prepared by the suppliers to explain how the information

modelling aspects of a project will be carried out

■ Pre-contract BEPs are assessed by Information Manager as part of

PQQ process

■ Post-contract BEP provides the methodologies of supply chain

adherence to the EIR

33

The Information Manager & PAS 1192

34

The Information Manager & PAS 1192

35

PAS 1192-5

Project Way

(control)

Contract

Assessment

InformationManagement

Process Management

OIR

AIR

EIR

CIC

PQQ

CDE

BEP

7 step BIM process

The Information Manager & PAS 1192

36

PAS 1192-5

Project Way

(control)

Contract

Assessment

InformationManagement

Process Management

OIR

AIR

EIR

CIC

PQQ

CDE

BEP

7 step BIM process

The Information Manager & PAS 1192

37