Introduction:
A nuclear power plant has endangered effects invarious phases of life besides producing electricalpower.
To avoid these effects we automate the workingof the plant by utilizing task managers,surveyors,and security robots guided by distributed controlsystem wherefrom they receive orders of their
jobs.
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 3/17
Necessity:
Necessity is the mother of all
inventions.Nuclear power plants producesharmful radiations along with nuclearwaste which effect the human health.Thusthe necessity of an automated nuclearpower plant arises.
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 4/17
The various operations are performed
by:
Task managers.
Communication hub.Sensors and surveyors.
Security robots.
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 5/17
Task managers:
These have wide applications in various circuits of
nuclear power plant.They are
Steam generation
Reactor cavity
Reactor vessel
Reactor head vessel
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 6/17
Steam generation:
Primary tube inspection and maintenance.
Channel head cleaning and decontamination.
Nozzle dam insertion.
Sludge lancing. Secondary side foreign object removal.
Foreign object removal in primarycircuit.
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 7/17
Reactor vessel:
Under water inspection and repair.
Lower internal valve inspection.
Reactor head vessel:
Surface decontamination.
Head inspection.
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 8/17
Reactor cavity:
Floor and wall decontamination.
Fuel transfer channel cleaning.
Miscellaneous:
Internal pipe inspection and nuclear waste removal.
Removal and welding of pressurized heaters.
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 9/17
Figure1:a typical task manager
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 10/17
Figure2:The grippers used for the task
managers.
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 11/17
KERNEL
DATABASE
TASK LEVEL TEACHING SYSTEM
DISPLAY
MOUSE AND
KEYBOARD
SERVICE
ENGINEER
OPERATOR
TASK LEVEL PROGRAMMER
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 12/17
MOTION PROGRAM GENERATION SECTION
KERNEL
MOTIONLEVELDATABASE
MOTION LEVEL PROGRAMMERROBOT CONTROLLER(INTERPRETOR)
ROBOTSENSOR
APPLICATION ‘a’
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 13/17
Communication Hub:
This forms a major part of the distributed control systemwith the capability to communicate with the taskmanagers,receive information from the sensors and prepareextra robots for disaster management.
This hub consists of five engineers needed for theworking of the plant- a mechanical engineer, a mechatronicsengineer, a communication engineer, an electronics engineerand a person well versed with the working of the powerplant. The communication sub-system shown receives andtransmits IR radiations of wavelength 904 nm.
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 14/17
Sensors and Surveyors:
All the factors can be analyzed by using varioussensors like temperature sensors, photoelectricsensors, ultrasonic sensors etc. The surveyors
collect the information and send them to the hub.
The hub receives the information, processes itusing the sensor program as designed for the safetyof the nuclear plant. Then the information is sent tothe safety robots.
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 15/17
Security robots:
The security of the plant is taken care by the microcontrollers, which prevent anyone from entering intothe plant. This is implemented by the password andfinger print- identification technique, which prevents
intruders from accessing the resources of the plant.
The security micro controller send an alarm signalto the hub, which then shut downs all the activities inthe reactor and the hub tries to locate the intruder.
8/14/2019 The Future Nuclear Power Plant
http://slidepdf.com/reader/full/the-future-nuclear-power-plant 16/17
Conclusion:
Automation makes the power plant a safer place andalso ensures that no mistakes happen which causes theplant to be destroyed. The nuclear power is the sourceof energy for the future. The developed and developingcountries are exploiting the energy in such a way that
without nuclear power we will be unable to satisfy theirenergy needs. So we can’t discard nuclear power sayingit causes harm to the mankind. Therefore the otheralternative is completely automating the plant to savemankind from the threat of nuclear radiations and inmaking the world a better place to live in.