TCM Update, January 2012 Tore Amundsen Managing Director

Foto: Søren Rysgaard / Galathea

? < 2°C

• CCS expected to cut 25 % of emissions • Contribution from 2030

TCM is the world’s largest

facility for testing and

improving CO2 capture.

Knowledge gained will prepare

the ground for CO2 capture

initiatives to combat climate

change.

Building the

Biggest!

TCM – Highlights

2006 2007 2008 2009 2010 2011 2012 2016

• State and Statoil agreed to build test centre

• Agreement to start planning and engineering

• Planning completed and preparatory work starting

• Parliament approved project

• TCM Partnership established

• Sasol joined partnership

• Plant start-up early 2012

• Initial five year test period

• Test, verify and demonstrate

CO2 capture technology owned

and marketed by vendors

• Reduce cost, technical,

environmental and financial

risks

• Encourage the development of

market for CO2 capture

technology

• Aim at international deployment

Test

Ambitions

75.12% 20% 2.44% 2.44%

Other potential partners to be invited

Our Owners

Company Meeting

Managing Director

Technology Manager Operations Manager

Technology Committee

(Partners reps.)

TCM Project Manager

Statoil

How we’re

organized

Power Plant

Amine

plant

Chilled Ammonia

plant

Admin

complex

Electrical

substation

Utilities

Future

technologies

Seawater

Piperacks

Refinery’s

cracker

Plant Layout

Power plant

Mongstad

Refinery

Project

office rig

Aerial photo 28.04.2011

TCM

TCM located next to

Statoil’s refinery

Area Philosophy

Amine plant Prefabricate modules

Site-build of foundations

Slip-form concrete structure

Chilled Ammonia plant Stick-build at site

Site-build of foundations

Slip-form concrete structure

Utilities and infrastructure Prefabricate modules

Prefabricate concrete

elements

Construction

Philosophy

Structural steel tons 2 966

Piping tons 1 174

Electrical cables m 236 965

Instrument cables m 201 029

Cable terminations no's 7 424

Junction Boxes no's 616

Instruments no's 3 904

Equipment tons 1 148

Purchased items no's 8 160(utility only)

Total TCM

Facts and

Figures

Plot the size of

11 soccer fields

Alstom and Aker

• Discharge permit granted

• No negative HSE impact

• Many studies performed

• University of Oslo, SINTEF,

CSIRO, Climate and Pollution

Agency (Klif), Nilu, MIT etc

was involved

The Amine Issue

How is CO2

captured?

Total capacity 100 ktonnes CO2 per year

Combined Heat

& Power plant

(CHP)

CO2 12.9%

CO2 3.5%

Chilled Ammonia

Treated

exhaust

Treated

exhaust

Residue

Catalytic

Cracker (RCC)

Amine CO

2

CO

2

Mobile Test Unit

Test concept

• Determine emissions and discharges from the test facilities

• Verify safe and stable continuous operation

• Determine design limits

• Minimise energy demand

• Identify and assess critical equipment

• Develop control philosophy and train advanced control system

• Develop and validate modelling tools

• Measure and compare overall test results against reference cases

• Assess cost efficiencies

• Establish cost models

Test Objectives

Three Operations

Rooms

Administration

complex

Become a globally

recognized centre

of competence on

CO2 capture

US Energy Minister

Steven Chu visit

3000 visitors to TCM so far….

Ban Ki Moon visit

Abu Dhabi invite

• Receive visitors to TCM

• Cooperate with R&D organisations and other

projects

• Participate in CCS conferences and present papers

• Keep outside world updated on status through

website

• Good communication with media and NGOs

• Subject to vendor confidentiality agreements

Knowledge

Sharing

www.tcmda.com