OPERATION OPERATION OPERATION OPERATION ---- CARGO WORK CARGO WORK CARGO WORK CARGO WORK (FOR VESSEL)(FOR VESSEL)(FOR VESSEL)(FOR VESSEL)
TANKCRUTANKCRUTANKCRUTANKCRU----00005555 Revision: Revision: Revision: Revision: 1111 Date: Date: Date: Date: 2004/10/12004/10/12004/10/12004/10/1
TABLE OF CONTENTS (TOC)
No. Title Page
1. TANKCRU 5 Operation (Cargo Work) 1-3
Attachments
TANKCRU 5
i. TANKCRU5 8480E Stowage Plan & Loadable Quantity
ii. TANKCRU5 8490E Stowage Plan (after loading)
iii. TANKCRU5 8410E Cargo Sequence (Disch)
OPERATION OPERATION OPERATION OPERATION ---- CARGO WORK CARGO WORK CARGO WORK CARGO WORK (FOR VESSEL)(FOR VESSEL)(FOR VESSEL)(FOR VESSEL)
TANKCRUTANKCRUTANKCRUTANKCRU----00005555 Revision: Revision: Revision: Revision: 1111 Date: Date: Date: Date: 2004/10/12004/10/12004/10/12004/10/1 Page No.:Page No.:Page No.:Page No.:1
(A) Loadable Plan
In the sailing instruction, the quantities and the grades you should nominate to the supplier
are shown.
You are requested to draw up the loadable plan in accordance with the sailing instructions
and advise Crude Oil Team (TANKCRU) and Tanker Management Team (MARTANKER) of
your loadable plan (Ship’s loadable quantity, tank wise, information which you want to tell us
if any, and etc…). If needed, Tanker Management Team (MARTANKER) will advise you of
their comments on your plan.
When you draw up the loadable plan, please use NYK Form.
: TANKCRU5_8480E Stowage Plan & Loadable quantity
(B) Stowage Report
Please advise Crude Oil Team (TANKCRU) and Tanker Management Team (MARTANKER)
of your loaded stowage report (NYK form) after sailing last loading port (after B/L figure is
confirmed).
: TANKCRU5_8490E Stowage Plan (after loading)
(C) Discharging Plan
(1) For NYK operating vessel
Charterer advises us of their discharging order directly or via local agent.
When you receive the discharging order, please draw up the discharging plan with NYK
form.
: TANKCRU5_8410E Cargo Sequence (Disch)
After you draw up the discharging plan, please send it to Crude Oil Team (TANKCRU)
and Tanker Management Team (MARTANKER) before you submit it to charterer.
Tanker Management Team check (or advise if any) the plan, and then they acknowledge
your plan, we (Crude Oil Team) pass the plan to charterer.
(2) For chartered out (T/C out) vessel
Charterer advise you of their discharging order directly or via local agent.
OPERATION OPERATION OPERATION OPERATION ---- CARGO WORK CARGO WORK CARGO WORK CARGO WORK (FOR VESSEL)(FOR VESSEL)(FOR VESSEL)(FOR VESSEL)
TANKCRUTANKCRUTANKCRUTANKCRU----00005555 Revision: Revision: Revision: Revision: 1111 Date: Date: Date: Date: 2004/10/12004/10/12004/10/12004/10/1 Page No.:Page No.:Page No.:Page No.:2
When you receive the discharging order, please draw up the discharging plan with
charterer’s form. (If charterer does not have their original form, please apply NYK form.)
After you draw up the discharging plan, please submit it to charterer (and copy to us)
from vessel directly.
Tanker Management Team (MARTANKER) check (or advise if any) the plan.
(D) Pumping Rate
If the vessel cannot maintain her maximum discharging rate due to shore reason(s), you
should obtain signature by shore representative on a statement of fact.
You should state clearly following points in the statement.
(1) Lower discharging rates requested by shore
(2) The periods and rates of reduction
(E) Cargo Remaining On Board
In order to protect us from R.O.B. claims, you are requested to follow below mentioned
procedures.
(1) Vessel should conclude stripping operation based on prior consultation with terminal or
its representative.
(2) Vessel should not disconnect hoses, nor allow disconnection of hoses, until instructed by
terminal or its representative, and certainly not until after dry survey is completed.
(3) If the surveyor alleges that there is cargo R.O.B. which is liquid, free flowing and
pumpabale, vessel should offer to restrip tanks until pumpable R.O.B. becomes nothing.
(F) Protest Letter
In order to protect us from any claims by charterer, you should submit protest letters to
terminal/shipper regarding below matters for instance.
(1) Cargo Discrepancy – in case ship’s figures are less than B/L (shore) figures
(2) Slow Loading Rate
OPERATION OPERATION OPERATION OPERATION ---- CARGO WORK CARGO WORK CARGO WORK CARGO WORK (FOR VESSEL)(FOR VESSEL)(FOR VESSEL)(FOR VESSEL)
TANKCRUTANKCRUTANKCRUTANKCRU----00005555 Revision: Revision: Revision: Revision: 1111 Date: Date: Date: Date: 2004/10/12004/10/12004/10/12004/10/1 Page No.:Page No.:Page No.:Page No.:3
(3) Free Water in loaded cargo
(4) Delay of Berthing
If you are irresolute whether you should submit “Protest Letter” or “Statement of Fact”
regarding some problem/situation, please consult us and follow our instruction.
(G) Pollution
You are strongly requested to pay due attention to avoid any oil spillage or pollution.
If this nevertheless occur, you must take an action immediately to limit and control such
spillage or pollution.
At the same time, you have to keep Tanker Management Team (MARTNAKER) informed of
its situation and development.
(H) Cargo Condition
In order to avoid any possible cargo claims, or to settle any cargo claims issued smoothly
and quickly, it is essential to inform us and/or your management company immediately when
you observe any abnormal condition on cargoes.
Such report should include the following.
(1) any usual incidents, either minor or major, during loading, discharging or voyage
(2) what is your opinion to the incidents or possible influence to the cargoes
(I) Port Captain
NYK arrange cargo operation safety superintendent in case of discharging at Japanese port
and Korean port. Please kindly cooperate with him/her.
M/V Voy. Stowage Plan & Loadable quantity
% % % % COMMINGLE DETAILS
UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls
MT MT MT MT
% % % % %
UL UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls
MT MT MT MT MT LINE VOLUME
% % % %
UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls
MT MT MT MT
Remarks:
Chief Officer Master
Grade N.Bbls MT
MT %Tank Grade UL N.Bbls
SBT SBT
2S 1S
3P 2P
Grade
4P
SBT
SS
MT
Total
PortTemp ToleranceOrder
3S
3C
EstimatedAPI
5C
5S
SP 5P
4S
1P
Net Bbls
SBT
Charterer's Nomination (Net Bbls) Ship's Loadable Quantity
2C
Max. Min.
4C 1C
Net BblsDifference
%
PortArrival Departure
DraftDisplacement
DraftDisplacementFore. Mid. Aft. Fore. Mid. Aft.
Form No.8480E-A (Ver.3 / Dated 2002.1.15)
M/V Voy. Stowage Plan & Loadable quantity
% % % % COMMINGLE DETAILS
UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls
MT MT MT MT
% % % % % %
UL UL UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls
MT MT MT MT MT MT LINE VOLUME
% % % %
UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls
MT MT MT MT
Remarks:
Chief Officer Master
Form No.8480E-B (Ver.3 / Dated 2002.1.15)
N.Bbls MT
Total
MT %
Port
SBT SBT
3S 2S 1S
3C 2CSBT SBT
4P 3P 2P
Difference%Net BblsNet Bbls MT
1P
N.BblsTank Grade UL
Ship's Loadable Quantity
Grade
6C
SP 5P
1C
SS 5S
5C
API
4S
Charterer's Nomination (Net Bbls)ToleranceOrder Min.
Grade
4C
EstimatedTemp Max.
Fore. Mid. Aft.Port
Arrival DepartureDraft
DisplacementDraft
DisplacementFore. Mid. Aft.
M/V Voy. Stowage Plan & Loadable quantity
% % % % % % COMMINGLE DETAILS
UL UL UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls
MT MT MT MT MT MT
% % % % %
UL UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls
MT MT MT MT MT LINE VOLUME
% % % % % %
UL UL UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls
MT MT MT MT MT MT
Remarks:
Chief Officer Master
Grade N.Bbls MT
MT %
GradePort
Total
Charterer's Nomination (Net Bbls)Net Bbls
Ship's Loadable Quantity DifferenceNet Bbls
PortFore. Mid.
Draft
3S
3C
TempAPIEstimated
SS
Order
1C2C5C
2S5S 4S
Grade UL
SP 5P
1S
N.Bbls
3P
Tank
4P
4C
1P2P
Tolerance %Max. Min. MT
Form No.8480E-C (Ver.3 / Dated 2002.1.15)
Aft.
Arrival Departure
Displacement DisplacementFore. Mid. Aft.Draft
% % % % COMMINGLE
DETAILS
UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls
% % % % %
UL UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls
MT LINE VOLUME
KL
% % % %
UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls
Remarks:
Chief Officer Master
MT
KL
MT
KL KL
MT
KL
KL
MT
KL
MT
KL
KL
MT
MT
Grade N.Bbls
SBT
MT
KL
MT
API
KL
UL KLMTN.Bbls
Total
3S
MTMTDiff. (Ship's - B/L)
LT Net BblsNet BblsShip's Figure
KL
MT
Grade
2S4S
MT
SBT
Tank
1C
1S
SBT
5S
GradeB/L Figure
%Ave. Temp Net Bbls LT
SBT
Fore. Mid. Aft.
Stowage Plan ( After loading )
1P3P 2P
KL
M/V Voy.
SP 5P
5C
4P
4C
MT
3C 2C
MT
KL KL
Port
SS
PortArrival Departure
DraftDisplacement
DraftDisplacementFore. Mid. Aft.
Form No.8490E-A (Ver.3 / Dated 2002.1.15)
% % % % COMMINGLE
DETAILS
UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls
MT
KL
% % % % % %
UL UL UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls
MT LINE VOLUME
KL
% % % %
UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls
MT
KL
Remarks:
Chief Officer Master
Form No.8490E-B (Ver.3 / Dated 2002.1.15)
MT
KL
MT
KL
MT
KL
MT
KL
MT
KL Grade N.Bbls MT
Net BblsMT
3S
Net Bbls
4C5C
APIPort Grade
MT
KL
KL
MT MT
3P4PSP 5P
2C
SS
6C
KL
Stowage Plan ( After loading )M/V Voy.
MT
1P
KL
1C
MTLT
MT
KL
SBT
4S5S
N.BblsTank Grade UL
Net BblsDiff. (Ship's - B/L)Ship's Figure
KLB/L Figure
1S
Total
MT KL
Ave.
Temp
SBT
KL
%LT
2S
MT
KL
SBT
2P
SBT3C
PortArrival Departure
DraftDisplacement
DraftDisplacementFore. Mid. Aft. Fore. Mid. Aft.
% % % % % % COMMINGLE
DETAILS
UL UL UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls
% % % % %
UL UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls
MT LINE VOLUME
KL
% % % % % %
UL UL UL UL UL UL
N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls N.Bbls
Remarks:
Chief Officer Master
MT
KL
MT
KL
MT
KL
MT
KL
MT
KL
MT
KL
KL
MT
KL KL
MT
KL
MT
KL KL
MT
Grade
MT
5S
4C
4P
KL
3C
MT
5C 2C
MT
SP 5P
M/V Voy. Stowage Plan ( After loading )
1P3P 2P
1CKL
MT
1S
Net BblsNet BblsPort
SS
B/L Figure
2S
LT MT
4S
API
MT
KL
MT
KL
3S
Tank Grade N.Bbls
Grade N.Bbls MT KL
MTLT
UL
Ave. Temp
Ship's FigureKL
MT KL
Total
Diff. (Ship's - B/L)Net Bbls %
PortArrival Departure
DraftDisplacement
DraftDisplacementFore. Mid. Aft. Fore. Mid. Aft.
Form No.8490E-C (Ver.32 / Dated 2002.1.15)
M.V. CARGO WORKING SEQUENCE (FOR DISCHARGING) VOY.NO.: DATE: PORT: MASTER: C/O: PAGE:
TIME 5 10 15 20 25 30 35 40
NO.1 COP
P NO.2 COP
U NO.3 COP
M T.C.P.
P STRIP. P'P
BALLAST P'P
0
5
C
A
R
G
O 10
T
A
N
K 15
U
L
L
A 20
G
E
(M)
25
30
5 10 15 20 25 30 35 40
C TANK
O (TOP/BTM/ALL)
W DRIVING
B F.P.T.
A NO.2 (P)
L (S)
L NO.4(P)
A (S)
S A.P.T
T BALLAST TTL
DRAFT (F)
(A)
TRIM
S.F.(%)
F.L.(%)
B.M.(%)
(SEA/H'BR)
CARGO DATA
& QTY
Ave. RATE (KL/H)
(Ver.1 / Dated 2000.2.28)
TIME
M.V. CARGO WORKING SEQUENCE (FOR DISCHARGING) VOY.NO.: DATE: PORT: MASTER: C/O: PAGE:
TIME 5 10 15 20 25 30 35 40
NO.1 COP
P NO.2 COP
U NO.3 COP
M T.C.P.
P STRIP. P'P
BALLAST P'P
0
5
C
A
R
G
O 10
T
A
N
K 15
U
L
L
A 20
G
E
(M)
25
30
5 10 15 20 25 30 35 40
C TANK
O (TOP/BTM/ALL)
W DRIVING
F.P.T.
B NO.2 (P)
A (S)
L NO.4 (P)
L (S)
A A.W.T. (P)
S (S)
T A.P.T
BALLAST TTL
DRAFT (F)
(A)
TRIM
S.F.(%)
F.L.(%)
B.M.(%)
(SEA/H'BR)
CARGO DATA
& QTY
Ave. RATE (KL/H)
(Ver.1 / Dated 2000.2.28)
TIME
M.V. CARGO WORKING SEQUENCE (FOR DISCHARGING) VOY.NO.: DATE: PORT: MASTER: C/O: PAGE:
TIME 5 10 15 20 25 30 35 40
NO.1 COP
P NO.2 COP
U NO.3 COP
M T.C.P.
P STRIP. P'P
NO.1 W.B.P
NO.2 W.B.P
0
5
C
A
R
G
O 10
T
A
N
K 15
U
L
L
A 20
G
E
(M)
25
30
5 10 15 20 25 30 35 40
C TANK
O (TOP/BTM/ALL)
W DRIVING
B F.P.T.
A NO.2 (P)
L (S)
L NO.4(P)
A (S)
S A.P.T
T BALLAST TTL
DRAFT (F)
(A)
TRIM
S.F.(%)
F.L.(%)
B.M.(%)
(SEA/H'BR)
CARGO DATA
& QTY
Ave. RATE (KL/H)
(Ver.1 / Dated 2000.2.28)
TIME
M.V. CARGO WORKING SEQUENCE (FOR DISCHARGING) VOY.NO.: DATE: PORT: MASTER: C/O: PAGE:
TIME 5 10 15 20 25 30 35 40
NO.1 COP
P NO.2 COP
U NO.3 COP
M T.C.P.
P STRIP. P'P
NO.1 W.B.P
NO.2 W.B.P
0
5 C A R G O 10
T A N K 15
U L L A 20 G E(M)
25
30
5 10 15 20 25 30 35 40
C TANK
O (TOP/BTM/ALL)
W DRIVING
F.P.T.
NO.1 (P)
(S)
B NO.2 (P)
A (S)
L NO.3 (P)
L (S)
A NO.4 (P)
S (S)
T NO.5 (P)
(S)
A.W.T.(P)
(S)
A.P.T
BALLAST TTL
DRAFT (F)
(A)
TRIM
S.F.(%)
F.L.(%)
B.M.(%)
(SEA/H'BR)
CARGO DATA
& QTY
Ave. RATE (KL/H)
(Ver.1 / Dated 2000.7.24)
TIME
M.V. CARGO WORKING SEQUENCE (FOR DISCHARGING) VOY.NO.: DATE: PORT: MASTER: C/O: PAGE:
TIME 5 10 15 20 25 30 35 40
NO.1 COP
P NO.2 COP
U NO.3 COP
M T.C.P.
P STRIP. P'P
NO.1 W.B.P
NO.2 W.B.P
0
C
A
R
G 5
O
T
A
N 10
K
U
L
L 15
A
G
E
(M)
20
5 10 15 20 25 30 35 40
C TANK
O (TOP/BTM/ALL)
W DRIVING
F.P.T.
NO.1 (P)
B (S)
A NO.2 (P)
L (S)
L NO.3 (P)
A (S)
S NO.4 (P)
T (S)
A.P.T
BALLAST TTL
DRAFT (F)
(A)
TRIM
S.F.(%)
F.L.(%)
B.M.(%)
(SEA/H'BR)
CARGO DATA
& QTY
Ave. RATE (KL/H)
(Ver.1 / Dated 2000.2.28)
TIME
M.V. CARGO WORKING SEQUENCE (FOR DISCHARGING)
VOY.NO.: DATE: PORT: MASTER: C/O: PAGE:
TIME 5 10 15 20 25 30 35 40
NO.1 COP
P NO.2 COP
U NO.3 COP
M T.C.P.
P STRIP. P'P
NO.1 W.B.P
NO.2 W.B.P
0
5 C A R G O 10
T A N K 15
U L L A 20 G E(M)
25
30
5 10 15 20 25 30 35 40
C TANK
O (TOP/BTM/ALL)
W DRIVING
F.P.T.
NO.1 (P)
(S)
B NO.2 (P)
A (S)
L NO.3 (P)
L (S)
A NO.4 (P)
S (S)
T NO.5 (P)
(S)
A.P.T
BALLAST TTL
DRAFT (F)
(A)
TRIM
S.F.(%)
F.L.(%)
B.M.(%)
(SEA/H'BR)
CARGO DATA
& QTY
Ave. RATE (KL/H)