Stormwater Data for Asset Management and Decision-makingmsgic.org/wordpress/wp-content/uploads/2018/11/...Stormwater BMP - Inventory Stormwater BMPs • Footprints, drainage areas

Post on 24-Aug-2021

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

Transcript

Stormwater Data for Asset Management and Decision-making

Peter Mattejat, PE

Environmental ManagerMarian Batton, GISPGIS Manager

Quarterly MeetingApril 18, 2018

Agenda

• Overview

• Stormwater BMP (Current)

• Other Assets (On-Going)

Overview - MDTA

• Safe + efficient transport via tolled highways, bridges, & tunnels

• Self funded with a Governing Board

• State agency in an environmentally progressive state

• Linear & highly impervious, close proximity to Chesapeake Bay

• Comply with stormwater NPDES permits (MS4 and Industrial Stormwater)

• Two recent mega roadway projects triple stormwater infrastructure …. more coming due to Chesapeake Bay TMDL Restoration

MDTA’s Footprint

4

Overview – MDTA Environmental

Environmental Assets

• Stormwater Best Management Practices

• Small Drainage (<48”) + Large Drainage

• Natural Resources (Trees, Stream Restoration, Wetlands)

MS4 Phase II General Permit

• Covers Toll Highways + Campuses

• 2018 renewal + adds Chesapeake Bay TMDLs

• Manage stormwater Best Management Practices (BMPs) & drainage systems

Industrial Discharge General Permits

• Maintenance Facilities + Truck Weigh Stations

• 2014 renewal includes Bay TMDLs

• Interface with Office of Maintenance and Structures Division (drainage structures ≥ 36”)

6

Overview – NPDES Permits

Stormwater BMP - Geodatabase

• Inventory

• Inspection

• Remediation

• System Preservation

• Compliance Reporting

Stormwater BMP - InventoryStormwater BMPs

• Footprints, drainage areas

• Attributes

• Existing, Proposed, Planned

Storm Drains

• structures, drainage areas

• Attributes

Impervious Area

Related Documents

• Site maps + photos

• Design plans & reports

Stormwater BMP - Inventory

Stormwater BMP - Inventory• ArcGIS Online (AGO) Dashboard

• Oversight of Inventory

• Multiple Users

Stormwater BMP - Inspection

• Maximum 3-year cycle, more frequent for specific types

• Inspect newly constructed as part of As-Built certification

• Inspect post-remediation to log improved condition

• BMPs at Maintenance facilities require annual investigation

• Long-term monitoring / trends

Stormwater BMP - Inspection

• AGO Collector Application

• Tablet and Smart Phone

• Assign Subsets of BMPs

0

10

20

30

40

50

Pond Infiltration Filtering

Ratings by Type

D

C

B

A

Stormwater BMP - Remedial

• Preventative Maintenance

• Repair

• Rehabilitation

• Enhancement

• Abandon

Stormwater BMP - Remedial

Stormwater BMP - Remedial

Stormwater BMP - Remedial

Stormwater BMP - Remedial

AGO Collector Application – Tablet and Smart Phone

View Maintenance Needs

Stormwater BMP - RemedialAddress Maintenance Needs

Stormwater BMP - RemedialReport Other Needs

Stormwater BMP – Asset Management• Life-Cycle Approach

• Data collection / evaluation

• System Preservation / Stormwater Compliance

• Integrate in highway setting

Other Assets - Drainage

• Small Drainage - verify inventory & video inspection

• Drainage Outfalls - Assess for Restoration + TMDL credit

• Roadside Ditch - Assess for Restoration + TMDL credit

• Drainage Investigation Program

• Large Drainage – support system preservation

Other Assets – Natural Resources

Tree Plantings

• verify installation & survivability

• Bay TMDL stormwater credits

• Bay Critical Area mitigation bank

Stream Restoration : 5-yr monitoring & repairs

Invasive Vegetation Management: inventory & remediate

Ecological Resources Bank: pending CAC

Closing

Chesapeake Bay:Economic - Environmental – Cultural Resource

top related