Hot Tapping FittingSplit Tee

Existing Pipe

1. Install Hot Tapping Split TeeSTEP 1 STEP 2

STEP 3 STEP 4

1. Install Butterfly Valve and plain ended pipe

1. Install Temporary Gate Valve (KGV)to hot tapping split tee 1. Install Tapping Machine to hot tapping split tee

Existing Pipe

UPT Hot Tapping Machine

Existing Pipe

Temporary Gate Valve (KGV)

Butterfly Valve

Existing Pipe

Plain ended pipe

EXISTING PIPE 2050

Completion Plug Machine

1. After Tapping close temporary valve. Then install completion plug machine

Completion Plug 1000mm

Temporary gate valve

Existing pipe 2050

1. Plug in Completion plug and remove temporary gate valve

Blind Flange

STEP 5

STEP 7

Existing pipe 2050

STEP 6

1. Install Blind Flange