LONG TREM STRATEGY
For Development of Tourism sites
1. National Park & Tourism Facilities at Mahudand (Swat)
2. Additional Facilities at Tourism Complex Kund.
3. Recreation Theme Park at Tanda Dam, Kohat.
4. Suspension Bridge and allied facilities at Kund.
5. Development of Sheikh Badin as hill resort.
6. Tourism Transport Service for NWFP. (Rs. 50 million)
7. Development of Thandiani Summer Resort (Abbottabad).
BRIEF FOR SECRETARY (TOURISM)
A detailed brief for the forthcoming investment conference has been
furnished to the SDA. A list of the potential sites, which STC intends to
develop for recreation and income generation is reproduced as under:-
LONG TERM PROJECTS
CONCEPT PAPER FOR THE DEVELOPMENT OF KUND PARK
DISTRICT SWABI
Kund Park is located on the confluence of river Kabul & river Indus near
Attock Bridge on the main G.T road between Peshawar & Islamabad. Due
to its enviable location the park is visited by tens of thousands of people
particularly by school children from Peshawar and Islamabad & adjoining
districts of Charsadda, Mardan, Nowshehra in NWFP and Attock &
Rawalpindi of Punjab Province. The total area of the park is about 802
kanal. The open lawns of the Kund Park contain variety of trees with
viewing decks for enjoying scenic flow of river Indus and river Kabul
from the same point.
The park also lodges a beautiful wild life park where some rare
species like that of bear, leopard, deer & birds have been kept for
public interest.
To enhance the beauty of the park some additional facilities i.e.
leveling & land scapping, construction of bridges & stairs facilities
along side river Kabul & river Indus are required. The detail of each
facility is discussed along with estimated cost as under with the
proposal that the either the federal government may release funds
for them or private sector may implement them on lease basis: -
1. Bridge on river Kabul
A bridge for light vehicular traffic is required to be constructed for
restoration of direct access to the Kund Park. The approximate cost
on bridge on river Kabul has been worked out to be Rs. 100 million.
LONG TERM PROJECTS
2. Supporting wall and stairs on the bank of two rivers
The length of the bank of the river Indus on the east and river Kabul
on south-west is about 2 km. STC has planned to raise supporting
wall and construct stairs containing over head shelter for the
tourists along side the river Kabul & river Indus. The cost estimates
on this facility have been to be calculated Rs. 100 million.
3. Leveling & land scaping.
The total area of the park is 802 kanal which needs to be rearranged
scientifically, making that plan besides raising variety of trees and
ornamental plants. Estimated cost on leveling & land scapping is
Rs.50 million.
LONG TERM PROJECTS
4. Tourist Hostel.
Kund Park is lacking appropriate accommodation facility for
tourists. Hence, some suitable structure for lodging of the tourists
is required. The Corporation is of the view that two hostels one
each overlooking river Kabul and other river Indus are required for
Kund Park. Estimated cost of the two hostels is Rs.100 million.
5. Construction of Restaurants
Two restaurants with modern facilities are proposed to be
constructed i.e. one on river Kabul and another on Indus. Each
one having tuck shops and souvenir shops for the tourists
attraction would give remarkable look. The estimated cost for
construction of two restaurants with the additional facility of tuck
shops & souvenir shops is Rs. 100 million.
LONG TERM PROJECTS
6. Children Park.
Children Park would be a major facility for school going children as
usually school students visit Kund park in group form. The
estimated cost for development of Children Park is Rs.10 million.
7. Rehabilitation/restoration of old building
Funds are required for the repair of the old buildings i.e. one Rest
house, 4 huts, golf club, foot path & toilets. The estimated cost on
this facility is Rs.10 million.
8. Boating & Canoeing facility
Kund Park is a unique place for boating & canoeing as it is
surrounded by famous two rivers i.e. Indus & Kabul. This facility will
require funds to the tune of Rs. 10 million.
LONG TERM PROJECTS
Summary of the cost of each facility
Development of Kund Park District Swabi
S.No Name of Facility Estimated cost in million
1. Bridge on river Kabul Rs.100.000
2. Supporting wall & stairs Rs.100.000
3. Leveling & land scapping Rs. 50.000
4. Tourists hostels Rs.100.000
5. Construction of restaurants Rs.100.000
6. Children park Rs. 10.000
7. Rehabilitation & restoration Rs. 10.000
of old building
8. Boating & canoeing Rs. 10.000 .
Total estimated cost = Rs.480.000 million
LONG TERM PROJECTS
At Shahi (Dir Lower), the STC has one small rest house on 30
Kanal land. This Shahi Can be developed as Summer Resort once
we provide suitable building, and provide electricity by installing a
small hydel power station. Estimated cost is Rs. 200 million
9. Development of Tourism Resort at Shahi (Dir Lower):
10. Summer Resort at Kumrat (Dir Upper):
Kumrat is one of the most beautiful valleys of the country. STC
has 5 kanal plot in Kumrat. A summer resort at the cost of Rs. 50
million is required.
LONG TERM PROJECTS
SHORT TERM DEVELOPEMNT PLAN
The following schemes need immediate attentions for implementation:
During summer, NWFP, is visited frequently by the people of other provinces.
The local tourists in the company of their families face difficulty owing to the
absence of road side facilities.
The following TFC on GT Road, Indus Highway, Silk Road (Kara Kuram
Highway) and Nowshera – Chakdara – Chitral (NCC) are required to be
established :-
Name of the facility / Location Estimated Cost
Kund Car Park, GT Road, Nowshera. Rs. 10 million
Peshawar on GT Road Rs. 20 million
Karak – Hamidan Chowk – Indus Highway. Rs. 10 million
D.I.Khan – Indus Highway. Rs. 10 million
Havellian – Abbottabad, Silk Road / K.K. Highway. Rs. 20 million
Besham – Kara Kuram Highway. Rs. 10 million
Chakdara (Malakand), Nowshera – Chitral Road. Rs. 10 million
Dir Upper, Nowshera – Chitral Road. Rs. 10 million
Landakay – Swat. Rs. 20 million
Drosh – Chitral Rs. 10 million
Total 11 TFC - Total Cost Rs.130.000 million
1. Construction of Tourism Facilitation Center in the Province:
Installation of Chair Lift between Naran and lake
Saifulmalook (Manshera), Estimated Cost Rs.120 million
Chair Lift Scheme at Dobanda – Zakhana, Dir (upper)
Estimated Cost Rs. 120 million
Chair Lift on River Kabul at Kund (Nowshera).
Total Length 300 meter. Estimated Cost Rs. 100 million
Transport fleet for STC – comprising 2 long vehicles,
2 tourist coaches, 6 tourist jeeps and 2 Cars,
Estimated Cost Rs. 50 million.