Status of GEO600. Benno Willke for the GEO600 team. ESF Exploratory Workshop Perugia, September 2005. Workshop. Central Building. Offices. Control Room / Visitor Center. Bathrooms. container cluster 2005. Tube / Trench. Clean Room / Control Room. Triple Pendulum Suspension. - PowerPoint PPT Presentation

Transcript

Status of GEO600

Benno Willkefor the GEO600 team

ESF Exploratory Workshop

Perugia, September 2005

ESF 05 / GEO, B. Willke

ESF 05 / GEO, B. Willke

container cluster 2005

Workshop Central Building

Bathrooms

OfficesControl Room / Visitor Center

ESF 05 / GEO, B. Willke

Tube / Trench

ESF 05 / GEO, B. Willke

Clean Room / Control Room

ESF 05 / GEO, B. Willke

Triple Pendulum Suspension

ESF 05 / GEO, B. Willke

Thermal Noise / Monolithic Suspension

Silicate (Hydroxy- Catalysis) Bonding

Weld

ESF 05 / GEO, B. Willke

reaction pendulum

ESF 05 / GEO, B. Willke

12W Laser

modecleaner

interferometer with „dual recycling“

detektor

GEO 600 – optical layout

ESF 05 / GEO, B. Willke

Dual Recycling Length Control

ESF 05 / GEO, B. Willke

< 10 Hz

> 10 Hz

< 0.1Hz

Michelson length control

Reaction Pendulum:

3 coil-magnet actuators at intermediate mass, range ~ 100µm

Electrostatic actuation on test mass bias 630V, range 0-900V= 3.5µm

ESF 05 / GEO, B. Willke

Alignment Control

Alignment Control

differential wave-front sensing

spot position control

4 degrees of freedom at MC 1

+4 at MC 2+4 at MI (common mode)+2 at MI (differential mode)+2 at Signal-Recycling cavity

16 + 20 = 36

ESF 05 / GEO, B. Willke

GEO 600 design sensitivity

ESF 05 / GEO, B. Willke

102

103

10-21

10-20

10-19

10-18

10-17

Frequency [Hz]

h(t

) [H

z-1/2

]

Jan 02

Aug 02 (S1)

Jan 04 (S3)

Sept 05

Feb 05 (S4)

Aug 04

Evolution of the GEO 600 Sensitivity

ESF 05 / GEO, B. Willke

GEO600 Duty Cycle

date run name duty cycle

longest lock

Jan 2002 E7 75% 3h 40min

Aug 2002 S1 98% 121h

Nov 2003Jan 2004

S3-I (7days)S3-II(14 days)

95%98%

95h

Aug 2004 –Jan 2005

over night runs

(51 days)

94%

Mar 2005 S4 97% 52h

ESF 05 / GEO, B. Willke

S4

Feb 22nd – March 23rd, 708 hours Two manned shifts/day (5-21 UTC), 1 „Expert-On-Duty“ 8-8UTC Fully automated overnight shifts; SMS alarms to ‚E-O-D‘

Locking status DAQS (DCUs running, frame making, timing, calibration) Temperatures Vacuum

Instrumental duty cycle 97.5%, 95% w/o noisy period, 72%>10h

Longest lock 52h

ESF 05 / GEO, B. Willke

detector characterization

Sensitivity Min/max spectrum of

h(t) 15 BLRMS of h(t) Inspiral monitor Spectrogram of h(t)

Calibration Data quality Chi2 Calibration

parameters

Bursts (HACRmon) Time frequency

distribution SNR distribution Duration Bandwidth

Lines (Linemon) Line cataloguing Harmonic

identification Sideband

identification

ESF 05 / GEO, B. Willke

Typical S4 Sensitivity

ESF 05 / GEO, B. Willke

Calibration

ESF 05 / GEO, B. Willke

On-line optical TF measurements

actuator optical

CAL P and Q

h

ESF 05 / GEO, B. Willke

Calibration

radiation pressure

calibrator

?

ESF 05 / GEO, B. Willke

Photon Pressure Calibrator

Good agreement with ESD calibrationWavelength: 1035 nm @ 20°CMax. power: 1.4 W, FWHM= 0.66nm

ESF 05 / GEO, B. Willke

Optical Gain

ESF 05 / GEO, B. Willke

Calibrated EP Quadrature Signals

h [1

/sqr

t(H

z)]

ESF 05 / GEO, B. Willke

Combining hP(t) and hQ(t) – results

h [1/sqrt(Hz)]

Get the best of hP and hQ plus a little extra!

Get the best of hP and hQ plus a little extra!

ESF 05 / GEO, B. Willke

Laser

Michelson Interferometer

Output Mode Cleaner

Mode Cleaners

10W 1.6W

1500W (typ.) 2000W (max) atBeam Splitter

5W

~40mW

T=0.09%

Power Recycling Cavity:

Mode matching >85%Finesse 8300Linewidth 30 Hz

4/0.09%*1.6 = 7000

increase of power recycling factor

ESF 05 / GEO, B. Willke

Thermal lensing in BSoutput mode pattern (PRMI)

Directly after relocking

f=20km

A few minutes after relocking

f= 8km

→ α≈0.3 +/- 0.05ppm/cm

ESF 05 / GEO, B. Willke

GEO 600 design sensitivity

ESF 05 / GEO, B. Willke

Tuning signal recycling to 300 Hz

lock acquisition at 5kHz

tuning needs to adjust of 6 parameters (look-up table)

improved input file for simulations and how to transfer results to experiment

achieved downtuning to 200Hz

MI AA instability could be fixed

ESF 05 / GEO, B. Willke

Interferometer Readout - Sidebands

phasemodualtor

laser beam splitter

mirror

mirror

photodetector

ESF 05 / GEO, B. Willke

Schnupp – Modulation

phasemodualtor

laser beam splitter

mirror

mirror

photodetector

ESF 05 / GEO, B. Willke

Gravitational Wave Side Bands

phasemodualtor

laser beam splitter

mirror

mirror

photodetector

ESF 05 / GEO, B. Willke

Detuned Signal Recycling

phasemodualtor

laser beam splitter

mirror

mirror

photodetector

ESF 05 / GEO, B. Willke

Unbalanced Sidebands

PRC

SRCbroad-band

SRCdetuned to1.1 kHz

MI-sidebandsSR-sidebands broadband

SR-sidebands1.1kHz detunedcarrier

-119 * fPRC

-72 * fPRC

72 * fPRC

119 * fPRC

0

72 D ( 765Hz) D (1.26kHz) D (1.26kHz) 72 D ( 765Hz)

2.2kHz 1.1kHz1.86kHz 2.3kHz

SR-sidebands2kHz detuned

ESF 05 / GEO, B. Willke

Signal Recycling digital

digital loop allows for steep filter

noise contribution reduced by up to a factor of 200

ESF 05 / GEO, B. Willke

Sqrt circuits in MI loop

ESD: F U^2

Sqrt circuits are necessary to give full linear force range for acquisition.

Drawback: sqrt circuits are noisy 1µV/sqrt(Hz)(=100µV/sqrt(Hz) @ ESD)

ESF 05 / GEO, B. Willke

MI loop whitening / dewhitening

dewhiten

dewhiten

dewhiten

Whiten

Whitening right after mixer:zero 3.5 Hzpole 35 Hz

Dewhitening for both split passes

Passive dewhit-ening done in HV path (0-1kV)

ESF 05 / GEO, B. Willke

sensitivity improvements since July

ESF 05 / GEO, B. Willke

102

103

10-21

10-20

10-19

10-18

10-17

Frequency [Hz]

h(t

) [H

z-1/2

]

Jan 02

Aug 02 (S1)

Jan 04 (S3)

Sept 05

Feb 05 (S4)

Aug 04

Evolution of the GEO 600 Sensitivity

ESF 05 / GEO, B. Willke

Current vs. Design sensitivity

102

103

10-24

10-23

10-22

10-21

10-20

10-19

10-18

10-17

Freq. [Hz]

ASD

[h/ H

z]GEO600 Theoretical Noise Budget

SeismicSuspension TNSubstrate TNCoating TNThermorefractiveShot 350HzTotalShot Sept 1 h(t) Sept 1

ESF 05 / GEO, B. Willke

Non-stationary Noise

ESF 05 / GEO, B. Willke

Near Future

finish commissioning increase circulating power find source of optical losses in PR cavity increase MI loop gain between 1-10 Hz improve RF circuitry optimize stability

join S5 in overnight/weekend mode until commissioning is finished

fully join S5

ESF 05 / GEO, B. Willke