Station Highlights - "Rapid MetroRail Gurgaon Newsletter 1" · PDF fileConcourse level will accommodate facilities like Ticketing and ... Ambience Corporate Tower Ambience...
Post on 06-Feb-2018
217 Views
Preview:
Transcript
Station Highlights
Rapid Metro Gurgaon corridor has six stations spread across the Network
Station 1
Located in close proximity to Sikanderpur
Interchange station to cross over from Delhi Metro to Rapid Metro Network
Entry to station from either side of the road
Elevated covered walkway for passengers to cross from Delhi Metro platform to
the Rapid Metro platform
Station 2
Located in DLF Phase 2
Building No 5 is a walk of less than 2 minutes away from the station
Concourse level will accommodate facilities like Ticketing and AFC collection gates
Station 3
Will provide access to Belvedere Towers residential complex and DLF Phase 2
A direct walk into Building No. 10 from the station
Station 4
Situated on NH8, this station is positioned at the entry of Cyber City
FOBs have been provided to give access to Gateway Tower, Ericsson Building and Building No. 8 and 4 on either side
Station 5
Located on Moulsari Avenue
A five minute walk to the Ambience Mall from the station
Passengers can enter the station from either side of the road
Station 6
Provides access to Cyber Green, Infinity Tower, Building No. 7 and 9
Approach to offices located in these buildings is within a walking distanceof less than 4 minutes
A boon for the visitors and residents of DLF phase 3 – metro station now ashort walk away!!
Bridging Distances Rapid Metro, a fully elevated corridor connecting Sikanderpur Metro station, Cyber City, DLF Phase 2, 3 and Ambience Mall
Trial runs to commence from October 2012
Commercial operations to start in early 2013
Common ticketing system with Delhi Metro
Trains to run from 5:30 am to 12:00 am (midnight)
Train frequency: every 4 – 5 minutes
Rapid Metro fare similar to Delhi Metro
Technology Partners We have partnered with Siemens Mobility for rolling stock, signaling
and electrification systems
Trains are being built in accordance with international standards to reduce the running noise
AFC (Automatic Fare Collection) system is being provided by Thales, a renowned and a major supplier of telecom and AFC systems for metros
Stations and the elevated viaducts are being constructed by IL&FS Engineering
About IL&FSThe driving force behind Rapid Metro Gurgaon is Infrastructure Leasing & Financial Services Limited (IL&FS), one of India’s leading infrastructure development and finance companies. IL&FS has a distinct mandate - to catalyse the development of infrastructure in the country.
Rapid Metro, Gurgaon Route Map
Community Engagement ‘Joy of Giving‘ week was organized and winter clothing was distributed to
more than 250 under-privileged students
Funding for plantation and maintenance of approximately 1000 trees at Nandigram Gaushala, near Palam Vihar
Rapid Metro sponsored the construction of a boundary wall at HUDA Primary School, Sector-9, Gurgaon
‘Rapid Walk Gurgaon 2012’ - a walkathon, was organized to promote the use of public transport in Gurgaon with nearly 2000 participants
IRL Foundation, the philanthropic arm of IL&FS Rail has been set up for holistic community development
Safety First Fully automated train operations to eliminate human error
CCTV monitoring across the Rapid Metro System, includingplatforms and coaches
“Press to Talk” to driver facility on train for onboard emergencies
Lifts / wheelchairs for senior citizens and disabled at all stations
Baggage scanning and security check at all stations
Customer care centre at every station with a 24x7 help line number facility
Eco-efficiency The project will reduce on an average more than one lakh tonnes of carbon
emission (CO2) per annum in the first year of operation
Reduction in electricity consumption of up to 5-7% through automatic light sensors at stations
Energy conservation through our air conditioning system which will monitor cooling requirement on the basis of passenger load
To recharge the Cyber City water table, more than 150 water harvesting bore wells have been constructed along the Rapid Metro alignment and the six stations
Rapid Metro, Gurgaon Route Map
Updates
Trains to arrive by August 2012
Future extension of Rapid MetroRail Gurgaon towards Sector 55-56 and Udyog Vihar to commence shortly
Sector 55-56 extension to be completed by 2015
Rapid MetroRail Gurgaon Limited2nd Floor, Ambience Corporate Tower
Ambience Island, NH No. 8, Gurgaon – 122001 Haryana (India)
Off: 0124 – 4716300, Fax: 0124-4716225
RAIL
Branding Opportunities
Advertise with us Line partnership Full train wrapping
Pillar branding and wrapping Static media inside the stations
Station naming rights Corporate color branding on stations
Duct panelling.
RetailTo set up retail spaces like kiosks, canopies, carts, ATM’s etc. inside the stations, contact - Amit Thapa: 9873678589, amit.thapa@ilfsindia.com
To know more about the Project write to info@rapidmetrogurgaon.com
top related