SOUTH BELLEVUE EAST LINK CONSTRUCTION U.S. Postage …€¦ · Committee (NTMC). The NTMC has met four times to develop the draft concept plan (pages 4-5). The Committee will consider
Post on 08-Oct-2020
1 Views
Preview:
Transcript
East Link segment along Bellevue Way SE and 112th Ave SE
South Bellevue Station
East Main
Station
Beaux Arts
Village
Surrey Downs
N
Lake Washington
Enatai
112t
h Av
e S
E
Bel
levu
e W
ay
Bellecrest
108t
h Av
e S
E
104t
h Av
e S
E
Main St
East Link Alignment
SE 8th St
I-90
SOUTH BELLEVUE EAST LINK CONSTRUCTION: DRAFT NEIGHBORHOOD TRAFFIC MITIGATION PLANYour feedback wanted
Project GoalLessen the potential for increased traffic on neighborhood streets during East Link light rail construction activities on Bellevue Way SE and 112th Ave SE.
BackgroundWith the construction of the South Bellevue East Link segment anticipated to begin as early as January 2017, the city is working with affected neighborhoods—through a Neighborhood Traffic Mitigation Committee (NTMC)—in helping to identify mitigation tools and locations to lessen the potential traffic impacts. Specifically, East Link construction will impact Bellevue Way SE from near the current location of the South Bellevue Park-and-Ride along the roadway to the “Y” intersection (Bellevue Way SE and 112th Ave SE) and extending onto 112th Ave SE. The construction will involve building the tracks of the East Link light rail and the South Bellevue station.
Bellevue Way SE is a major arterial serving neighborhoods south of downtown and downtown Bellevue. It is a key connection for commuters entering and exiting Bellevue via I-90. When traffic becomes congested, typically southbound during the afternoon commute, some drivers bypass the congestion by using 108th Ave SE and other neighborhood streets. The enclosed plan, developed by the NTMC, helps to mitigate these impacts.
Plan OverviewThe draft concept plan (pages 4-5) recommends strategic turn restrictions at key entrances in/out of neighborhood areas to deter commuter traffic from using neighborhood streets.
We want your anonymous feedbackComplete a short survey by October 16 here: www.surveymonkey.com/r/COBntmc to help the Neighborhood Traffic Mitigation Committee refine the draft plan (found on pages 4-5).
Hard copy of survey available upon request.
We want your feedback by October 16!www.surveymonkey.com/r/COBntmc
1
Front pageBack page
Title VI Notice to the Public It is the City of Bellevue’s policy to assure that no person shall on the grounds of race, color, national origin or sex, as provided by Title VI of the Civil Rights Act of 1964, be excluded from participating in, be denied the benefits of, or be otherwise discriminated against under any of its federally funded programs and activities. Any person who believes his/her Title VI protection has been violated may file a complaint with the Title VI Coordinator. For Title VI complaint forms and advice, please contact the Title VI Coordinator at 425-452-4496.
SOUTH BELLEVUE EAST LINK CONSTRUCTION: Draft Neighborhood Traffic Mitigation Plan
City of BellevueTransportation DepartmentPO Box 90012Bellevue, WA 98009-9012
SOUTH BELLEVUE EAST LINK CONSTRUCTIONDraft Neighborhood Traffic Mitigation Plan
www.bellevuewa.gov/light-rail.com
Question and Comments
Marie JensenEast Link Outreach LeadCity of BellevueTransportation Department
mjensen@bellevuewa.gov(425) 452-2064PO Box 90012Bellevue, WA 98009-9012
www.bellevuewa.gov/light-rail.com
PRSRT STDU.S. Postage
PAID Bellevue, WA Permit No. 61
September 2016
Staff Contact: Marie Jensen, East Link Outreach | City of Bellevue Transportation Departmentmjensen@bellevuewa.gov | (425)452-2064
TRANSPORTATION DEPARTMENT
S O U T H B E L L E V U E E A S T L I N K C O N S T R U C T I O NNEIGHBORHOOD TRAFFIC MITIGATION
SEPTEMBER 2016TRANSPORTATION DEPARTMENT
S O U T H B E L L E V U E E A S T L I N K C O N S T R U C T I O NNEIGHBORHOOD TRAFFIC MITIGATION
SEPTEMBER 2016
72
Neighborhood Traffic Mitigation Committee (NTMC)The Neighborhood Traffic Mitigation Committee (NTMC) includes a broad and geographically balanced representation from the neighborhoods of Bellecrest, Enatai and Surrey Downs and Beaux Arts Village. Membership includes one member of the association’s board of the below listed neighborhoods and seven “community-at-large” members.
COMMITTEE MEMBERS
BellecrestMike KoehnTricia ThomasonLiz Hale
EnataiKevin PaulichRebecca SearsKatherine Christopherson
Surrey DownsKerri PattersonEd Nugent
Beaux Arts VillageTom StoweCynthia HudsonEugenia Yen
East Link and South Bellevue Construction FAQs
East Link
What is East Link?Sound Transit’s East Link light rail line will extend 14 miles from downtown Seattle to the Overlake area in Redmond, with 10 stations in Mercer Island, South Bellevue, downtown Bellevue, BelRed (Bellevue) and Overlake (Redmond).
When will it begin operations?After a testing period of one year, revenue service will begin in 2023.
South Bellevue ConstructionWhen will construction of the South Bellevue segment begin?As early as January 2017.
How long will construction of the South Bellevue segment take?The portion of Bellevue Way SE between the South Bellevue Park-and-Ride and 112th Ave SE is expected to take 26 to 28 months with incentives for the contractor to complete the construction within 19 to 21 months. The South Bellevue segment (E320) construction will be approximately 4 years.
Has a contractor been hired?A contractor is expected to be on-board this fall (2016).
Where will construction equipment staging be located?Most of the staging will occur at the South Bellevue Park-and-Ride site. Additional staging will also occur adjacent to the alignment along Bellevue Way SE and 112th Ave SE and within the median of I-90.
What will be the hours of construction?Typical construction hours will be Monday through Friday, 7 a.m. to 6 p.m. and Saturday, 9 a.m. to 6 p.m. However, on occasion, work hours for certain activities may extend until 8 p.m. During weekend road closures, expect work hours from 7 a.m. to 9 p.m. on Saturday and Sunday.
Where will Sound Transit’s contractors park?Sound Transit’s contractors will park within their own designated area but may not park on neighborhood streets.
South Bellevue Park-and-Ride ClosureWhen will South Bellevue Park-and-Ride close and for how long?Sound Transit anticipates the closure as early as January 2017 and expects the closure to last approximately five years.
Where will South Bellevue Park-and-Ride commuters park during the closure?Sound Transit is establishing replacement parking lots in eastside communities. In addition to using church lots, Sound Transit will also use existing underutilized park-and-ride lots. Information on commuter options is available at kingcounty.gov/metro.
What is being done to prevent hide and ride parking in the neighborhood areas when the Park-and-Ride closes?The City of Bellevue is prepared to work with Sound Transit to implement parking restrictions in neighborhoods, should they be warranted, to limit the amount of spillover parking as a result of the Park-and-Ride closing.
How we got here The city’s Transportation Department hosted an informational meeting on April 27, 2016 with residents of Bellecrest, Enatai and Surrey Downs neighborhoods and Beaux Arts Village. The purpose of the meeting was to share background on known areas of traffic conditions and constraints, to receive additional feedback on other areas of concerns as they relate to East Link construction, and to address the next steps to form the Neighborhood Traffic Mitigation Committee (NTMC). The NTMC has met four times to develop the draft concept plan (pages 4-5). The Committee will consider the feedback received by the community and refine the draft concept plan in October.
April-August 2016NTMC formed draft concept plan.
September-October 2016Outreach to South Bellevue neighborhoods begins; NTMC considers public feedback and finalizes draft concept plan.
January 2017East Link construction in South Bellevue anticipated to begin; NTMC plan implementation coordinated at start of construction activities or shortly thereafter.
January 2017 through 2021 Construction continues in the South Bellevue area and mitigation tools are evaluated and refined on an ongoing basis.
2021Major construction activity wraps up and mitigation tools are removed.
2023East Link opens for passenger service.
We are here
Submit plan feedbackComplete a short survey by October 16:www.surveymonkey.com/r/COBntmc Submit plan feedback Complete a short survey by October 16: www.surveymonkey.com/r/COBntmc
TRANSPORTATION DEPARTMENT
S O U T H B E L L E V U E E A S T L I N K C O N S T R U C T I O NNEIGHBORHOOD TRAFFIC MITIGATION
SEPTEMBER 2016 TRANSPORTATION DEPARTMENT
S O U T H B E L L E V U E E A S T L I N K C O N S T R U C T I O NNEIGHBORHOOD TRAFFIC MITIGATION
SEPTEMBER 2016
36
Draft plan on next page
Enforcement The NTMC had numerous discussions about the need for adequate enforcement to ensure people driving are obeying proposed mitigation measures (e.g. turn restrictions).
The Police Department has been involved with this work and the NTMC has had the opportunity to speak with officers about the best way to enforce their plan. While enforcement cannot occur 24 hours a day, 7 days a week, targeted enforcement will occur in the project area as resources allow.
Radar signs provide a dynamic speed display to the driver of a passing vehicle to encourage the motorist to reduce vehicle speeds if necessary. Speed humps are slightly raised areas of roadway (usually 22 feet in length). They are different from the severe speed bumps that you may find in parking lots. Speed humps reduce vehicle speeds and create delay for motorists.Local access only signs are placed at entrances to neighborhood streets that communicate the street should be traveled by those who have a destination within the immediate area. One lane zones, such as chicanes and slow points, are a series of curb extensions that form S-shaped curves on what would be an otherwise straight roadway or are curb extensions that narrow a roadway, allowing only one car at a time to pass. Access restrictions prohibit ALL traffic from traveling on a street through the use of signage at intersections where heavily traveled roads intersect with less traveled roads.Partial closures restrict the roadway to one direction of travel. They limit vehicular access into neighborhoods while still providing residents with either an exit or entrance depending on the restriction.Full closures physically closes a roadway in a neighborhood and are considered the most restrictive and severe form of traffic calming.
Least restrictive Most restrictive
Does little to discourage cut-through traffic
Limited impact on cut-through traffic, significant impact to emergency response vehicles, school bus or transit route, potential noise impacts from motorists traversing the speed hump
Extremely difficult to enforce
Moderate impact to emergency response, may restrict parking
Requires strong enforcement component, limits access to ALL motorists (commuters and local residents alike), could relocate issue to other streets
May restrict parking, impacts to emergency response vehicles, compliance a concern, limits access to ALL motorists (commuters and local residents alike), could relocate issue to other streets
Impact to emergency response, limits access to ALL motorists (commuters and local residents alike), could relocate issue to other streets
radar signs speed hump one lane zonelocal access only access restriction partial closure full closure
Mitigation toolsThe Committee considered a wide range of tools (below) that would help to lessen the potential for increased traffic on neighborhood streets during East Link construction activities on Bellevue Way SE and 112th Ave SE. The Committee developed tools that would work in a holistic fashion to ensure restrictions work as a system (e.g. restriction to Bellevue Way from southbound 108th Ave SE works in concert with restrictions to southbound Bellevue Way at 112th Ave SE and 113th Ave SE). This allows residential access to Bellecrest and Enatai but restricts commuter traffic.
Tools are temporaryAll tools will be installed on a temporary basis meaning during active construction on Bellevue Way and 112th Ave SE (approximately four years)
Draft Concept Plan Notes• The Committee’s priority is to help lessen the potential for increased
traffic on neighborhood streets during East Link construction activities
on Bellevue Way SE and 112th Ave SE.
• This draft concept plan was developed by members of the NTMC
with input from staff from the City of Bellevue Police, Fire, and
Transportation Departments.
• The Committee sought to apply tools to the key entrances/exits into/
out of the neighborhood areas. The thought being that limited access
will be a deterrent to commuters using neighborhood streets.
• This plan was developed in a holistic fashion to ensure restrictions work
as a system (e.g. restriction to Bellevue Way from southbound 108th
Ave SE works in concert with restrictions to southbound Bellevue
Way at 112th Ave SE and 113th Ave SE). This allows residential access to
Bellecrest and Enatai but restricts commuter traffic.
• Upon selecting these tools, the Committee extensively discussed the
trade-offs associated with their implementation.
• The Committee recognizes that turn restrictions apply to both
commuters and residents alike.
• The Committee discussed the use of additional tools (such as one lane
zones and full closures on 108th Ave SE near Bellevue High School).
• The Committee expressed interest in possibly revisiting these
tools but are first proposing the turn restriction concept to share
with the community.
There are several tools that can help to achieve this goal of lessening the
potential for increased neighborhood traffic (see page 6 for details). Any
traffic mitigation tool comes with tradeoffs that can impact both commuters
and residents alike. The more restrictive a tool is, the more tradeoffs
associated with that tool. Their appropriateness can depend on:
• impacts to residents’ travel times
• increased noise
• effectiveness of enforcement
• impact to overall roadway network
• emergency response times
• bus service
• bicycle access
Subscribe to East Link Construction Updates
www.soundtransit.org/subscribe
How this work got started
On April 20, 2015 the Bellevue City Council unanimously approved a final agreement with Sound Transit regarding the East Link light rail project and possible siting of the operations and maintenance facility in BelRed. The Sound Transit Board unanimously approved the agreement on April 23, 2015. The agreement, known as the amended Memorandum of Understanding (amended MOU), is the culmination of years of partnership between the City and Sound Transit to ensure that the East Link project is constructed in a way that meets the needs of Bellevue and the region. It amends a previous legal agreement (the Umbrella Memorandum of Understanding) signed by both agencies in November 2011. The work of the NTMC is called for in the MOU. Specifically, the city “shall work with affected neighborhoods to address traffic related impacts during construction of the Project and to identify mitigation measures to be implemented.” To view the MOU, go to:www.bellevuewa.gov/light-rail.htm
Submit plan feedbackComplete a short survey by October 16: www.surveymonkey.com/r/COBntmc
TRANSPORTATION DEPARTMENT
S O U T H B E L L E V U E E A S T L I N K C O N S T R U C T I O NNEIGHBORHOOD TRAFFIC MITIGATION
SEPTEMBER 2016 TRANSPORTATION DEPARTMENT
S O U T H B E L L E V U E E A S T L I N K C O N S T R U C T I O NNEIGHBORHOOD TRAFFIC MITIGATION
SEPTEMBER 2016
Proj
ect G
oal
Less
en t
he p
oten
tial f
or in
crea
sed
traf
fic o
n ne
ighb
orho
od s
tree
ts d
urin
g Ea
st L
ink
cons
truc
tion
activ
ities
on
Belle
vue
Way
SE
and
112th
Ave
SE.
108THAVENE
110THAVENE
SE5T
HST
SE 1
4TH
ST
SE1 S
TD
R
SE 11
TH S
T
SE28
THST
107THAVESE
SE 7
TH S
T
106TH AVE SE
SE 2
9TH
ST
107TH CT SE
110THAVESE
SE 1
1TH
ST
SE 1
6TH
ST
107TH LN SE
107TH AVE SE
118THAVESE
MA
IN S
T
102ND PL SE
SE 8
TH S
T
NE1S
TST
111THAVESE
SE 2
5TH
ST
SE10
THPL
99THAVENE
BELLEVUE WAY NE
SE 1
0TH
ST
116THAVENE
102NDAVENE
103RDAVESE
106THAVENE
106TH PL NE
SE 1
8TH
ST
100THAVENE
SEBE
LLEV
UEPL
NE
2ND
ST
KAYLEN PL SE
SE 4
TH S
T
111TH PL SE
SE7T
HCT
SE17
THST
107TH AVE SE
96THAVESE
112THAVENE
SE32
NDST
SE30
THST
SE 3
2ND
LN
NE
1ST
ST
SE10
THC
T
SE 2
0TH
ST
100THPLSE
MA
IN S
T
103RDAVESE
SE 10TH
ST
102NDAVESE
SE 1
3TH
LN
SE5THPL
SE 1
4TH
ST
109TH AVE SE
SE 2
ND
ST
105THAVESE
110THAVESE
SE1S
TPL
102ND PL NE
SE 8
TH S
T
97TH AVE SE
SE27
THST
SE15
T HS T
S E2 1
STST
SE16
THPL
107TH PL SE
112THAVESE
SE 3
RD
ST
SE34
THST
109THAVESE
NE
2ND
PL
102NDPLSE
SE 2
5TH
PL
SE 1
2TH
ST
SE32
NDS
T
SE
4THPL
SECLI
FFPL 106THPLSESE
18TH
LN
121ST AVE SE
SE 1
8TH
ST
101STPLSE
101STAVESE
118THAVESE
120THAVESE
SE 3
0TH
PL
120THAVENE
120TH PLSE
SE 2
8TH
PLSE
13TH
PL
SE 2
9TH
PL
CEDA
RC
RES
TL N
PAR
KR
IDG
ELN
112THAVESE
SE WOLVERINE WAY
111THAVESE
SE 9
TH S
T
SE 2
4TH
PL
SELA
KERD
SHORELAND
DRSE
105THAVESESE
13TH
ST
SE 11
TH S
T
106THAVESE
SE 6
TH S
T
SE 3
1ST
ST
SE5T
HST
MEY
DENB
AU
ER
WAY
SE
SE 2
6TH
ST
KILLARNEY
DR
DET
WILL
ER LN
SE 15TH
ST
114TH AVE SE
SE1ST
ST
110THPLSE
SE19
THST
SE 2
0TH
ST
SE 6
TH S
T
SE 2
2ND
ST
LAK
E H
ILLS
CN
SE2 3
RD
S T
SESH
ORELAN
DDR
111THAVENE
104TH AVE SE
105THAVESE
108THAVESE
BELLEVUE WAY SE
BELLEVUE WAY SE
SE 27TH PL
100THAVESE
106THAVESE
KILLARNEY WAY
105THAVENE
103RDAVENE
BELL
EFIE
LDPA
RK
LN
WOOD
HAV
ENLN
NORTHSIDERD
SE3 2
ND
CT
112THAVESE
114TH AVE NE
121STAVESE
SE15
THCT
100THAVESE
SE 9
TH P
L
107THPLSE97TH PL SE
SESHO
REL
AND
PL
99TH
AVESE
116THAVESE
107THAVENE
102N
DAVE SE
104THPLSEENATAIDR
94TH AVE SE
98TH AVE SE
LAKEWASHINGTONBLVDSE
BE
LLE
VU
EH
.S.
EN
ATA
IE
LEM
.
ED
UC
AT
ION
AL
SERV
ICE
CE
NT
ER
Ea
st
Ea
st
Ma
inM
ain
So
uth
So
uth
Be
lle
vu
eB
ell
ev
ue
Belle
cres
t
Enat
aiKi
llarn
eyCi
rcle
Surr
eyD
owns
Dis
clai
mer
:Th
e in
form
atio
n on
thi
s m
ap i
s a
geog
raph
ic r
epre
sent
atio
n de
rived
from
the
City
of
Bel
levu
e G
eogr
aphi
c In
form
atio
n S
yste
m.
The
City
of
Belle
vue
does
not
gua
rant
ee t
hat
the
info
rmat
ion
on t
his
map
is
accu
rate
or
com
plet
e. T
his
map
is
prov
ided
on
an "
as i
s" b
asis
and
disc
laim
s al
l war
rant
ies,
exp
ress
or
impl
ied,
incl
udin
g bu
t not
lim
ited
tow
arra
ntie
s of
mer
chan
tabi
lity,
fitn
ess
for
a pa
rticu
lar
purp
ose
and
non-
infri
ngem
ent.
Any
com
mer
cial
use
or
sale
of
this
map
or
porti
ons
ther
eof,
is p
rohi
bite
d w
ithou
t exp
ress
writ
ten
auth
oriz
atio
n by
the
City
of
Belle
vue.
The
City
of
Bel
levu
e is
not
res
pons
ible
for
any
dam
ages
aris
ing
from
the
use
of
info
rmat
ion
on t
his
map
. U
se o
f thi
s m
ap is
at
user
's r
isk.
Use
rs s
houl
d ve
rify
the
info
rmat
ion
befo
re m
akin
g pr
ojec
tco
mm
itmen
ts.
Coo
rdin
ate
Sys
tem
: S
tat e
Pla
ne, W
ashi
ngto
n N
orth
Zon
e,N
AD
83 N
SR
S200
7 (B
elle
vue)
IT D
epar
tmen
t
00.
055
0.11
0.16
50.
220.
0275
Mile
s
Sour
ces:
City
of B
elle
vue
027
054
081
01,
080 Fe
et"
Lege
nd City
Lim
its
Sch
ool P
rope
rty
City
Par
ks
Bea
ux A
rts
Ena
tai
Bel
lecr
est
Kill
arne
y C
ircle
Sur
rey
Dow
ns
Sch
ool P
rope
rty
City
Par
ks
Eas
t Lin
k S
tatio
ns
Eas
t Lin
k R
oute
Dat
e: 4
/14/
2016
Fi
le N
ame:
J:\N
TCP
Pro
ject
s\E
ast L
ink\
E32
0 B
ase
Map
\E32
0bas
emap
.mxd
Sout
h Be
llevu
e N
eigh
borh
oods
GIS
Se
rvic
es
City
of
Belle
vue
East
Link T
raffic
Mitig
ation
Beau
x Ar
ts
SOU
TH
B
ELLE
VUE
STAT
ION
EAST
MA
IN
STAT
ION
AB C
DE
F
G
H
I
SOU
THB
OU
ND
A
CC
ESS
TO
BEL
LEVU
E W
AY
RES
TRIC
TED
4:
00-7
:00
PM
The
Cit
y o
f B
elle
vue
do
es n
ot
guar
ante
e th
at t
he
info
rmat
ion
on
th
is
map
is a
ccu
rate
or
com
ple
te. T
his
dat
a is
pro
vid
ed o
n a
n "
as is
" b
asis
an
d d
iscl
aim
s al
l war
ran
ties
.
SE 1
6TH
ST
BELLEVUE WAY
4-7
PMEX
CEP
T BI
KES
/BU
SES
7-9
AM
EXC
EPT
BIK
ES/B
USE
S
N
The
Cit
y o
f B
elle
vue
do
es n
ot
guar
ante
e th
at t
he
info
rmat
ion
on
th
is
map
is a
ccu
rate
or
com
ple
te. T
his
dat
a is
pro
vid
ed o
n a
n "
as is
" b
asis
an
d d
iscl
aim
s al
l war
ran
ties
.
108TH AVE SEBEL
LEVU
E W
AY
4-7
PMEX
CEP
T BI
KES
/BU
SES 7-
9 A
MEX
CEP
T BI
KES
/BU
SES
4-7
PMEX
CEP
T BI
KES
/BU
SES
4-7
PMEX
CEP
T BI
KES
/BU
SES
Impl
emen
t Eas
t Mai
n C
itize
n A
dviso
ry C
omm
ittee
(C
AC) r
ecom
men
datio
n of
impl
emen
ting
prot
ecte
d le
ft-t
urn
phas
e fo
r al
l leg
s of
108
th
Ave
and
Mai
n St
whi
le e
valu
atin
g co
ncur
rent
ly
with
str
eet t
raffi
c m
itiga
tion.
SOU
THB
OU
ND
A
CC
ESS
TO
BEL
LEVU
E W
AY
RES
TRIC
TED
4:
00-7
:00
PM
SOU
THB
OU
ND
A
CC
ESS
TO
BEL
LEVU
E W
AY
AT 1
12TH
AVE
A
ND
113
TH A
VE
RES
TRIC
TED
4:
00-7
:00
PM108TH AVE SE
108TH AVE SE
112TH AVE SE
113TH AVE SE
SE 3
4TH
ST
BELLEVUE WAY104TH AVE SE
SE 1
6TH
ST
SOU
THB
OU
ND
A
CC
ESS
TO
BEL
LEVU
E W
AY
RES
TRIC
TED
4:
00-7
:00
PM
Prop
osed
Too
lsA
108th
Ave
SE
sou
th o
f Mai
n St
Sign
* st
atin
g ac
cess
to
Belle
vue
Way
re
stri
cted
4-7
PM
Mon
day-
Frid
ay. I
mpl
emen
t Ea
st M
ain
Citi
zen
Adv
isor
y C
omm
ittee
(C
AC
) re
com
men
datio
n or
add
ing
a pr
otec
ted
left
turn
sig
nal p
hase
for
all l
egs
of
the
Mai
n St
reet
and
108
th A
venu
e SE
whi
le
eval
uatin
g co
ncur
rent
ly w
ith s
tree
t tr
affic
m
itiga
tion.
B SE
2nd
St
east
of 1
08th
Ave
SE
Res
iden
tial A
rea
sign
for
east
boun
d tr
affic
C SE
11th
St
east
of 1
08th
Ave
SE
Res
iden
tial A
rea
sign
for
east
boun
d tr
affic
D 10
4th A
ve S
E a
nd S
E 1
6th S
tSi
gn*
stat
ing
acce
ss t
o Be
llevu
e W
ay
rest
rict
ed 4
-7 P
M M
onda
y-Fr
iday
.
E SE
16th
St
and
Bel
levu
e W
ayTu
rn r
estr
ictio
ns: 1
) no
left
turn
from
w
estb
ound
SE
16th S
t to
Bel
levu
e W
ay fr
om
4-7
PM M
onda
y-Fr
iday
and
2)
no r
ight
tur
n fr
om n
orth
boun
d Be
llevu
e W
ay t
o SE
16th
St
from
7-9
AM
Mon
day-
Frid
ay.
F 10
8th A
ve S
E a
nd B
elle
vue
Way
Tu
rn r
estr
ictio
ns: 1
) no
left
turn
from
so
uthb
ound
108
th A
ve S
E to
Bel
levu
e W
ay
from
4-7
PM
Mon
day-
Frid
ay a
nd 2
) no
rig
ht
turn
from
nor
thbo
und
Belle
vue
Way
to
108th
A
ve S
E fr
om 7
-9 A
M M
onda
y-Fr
iday
. Sig
n*
stat
ing
acce
ss t
o Be
llevu
e W
ay r
estr
icte
d 4-
7 PM
Mon
day-
Frid
ay.
G 11
2th A
ve S
E a
nd B
elle
vue
Way
Turn
res
tric
tion:
no
righ
t tu
rn fr
om
nort
hbou
nd 1
12th A
ve S
E to
Bel
levu
e W
ay
from
4-7
PM
Mon
day-
Frid
ay.
H 11
3th A
ve S
E a
nd B
elle
vue
Way
Tu
rn r
estr
ictio
n: n
o ri
ght
turn
from
no
rthb
ound
113
th A
ve S
E to
Bel
levu
e W
ay
from
4-7
PM
Mon
day-
Frid
ay.
I SE
34th
St
near
110
th A
ve S
ESi
gn*
stat
ing
acce
ss t
o Be
llevu
e W
ay
rest
rict
ed 4
-7 P
M M
onda
y-Fr
iday
.
*sig
n m
ay b
e bl
ack
text
on
oran
ge b
ackg
roun
d or
bl
ack
text
on
whi
te b
ackg
roun
d
Not
e: th
e ex
act p
lace
men
t of t
hese
sig
ns m
ay
vary
upo
n im
plem
enta
tion
and
will
be e
valu
ated
fo
r saf
ety
and
in b
est m
eetin
g th
e st
ated
goa
l of
less
enin
g th
e po
tent
ial f
or in
crea
sed
traffi
c on
ne
ighb
orho
od s
treet
s.
DR
AFT
Dra
ft N
eigh
borh
ood
Traf
fic M
itiga
tion
Plan
112TH AVE SE
Tool
s ar
e te
mpo
rary
All
tool
s w
ill b
e in
stal
led
on
a te
mpo
rary
bas
is m
eani
ng
duri
ng a
ctiv
e co
nstr
uctio
n on
Be
llevu
e W
ay a
nd 1
12th
Ave
SE
(ap
prox
imat
ely
four
yea
rs)
Subm
it pl
an fe
edba
ckCo
mpl
ete
a sh
ort s
urve
y by
Oct
ober
16:
w
ww
.sur
veym
onke
y.co
m/r
/CO
Bnt
mc
36
Draft plan on next page
Enforcement The NTMC had numerous discussions about the need for adequate enforcement to ensure people driving are obeying proposed mitigation measures (e.g. turn restrictions).
The Police Department has been involved with this work and the NTMC has had the opportunity to speak with officers about the best way to enforce their plan. While enforcement cannot occur 24 hours a day, 7 days a week, targeted enforcement will occur in the project area as resources allow.
Radar signs provide a dynamic speed display to the driver of a passing vehicle to encourage the motorist to reduce vehicle speeds if necessary. Speed humps are slightly raised areas of roadway (usually 22 feet in length). They are different from the severe speed bumps that you may find in parking lots. Speed humps reduce vehicle speeds and create delay for motorists.Local access only signs are placed at entrances to neighborhood streets that communicate the street should be traveled by those who have a destination within the immediate area. One lane zones, such as chicanes and slow points, are a series of curb extensions that form S-shaped curves on what would be an otherwise straight roadway or are curb extensions that narrow a roadway, allowing only one car at a time to pass. Access restrictions prohibit ALL traffic from traveling on a street through the use of signage at intersections where heavily traveled roads intersect with less traveled roads.Partial closures restrict the roadway to one direction of travel. They limit vehicular access into neighborhoods while still providing residents with either an exit or entrance depending on the restriction.Full closures physically closes a roadway in a neighborhood and are considered the most restrictive and severe form of traffic calming.
Least restrictive Most restrictive
Does little to discourage cut-through traffic
Limited impact on cut-through traffic, significant impact to emergency response vehicles, school bus or transit route, potential noise impacts from motorists traversing the speed hump
Extremely difficult to enforce
Moderate impact to emergency response, may restrict parking
Requires strong enforcement component, limits access to ALL motorists (commuters and local residents alike), could relocate issue to other streets
May restrict parking, impacts to emergency response vehicles, compliance a concern, limits access to ALL motorists (commuters and local residents alike), could relocate issue to other streets
Impact to emergency response, limits access to ALL motorists (commuters and local residents alike), could relocate issue to other streets
radar signs speed hump one lane zonelocal access only access restriction partial closure full closure
Mitigation toolsThe Committee considered a wide range of tools (below) that would help to lessen the potential for increased traffic on neighborhood streets during East Link construction activities on Bellevue Way SE and 112th Ave SE. The Committee developed tools that would work in a holistic fashion to ensure restrictions work as a system (e.g. restriction to Bellevue Way from southbound 108th Ave SE works in concert with restrictions to southbound Bellevue Way at 112th Ave SE and 113th Ave SE). This allows residential access to Bellecrest and Enatai but restricts commuter traffic.
Tools are temporaryAll tools will be installed on a temporary basis meaning during active construction on Bellevue Way and 112th Ave SE (approximately four years)
Draft Concept Plan Notes• The Committee’s priority is to help lessen the potential for increased
traffic on neighborhood streets during East Link construction activities
on Bellevue Way SE and 112th Ave SE.
• This draft concept plan was developed by members of the NTMC
with input from staff from the City of Bellevue Police, Fire, and
Transportation Departments.
• The Committee sought to apply tools to the key entrances/exits into/
out of the neighborhood areas. The thought being that limited access
will be a deterrent to commuters using neighborhood streets.
• This plan was developed in a holistic fashion to ensure restrictions work
as a system (e.g. restriction to Bellevue Way from southbound 108th
Ave SE works in concert with restrictions to southbound Bellevue
Way at 112th Ave SE and 113th Ave SE). This allows residential access to
Bellecrest and Enatai but restricts commuter traffic.
• Upon selecting these tools, the Committee extensively discussed the
trade-offs associated with their implementation.
• The Committee recognizes that turn restrictions apply to both
commuters and residents alike.
• The Committee discussed the use of additional tools (such as one lane
zones and full closures on 108th Ave SE near Bellevue High School).
• The Committee expressed interest in possibly revisiting these
tools but are first proposing the turn restriction concept to share
with the community.
There are several tools that can help to achieve this goal of lessening the
potential for increased neighborhood traffic (see page 6 for details). Any
traffic mitigation tool comes with tradeoffs that can impact both commuters
and residents alike. The more restrictive a tool is, the more tradeoffs
associated with that tool. Their appropriateness can depend on:
• impacts to residents’ travel times
• increased noise
• effectiveness of enforcement
• impact to overall roadway network
• emergency response times
• bus service
• bicycle access
Subscribe to East Link Construction Updates
www.soundtransit.org/subscribe
How this work got started
On April 20, 2015 the Bellevue City Council unanimously approved a final agreement with Sound Transit regarding the East Link light rail project and possible siting of the operations and maintenance facility in BelRed. The Sound Transit Board unanimously approved the agreement on April 23, 2015. The agreement, known as the amended Memorandum of Understanding (amended MOU), is the culmination of years of partnership between the City and Sound Transit to ensure that the East Link project is constructed in a way that meets the needs of Bellevue and the region. It amends a previous legal agreement (the Umbrella Memorandum of Understanding) signed by both agencies in November 2011. The work of the NTMC is called for in the MOU. Specifically, the city “shall work with affected neighborhoods to address traffic related impacts during construction of the Project and to identify mitigation measures to be implemented.” To view the MOU, go to:www.bellevuewa.gov/light-rail.htm
Submit plan feedbackComplete a short survey by October 16: www.surveymonkey.com/r/COBntmc
TRANSPORTATION DEPARTMENT
S O U T H B E L L E V U E E A S T L I N K C O N S T R U C T I O NNEIGHBORHOOD TRAFFIC MITIGATION
SEPTEMBER 2016 TRANSPORTATION DEPARTMENT
S O U T H B E L L E V U E E A S T L I N K C O N S T R U C T I O NNEIGHBORHOOD TRAFFIC MITIGATION
SEPTEMBER 2016
72
Neighborhood Traffic Mitigation Committee (NTMC)The Neighborhood Traffic Mitigation Committee (NTMC) includes a broad and geographically balanced representation from the neighborhoods of Bellecrest, Enatai and Surrey Downs and Beaux Arts Village. Membership includes one member of the association’s board of the below listed neighborhoods and seven “community-at-large” members.
COMMITTEE MEMBERS
BellecrestMike KoehnTricia ThomasonLiz Hale
EnataiKevin PaulichRebecca SearsKatherine Christopherson
Surrey DownsKerri PattersonEd Nugent
Beaux Arts VillageTom StoweCynthia HudsonEugenia Yen
East Link and South Bellevue Construction FAQs
East Link
What is East Link?Sound Transit’s East Link light rail line will extend 14 miles from downtown Seattle to the Overlake area in Redmond, with 10 stations in Mercer Island, South Bellevue, downtown Bellevue, BelRed (Bellevue) and Overlake (Redmond).
When will it begin operations?After a testing period of one year, revenue service will begin in 2023.
South Bellevue ConstructionWhen will construction of the South Bellevue segment begin?As early as January 2017.
How long will construction of the South Bellevue segment take?The portion of Bellevue Way SE between the South Bellevue Park-and-Ride and 112th Ave SE is expected to take 26 to 28 months with incentives for the contractor to complete the construction within 19 to 21 months. The South Bellevue segment (E320) construction will be approximately 4 years.
Has a contractor been hired?A contractor is expected to be on-board this fall (2016).
Where will construction equipment staging be located?Most of the staging will occur at the South Bellevue Park-and-Ride site. Additional staging will also occur adjacent to the alignment along Bellevue Way SE and 112th Ave SE and within the median of I-90.
What will be the hours of construction?Typical construction hours will be Monday through Friday, 7 a.m. to 6 p.m. and Saturday, 9 a.m. to 6 p.m. However, on occasion, work hours for certain activities may extend until 8 p.m. During weekend road closures, expect work hours from 7 a.m. to 9 p.m. on Saturday and Sunday.
Where will Sound Transit’s contractors park?Sound Transit’s contractors will park within their own designated area but may not park on neighborhood streets.
South Bellevue Park-and-Ride ClosureWhen will South Bellevue Park-and-Ride close and for how long?Sound Transit anticipates the closure as early as January 2017 and expects the closure to last approximately five years.
Where will South Bellevue Park-and-Ride commuters park during the closure?Sound Transit is establishing replacement parking lots in eastside communities. In addition to using church lots, Sound Transit will also use existing underutilized park-and-ride lots. Information on commuter options is available at kingcounty.gov/metro.
What is being done to prevent hide and ride parking in the neighborhood areas when the Park-and-Ride closes?The City of Bellevue is prepared to work with Sound Transit to implement parking restrictions in neighborhoods, should they be warranted, to limit the amount of spillover parking as a result of the Park-and-Ride closing.
How we got here The city’s Transportation Department hosted an informational meeting on April 27, 2016 with residents of Bellecrest, Enatai and Surrey Downs neighborhoods and Beaux Arts Village. The purpose of the meeting was to share background on known areas of traffic conditions and constraints, to receive additional feedback on other areas of concerns as they relate to East Link construction, and to address the next steps to form the Neighborhood Traffic Mitigation Committee (NTMC). The NTMC has met four times to develop the draft concept plan (pages 4-5). The Committee will consider the feedback received by the community and refine the draft concept plan in October.
April-August 2016NTMC formed draft concept plan.
September-October 2016Outreach to South Bellevue neighborhoods begins; NTMC considers public feedback and finalizes draft concept plan.
January 2017East Link construction in South Bellevue anticipated to begin; NTMC plan implementation coordinated at start of construction activities or shortly thereafter.
January 2017 through 2021 Construction continues in the South Bellevue area and mitigation tools are evaluated and refined on an ongoing basis.
2021Major construction activity wraps up and mitigation tools are removed.
2023East Link opens for passenger service.
We are here
Submit plan feedbackComplete a short survey by October 16:www.surveymonkey.com/r/COBntmc Submit plan feedback Complete a short survey by October 16: www.surveymonkey.com/r/COBntmc
TRANSPORTATION DEPARTMENT
S O U T H B E L L E V U E E A S T L I N K C O N S T R U C T I O NNEIGHBORHOOD TRAFFIC MITIGATION
SEPTEMBER 2016 TRANSPORTATION DEPARTMENT
S O U T H B E L L E V U E E A S T L I N K C O N S T R U C T I O NNEIGHBORHOOD TRAFFIC MITIGATION
SEPTEMBER 2016
East Link segment along Bellevue Way SE and 112th Ave SE
South Bellevue Station
East Main
Station
Beaux Arts
Village
Surrey Downs
N
Lake Washington
Enatai
112t
h Av
e S
E
Bel
levu
e W
ay
Bellecrest
108t
h Av
e S
E
104t
h Av
e S
E
Main St
East Link Alignment
SE 8th St
I-90
SOUTH BELLEVUE EAST LINK CONSTRUCTION: DRAFT NEIGHBORHOOD TRAFFIC MITIGATION PLANYour feedback wanted
Project GoalLessen the potential for increased traffic on neighborhood streets during East Link light rail construction activities on Bellevue Way SE and 112th Ave SE.
BackgroundWith the construction of the South Bellevue East Link segment anticipated to begin as early as January 2017, the city is working with affected neighborhoods—through a Neighborhood Traffic Mitigation Committee (NTMC)—in helping to identify mitigation tools and locations to lessen the potential traffic impacts. Specifically, East Link construction will impact Bellevue Way SE from near the current location of the South Bellevue Park-and-Ride along the roadway to the “Y” intersection (Bellevue Way SE and 112th Ave SE) and extending onto 112th Ave SE. The construction will involve building the tracks of the East Link light rail and the South Bellevue station.
Bellevue Way SE is a major arterial serving neighborhoods south of downtown and downtown Bellevue. It is a key connection for commuters entering and exiting Bellevue via I-90. When traffic becomes congested, typically southbound during the afternoon commute, some drivers bypass the congestion by using 108th Ave SE and other neighborhood streets. The enclosed plan, developed by the NTMC, helps to mitigate these impacts.
Plan OverviewThe draft concept plan (pages 4-5) recommends strategic turn restrictions at key entrances in/out of neighborhood areas to deter commuter traffic from using neighborhood streets.
We want your anonymous feedbackComplete a short survey by October 16 here: www.surveymonkey.com/r/COBntmc to help the Neighborhood Traffic Mitigation Committee refine the draft plan (found on pages 4-5).
Hard copy of survey available upon request.
We want your feedback by October 16!www.surveymonkey.com/r/COBntmc
1
Front pageBack page
Title VI Notice to the Public It is the City of Bellevue’s policy to assure that no person shall on the grounds of race, color, national origin or sex, as provided by Title VI of the Civil Rights Act of 1964, be excluded from participating in, be denied the benefits of, or be otherwise discriminated against under any of its federally funded programs and activities. Any person who believes his/her Title VI protection has been violated may file a complaint with the Title VI Coordinator. For Title VI complaint forms and advice, please contact the Title VI Coordinator at 425-452-4496.
SOUTH BELLEVUE EAST LINK CONSTRUCTION: Draft Neighborhood Traffic Mitigation Plan
City of BellevueTransportation DepartmentPO Box 90012Bellevue, WA 98009-9012
SOUTH BELLEVUE EAST LINK CONSTRUCTIONDraft Neighborhood Traffic Mitigation Plan
www.bellevuewa.gov/light-rail.com
Question and Comments
Marie JensenEast Link Outreach LeadCity of BellevueTransportation Department
mjensen@bellevuewa.gov(425) 452-2064PO Box 90012Bellevue, WA 98009-9012
www.bellevuewa.gov/light-rail.com
PRSRT STDU.S. Postage
PAID Bellevue, WA Permit No. 61
September 2016
Staff Contact: Marie Jensen, East Link Outreach | City of Bellevue Transportation Departmentmjensen@bellevuewa.gov | (425)452-2064
TRANSPORTATION DEPARTMENT
S O U T H B E L L E V U E E A S T L I N K C O N S T R U C T I O NNEIGHBORHOOD TRAFFIC MITIGATION
SEPTEMBER 2016TRANSPORTATION DEPARTMENT
S O U T H B E L L E V U E E A S T L I N K C O N S T R U C T I O NNEIGHBORHOOD TRAFFIC MITIGATION
SEPTEMBER 2016