Somewhere on Earth, Along a Critical Corridor

2

• The East Coast’s Main Street • Along with SR 1, the most significant highway in Delaware

3

Roadway Miles

4

I-95 23 Miles

I-295 6 Miles

I-495 11 Miles

5

6

7

8

9

10

11

12

13

14

15

Bridge Safety

16

17

18

Where are the workers?

19

20

21

22

23

90’s to Early 2000s

24

Cooperating Environmental Resource and Regulatory Agencies

25

State Historic Preservation Office

Department of Natural Resources and Environmental Control

National Marine Fisheries

Corps of Engineers

US Fish and Wildlife Service

Environmental Protection Agency

Sponsoring Agencies

26

Delaware Department of Transportation Federal Highway

Administration

Prior to the ‘90s Administrations

If you build it they will come

27

90’s to Early 2000s Philosophy

If you don’t build it,

they will take the bus, or train, or bike, or walk…

28

New Philosophy

Optimization Communication Beautification

29

Optimization

Utilize your existing resources as efficiently as possible

30

31

I-95 Reconstruction Maximizing Contractor Work Area

Optimization

32

33

Transportation Management Plan

34

Optimization

5 Elements for Improved Mobility Transportation Management Improvements Traveling Together Public Information Integrated Transportation Management Capital Improvement Program Coordination

35

Optimization

Traffic Management Improvements

36

Optimization

Traveling Together

37

Optimization

Ridesharing…

38

Optimization

Expresso Bus Promotion

39

Commuter Rail Service

40

41

Integrated Transportation Management System

(ITMS)

Optimization

Managing the Flow of Traffic Traffic adaptive signal

systems (smart lights) Coordinated Incident

Management Real-time Information

- WTMC 1380 AM - Website cameras online - Hotlines - Variable message signs

42

43

Optimization Communication Beautification

Communication

Broader Message to a Broader Audience

44

Billboard

Coloring Book

Developed Survival Guides

45

Newark Toll Plaza Brochure

46

47

Optimization Communication Beautification

Beautification

48

49

50

51

52

53

54

55

Lime Green

56

Midnight Green

57

58

J a d e

59

Verdigris

Citrine

Cyan

Phthalocycanine Green

Fern

Spring Bud

60

61

62

63

64

I-95 Brandywine Bridge Enhancements

65

66

I-95 Now…

67

Be warned: Lots of construction happening!

68

1990 Projection of 20-year Traffic Growth (2010)

69

1990 2010

190,000

120,000 2000

Average Daily

Traffic

128,234

189,500

Traffic Growth vs Projections

219,950

200,000

Actually Exceeded in 1998 – 8 Years

Residential Land Use Trends – South of C&D Canal

70

1984 1992 1997 2004

Projects In the Current Years

Churchman’s Bridge Over I-95 I-95 Mainline Widening SR 1/I-95 Interchange I-95 Newark Toll Plaza Highway Speed

E-ZPass Lanes I-295/13 Interchange/DRBA I-95 Collector-Distributor Roads (Long Range Plan) I-95/202 Interchange I-95/141 Interchange

71

Churchman’s Road Bridge Over I-95

72

73

74

I-95 Mainline Widening

75

48’ 48’ 14’ 14’ 12’ 12’ EX.1-95 SBR (4-LANES) EX.1-95 NBR (4-LANES) Shldr. Shldr. Shldr. Shldr.

Approx. 103’ to Wetland Boundary Southbound

Approx. 100’ to Wetland Boundary Northbound

Selected Alternative – 5th Lane Widening on North and South Sides

76

New Shldr.

14’ 4’ 8’ 48’ 48’ 14’ EX.1-95 SBR (4-LANES) EX.1-95 NBR (4-LANES) Shldr. Shldr.

14’ 5 th

Lane

12’ 5 th

Lane

12’ New

Shldr.

14’ 4’

MSE Wall

Limit of Disturbance

Wetland Boundary

MSE Wall

Limit of Disturbance

Wetland Boundary

8’

Access to NB Construction Zone

77

Barrier Protected Work Zone

Face of Proposed

Sheet Pile Wall

18’ +/-

Proposed Limit of Excavation

8’ 13’

Wetland Boundary / Limit of Disturbance / Silt Fence Temporary

Safety Barrier

78

Limited Construction Area

79

80

81

82

83

84

Wetland Mitigation Sites

85

Successful Project

86

I-295/US13 DRBA Program

87

88

89

Filling in the Bridges

90

Filling in the Bridges

91

Pedestrian Tunnel

92

Pedestrian Tunnel

93

Pedestrian Tunnel

94

I-95 Newark Toll Plaza

95

I-95 / Newark Toll Plaza – Issues

96

Southbound: Poor roadway alignment approaching Plaza promotes use of middle lanes, blocking access to median / E-Z Pass Only lanes Note: Traffic cannot get to E-Z Pass Lanes

Vehicles Per Hour Per Lane

97

1,000

Booth Dedicated E-ZPass

2,000

Highway Speed E-ZPass Lane

350 Cash Booth

98

During Construction

99

During Construction

100

I-95/SR1 Interchange

101

Failing Movements

102

95

1

1 7

Christiana Mall

Bridge Skews – Deckover

103

Bridge Skews – Deckover

104

Cavaliers Community and Noise Mitigation

105

Cavaliers Community and Noise Mitigation

106

Cavaliers Community and Noise Mitigation

107

Proposed Project

(Looking North) 108

Alternative #1 – Landscaping

(Looking North) 109

Alternative #2 – Fence with Landscaping

(Looking North) 110

Alternative #3 – Noise Wall

(Looking North) 111

112

I-95/US202 Interchange

113

Community Input

114

Community Input

115

Process Changes for the Better

116

Time is Money

117

Professional Contracting Bids the Job

118

119

Low Bid Wins the Job

120

121

I can build it in 950 days!

I can build that job in 976 days.

Congratulations… Build That Job!

122

Roadside Maintenance – Mow it Down!

123

124

The Natural Look

125

126

127

128

129

130

131

132