Unloading: Internal checking 7 UP pumps

Site Photos

Unloading: Official inspection 7 UP pumps

Clear punch list: Clean the granite for Electrical building

Clear punch list: Clean the granite for Control building

Clearance the Asphalt road Entrance Jetstar

Clear punch list: Install Emergency light for Fire building

Clear punch list: Painting work for Fence behind Control building

Site photo: Flower bed Near Air port check point at Plot 4

Technical pad: Drain off Low point drain

Plot 2: Drain off Low point drain

Testing and Commissioning for CCTV system

Testing and Commissioning for CCTV system

Clear punch list: Re-paint for handrail of Unloading platform

Testing and Commissioning for CCTV system

Clear punch list: Clearance and Repair surface of UP pump at Technical pad