September 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2006.
Post on 30-Dec-2015
215 Views
Preview:
Transcript
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 11
News from ELANNews from ELAN
SC of CARESC of CARE
CERN September 2006CERN September 2006
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 22
OutlineOutline
The ELAN workshop in OrsayThe ELAN workshop in OrsayDiscussions in view of FP7Discussions in view of FP7ILC at VancouverILC at VancouverELAN documentsELAN documents
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 33
2006
ILC-LET Workshop 08 - 11 February CERN
LCWS2006 International Linear Collider WorkshopGDE Meeting
09 - 13 March 09 - 11 March
Bangalore, India
Compton Posipol Workshop 2006 26 - 28 April CERN
XFEL Workshop organized by EIFast 09 - 10 May DESY, Hamburg
Electron Accelerator R&D for the Energy Frontier 15 - 17 May Orsay, France
ILC School 19 - 27 MaySokendai, Hayama, Japan
VLCW06 Vancouver Linear Collider Workshop 19 - 22 JulyVancouver, British Columbia,
HG2006 Workshop on High Gradient RF and breakdown studies
25 - 27 September CERN
International Workshop on "Thin films applied to Superconducting RF: Pushing the limits of RF Superconductivity"
09 - 12 OctoberLegnaro National Laboratories INFN (Padua)
International Linear Collider (ILC) Workshop ( ILC-ECFA and GDE Joint Meeting ) 6-10 November Valencia
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 44
Electron Accelerator R&D Electron Accelerator R&D for the Energy Frontier for the Energy Frontier
CARE/ELAN on May 15: CARE/ELAN on May 15: - Plenary in the morning on laser/plasma, a - Plenary in the morning on laser/plasma, a
proposal for a new infrastructure on SC, proposal for a new infrastructure on SC, Progress in CLIC cavities, BDYN+INSTR…Progress in CLIC cavities, BDYN+INSTR…
- FP7 1h30 discussion in the afternoon followed - FP7 1h30 discussion in the afternoon followed by a working party (ELAN Doc. 2006-04)by a working party (ELAN Doc. 2006-04) - 4 Parallel ELAN sessions for 3h30- 4 Parallel ELAN sessions for 3h30 EUROLEAP kick-off meeting on May 16EUROLEAP kick-off meeting on May 16 In // EUROTEV on May 16In // EUROTEV on May 16 Conclusions May 17Conclusions May 17
EUROLEAP
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 55
PlenaryPlenary Introduction: LAL DirectorIntroduction: LAL Director Laser plasma accelerators: achievements and Laser plasma accelerators: achievements and
plans (20') Brigitte Cros (plans (20') Brigitte Cros (LPGP/OrsayLPGP/Orsay) ) Progress and plans on warm cavity technology Progress and plans on warm cavity technology
Sergio Calatroni (Sergio Calatroni (CERNCERN) ) Summary of the workshop on polarized positron Summary of the workshop on polarized positron
source based on Compton back scattering source based on Compton back scattering Louis Rinolfi (Louis Rinolfi (CERNCERN) )
An SC RF Facility at CERN ? Lutz Lilje (An SC RF Facility at CERN ? Lutz Lilje (DESYDESY)) Achievements and plans for Instrumentation and Achievements and plans for Instrumentation and
Beam Dynamics Daniel Shulte (Beam Dynamics Daniel Shulte (CERNCERN) )
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 66
FP7 discussionFP7 discussion
New Inf (10') Francois Richard (New Inf (10') Francois Richard (LALLAL) ) Infrastructures for R&D on SC available Infrastructures for R&D on SC available
at CERN Sergio Calatroni (at CERN Sergio Calatroni (CERNCERN) ) Possible synergy with R&D for protons Possible synergy with R&D for protons
Jean-Pierre Delahaye (Jean-Pierre Delahaye (CERNCERN) ) The ELI proposal Victor Malka (The ELI proposal Victor Malka (LOALOA) ) Questions and issues on an new IS for Questions and issues on an new IS for
SCRF Lutz Lilje (SCRF Lutz Lilje (DESYDESY) ) Proposals for JRA Francois Richard (Proposals for JRA Francois Richard (LALLAL))
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 77
Participation: 85Participation: 85
FR
UK
SZ
D
NL
SP
IT
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 88
Preparation of FP7 Preparation of FP7
First discussion within ESGARD FebruaryFirst discussion within ESGARD February From Pasini: no call for I3 before end 2007From Pasini: no call for I3 before end 2007 and low funding on DS and low funding on DS Important discussions took place at the Important discussions took place at the
CCSG in Berlin Zeuthen beginning of May CCSG in Berlin Zeuthen beginning of May -> ELAN meeting was timely on these issues-> ELAN meeting was timely on these issues What are our goals after CARE+EUROTEV ?What are our goals after CARE+EUROTEV ? Why do we need a European SC RF facility Why do we need a European SC RF facility
beyond TTF ?beyond TTF ?
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 99
European SC RF Facility at CERNEuropean SC RF Facility at CERN LoI sent to the CERN-Council SG ON March 15LoI sent to the CERN-Council SG ON March 15 Participation of ELAN (L. Lilje, F.R.)Participation of ELAN (L. Lilje, F.R.) Basic idea: TTF facility (SC technology) heavily Basic idea: TTF facility (SC technology) heavily
used for XFEL and should be partially replaced used for XFEL and should be partially replaced by a new facility dedicated to R&D on SCby a new facility dedicated to R&D on SC
CERN, as a center of excellency for SC, could CERN, as a center of excellency for SC, could house such a facilityhouse such a facility
Needs support from the CERN-Council to be Needs support from the CERN-Council to be
inscribed by ESFRI in the roadmapinscribed by ESFRI in the roadmap
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 1010
VancouverVancouver
Evolution on various issues (cost):Evolution on various issues (cost): Xangles 2+20 mrad -> 14+14 mradXangles 2+20 mrad -> 14+14 mrad Not final: R&D on magnets (NbSn) strongly Not final: R&D on magnets (NbSn) strongly
encouraged encouraged Generation of e+ : re-consider ‘classical option’ Generation of e+ : re-consider ‘classical option’ Then Compton for polarized e+ Then Compton for polarized e+ 1 e+ DR seems feasible1 e+ DR seems feasible 1 Tunnel option comes back 1 Tunnel option comes back ……
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 1111
# CARE document type and number Title
Authors and Labs
1 CARE/ELAN document-2006-001
Status report on active stabilisation of a linear collider final focus quadrupole mock-up
J. Lottin1, C. Adloff2, Y. Bastian2, B. Bolzon2, L Brunetti1, F. Cadoux2, F. Formosa1, N. Geffroy2, C. Girard2, A. Jeremie2, Y. Karyotakis2, F. Peltier2
2 CARE/ELAN document-2006-002
Letter of Intent about a European SC RF Facility
Albrecht Wagner DESY Chair, TESLA Technology Collaboration Editors: Eckhard Elsen DESY, Lutz Lilje DESY, Francois Richard LAL/Orsay and Carlo Pagani Milano/INFN
3 CARE/ELAN document-2006-003
Power couplers for the XFEL project: industrialization process
S. Prat LAL/Orsay
4 CARE/ELAN document-2006-004
A SCRF Infrastructure for Europe
5 CARE/ELAN document-2006-005
A Compton Polarised Positron Source : Parameters Optimisation
A. Variola LAL/Orsay
6 CARE/ELAN document-2006-006
CLIC POLARIZED POSITRON SOURCE BASED ON LASER COMPTON SCATTERING
F. Zimmermann, H. Braun, M. Korostelev, L. Rinolfi, D. Schulte, CERN, Geneva, Switzerland; E. Bulyak, P. Gladkikh, NSC/KIPT, Kharkov, Ukraine; S. Araki, Y. Higashi, Y. Honda, Y. Kurihara, M. Kuriki, T. Okugi, T. Omori, T. Taniguchi, N. Terunuma, J. Urakawa, KEK, Ibaraki, Japan; K. Moenig, DESY, Zeuthen, Germany; A. Variola, F. Zomer, LAL, Orsay, France; X. Artru, R. Chehab, M. Chevallier, IPN, Lyon, France; V. Strakhovenko, BINP, Novosibirsk, Russia; J.Gao, IHEP, Beijing, China; S. Guiducci, P. Raimondi, INFN/LNF, Frascati, Italy; V. Soskov, LPI, Moscow, Russia; M. Fukuda, K. Hirano, M. Takano, NIRS, Chiba, Japan; T. Hirose, K. Sakaue, M. Washio, Waseda U., Tokyo, Japan; T. Takahashi, H. Sato, Hiroshima U.,H., Japan; A. Tsunemi, Sumitomo Heavy Industries Ltd., Tokyo, Japan(POSIPOL collaboration)
7 CARE/ELAN document-2006-007
Optimization of the e-e- Option for the ILC
M. Alabau Pons1,2, R. Appleby3, P. Bambade1, O. Dadoun1, A. Faus-Golfe21) LAL, IN2P3-CNRS and Universite de Paris-Sud, Bat.200, BP34, 91898 Orsay Cedex, France2) IFIC, Edificio Institutos de Paterna, Aptdo. 22085, 46071 Valencia, Spain3) Cockcroft Institute and the University of Manchester, Oxford Road, Manchester, M139PL, UK
8 CARE/ELAN document-2006-008
XVIII IEEE-SPIE Symposium on Photonics and Web Engineering Electronics for Accelerators and HEP, WILGA May 2006
R.S. Romaniuk, Warsaw University of Technology
9 CARE/ELAN document-2006-009
Report on the 2005 CTF3 collaboration meeting. Status of CTF3 at 2005's end.
G.Geschonke (for the CTF3 Team)
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 1212
ConclusionsConclusions
Very active period on electron accelerator Very active period on electron accelerator R&DR&D
Successful ELAN workshop at OrsaySuccessful ELAN workshop at Orsay ELAN is a useful tool in:ELAN is a useful tool in:
- Supporting workshops on future linear - Supporting workshops on future linear colliders colliders
- Promoting new techniques for acceleration- Promoting new techniques for acceleration
- Preparing for FP7- Preparing for FP7
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 1313
Main Deliverable for 2006Main Deliverable for 2006
Data base on diagnostics performance Data base on diagnostics performance WP4 CCLRC, UMAWP4 CCLRC, UMA
Web page connected to GDE Web page connected to GDE • http://www.pp.rhul.ac.uk/~blair/ELAN/http://www.pp.rhul.ac.uk/~blair/ELAN/
INSTR/ELAN_INSTR_home.htmINSTR/ELAN_INSTR_home.htm
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 1414
bcd:instrumentation_and_controls:instrumentation_and_controls_home ILC
Table of Contents• Instrumentation and Controls
• Overview • Baseline • Subsystems • Alternatives
[] Instrumentation and ControlsIntroduction 10.0 The Instrumentation and Controls BCD consists of 13 sections and
an introduction. Overview
Baseline
September 2006September 2006 F. Richard LAL/OrsayF. Richard LAL/Orsay 1515
Subsystems
10.1 Controls Standard Architecture 10.2 Timing system 10.3 Diagnostic Interlock Layer 10.4 Global Accelerator Network 10.5 Machine Protection System 10.6 Low Level RF 10.7 Feedback 10.8 Controls - Instrumentation Integration 10.9 Machine Detector Interface (TBA) 10.10 Beam Position Monitors 10.11 Transverse Profile Monitors 10.12 Longitudinal Diagnostics System.pdf 10.13 Special Systems (TBA) Alternatives
Description
Supporting Documentation
Required R&D