Scotland’s Changing Hydro Resource – 2008 to 2012 and Beyond. Nick Forrest. Topics. Recent history of hydro National resource – what is it now? What the sites look like How fast will hydro grow? What are the critical factors?. Cumulative Installed Hydro. Developers. Uncertain markets - PowerPoint PPT Presentation

Transcript

Small hydro from idea to operation

Scotland’s Changing Hydro Resource – 2008 to 2012 and Beyond

Nick Forrest

Small hydro from idea to operation

Topics Recent history of hydro National resource – what is it now? What the sites look like How fast will hydro grow? What are the critical factors?

Small hydro from idea to operation

Cumulative Installed Hydro

Small hydro from idea to operation

Developers Uncertain markets Money looking for investments Many new developers Land grab How much is left?

Small hydro from idea to operation

SNH and SEPA Increasing number of

applicants Cumulative effects

Small hydro from idea to operation

Scottish Government Pollution & climate change Energy security Rural income

Small hydro from idea to operation

National Surveys

Small hydro from idea to operation

Hydrobot Remote hydro prediction, including:

Flow duration statistics Layout and equipment optimisation Grid connection Costs and revenues NPV indicating best option Applicable across regions

Small hydro from idea to operation

1020

30

50

40

T1T2

Small hydro from idea to operation

Scottish Hydropower

Resource Study

657MW of untapped potential

>1,000 schemes, 20kW to 20MW

Small hydro from idea to operation

Employment Study The Employment Potential of

Scotland’s Hydro Resource Refined costings Included micro hydro (<100kW) Feed-In Tariffs (FITs)

Small hydro from idea to operation

Revised Resource 1.2 GW potential, 7,000 schemes 169 MW across 4,400 micro-hydro sites

0100200300400500600

0

1,000

2,000

3,000

4,000

5,000

Pot

entia

l pow

er (M

W)

Num

ber o

f pot

entia

l sch

emes

Power band

Number

Potential power (MW)

Small hydro from idea to operation

SNH Study New Feed-In Tariffs Simple payback of 10 years or less Variable design flow (1 to 1.3) Survey and mitigation costs Full set of CAR licenses entered 706MW across 6,312 schemes

Small hydro from idea to operation

babyHydro 2012 (I’m talking about this one) FITs as of December 2012 997MW across 9,152 schemes

Small hydro from idea to operation

Small hydro from idea to operation

Technical Screening 1:50,000 maps Maps of distribution grid River status Existing schemes

Small hydro from idea to operation

Technical ScreeningCode Description

T1 Forestry CommissionT2 Access or gorgeT3 Other obstacleT4 Grid issues

T5Interferes with existing scheme

T6 ErrorT7 Low gradientT8 Good

Small hydro from idea to operation

Screened Resource Total resource = 997MW 33% good = 329MW 165MW on Forestry Commission land 33% good = 55MW Total without barriers = 384MW

Small hydro from idea to operation

Two Waves?20

00

2002

2004

2006

2008

2010

2012

2014

2016

2018

1,400.00

1,450.00

1,500.00

1,550.00

1,600.00

1,650.00

1,700.00

1,750.00

1,800.00

Cumulative Installed Capacity

Inst

alle

d Ca

paci

ty (M

W)

Small hydro from idea to operation

But How Fast? Do We Care? Market size Targets Replacing other sources in time Incentives to stimulate market Degression

Small hydro from idea to operation

Straight-Line Trends Rate of commissioning Rate of consenting

Small hydro from idea to operation

Cumulative Installed Hydro

Small hydro from idea to operation

Excluding Fasnakyle & Glendoe

Small hydro from idea to operation

Commissioning and Consenting Trends

Small hydro from idea to operation

Commissioning and Consenting Trends

Small hydro from idea to operation

Employment Study Human resources for hydro Realistic growth – Normal curve Growth in workforce defines upper limit in

hydro deployment

Small hydro from idea to operation

Employment Study

Graph by Jamie Wallace, Highland Eco-Design

0

200

400

600

800

1000

1200

1400

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Full-

time

Equi

vale

nt J

obs

GlobalUKScotland-wide (Baseline)Scotland-wide (10%)Scotland-wide (12%)Local

Small hydro from idea to operation

Cumulative Normal Curves

Small hydro from idea to operation

Cumulative Normal Curves

Small hydro from idea to operation

Cumulative Normal Curves

Small hydro from idea to operation

Cumulative Normal Curves

Small hydro from idea to operation

Degression

10%

20%

5%

2.5%

Small hydro from idea to operation

Influences Sites Grid Revenue support Funding Rents Environment

Small hydro from idea to operation

Conclusion 997MW total capacity, mostly in 100-

500kW band 384MW has no known barrier We predict around 112MW deployment

between now and 2020 5% degression probably for >10 years 10% degression likely on occasion

Small hydro from idea to operation

Nick ForrestbabyHydro Ltd

M: 07784 066 445E: nick@hydrobot.co.uk

Small hydro from idea to operation

Influences Sites Grid Revenue support Funding Rents Environment