Scheduling Reports in Web Intelligence

Post on 13-Dec-2014

104 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

This document shows the screen shots to schedule reports in BOXI R2.

Transcript

Scheduling Reports in web intelligence (BOXI R2)

Manoj Kumar rakesh BO developer Mkrakesh@rediffmail.com

This documents is basically based on screeshot taken while scheduling the report.The report is stored at directory as pdf.

Before scheduling the reports logon to central management console.

Click on central management console.

Click on servers.

Click on web intelligence job server to configure.

Click on destination tab.

Check on unmanaged disk and click on enable button on the right.

Click ok to enable the selected item.

Go back to central management console and re start the web intelligence job server.

Open the report to be schedule.

Click on schedule option in the report.

Select the format as Adobe Acrobat.Expand the destination option

Uncheck “use the job server Default”

Give the destination location for the file. Ex.D:\Scheduled.Click on schedule button below right to run the job.