River & channel protection, short presentation

Post on 23-Jan-2018

57 Views

Category:

Engineering

5 Downloads

Preview:

Click to see full reader

Transcript

LOCATION

Friuli Venezia Giulia Region – NE Italy Basilicata Region – South Italy

GOALS TO REACH Erosion control and soil reinforcement Environmental restoration

TARGET WORKS River, creek and channel banks

SURFACE

LYTHOTYPE Gravel, sand, loam

1° SEEDING DATE 2001, 2006, 2007

REMARKS 4 different sites

River, creek and channel banks consolidation

River banks consolidation – Noncello river – NE Italy

Re-profiled riverbanks and site preparation

October 2001

March 2002

River banks consolidation – Noncello river – NE Italy

April 2002

River banks consolidation – Noncello river – NE Italy

Environmental restoration. Results after 5 years

April 2007

Overflow channel banks consolidation – NE Italy

Site view before FortGrass application

July 2008

Overflow channel banks consolidation – NE Italy

Soil reinforcement after FortGrass application

FortGrass sprouting

December 2006

Creek banks consolidation – NE Italy

FortGrass results

August 2009

Creek banks consolidation – NE Italy

FortGrass application

November 2006

Channel banks consolidation – NE Italy

Erosion control and soil reinforcement. FortGrass after a flooding

May 2007

Channel banks consolidation – NE Italy

top related