RHODE ISLAND TROLLEYTRAIL
From Charles Armentrout Dr to Farragut St
Kidus Debasu
Transportation Engineer, Office of Highway Development
MDOT State Highway Administration
Kdebasu@sha.state.md.us
Topics
Project Purpose and Need
Project Limits
Project Schedule and Path
Current Design
Current status and Next steps
Public Meeting and Outreach
Purpose and Need
-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing Rhode Island Trolley Trail and the Anacostia Tributary Trail system.
-While the primary aim of this project is to improve the connectivity amongst the existing
trail systems it will also further enhance connectivity between neighboring towns.
Project Limits
Existing Rhode
Island Trolley
Trail
Proposed
10’ SUP
Anacostia
Tributary
Trail System
Proposed ADA
Compliant
Sidewalk
Milestones to Date
Project was requested by the City of Hyattsville.
Early 2016
Surveys Started
Mar. 2017
Design initiation
Aug. 2017
Line Grade and Typical
Mar. 2018
Official 30% Design Completion Meeting
Aug. 2018
Project Schedule
Right of Way (ROW) needs and estimate prepared
Dec .2018
Agreement signature
(anticipated)
Spring. 2019
ROW cleared
(agreement dependent)
Spring. 2020
Project Advertised to Prospective Bidders
(ROW dependent)
Fall. 2019
Construction Start
(ROW dependent)
Spring. 2020
Existing Condition
Existing Condition :-
• 4-Lane high way, two lanes on each direction.
• Intersection of Charles Armentrout Dr with Rhode Island Ave
• Adjacent to North Bound lane is the CSX trainline.
Existing Bicycle and Pedestrian Facilities
Bus Stop #1 Bus Stop
#3Bus Stop
#2
Bus Stop #5
Bus Stop #4
Existing SidewalkSouth Bound
Existing SidewalkNorth Bound
Existing Shared Use Path
Existing Rhode Island Trolley Trail
Proposed Bicycle and Pedestrian Facilities
Bus Stop (removed) Bus Stop
#3
Bus Stop #2
Bus Stop #5
Bus Stop #4
Proposed Sidewalk
Proposed Shared Use Path
Current Design
• Proposed:-
• Resurfacing on Charles Armentrout Dr. to increase separation between vehicular traffic and the existing Shared Use Path.
• Construct a Shared Use Path from Charles Armentrout to Farragut Street NB side.
• Construct ADA Compliant Sidewalk from 41st St. up until Braxton Pl.
• A road diet on US 1 is proposed to accommodate these improvements.
Grinding and
Resurfacing
Existing Typical Section
Proposed Design Typical Section(Road Diet)
Traffic Analysis
• Road Diet Analysis
• Traffic analysis was completed by MDOT SHA.
• Traffic analysis numbers predict future traffic conditions with a road diet will be comparable to the existing traffic condition.
• Traffic signals will be optimized throughout the corridor to minimize exasperating vehicular traffic operations.
No Road No Road Road
Diet
Build Diet Build Diet(Optimiz
ed)
US 1 at E E E F E
41st Pl/Charles 66.6 67.4 74.1 88.3 77.5
Armentrout Dr
US 1 at B B C C C
Crittenden St/ 13.9 14.1 32.4 30 28.2
42nd
St
US 1 at A A A A A
Farragut St 3.8 3.7 6.7 5.2 4.9
US 1 at A A A A A
Gallatin St 4.3 4.2 3.6 3.6 3
2040 PM
Intersection
2040 AM
Proposed Design Bus Turnouts
Bus Turnout Design
Existing Proposed
Bus Turnout by
42nd PlBus Stop by
42nd Pl
Bus Turnout Design
Existing Proposed
Bus Stop by
District Court
Bus Turnout by
District Court
Other Road Diet treatments Left turn lanes
• Increasing Storage on left turn onto Crittenden St.
Other Road Diet treatments Provisions for stalled vehicles
• Removing Median at US 1 north of 43rd Ave.• Restricting Left Turn from 43rd Ave onto US 1.
Prince George’s County District Court
43
rdA
ve
ROW (Right of Way) Information
Prince George's County District Court
Current Status and Next Steps
• Design has reached 30% design completion.
• Additional Right of way (ROW) will be required for Storm Water Management.
• The extent of right of way need will be finalized after supplemental metes and bounds surveys are complete. Anticipated to be done by the end of October.
• Coordination with CSX transportation will be required to ensure smooth ROW transaction.
• Estimated construction date would be based on right of way.
Public Meeting and Outreach
• A mandatory referral in partnership with the city of Hyattsville and M-NCPPC(Maryland-National Capital Park and Planning Commission) will be scheduled prior to the end of the year.
• A public meeting will be coordinated with City officials subsequent to the Mandatory referral.
Questions
Need information /Have QuestionsUS 1 from Chapman Avenue to Farragut Street Bicycle Retrofit
(Rhode Island Trolley Trail)
Kidus Debasu- MDOT SHA
Project Manager
Phone: 410-545-8824
Email: Kdebasu@sha.state.md.us