Revised Pavement Design - Beawar Pali Section.pdf
Post on 07-Aug-2018
229 Views
Preview:
Transcript
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
1/119
INDEPENDENT CONSULTANT :
CONCESSIONAIRE : DESIGN CONSULTANT :
L&T Construction
DSGN 22.08.2012
CHKD 22.08.2012
APPD 22.08.2012
DOC. No. O 11 2 3 8 - C - R P - R D - P D - 0 0 0 1
RELEASED FOR PRELIMINARY TENDER INFORMATION
APPROVAL CONSTRUCTION
AAN
INDIA
MJT
DESCRIPTION
AAN
VGS
Approved
Pavement Design Report (Beawr - Pali Section)
Pavement Design Report (Beawr - Pali Section)
CheckedDesigned
RHN
RHN MJT
RHN
SIGN
T h i s d o c u m e n t i s t h e p r o p e r t y o f L &
T C o n s t u c t i o n ,
I n f r a s t r c u t u r e ,
E D R C & T
m u s t n o t b e p a s s e d o n t o a n y t h i r d p e r s o n o r f i r m
n o t a u t h o r i s e d b y u s ,
n o r b e c o p i e d / m a d e u s e o f i n f u l l o r p a r t b y s u c h
p e r s o n o r f i r m w
i t h o u t o u r p r i o r p e r m i s s i o n w r i t i n g
REVISIONS
Pavement Design Report (Beawr - Pali Section)
L&T Construc t ion
Infrastucture
B AAN
JOB No.
L & T BPP TOLLWAY PRIVATE LIMITED
CIRC
PAVEMENT DESIGN REPORT
(BEAWAR - PALI SECTION)
TOTAL NO. OF PAGES
O11238-C-RP
CODE REV.
VGS
NAME
RHN
AAN
NATIONAL HIGHWAYS AUTHORITY OF
Infrastucture-EDRC&T
TITLE :
22.08.2012 C
DATE
DATE
PROJECT :
12.07.2101
25.01.2012 A
REV. NO.
CLIENT :
BEAWAR-PALI-PINDWARA ROAD PROJECT (BPPRP )
EPC CONTRACTOR :
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
2/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 1 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Table of Contents
1.0 Introduction, Background and Description .......................................................................... 4
1.1 Introduction ...................................................................................................................... 4
1.2 Project Description and Scope ......................................................................................... 4
2.0 Field Investigations and Geotechnical Sampling ................................................................. 6
2.1 Pavement Condition Survey ............................................................................................. 6
2.2 Benkelman Beam Deflection Testing .............................................................................. 6
2.2.1 Leg Correction Factor ................................................................................................... 7
2.2.2 Correction for Temperature .......................................................................................... 7
2.2.3
Correction for Seasonal Variation ................................................................................ 8
2.2.4 Characteristic Deflection .............................................................................................. 8
2.3 Field Investigation and Sampling ..................................................................................... 8
2.4 Laboratory Testing ........................................................................................................... 9
3.0 Field Investigation Survey and Laboratory Test Results ................................................... 10
3.1 Pavement Condition Survey Results .............................................................................. 10
3.2 Benkelman Beam Deflection Testing Data and Results ................................................ 10
3.3 Field Investigation and Sampling Results ...................................................................... 13
3.3.1
Assessment of Existing Pavement Composition .................................................... 13
3.3.2 Assessment of In-situ Density of Subgrade ............................................................ 15
3.3.3 Assessment of Subgrade CBR Using Dynamic Cone Penetrometer ...................... 17
3.3.4 Laboratory Testing Results ..................................................................................... 19
4.0 Traffic Study & Analysis ................................................................................................... 21
5.0 Impact of Concession Agreement on Pavement Design .................................................... 23
6.0 Overlay Pavement Design (Flexible Pavement) ................................................................ 24
6.1
Calculation of Characteristic Deflection ........................................................................ 24
6.2 Pavement Overlay Thicknesses ...................................................................................... 24
7.0 Flexible Pavement Design for Main Carriageway Widening, Reconstruction Sections, and
Approaches of Grade Separators .................................................................................................. 26
7.1 Discussion of Design CBR ............................................................................................. 26
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
3/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 2 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
7.2 Pavement Layer Thickness Design ................................................................................ 27
7.2.1 Methodology for Pavement Sections with Design CBR 10% .................................... 27
7.2.2 Methodology for Pavement Sections with Design CBR 12% .................................... 27
7.2.2.1 Allowable Strains in the Pavement Structure ......................................................... 28
7.2.2.2 Actual Strains in the Pavement Structure ............................................................... 28
7.3 Validation of Analytical Approach of Pavement Design Using Standard IRC Sections 29
7.4 Pavement Layer Thicknesses Recommendation ............................................................ 29
8.0 Pavement Design (Flexible Pavement) for Service Road, and Slip Road of Flyover and
Underpass ...................................................................................................................................... 31
9.0 Pavement Design (Rigid Pavement) for Toll Plaza ........................................................... 32
9.1 Methodology .................................................................................................................. 32
10.0 Conclusion ......................................................................................................................... 36
List of Figures
Figure 1 Key Map ........................................................................................................................... 5
List of Tables
Table 3.1 Summary of Pavement Condition Survey .................................................................... 10
Table 3.2 Pavement Distress Analysis .......................................................................................... 10
Table 3.3 Kilometer-wise Characteristic Deflections ................................................................... 11
Table 3.4 Existing Pavement Crust Composition ......................................................................... 13
Table 3.5 In-situ Density of Subgrade .......................................................................................... 16
Table 3.6 In-Situ DCP-CBR ......................................................................................................... 18
Table 4.1 Homogeneous Section-wise Cumulative Traffic .......................................................... 22
Table 6.1 Overlay Design ............................................................................................................. 25
Table 7.1 Design CBR Values for Pavement Design ................................................................... 26
Table 7.2 Recommendations for New Pavement Sections ........................................................... 30
Table 8.1 Pavement Crust for Service Road ................................................................................. 31
Table 9.1 Design Traffic ............................................................................................................... 33
Table 9.2 Design Calculations of Rigid Pavement ....................................................................... 33
Table 9.3 Rigid Pavement Design - Summary.............................................................................. 35
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
4/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 3 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
List of Appendices
Appendix 1 Pavement Condition Survey Data
Appendix 2 Benkelman Beam Deflection Survey DataAppendix 3 Laboratory Testing Results
Appendix 4 Overlay Design
Appendix 5 Pavement Structural Sections Recommendations for New Pavement Design
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
5/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 4 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
1.0 Introduction, Background and Description
1.1 Introduction
This pavement design report is prepared in order to recommend suitable pavement structural
sections for the overlay as well as the new pavement portions for four laning of the Beawar to
Pali section of NH-14. Pavement design is the most important component of any highway
project, since a pavement has to ultimately carry the entire traffic loads and protect the subgrade.
The following pages contain a comprehensive report consisting of a review of the project site
parameters; review and analysis of various field surveys and pavement materials; review of
traffic components; analysis and design of the pavement overlay sections; and analysis and
design of the new pavement structural sections.
1.2
Project Description and Scope
The aerial extent of the proposed project comprises of three districts: Ajmer, Pali, and Sirohi, all
in the state of Rajasthan. The project road lies in the district of Ajmer, Rajasthan from Km 0.00
to Km 6.900, in the district of Pali, Rajasthan from Km 6.900 to Km 185.00, and in the district of
Sirohi, Rajasthan from Km 185.00 to Km 246.00.
It is expected that about 4853028 persons (about 8.59% of total population of Rajasthan) are
likely to be benefited. Among the three districts, Ajmer has the highest population density of
about 257 persons/sq.km while Pali has the lowest population density of 147 persons/sq.km. The
decadal population growth from 1991-2001 is maximum in Sirohi at 30.13 %, and the lowest inPali at 22.46%.
The project alignment connects the western part of the state of Rajasthan to NH-8 in the north (to
Jaipur) and to NH-76 in the south (to Udaipur and Abu Road). The project road from Beawar to
Pali is a part of this National Highway (NH-14) in the state of Rajasthan. The limits of the
project extend from the station at existing km 000+000 up to the station at km 115+400
(proposed chainage of Km 113+000) just beyond the junction of NH-65 at Pali. The road is a
part of a high density traffic corridor. Some of the major towns and villages through which the
alignment of the road traverses through are: Sadatana, Lalpura, Sapalpura, Dhaba, Jhala ki
Chowk, Barr, Raipur, Juta, Juta Mata Nagri, Pipalia Kalan, Sandiya, Dhaba, Sojat, Bhagavas,Ravia Bara, Jardan, Math, Pali Balaji Area, and the major town of Pali. A key map showing the
project with the proposed bypasses is attached as Figure 1.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
6/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 5 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Figure 1 Key Map
The existing road consists of flexible type pavement, with two lanes. From a road inventory
survey performed, it was observed that the most of the carriageway as about 7 m wide.
The road has been identified by the National Highway Authority of India (NHAI) for
strengthening of the existing carriageway and augmentation in its traffic carrying capacity.
Keeping in view the importance of the project road for the socio economic development of the
region and to meet the growing demands of traffic, it is proposed to: (i) strengthen the existing 2
lane pavement, and (ii) augment its capacity by widening it to 4 lanes.
Since the existing pavement is of flexible type, it is proposed to design flexible pavements for
the additional two lane carriageway sections, and flexible overlays for strengthening the existing
pavement.
The scope of this work was to collect the data needed for the design of new pavements for the
additional two lane carriageway portions, and to prepare pavement rehabilitation andstrengthening strategy. In order to perform the above broad scope of work, L&T also included in
its scope field investigations field sampling, field testing, and laboratory testing. Some of these
tasks were completed by L&T, while others were completed by outside agencies and reviewed
by L&T.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
7/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 6 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
2.0 Field Investigations and Geotechnical Sampling
In order to perform the scope of work, the following investigations/surveys were conducted by
L&T:
1. Pavement Condition Survey;
2. Benkelman Beam Deflection Testing;
3. Field Investigation and Sampling;
4. Laboratory Testing.
Following is a brief description of the investigations and surveys that we conducted for the
project.
2.1
Pavement Condition Survey
The visual condition survey was conducted in order to record the pavement condition for every
100 m intervals. This included recording information on any deficiencies that were visible and
also any improvements and treatments. The type of rehabilitation strategy to be adopted is
contingent upon the existing pavement crust composition and the visual condition survey. The
condition survey was conducted by considering the following details and their brief descriptions:
1. Length : Minimum of 100 m section
2. Surfacing Description : BT/CC/GR/ER
3. Rut Depth : in mm4. Cracks : % of Area
5. % Area Covered by : Potholes, Raveling, Patching
6. Shoulder Condition : Good/Fair/Poor/Very Poor
7. Remarks : If any
The data and finding from this pavement condition survey are given in Appendix 1.
2.2 Benkelman Beam Deflection Testing
Benkelman Deflection Survey was carried out to assess the residual strength of the existingflexible pavement and thereby assess the requirement of structural overlay. The survey was
conducted in accordance with IRC: 81-1997 provisions, and the Canadian Good Road
Association (CGRA) method. Deflection readings were taken on previously identified stretches
that were based on the pavement condition survey. The collected deflection data were analyzed
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
8/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 7 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
along with the corrections required in accordance with requirement of IRC: 81-1997. The
corrections were calculated for:
Leg correction.
Pavement Temperature.
Seasonal Correction.
Subgrade moisture content.
PI of Subgrade.
The data and finding from Benkelman beam deflection survey are given in Appendix 2.
2.2.1 Leg Correction Factor
While measuring the deflection there is every chance of deflection bowl extending up tosupporting legs of the Benkelman beam. The deflection of legs is revealed by the difference in
differential reading between initial, intermediate and final reading. If the differential reading
between initial and final and intermediate and final differ by more than 0.025mm then leg
correction needs to be applied. The true deflection is computed as:
XT = XA + 2.91 Y
Where,
XT = True pavement deflection
XA = Apparent pavement deflection i.e. 2X (Final – Initial reading)
Y = Vertical movement of the front legs i.e., twice the difference between the final and intermediatereading.
2.2.2 Correction for Temperature
The stiffness of bituminous layers changes with temperature of the bonder and consequently the
surface deflection of bituminous pavement will vary depending upon the temperature of the
constituent bituminous layers. Therefore it is necessary that the measured deflection be corrected
to a common standard temperature for tropical climate of India. The standard temperature is
taken as 35°C. Correction for temperature variation on deflection for values other than those
measured at 35°C shall be 0.01 mm for each degree of change from the standard temperature of
35°C. The correction will be positive for pavement temperatures lower than 35°C and negative
for pavement temperature higher than 35°C.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
9/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 8 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
2.2.3 Correction for Seasonal Variation
Since the pavement deflection is dependent upon change in climate/season of the year, it is
always desirable to take deflection measurements during the season when the pavement in its
weakest condition. This condition occurs immediately after the monsoons in India. When
deflection measurements are taken during dry months, they require correction factor, which is
defined as the ratio of maximum deflection immediately after the monsoon to that of deflection
in the dry months.
Correction for seasonal variation depends upon the type of the sub-grade soil, its field moisture
content (at the time of deflection testing), and average rain fall in the area. For this purpose sub-
grade soil has been divided into three broad categories namely sandy/gravely clayey with low
plasticity (PI 15). Similarly rainfall has been divided
into two categories namely annual low rainfall (< 1300mm) and annual high rainfall (>1300mm).
2.2.4 Characteristic Deflection
The statistical analysis involves calculation of mean deflection value, standard deviation and
characteristic deflection. The design calculations are us under.
∑
∑ ⃛
Where,
X = individual deflection, mm
x = mean deflection, mm
ƞ = number of deflection measurements
2.3 Field Investigation and Sampling
An extensive field investigation and sampling exercise was conducted. The following were the
objectives of this exercise:
1. To assess the existing pavement composition;
2. To assess the in-situ density of the subgrade;
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
10/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 9 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
3. To assess the subgrade California bearing ratio (CBR), using the dynamic cone
penetrometer (DCP) test; and
4. To collect subgrade samples for performing laboratory tests.
Assessment of the existing pavement composition was done by excavating test pits (size 1.0 m x
1.0 m) at every 1 kilometer interval. These test pits were excavated on the shoulders, extending
for about 10 cm into the outside lane of the project road. Test pit investigations were not
conducted along those locations on the project road which formed a part of bypasses, re-
alignments, and reconstruction sections. The number of test pits excavated along the project
length was seventy one (71).
Field density tests were conducted by Sand Replacement method for the test pits and also the
natural moisture content were determined at each test pits. Dynamic Cone Penetration tests were
conducted at pit locations to assess in-situ CBR at subgrade level. The equivalent CBR value was
calculated based on different soil layers encountered. The slope change in the graph (Penetration
Vs Number of Blows) indicates the interface of two layers of different penetration resistance.
From the graph, thickness of layer and slope (penetration mm/blow) were calculated. The
following TRRL equation has been used to calculate the layer DCPCBR value for each layer.
2.4 Laboratory Testing
The following laboratory tests were conducted for all the samples collected from the test pits.
Grain Size Analysis (As per IS:2720-Part 4);
Atterberg Limit test (As per IS:2720-Part 5);
Standard Proctor tests (As per IS:2720-Part 8);
4-day Soaked CBR at 3 energy levels (As per AASHTO method).
Bulk sample of about 50 Kg was collected from all the test pits at sub grade level to analyze the
characteristics of the existing subgrade material. The laboratory CBR tests were conducted on
the test pit samples. Further three remoulded soil specimen were prepared from the samples
collected from the test pits at an interval of 1 Km along the road and tested for CBR in
accordance with AASHTO at three different energy levels by giving 10 blows, 30 blows and 65
blows per layer in each CBR mould. These specimens were tested after soaking in water for four
days. The CBR values were plotted in the Density Vs CBR graph and the CBR values
corresponding to 97 % of MDD is interpolated.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
11/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 10 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
3.0 Field Investigation Survey and Laboratory Test Results
3.1 Pavement Condition Survey Results
Table 3.1 below summarizes the overall pavement condition of the project road.
Table 3.1 Summary of Pavement Condition Survey
Pavement Condition Length (km)
Good 33.300
Fair 15.900
Poor 20.400
Table 3.2 below outlines the overall break-up and percentage distribution of the various
pavement distresses such as cracking, potholes, raveling, and patching that were encountered
along the length of the project.
Table 3.2 Pavement Distress Analysis
Sr.
No
Cracking
(%)
Length
(km)
Patching
(%)
Length
(km)
Pot holes
(%)
Length
(km)
Raveling
(%)
Length
(km)
1 1-5 2.4 1-5 6.6 1-5 1.4 1-5 1.3
2 5-10 7.6 5-10 9.7 5-10 2.7 5-10 2.4
3 10-20 12.7 10-20 10.9 10-20 2.3 10-20 6.1
4 20-30 7.9 20-30 3.4 20-30 1.3 20-30 2.9
5 30-40 5.7 30-40 2.5 30-40 0.5 30-40 2.0
6 >40 6.7 >40 4.1 >40 - >40 1.5
From the table above, it can be seen that the major distresses affecting the pavement were
cracking, patching, pot holes and raveling. The portion of project length that was affected by
more than 20% cracking was about 20 kilometers.
3.2
Benkelman Beam Deflection Testing Data and Results
The results of the Benkelman beam deflection testing are depicted in the following tables. Table
3.3 below summarizes the kilometer-wise calculated characteristic deflections.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
12/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 11 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Table 3.3 Kilometer-wise Characteristic Deflections
Chainage Characteristic
Deflection (mm)From To
9+600 10+550 0.430
18+000 19+000 0.396
19+000 20+000 0.545
20+000 21+000 0.505
21+000 22+000 0.719
22+000 23+000 0.677
26+100 27+000 0.516
27+000 28+000 0.376
28+000 29+000 0.397
29+000 30+000 0.397
30+000 31+000 0.422
31+000 32+000 0.505
32+000 33+000 0.780
33+000 34+000 0.905
36+000 37+000 1.160
37+000 38+000 0.949
38+000 39+000 0.836
39+000 40+000 1.170
40+000 41+250 1.323
44+500 45+000 0.669
45+000 46+000 0.773
46+000 47+000 1.011
47+000 48+000 1.017
48+000 49+000 1.041
49+000 50+000 1.171
50+000 50+650 1.087
53+000 54+000 0.746
54+000 55+000 0.593
55+000 56+000 0.751
56+000 57+000 0.616
57+000 58+000 0.782
58+000 59+000 0.658
59+000 60+000 0.786
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
13/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 12 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Chainage Characteristic
Deflection (mm)From To
60+000 61+000 1.090
61+000 62+000 0.720
62+000 63+000 0.610
63+000 64+000 0.566
64+000 64+550 0.552
65+150 66+000 0.665
66+000 67+000 0.571
67+000 67+850 0.682
69+000 70+000 0.750
70+000 71+000 0.795
71+200 72+200 1.205
73+000 74+000 1.650
74+000 75+000 1.365
75+000 76+000 0.957
76+000 77+000 0.974
77+000 78+000 0.889
78+000 79+000 0.998
78+600 79+600 1.073
80+900 82+000 1.113
82+000 83+000 0.861
83+000 84+000 1.112
84+000 85+000 1.252
85+000 86+000 1.081
86+000 87+000 1.166
87+000 88+000 1.373
88+000 89+000 1.083
89+000 90+000 1.397
90+000 91+000 1.033
91+600 92+000 1.000
92+000 93+000 1.273
93+000 94+000 0.642
94+000 95+000 1.181
95+000 96+000 1.310
96+000 97+000 1.695
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
14/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 13 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Chainage Characteristic
Deflection (mm)From To
97+000 98+000 1.295
103+000 104+000 0.866
104+000 105+000 1.224
106+600 107+000 1.618
107+000 108+000 1.397
108+000 109+000 1.264
109+000 110+000 1.660
110+000 111+000 1.942
111+000 112+000 1.641
Upon completion of the field survey, characteristic deflection was computed for each kilometer
length of the project. These characteristic deflections formed the basis of delineations of the
project length into various homogenous sections in terms of pavement distress.
3.3 Field Investigation and Sampling Results
The findings from the field investigations conducted are summarized in the following sections.
3.3.1 Assessment of Existing Pavement Composition
The profile of the excavated test pits was visually examined in order to record the existing
pavement crust composition and identify the layer thicknesses. The outcome of this exercise is a
table containing the break-up of the pavement crust, which is listed below in Table 3.4.
Table 3.4 Existing Pavement Crust Composition
Sr.
No.Chainage
(Km)Side
Existing Crust Composition (mm)
Bituminous WBM GSB Total
1 19+000 LHS 110 180 290
2 20+000 RHS 100 160 260
3 21+000 LHS 110 200 310
4 22+000 RHS 170 300 470
5 27+000 RHS 200 140 340
6 28+000 RHS 190 120 310
7 29+000 RHS 200 130 330
8 30+000 RHS 180 140 320
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
15/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 14 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Sr.
No.Chainage
(Km)Side
Existing Crust Composition (mm)
Bituminous WBM GSB Total
9 31+000 RHS 200 100 30010 32+000 RHS 200 230 430
11 33+000 RHS 200 230 430
12 34+000 LHS 110 200 310
13 36+000 RHS 110 210 320
14 37+000 RHS 160 210 370
15 38+000 LHS 110 220 330
16 39+000 RHS 170 220 390
17 40+000 RHS 140 200 340
18 41+000 RHS 170 180 350
19 42+000 RHS 170 230 400
20 45+000 RHS 170 250 420
21 46+000 RHS 210 240 450
22 47+000 RHS 180 220 400
23 48+000 RHS 160 180 340
24 49+000 RHS 180 240 420
25 50+000 RHS 130 260 390
26 54+000 RHS 270 160 430
27 55+000 RHS 220 260 480
28 56+000 RHS 110 150 260
29 57+000 RHS 190 230 420
30 58+000 RHS 250 210 460
31 59+000 RHS 230 260 490
32 60+000 RHS 200 320 520
33 61+000 RHS 170 230 400
34 63+000 RHS 170 190 360
35 64+000 RHS 170 200 370
36 66+000 RHS 200 160 360
37 67+000 RHS 250 220 470
38 69+000 RHS 120 240 360
39 70+000 RHS 200 180 380
40 71+000 LHS 120 300 420
41 72+000 LHS 70 270 290 630
42 73+000 RHS 70 260 270 600
43 74+000 RHS 160 200 360
44 75+000 RHS 150 270 420
45 76+000 RHS 90 290 380
46 77+000 RHS 130 270 400
47 78+000 RHS 120 220 340
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
16/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 15 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Sr.
No.Chainage
(Km)Side
Existing Crust Composition (mm)
Bituminous WBM GSB Total
48 82+000 RHS 110 270 38049 83+000 RHS 150 220 370
50 84+000 RHS 130 190 320
51 85+000 RHS 100 200 300
52 86+000 RHS 120 310 430
53 87+000 RHS 180 180 360
54 88+000 RHS 120 290 410
55 89+000 RHS 90 320 410
56 90+000 LHS 120 210 330
57 92+000 LHS 160 250 410
58 93+000 RHS 150 230 380
59 94+000 RHS 270 180 450
60 95+000 RHS 250 200 450
61 96+000 LHS 320 290 610
62 97+000 RHS 290 250 540
63 98+000 RHS 260 190 450
64 104+000 LHS 200 350 550
65 107+000 RHS 130 310 140 580
66 108+000 RHS 130 220 350
67 109+000 RHS 150 220 370
68 110+000 RHS 190 320 510
69 115+050 LHS 290 220 510
70 116+000 LHS 260 220 480
71 117+000 LHS 190 220 410
From the above table, it can be inferred that the combined thickness of the bituminous layers
varies from 70 to 320 mm and that of WBM layer varies from 100 to 350 mm. The thickness of
the GSB layer varies from 140 to 390 mm. The total pavement crust thickness over the subgrade
varies from 260 to 630 mm.
3.3.2 Assessment of In-situ Density of Subgrade
The field density at the existing subgrade level was conducted in the test pits by means of SandReplacement method. Relative compaction ranged from 85.67 to 102.12 percent. The results of
this testing are summarized in Table 3.5 below.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
17/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 16 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Table 3.5 In-situ Density of Subgrade
Chainage SideFMC
(%)
FDD
(gm/cc)
O M C
(%)
MDD
(gm/cc)% Compaction
19+000 LHS 7.86 1.987 9.80 2.084 95.3520+000 RHS 8.98 1.883 10.00 1.985 94.85
21+000 LHS 7.40 1.860 9.90 2.107 88.25
22+000 RHS 8.72 1.947 9.60 2.110 92.26
27+000 RHS 7.80 1.831 8.25 2.060 88.90
28+000 RHS 6.96 1.915 9.70 2.022 94.71
29+000 RHS 8.15 1.875 7.90 2.036 92.09
30+000 RHS 7.35 1.935 8.25 2.060 93.93
31+000 RHS 7.93 1.858 8.20 2.105 88.26
32+000 RHS 6.19 1.817 7.50 2.014 90.22
33+000 RHS 4.47 1.690 9.20 1.889 89.45
34+000 LHS 2.56 1.703 9.60 1.900 89.64
36+000 RHS 1.22 1.862 8.50 1.952 95.39
37+000 RHS 2.24 1.813 8.80 2.025 89.52
38+000 LHS 1.35 1.854 8.00 2.100 88.28
39+000 RHS 4.12 1.810 8.40 2.055 88.08
40+000 RHS 4.15 1.635 9.50 1.909 85.67
41+000 RHS 4.65 1.870 7.80 2.035 91.88
42+000 RHS 4.12 1.634 11.30 1.870 87.37
45+000 RHS 7.46 2.042 7.80 2.068 98.75
46+000 RHS 4.19 1.831 8.20 2.074 88.27
47+000 RHS 3.01 1.862 8.00 2.060 90.37
48+000 RHS 2.66 1.905 9.60 2.050 92.92
49+000 RHS 2.36 1.840 8.00 2.070 88.90
50+000 RHS 2.52 1.768 8.90 1.956 90.40
54+000 RHS 5.57 2.041 7.00 2.090 97.66
55+000 RHS 6.10 1.920 8.10 2.062 93.12
56+000 RHS 3.21 1.912 9.80 2.100 91.05
57+000 RHS 8.32 2.013 7.50 2.104 95.66
58+000 RHS 6.89 1.797 7.90 2.075 86.62
59+000 RHS 11.68 1.953 7.70 2.112 92.46
60+000 RHS 9.64 1.860 7.30 2.110 88.16
61+000 RHS 7.77 1.758 9.60 2.035 86.37
63+000 RHS 9.72 1.876 5.85 2.067 90.77
64+000 RHS 2.59 1.767 7.40 1.985 89.0366+000 RHS 1.68 1.731 7.50 1.990 86.97
67+000 RHS 2.33 1.930 7.20 2.066 93.43
69+000 RHS 2.19 1.857 7.30 2.109 88.06
70+000 RHS 4.17 1.866 7.10 2.118 88.12
71+000 LHS 3.33 2.001 6.00 2.123 94.23
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
18/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 17 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Chainage SideFMC
(%)
FDD
(gm/cc)
O M C
(%)
MDD
(gm/cc)% Compaction
72+000 LHS 2.24 1.812 7.55 2.105 86.08
73+000 RHS 5.56 1.834 7.70 2.015 91.03
74+000 RHS 5.36 1.820 7.60 2.080 87.52
75+000 RHS 3.84 1.903 7.95 2.082 91.42
76+000 RHS 6.23 1.863 7.70 2.068 90.09
77+000 RHS 7.35 1.915 7.60 2.047 93.55
78+000 RHS 6.92 1.832 7.50 2.100 87.25
82+000 RHS 5.07 1.816 7.50 2.056 88.35
83+000 RHS 5.29 1.925 8.00 2.086 92.28
84+000 RHS 6.09 1.798 8.00 2.066 87.03
85+000 RHS 5.37 2.061 8.80 2.018 102.12
86+000 RHS 4.70 1.859 7.20 2.040 91.11
87+000 RHS 7.11 1.975 7.70 2.025 97.55
88+000 RHS 5.77 1.966 7.60 2.032 96.7589+000 RHS 4.72 1.971 7.20 2.042 96.54
90+000 LHS 5.83 1.778 9.80 1.963 90.58
92+000 LHS 5.62 1.910 7.60 2.058 92.80
93+000 RHS 3.81 1.884 8.20 2.032 92.73
94+000 RHS 9.20 1.928 8.00 2.080 92.70
95+000 RHS 4.36 1.852 8.20 1.990 93.06
96+000 LHS 3.79 1.999 7.90 2.057 97.16
97+000 RHS 4.35 1.899 7.60 2.070 91.74
98+000 RHS 8.21 1.812 7.80 2.027 89.38
104+000 LHS 7.93 1.918 7.60 2.092 91.69
107+000 RHS 4.13 1.819 8.00 2.080 87.44
108+000 RHS 3.46 1.838 7.80 2.105 87.29
109+000 RHS 6.16 1.958 7.60 2.089 93.74
110+000 RHS 3.49 1.862 7.30 2.043 91.16
115+050 LHS 6.45 1.866 7.40 2.090 89.29
116+000 LHS 6.26 1.923 7.50 2.102 91.47
117+000 LHS 7.63 1.846 7.00 2.030 90.95
3.3.3 Assessment of Subgrade CBR Using Dynamic Cone Penetrometer
The maximum and minimum values of in-situ DCP-CBR for the existing subgrade were foundto be 33.04 and 3.33 percent respectively. The test results are summarized in Table 3.6 below.
The CBR was found to be 10% or greater at sixty one out of a total seventy one locations.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
19/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 18 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Table 3.6 In-Situ DCP-CBR
Chainage Side
Field CBR (%)
Layer-1 Layer-2 Layer-3 Layer-4 WeightedAverage
19+000 LHS 11.87 13.82 17.25 13.84
20+000 RHS 6.74 12.76 13.31 11.06
21+000 LHS 13.57 16.54 17.25 15.36
22+000 RHS 14.88 15.82 25.89 16.60
27+000 RHS 17.47 16.18 23.38 17.82
28+000 RHS 5.63 16.76 38.61 13.78
29+000 RHS 13.25 18.09 15.41
30+000 RHS 4.83 6.55 5.49
31+000 RHS 17.25 6.79 5.10 7.58
32+000 RHS 12.99 14.66 14.66 13.7933+000 RHS 10.92 11.94 11.94 11.62
34+000 LHS 42.63 25.31 20.59 26.32
36+000 RHS 40.93 25.67 8.81 21.50
37+000 RHS 14.36 13.07 19.55 14.24
38+000 LHS 18.74 21.19 18.54 19.45
39+000 RHS 4.71 3.52 4.36
40+000 RHS 4.83 5.15 5.05
41+000 RHS 5.40 6.67 6.01
42+000 RHS 20.92 18.74 16.88 18.25
45+000 RHS 23.47 27.09 16.53 23.10
46+000 RHS 9.23 28.07 22.58 18.3447+000 RHS 21.24 24.42 24.02 23.38
48+000 RHS 38.47 22.46 19.64 23.62
49+000 RHS 25.54 26.24 22.50 25.11
50+000 RHS 38.61 23.74 15.85 23.58
54+000 RHS 25.49 25.80 14.66 23.00
55+000 RHS 18.39 18.21 18.77 18.55
56+000 RHS 13.63 14.02 16.43 15.04
57+000 RHS 17.77 16.12 19.26 17.36
58+000 RHS 9.28 11.24 9.58
59+000 RHS 14.13 26.49 15.19
60+000 RHS 7.56 7.54 7.55
61+000 RHS 4.37 7.32 5.90
63+000 RHS 24.54 18.56 17.88 19.51
64+000 RHS 10.62 21.10 26.75 17.89
66+000 RHS 28.88 30.83 13.63 24.79
67+000 RHS 8.29 27.61 22.91 17.80
69+000 RHS 14.44 23.95 24.63 20.92
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
20/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 19 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Chainage Side
Field CBR (%)
Layer-1 Layer-2 Layer-3 Layer-4Weighted
Average
70+000 RHS 15.94 16.41 17.25 16.45
71+000 LHS 7.94 63.52 97.58 33.04
72+000 LHS 19.56 29.71 32.25 27.28
73+000 RHS 7.56 30.25 27.53 19.52
74+000 RHS 12.90 24.63 37.07 21.84
75+000 RHS 21.56 19.36 20.52 20.59
76+000 RHS 28.88 27.44 16.59 24.72
77+000 RHS 17.72 14.95 17.45 16.34
78+000 RHS 12.09 25.36 25.15 19.37
82+000 RHS 28.76 23.50 10.62 19.82
83+000 RHS 17.25 21.61 20.39 20.02
84+000 RHS 13.17 13.89 15.31 13.99
85+000 RHS 29.61 17.06 6.01 14.63
86+000 RHS 25.31 29.39 33.16 28.36
87+000 RHS 14.66 26.26 24.63 21.75
88+000 RHS 18.63 19.84 17.25 18.78
89+000 RHS 35.90 12.62 9.77 12.80
90+000 LHS 10.62 23.76 32.91 19.25
92+000 LHS 17.25 10.50 8.29 10.95
93+000 RHS 30.50 27.16 20.92 26.49 25.17
94+000 RHS 30.50 16.44 14.61 18.18
95+000 RHS 17.25 18.67 12.61 15.77
96+000 LHS 12.73 17.25 19.19 16.9797+000 RHS 3.55 3.20 3.33
98+000 RHS 9.37 13.44 9.88
104+000 LHS 6.08 28.74 45.65 21.21
107+000 RHS 35.28 22.10 24.13 27.96 24.73
108+000 RHS 18.12 16.67 17.99 17.62
109+000 RHS 11.24 14.13 23.79 14.30
110+000 RHS 41.76 16.31 19.17
115+050 LHS 26.49 8.75 9.94 10.63
116+000 LHS 35.90 13.77 10.19 13.59
117+000 LHS 14.02 30.81 40.13 23.68
3.3.4 Laboratory Testing Results
The laboratory testing results include CBR, sieve analysis, Atterberg’s limits, and moisture-
density relationships for the existing subgrade. From the CBR testing program, it was seen that
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
21/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 20 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
the CBR values ranged from 6.5 to 27 percent. The CBR was 10% or greater at sixty one out of a
total seventy one locations. Based on Atterberg’s limit test, it was seen that most of the soil
samples were non-plastic (NP) soils. The plasticity index of the soil samples ranged from 7 to 22.
The results are indicated in Appendix 3.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
22/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 21 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
4.0 Traffic Study & Analysis
The traffic study for this project is presented in the traffic report “Traffic Surveys & Analysis
Report” dated 20-01-2012. The pavement design parameters such as growth rates, vehicle
damage factor (VDF) values, and the annual average daily traffic (AADT) values are presented
and analyzed in that report. The traffic volume calculations (MSA) which have been calculated
in that report are highlighted hereunder.
In accordance with IRC guidelines, the pavement of the main highway was designed for the
cumulative number of standard axles of 8.16 tones over the design life. Base year traffic, axle
load distribution, and vehicle damage factor for design shall be determined on the basis of survey
and investigation to be carried out by the concessionaire.
The design traffic is considered in terms of the cumulative number of standard axles (in the lane
carrying maximum traffic) to be carried during the design life of the road. It is referred to as the
"cumulative traffic" and measured in million standard axle, and was computed using the
following equation:
365 [(1 ) 1]nr N A D F
r
Where,
N = Cumulative number of standard axles to be catered for in the design in terms of Million Standard
Axles (msa).A = Initial traffic in the year of completion of construction in terms of the number of Commercial
vehicles per day (CVPD). It is computed by dividing the vehicle category-wise AADT by the
directional distribution factor, which is equal to 0.5 for this project corridor.
D = Lane distribution factor. According to IRC: 37- 2001 and its draft revision of 2011, the lane
distribution factor for four-laning project is 0.75.
F = Vehicle damage factor (VDF).
n = Design life in years.
r = Annual growth rate of commercial vehicles
For the purpose of this Traffic study, the base year is 2011 and the concession period is twenty
years excluding the construction period and it will end on 2033. Detailed computation is
presented in the traffic report.
A detailed analysis of the vehicular movement on the project road indicated that the traffic
pattern was significantly different along the length of the project, and this resulted in designating
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
23/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 22 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
three (3) homogenous sections. The design chainage-wise limits of the homogenous sections are
as follows:
1. Homogenous Section 1: 0+000 km to 21+300 km.
2. Homogenous Section 2: 21+300 km to 71+150 km.
3. Homogenous Section 3: 71+150 km to 113+143 km.
It was also concluded that the traffic pattern in the Beawar to Pali direction (LHS carriageway) is
significantly different from that in the Pali to Beawar direction (RHS carriageway). As result of
this findings, the cumulative traffic on the LHS as well as RHS carriageway consisted of three
different values.
Summary of the results of cumulative traffic computations is presented in Table 4.1 below.
Table 4.1 Homogeneous Section-wise Cumulative Traffic
Homogeneous
Section
Existing
Chainage, km
Design
Chainage,
km
10 Year MSA
(2023)
15 Year MSA
(2028)
20 Year MSA
(2033)
Pali to
Beawar
Beawar
to Pali
Pali to
Beawar
Beawar
to Pali
Pali to
Beawar
Beawar
to Pali
10+000 to
22+700
0+000 to
21+30081 62 138 108 214 168
222+700 to
72+550
21+300 to
71+15067 49 113 86 174 133
3
72+550 to
115+000
71+150 to
113+143 84 63 145 110 224 170
Actual cumulative traffic values (in msa) have been rounded up or down, as applicable, to the nearest whole number. For example: A
value of 61.90 msa has been rounded up to 62 msa, since 62 is the whole number that is nearest to 61.90. A value of 63.19 msa has been
rounded down to 63 msa, since 63 is the whole number that is nearest to 63.19.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
24/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 23 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
5.0 Impact of Concession Agreement on Pavement Design
This project will be implemented as a DBFOT project to the Concessionaire for a concession
period of 23 years. The operation period is 20 years. Hence, the service life of the project road is
taken as twenty years after the project road is opened to traffic. The road is expected to be
opened to traffic in 2014.
In order to achieve economy in construction and to avail the benefits of any future technological
and material improvements, it was decided to adopt the stage construction technique.
Accordingly, the pavement designs in this report are completed assuming a design period of 10
years for the bituminous layers and 20 years (operation period) for the granular layers. This
complies with the provisions of IRC:SP:84 – 2009 (Schedule D).
Flexible pavement has been proposed for the entire project road. The existing project road is of
two lane configurations. The strengthening of the existing carriageway with flexible overlays
will be in general accordance with IRC 81-1997, and the widening of the flexible pavement will
be in general accordance with IRC 37-2001. The pavement designs were completed using the
mechanistic method of pavement design.
The crust thickness and composition of pavement under paved shoulder and the bus bays are
kept identical to that of main carriageway.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
25/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 24 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
6.0 Overlay Pavement Design (Flexible Pavement)
The pavement designs for the overlay sections of this project have been conducted in general
accordance with the IRC: 81-1997 “Guidelines for Strengthening of Flexible Road Pavements
Using Benkelman Beam Deflection Technique”.
The elastic deformation (deflection) of the pavement was measured at various locations along the
project road. The sampling frequency was 50 m. The elastic deflection generated due to the
application of load on the pavement is a function of various pavement crust and subgrade soil
material properties. The elastic deflection was expressed in terms of “characteristic deflection”.
From the characteristic deflection values so generated, the pavement was subdivided into various
stretches of statistically similar characteristic deflections. These stretches were designated as the
pavement homogenous sections. This analysis is outlined in the paragraphs below.
6.1
Calculation of Characteristic Deflection
The deflection data collected in the field survey was processed for calculating the characteristic
deflections. This was the first stage of calculation of characteristic deflections. In this stage, the
processed deflection values from the raw data for each kilometer length were averaged, and the
standard deviation of the data set was calculated. Twice the value of the standard deviation was
then added to the average in order to get the kilometer-wise characteristic deflection using the
statistical approach as identified in IRC: 81, Section 6. The raw deflection values that were a part
of approaches of VUP, PUP, flyovers, and reconstruction sections were not used in the
calculation of overlay thickness.
6.2 Pavement Overlay Thicknesses
Based on the analysis, an overlay strategy that is outlined in Appendix 4 recommended. In
general, for the wearing course, bituminous concrete (BC) overlay of 40 mm, composed of
polymer modified binder (PMB) of VG30 grade is proposed throughout the length of the project.
The binder course recommended for the overlay is dense bituminous macadam (DBM).
A brief summary of overlay design is given in Table 6.1.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
26/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 25 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Table 6.1 Overlay Design
From to From to Ch. Def.Beawar -
Pali
Pali -
BeawarBC
DBM
(Provided)BC
DBM
(Provided)
0.000 7.790 0.000 6.110
7.790 11.068 6.110 9.420
11.068 16.454 9.420 15.200
16.454 18.243 15.200 16.800
18.243 18.780 16.800 17.370 570.000 0.394 62 81 50 --- -- ---
18.780 19.600 17.370 18.170
19.600 20.970 18.170 19.520 1350.000 0.516 62 81 -- --- 50 ---
20.970 21.700 19.520 20.170
21.700 22.749 20.170 21.300 1130.000 0.708 62 81 -- --- 50 ---
22.749 26.182 21.300 24.750
26.182 26.460 24.750 25.030 280.000 0.605 49 67 -- --- 50 ---
26.460 27.210 25.030 25.780
27.210 32.229 25.780 29.700 3920.000 0.475 49 67 -- --- 50 ---
32.229 33.834 29.700 32.400
33.834 34.034 32.400 32.600 200.000 0.914 49 67 40 50 -- ---
34.034 35.979 32.600 34.400
35.979 37.679 34.400 36.100 1700.000 1.237 49 67 -- --- 40 65
37.679 38.620 36.100 37.000
38.620 41.327 37.000 39.750 2750.000 1.494 49 67 -- --- 40 95
41.327 44.302 39.750 42.900
44.302 50.494 42.900 49.150 6250.000 1.103 49 67 -- --- 40 50
50.494 53.145 49.150 51.700
51.700 54.050 -- --- 50 ---
54.050 54.950 50 --- -- ---
54.950 58.200 -- --- 50 ---
59.620 62.020 58.200 60.600
62.020 62.709 60.600 61.300
62.709 64.327 61.300 62.925 1625.000 0.580 49 67 -- --- 50 ---
64.327 65.337 62.925 63.930
65.337 67.791 63.930 66.440 2510.000 0.642 49 67 -- --- 50 ---
67.791 68.616 66.440 67.140
68.616 70.090 67.140 68.680 1540.000 0.900 49 67 -- --- 40 50
70.090 71.000 68.680 69.590
71.000 72.000 69.590 70.800 1210.000 1.191 49 67 40 50 -- ---
72.000 72.980 70.800 71.580
72.980 79.270 71.580 77.900 6320.000 1.368 63 84 -- --- 40 90
79.270 80.510 77.900 79.150
79.150 88.500 -- --- 40 70
88.500 89.650 40 60 -- ---
89.650 91.400 40 60 -- ---
89.650 91.400 -- - 40 70
92.680 94.590 91.400 93.330
93.330 94.200 -- --- 40 100
94.200 94.700 40 90 -- ---
94.700 96.740 -- --- 40 100
98.050 102.793 96.740 101.660
102.793 104.800 101.660 103.540 1880.000 1.205 63 84 40 60 -- ---
104.800 115.000 103.540 113.140
Overlay Pavement Crust Thickness
Existing Chainage,
km
Design Chainage,
km
Length ofOverlay (m)
Characteristic
Deflections in
Pavement
Traffic (MSA)
Overlay Pavement Crust Thickness , mm
RECONSTRUCTION
Beawar - Pali Pali - Beawar
BEAWAR BYPASS
REALIGNMENT
SENDRA BYPASS
REALIGNMENT
RECONSTRUCTION
RECONSTRUCTION
BARR BYPASS
53.145 59.620 6500.000
VUP
RECONSTRUCTION
REALIGNMENT
RECONSTRUCTION
PIPLIKALAN BYPASS
CHANDAWAL BYPASS
0.711 49 67
RECONSTRUCTION
PUP
RECONSTRUCTION
RECONSTRUCTION
VUP
RECONSTRUCTION
80.510 92.680 12250.000 1.216 63 84
RECONSTRUCTION
94.590 98.050 3410.000 1.453 63 84
RECONSTRUCTION
RECONSTRUCTION
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
27/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 26 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
7.0 Flexible Pavement Design for Main Carriageway Widening, Reconstruction Sections,
and Approaches of Grade Separators
This section describes the philosophy and methods used to design the pavement crust for all
those sections of the pavement that will carry full strength cumulative traffic through their design
life. The sections that fall under this category are the widening portion of the main carriageway,
full depth reconstruction portions, and approaches of all grade separators such as flyover, VUP,
and PUP.
7.1 Discussion of Design CBR
The following discussion is based on a review of the CBR values of the subgrade as well as the
results of the tests conducted on borrow area soils. The design CBR was chosen on the basis of a
review of the test results and past experience on similar projects and conditions.
From the laboratory CBR testing program and results, it was seen that the CBR values of the
existing subgrade ranged from 6.5 to 27 percent. Atterberg’s limit test results on soil samples
indicated that most of the subgrade soils were non-plastic (NP). The plasticity index of the soil
samples ranged from 7 to 22.
From the results of the CBR testing program conducted for borrow areas, it was seen that from
the start of the project (existing chainage: 0+000 km) up to chainage 40+000 km, the CBR values
ranged from 10 to 21 percent. Based on this evaluation, a design CBR value of 10 percent was
adopted for this section of the project.
Testing in borrow areas from existing chainage 40+000 km up to the end of the project (existing
chainage: 115+000 km) indicated that the CBR values ranged from 14 to 36 percent. Based on
this evaluation, a design CBR value of 12 percent was adopted for this section of the project.
The design CBR values chosen for various sections of the road for this Project are tabulated
below in Table 7.1.
Table 7.1 Design CBR Values for Pavement Design
Homogeneous
SectionExisting Chainage, km Design Chainage, km Design CBR, %
1 0+000 to 40+000 0+000 to 38+420 10
2 40+000 to 115+000 38+420 to 113+143 12
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
28/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 27 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
7.2 Pavement Layer Thickness Design
The pavement was designed based on traffic parameters as outlined in Section 1.4.7.1. Pavement
sections recommended were based on a design period of 10 years for the bituminous layers.
However, in accordance with IRC: SP-84, “Manual of Specifications and Standards for Four
Laning of Highways through Public Private Partnership”, and the Concession Agreement, the
granular layers (base and subbase) were analyzed based on design life corresponding to the full
concession period (20 years)
The flexible pavement design was conducted in accordance with the guidelines stipulated in the
IRC: 37-2001. In general, the traffic loading in terms of million standard axles (MSA) was
determined using the data collected from the traffic surveys. The soil CBR was determined using
the data collected from soil investigations. Based on the CBR value, typical values for moduli of
various pavement layers were determined.
7.2.1 Methodology for Pavement Sections with Design CBR 10%
For the section of the project from design chainage 0+000 km to 38+420 km (existing chainage
0+000 to 40+000), the design CBR value adopted was 10 percent. Pavement design for this
section was accomplished using the recommended values for various pavement layers in IRC:
37-2001, Plate 2.
7.2.2 Methodology for Pavement Sections with Design CBR 12%
For the section of the project from design chainage 38+420 km to 113+143 km (existing
chainage 40+000 to 115+000), the design CBR value adopted was 12 percent. Pavement design
procedures for this section were accomplished using the analytical approach of flexible pavement
design, as outlined in IRC: 37-2001. Guidance for implementing the analytical approach is given
in Section 4.3 "Pavement Design Catalogue", Page 42, sub-section 4.3.2, and the required
parameters and equations are given in pages from 51 through 56 in the same IRC: 37-2001.
FPAVE software was used for this evaluation.
The allowable strains in pavement layers were calculated in terms of two primary pavement
distress criteria: fatigue cracking and rutting. The actual strains arising in the pavement layers
due to traffic loading were then calculated, assuming suitable thickness values for different
pavement layers. The assumed pavement crust was deemed to be safe for the design loads if the
actual strains were less that the allowable strains.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
29/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 28 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
7.2.2.1 Allowable Strains in the Pavement Structure
The allowable strains in the pavement layers were calculated primarily based on two pavement
distress criteria: fatigue cracking and rutting.
The distress of fatigue cracking is more critical in the bituminous layer in the pavement crust.
This type of cracking is usually initiated at the bottom of the bituminous layer after repeated
application of the axle loads. This initiation means that the actual horizontal tensile strain at the
bottom of the bituminous layer has exceeded a certain limit, which is the allowable strain. The
allowable tensile strains were calculated using the fatigue criteria equation as outlined in the
Appendix I of IRC: 37-2001. The equation is as follows.
Where;
The distress of rutting is more critical in the subgrade under the pavement crust. This type of
cracking is usually initiated at the top of the subgrade layer after repeated application of the axle
loads. This initiation means that the actual vertical compressive strain at the top of the subgrade
layer has exceeded a certain limit, which is the allowable strain. The allowable compressive
strains were calculated using the rutting criteria equation as outlined in the Appendix I of IRC:
37-2001. The equation is as follows.
Where;
7.2.2.2 Actual Strains in the Pavement Structure
The actual tensile strains were calculated using the various pavement design parameters as inputs
in the FPAVE program. The actual strains are computed using various trial pavement structural
layer combinations.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
30/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 29 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
The design and material parameters used for this project were in general accordance with the
postulates of the IRC: 37-2001, "Guidelines for the Design of Flexible Pavements", (Second
Revision).
The type of binder (bitumen) used was polymer modified binder (PMB), and the base binder is
of VG 30 grade. PMB is proven to enhance the performance of the pavement in terms of its load
carrying capacity under heavy traffic loads. The pavement temperature was taken as 35°C. In
accordance with IRC: 37-2001, the resilient modulus of the BC and DBM layer was chosen as
1700 MPa, which corresponds to 60/70 grade bitumen. The statistical level of reliability used in
the pavement design was 80 percent.
The various layer moduli and Poisson's ratios were calculated in accordance with the guidance
and equations given in IRC: 37-2001.
The tyre pressure used in the analysis was 0.56 MPa. Standard axle used was dual type, having a
mass of 8160 kg. This resulted in a single tyre load of 20,500 N.
7.3 Validation of Analytical Approach of Pavement Design Using Standard IRC Sections
Before generating pavement sections for 12% CBR using the FPAVE software, an exercise was
conducted in order to validate the usage of FPAVE with respect to the standard pavement design
sections given in IRC: 37-2001. In this exercise, three pavement sections given in the code for
CBR 10% and cumulative traffic of 50, 100, and 150 msa were chosen. FPAVE software was
run in order to calculate the actual tensile strains at the bottom of bituminous layer and actual
compressive strains at the top of the subgrade layer. It was found that the actual strains were well
within the allowable limits. It was also found that the pavement section thicknesses given in the
IRC in each case satisfied the requirement of optimum pavement crust.
7.4 Pavement Layer Thicknesses Recommendation
Table 7.2 below indicates the pavement thickness strategy for new pavement and reconstruction
sections of the project. The pavement design analysis parameters are indicated in Appendix 5.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
31/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 30 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Table 7.2 Recommendations for New Pavement Sections
Description
of Pavement
Section
Direction
Existing
Chainage
Limits,km
Design
Chainage
Limits,km
CBR,
%
Cumulative
Traffic, msa
Layer Thickness, mm
BC DBM WMM GSB
Homogenous
Section 1
Beawar to
Pali0+000 to
22+700
0+000 to
21+30010 62 40 120 250 200
Homogenous
Section 1
Pali to
Beawar0+000 to
22+700
0+000 to
21+30010 81 40 130 250 200
Homogenous
Section 2
Beawar to
Pali22+700 to
40+000
21+300 to
38+42010 49 40 110 250 200
Homogenous
Section 2
Pali to
Beawar22+700 to
40+000
21+300 to
38+42010 67 40 125 250 200
Homogenous
Section 2
Beawar to
Pali40+000 to
72+550
38+420 to
71+150 12 49 40 95 250 200
Homogenous
Section 2
Pali to
Beawar40+000 to
72+550
38+420 to
71+15012 67 40 110 250 200
Homogeneous
Section 3
Beawar to
Pali72+550 to
115+000
71+150 to
113+14312 63 40 110 250 200
Homogeneous
Section 3
Pali to
Beawar72+550 to
115+000
71+150 to
113+14312 84 40 120 250 200
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
32/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 31 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
8.0 Pavement Design (Flexible Pavement) for Service Road, and Slip Road of Flyover and
Underpass
This section describes the philosophy and methods used to design the pavement crust for all
those sections of the pavement that will carry nominal traffic through their design life. The
sections that fall under this category are the service roads, and slip roads of flyovers and
underpasses.
In accordance with the IRC: SP 84-2009, the roads that fall under this category were designed
for a cumulative traffic of 5 msa.
For the section of the project from design chainage 0+000 km to 38+420 km (existing chainage
0+000 to 40+000), the intended field CBR value is 10 percent. Pavement design for this section
was accomplished using the recommended values for various pavement layers in IRC: 37-2001,
Plate 1.
For the section of the project from design chainage 38+420 km to 113+143 km (existing
chainage 40+000 to 115+000), the intended CBR value is 12 percent. The design Plates in IRC:
37-2001 do not contain recommendations for CBR 12 percent. Since the layer thicknesses of
SDBC, DBM, WMM and GSB that are recommended for the combination of cumulative traffic
of 5 msa and CBR 10 percent are minimum that can be constructed practically, the same
pavement design was adopted for the section with CBR 12 percent.
Table 8.1 below summarizes the pavement design for service roads.
Table 8.1 Pavement Crust for Service Road
Description
of Pavement
Section
Direction
Existing
Chainage
Limits,
km
Design
Chainage
Limits,
km
CBR,
%
Cumulative
Traffic, msa
Layer Thickness, mm
SDBC DBM WMM GSB
Sections with
CBR 10%
Both
directions0+000 to
40+000
0+000 to
38+42010 5 25 50 250 150
Sections with
CBR 12%
Both
directions40+000 to
115+000
38+520 to
113+14312 5 25 50 250 150
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
33/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 32 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
9.0 Pavement Design (Rigid Pavement) for Toll Plaza
This section describes the philosophy and methods used to design the pavement crust for all
those sections of the pavement that will form a part of the toll plaza.
Rigid pavement design is worked out as per the method outlined in IRC 58-2002 for toll plaza
location. The design of rigid pavement is worked out for 30 years of design period.
The parameters used for the design of rigid pavement method are as follows:
9.1 Methodology
Rigid Pavement Design is worked out as per recommended in IRC 58-2002, the parameters used
for the design of rigid pavement method are as follows:
Concrete
Compressive Strength, f ck = 450 kg/cm2
Flexural modulus, f cr = 46.96 kg/cm2
Elastic modulus, Ec = 3 x 105kg/cm
2
Coefficient of thermal expansion, α =10 x 10-6
per0C
Poisson’s ratio, µ = 0.15
Other
Modulus of subgrade Reaction = 5.500 kg/cm2/cm
(Corresponding to Sub-grade CBR of 10% )
Load safety factor = 1.2
Tyre pressure = 8 kg/cm2
Since the soaked CBR value of the sub-grade borrow material is taken as 10%, it has a
‘ksg’ value of 5.500 kg/cm2/cm which is less than the suggested minimum, of 6.0 kg/cm
3,
required for placing the slab directly over sub-grade. As per the Table-4 of IRC 58-2002
the modified k-value of DLC sub- bases ‘ksb’ corresponding to 150 mm thickness is
41.700 kg/cm3.
The IRC Guidelines suggest 25% of traffic in one direction as sufficient for design
against fatigue failure.
Design Traffic
The Design traffic for 30 years is worked out based on the Continuous vehicle count
survey data and Axle Load Survey data as illustrated in the
Table 9.1 below
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
34/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 33 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Table 9.1 Design Traffic
At Ch. 34+000 At Ch. 93+000
Design life 30 years 30 years
Cumulative repetition in 30 years 125670523 155954465
Design Traffic (25% of total repetitions of
commercial vehicle)31417631 38988616
Average Number of Axles per Vehicle 2.05 2.25
No. of Axles for Design Traffic 64406144 87724386
The rigid pavement design is illustrated in Table 9.2 along with their joints detail.
Rigid Pavement comprising of 290 mm PQC as per IRC 58-2002, resting over 150mm DLC
over 150mm thick granular sub base. The design is found to be safe in fatigue stress, temperature
stress and corner stress.
Summary of Rigid pavement design is illustrated in Table 9.3.
Table 9.2 Design Calculations of Rigid Pavement
Location of Toll Plaza At Ch. 34+000 At Ch. 93+000
28 days Compressive Strength of Concrete fck 450 kg/cm2 450 kg/cm2
Flexural Strength of Concrete Fcr 46.96 kg/cm2 46.96 kg/cm2
Modulus of Elasticity of Concrete E 300000 kg/cm2 300000 kg/cm2
Poisson’s Ratio of Concrete µ 0.15 0.15
Coefficient of Thermal Expansion of
Concrete
a 10.0E-6 / oC 10.0E-6 / oC
Sub-grade CBR (%) 10.000 12.000
K Value of Sub grade Ksg 5.500 Kg/cm3 5.780 Kg/cm3
Dry lean concrete as Sub-base Type
Thickness of Dry Lean Concrete >= 10
cm
15 cm 15 cm
K Value of Sub-base Ksb 41.700 Kg/cm3 41.700 Kg/cm3
Assume Trail Slab Thickness h 29 cm 29 cm
Spacing of Contraction Joints L 4.5 m 4.5 m
Length of Slab (Lane Width) W 3.5 m 3.5 m
Radius of Relative Stiffness l 62.19 cm 62.19 cm
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
35/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 34 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Design of Dowel Bars
Percentage of load transfer 40 % 40 %
Joint width 2 cm 2 cm
Diameter of Dowel bar d 3.2 cm 3.2 cm
Design Wheel Load P 8000 kg 8000 kg
Assumed spacing between the dowel bars 22 cm 22 cm
Assumed length of dowel bars 50 cm 50 cm
Modulus of elasticity of Steel 2000000 Kg/cm2 2000000 Kg/cm2
Modulus of concrete / dowel interaction K 41500.000 kg /cm3 41500.000 kg /cm3
Permissible bearing stress in concrete Fb 328.82 Kg/cm2 328.82 Kg/cm2
No. of dowel bars required for load
transfer
4 No.s 4 No.s
Load transferred by dowel system Pt * 1.877 1.877
Load carried by outer dowel bar Pt 1704.42 kg 1704.42 kg
Moment of Inertia of Dowel bar MI 5.147 cm4 5.147 cm4
Relative stiffness of Dowel bar β 0.238 0.238
Bearing stress in dowel bar 314.35 Kg/cm2 314.35 Kg/cm2
SAFE SAFE
Design of Tie Bars (With Plain Bars)
Coefficient of friction f 1.5 1.5
Diameter of Tie bar (Range : 12 to 16 mm) 12 mm 12 mm
Density of Concrete 2400 kg/cm3 2400 kg/cm3
Select type of tie bar Plain Plain
Allowable tensile stress in tie bars 1250 Kg/cm2 1250 Kg/cm2
Allowable bond stress for tie bars 17.5 Kg/cm2 17.5 Kg/cm2
Area of steel bar per unit length 2.923 cm2 2.923 cm2
Cross sectional area of Tie bar 1.131 cm2 1.131 cm2
Perimeter of Tie bar 3.770 cm 3.770 cm
Spacing of Tie bars 38.69 cm 38.69 cm
Take Spacing of Tie bars 38 cm 38 cm
Length of Tie bar 42.857 cm 42.857 cm
Adopt Length of Tie bar (increase 10 cm
for loss of bond due to bending + 5 cm for
improper placement)
58 cm 58 cm
Design of Tie Bars (With Deformed Bars)
Coefficient of friction f 1.5 1.5
Diameter of Tie bar (Range : 12 to 16 mm) 12 mm 12 mm
Density of Concrete 2400 kg/cm 2400 kg/cm
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
36/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 35 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
Select type of tie bar Deformed Deformed
Allowable tensile stress in tie bars 2000 Kg/cm 2000 Kg/cm
Allowable bond stress for tie bars 24.6 Kg/cm2 24.6 Kg/cm2
Area of steel bar per unit length 1.827 cm2 1.827 cm2
Cross sectional area of Tie bar 1.131 cm 1.131 cm
Perimeter of Tie bar 3.770 cm 3.770 cm
Spacing of Tie bars 61.9 cm 61.9 cm
Take Spacing of Tie bars 61 cm 61 cm
Length of Tie bar 48.78 cm 48.78 cm
Adopt Length of Tie bar (increase 10 cm
for loss of bond due to bending + 5 cm for
improper placement)
64 cm 64 cm
Table 9.3 Rigid Pavement Design - Summary
S.No Design ParametersAt Ch.
34+000
At Ch.
93+000
1 Pavement Quality Concrete (PQC) (mm) 290 290
2 Dry Lean Concrete (DLC) (mm) 150 150
3 Granular Sub-base (GSB) (mm) 150 150
4 Subgrade (mm) 500 500
5 Characteristic Strength of Concrete (kg/cm2) 450 450
6 Slab length (m) 4.5 4.5
7 Slab width (m) 3.5 3.5
8 Joint width (mm) 20 20
9 Dowel bar diameter (mm) 32 32
10 Spacing of Dowel bar (mm) 22 22
11 Length of Dowel bar(mm) 500 500
12 Tie bar Diameter (mm) 12 12
13 Spacing of Tie bar (mm) (Plain/Deformed) 380/610 380/610
14 Length of Tie bar (mm) (Plain/Deformed) 580/640 580/640
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
37/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T SHEET 36 of 36
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
10.0 Conclusion
The findings and recommendations of this pavement design report are summarized as follows:
1. Four-laning of Beawar to Pali section of NH-14 in the State of Rajasthan starts from
design chainage 0+000 km in Beawar town up to chainage 113+143 km in Pali town.
2. Project corridor is divided into the following three (3) homogeneous sections, the limits
of which are expressed hereunder in terms of design chainages:
a. Homogeneous Section 1: km 0+000 to km 21+300
b. Homogeneous Section 2: km 21+300 to km 71+150
c. Homogeneous Section 3: km 71+150 to km 113+143
3. Overlay Design: The recommended overlay design is given in Table 6.1 Appendix 4.
4. New Pavement Design:
a. A CBR values of 10 percent is used from design chainage 0+000 km up to
38+420 km. From chainage 38+420 km up to chainage 113+143 km, a design
CBR value of 12 percent is used.
b. The recommended pavement design is indicated in Error! Reference source not
found., and Appendix 5.
5. Service Road Design: The recommended service road design is given in Table 8.1.
6. Rigid Pavement Design: The recommended rigid pavement design is given in Table 9.3.
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
38/119
L&T Construction Document No.
Infrastructure O11238-C-RP-RD-PD-0001
EDRC&T
Beawar-Pali-Pindwara Road Project (BPPRP)
(Beawar to Pali Section)
APPENDIX 1
Pavement Condition Survey Data
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
39/119
Project: NH 14 (Beawar ‐ Pali) Chainage:
Name of Investigator: Anudeep, Ranjith Kumar & Satish Kumar Date:
From To Cracks Pot holes Ravelling Bleeding Patching
9+600 9+700 G F
9+700 9+800 G F 6838 (SC)
9+800 9+900 2 G F 6839
9+900 10+000 G F 6840-41
10+000 10+100 2 G F 6842
10+100 10+200 G F 6843
10+200 10+300 3 G F
10+300 10+400 G F 6844 (SC)
10+400 10+500 G F
10+500 10+600 8 2 G F 6845-46 ,7295
18+000 18+100 2 G F 730518+100 18+200 G F 7306
18+200 18+300 G F 7307
18+300 18+400 5 G F 6866
18+400 18+500 G F 7308
18+500 18+600 G F 6867
Remarks ShoulderCondition
Chainage Rutting(mm)
Distressess in (%) PavementCondition
PAVEMENT CONDITION SURVEY
18+600 18+700 G F 6868-69
18+700 18+800 G F 6870
18+800 18+900 G F 6871
18+900 19+000 G F 6872
19+000 19+100 G F 6873-74
19+100 19+200 15 F F 7309
19+200 19+300 10 20 F F 6875 ,7310
19+300 19+400 20 40 F F 6876 ,7311 , 731219+400 19+500 10 20 F F 6878 , 7313
19+500 19+600 20 F F 6879 , 7314
19+600 19+700 10 F F 6880 , 7315
19+700 19+800 5 G F 6881
19+800 19+900 5 25 F F 6882 ,7316-17
19+900 20+000 G F 6883-84
Page 1 of 20
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
40/119
From To Cracks Pot holes Ravelling Bleeding PatchingRemarks
Shoulder
Condition
Chainage Rutting
(mm)
Distressess in (%) Pavement
Condition
20+000 20+100 5 3 5 3 F F 690-691 , 7318
20+100 20+200 3 15 F F 692-93 ,7319
20+200 20+300 5 5 10 10 F F 694-95 , 7320-21
20+300 20+400 15 5 F F 696 , 7322
20+400 20+500 2 G F 697
20+500 20+600 2 G F 698
20+600 20+700 3 G F 699 , 7323
20+700 20+800 G F 700
20+800 20+900 G F 701
20+900 21+000 10 F F 702-03 , 7324
21+000 21+100 15 10 F F 704-05 ,7325
21+100 21+200 15 10 3 F F 706
21+200 21+300 5 5 F F 707
21+300 21+400 10 3 3 F F 708-10
21+400 21+500 G F 7326
21+500 21+600 G F 711 , 7327
21+600 21+700 50 10 5 20 VP F 712-13 , 7328-29
21+700 21+800 2 G F 716 , 7330
21+800 21+900 15 G F 717-18 , 7331
21+900 22+000 2 10 G F 719
22+000 22+100 15 3 G F 7332
22+100 22+200 G F 6721
22+300 22+400 2 G F 6723
22+400 22+500 3 3 10 F F 6724
22+500 22+600 5 10 10 F F 7333
22+600 22+700 5 G F 6725
22+700 22+800 G F 7334
22+800 22+900 5 15 F F 6726 , 7335
26+100 26+200 G F 7337
26+200 26+300 2 G F 7338
26+300 26+400 10 2 F F 7339-40
26+400 26+500 10 3 F F 7341
26+500 26+600 2 2 G F 7342
26+600 26+700 3 G F
Page 2 of 20
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
41/119
From To Cracks Pot holes Ravelling Bleeding PatchingRemarks
Shoulder
Condition
Chainage Rutting
(mm)
Distressess in (%) Pavement
Condition
26+700 26+800 5 2 G F 7343
26+800 26+900 3 G F 7344
26+900 27+000 G F
27+000 27+100 G F 7345
27+100 27+200 G F 6763
27+200 27+300 15 G F 7346
27+300 27+400 3 G F 7347
27+400 27+500 5 3 G F 6764 ,7348
27+500 27+600 G F 6765
27+600 27+700 2 G F 7349
27+700 27+800 2 G F 7350
27+800 27+900 G F 7351
27+900 28+000 G F 6767-766
28+000 28+100 G F 7352
28+100 28+200 G F 7353
28+200 28+300 10 10 F F 7354-55
28+300 28+400 12 G F 7356
28+400 28+500 G F 7357
28+500 28+600 25 5 F F 7358-59
28+600 28+700 10 10 F F 7360-61
28+700 28+800 G F 7362
28+800 28+900 G F 7363
- , -
29+000 29+100 15 F F 7366
29+100 29+200 5 G F 6771 , 7367
29+200 29+300 G F 7368
29+300 29+400 4 G F 7369
29+400 29+500 G F 7370
29+500 29+600 G F 6772
29+600 29+700 G F 6773
29+700 29+800 G F 7371
29+800 29+900 G F 7372
29+900 30+000 G F 6774-75
30+000 30+100 G F 7373
30+100 30+200 G F 7374
30+200 30+300 G F 7375
Page 3 of 20
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
42/119
From To Cracks Pot holes Ravelling Bleeding PatchingRemarks
Shoulder
Condition
Chainage Rutting
(mm)
Distressess in (%) Pavement
Condition
30+300 30+400 G F 7376
30+400 30+500 G F 7377
30+500 30+600 G F 7378
30+600 30+700 G F 7379
30+700 30+800 G F 7380
30+800 30+900 G F 7381
30+900 31+000 G F 6776-78
31+000 31+100 5 G F 7382
31+100 31+200 5 G F 6779 , 7383
31+200 31+300 G F 6780 , 7384
31+300 31+400 G F 6781 , 7385
31+400 31+500 G F 7386
31+500 31+600 G F 7387
31+600 31+700 G F 7388
31+700 31+800 5 5 G F 7389-90
31+800 31+900 G F 7391
31+900 32+000 G F 782-83 ,7392
32+000 32+100 10 F F 7393
32+100 32+200 5 3 G F 7394
32+200 32+300 5 5 10 G F 7395-96
32+300 32+400 10 10 G F 7397-98
32+400 32+500 5 15 5 G F 7399
32+600 32+700 5 10 5 G F 7401-02
32+700 32+800 8 10 G F 7403-04
32+800 32+900 25 P F 7405-06
32+900 33+000 3 15 F F 7407-08
33+000 33+100 15 3 F F 7409
33+100 33+200 25 P F 7410
33+200 33+300 20 P F 7411
33+300 33+400 2 G F
33+400 33+500 3 G F
33+500 33+600 30 10 P F 7412
33+600 33+700 25 5 P F 7413
33+700 33+800 5 3 G F 7414
33+800 33+900 G F
Page 4 of 20
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
43/119
From To Cracks Pot holes Ravelling Bleeding PatchingRemarks
Shoulder
Condition
Chainage Rutting
(mm)
Distressess in (%) Pavement
Condition
33+900 34+000 10 G F
36+000 36+100 10 30 5 5 P F
36+100 36+200 40 5 VP F 7416-17
36+200 36+300 20 P F 7418-19
36+300 36+400 25 5 P F 7420
36+400 36+500 30 10 P F 7421
36+500 36+600 25 3 P F 7422
36+600 36+700 25 P F 7423-24
36+700 36+800 30 3 P F 7425
36+800 36+900 5 3 G F 7426
36+900 37+000 20 3 P F 6611-613
37+000 37+100 25 P F 6615-616
37+100 37+200 35 VP F 6617
37+200 37+300 20 10 P F 6618-19 , 7427
37+300 37+400 20 P F 6620
37+400 37+500 10 F F 6621
37+500 37+600 40 VP F 6622
37+600 37+700 20 P F 6623
37+700 37+800 20 P F 6624
37+800 37+900 20 P F 6625
37+900 38+000 30 P F 6626-27
38+100 38+200 10 F F 7429
38+200 38+300 5 G F 7430
38+300 38+400 12 F F 7431
38+400 38+500 5 3 G F 7432
38+500 38+600 15 F F 7433
38+600 38+700 10 F F 7434
38+700 38+800 5 G F 7435
38+800 38+900 10 F F 7436
38+900 39+000 G F 6629-30
39+000 39+100 5 3 G F 6631
39+100 39+200 10 5 F F 7437
39+200 39+300 25 10 P F 7438-39
39+300 39+400 10 10 F F 7440
Page 5 of 20
8/21/2019 Revised Pavement Design - Beawar Pali Section.pdf
44/119
From To Cracks Pot holes Ravelling Bleeding PatchingRemarks
Shoulder
Condition
Chainage Rutting
(mm)
Distressess in (%) Pavement
Condition
39+400 39+500 25 10 P F 7441-42
39+500 39+600 10 3 F F 7443
39+600 39+700 15 5 F F 7444
39+700 39+800 30 3 10 P F 7445-46
39+800 39+900 30 10 P F 7447-48
39+900 40+000 35 10 VP 0 7449-50
40+000 40+100 5 G F 7451
40+100 40+200 3 G F 7452
40+200 40+300 5 10 F F 7453
40+300 40+400 10 10 P F 7454
40+400 40+500 25 10 P F 7455-56
40+500 40+600 15 2 F F 7457
40+600 40+700 15 5 F F 7458
40+700 40+800 15 5 F F 7459
40+800 40+900 15 F F 7460
40+900 41+000 5 3 G F 7461
41+000 41+100 5 5 G F 7462-63
41+100 41+200 10 F F 7464
41+200 41+300 5 3 G F 7465
44+700 44+