Transmitted via electronic mail and express courier
February 21 2007
Mr Dean Tagliaferro EPA Project Coordinator United States Environmental Protection Agency co Weston Solutions Inc 10 Lyman Street PIttsfield MA 01201 Re GE-PittsfieldHousatonic River Site
Hill 78 On-Plant Consolidation Area (GECD220)
Dear Mr Tagliaferro
The General Electric Company (GE) has prepared this letter to present information requested by the US Environmental Protection Agency (EPA) in a February 13 2007 e-mail from EPA to GE Presented below are EPAs questions with each followed by GEs response
EPA Ouestion 1 What is the remaining capacity in the Hill 78 OPCA for waste material
GE Response 1 The remaining capacity in the Hill 78 OPCA for future material consolidation is estimated to be 17400 cubic yards This volume has been calculated based on a topographic survey conducted ofthe existing OPCA surfaces as of December 2006 and then comparing that information to the fmal designconfiguration ofthe OPCA
EPA Ouestion 2 The final capping design ofthe 19 acres of Hill 78 OPCA was approved by EPA last year Provide a firm start date for the capping of this 19 acres and an estimated duration for the capping ofthe 19 acres
GE Response 2 GE is planning to start on the capping ofthe 19-acre portion of this OPCA previously approved by EPA at the beginning of the 2007 construction season this spring Once initiated it is anticipated that activities associated with capping this 19-acre portion will take approximately eight weeks depending on site conditions at the time of construction
EPA Ouestion 3 The entire Hill 78 OPCA and cap encompass 60 acres Please submit the final capping design for the 41 acres by April 15 2007 so the Agencies will have sufficient time to review and approve the submittal in time to allow for final capping in the summer and fall of 2007
GE Response 3 Construction details and specifications associated with capping the remaining portion ofthe Hill 78 OPCA (ie the cap area beyond the 19 acres already approved by EPA) were included in GEs 2006 Consolidation and Phase II Final Cover Construction document which was submitted to EPA on May 5
VGE_Pittsfield_CD_OPCAsCon-espondenceFinal017711202doc
Corporote Environmentol Programs
Mr Dean Tagliaferro February 21 2007
Page 2 of 3
2006 That document was conditionally approved by EPA on August 1 2006 and in response to EPAs conditional approval letter and subsequent communications between EPA and GE GE submitted an Addendum to Phase II Final OPCA Cover Construction Plan on August 25 2006 which was approved by EPA on August 29 2006 Although those documents focused largely on the Phase II capping activities planned for 2006 the 2006 Phase II Final Cover Construction document also provided fmal cover construction details for the entirety of the Hill 78 OPCA and the additional cover installation procedures described in the August 2006 Addendum will also apply to capping the entire Hill 78 OPCA GE will reshysubmit this design and implementation information as it relates to the capping ofthe remaining 41-acre portion ofthe Hill 78 OPCA to EPA for approval by April 15 2007 as requested
EPA Ouestion 4 Provide a firm schedule for the placement of the remaining material Into the Hill 78 OPCA
GE Response 4 It is anticipated that the majority of the remaining capacity at the Hill 78 OPCA will be utilized for the consolidation of building demolition debris Buildings 7 17 17C and 19 as well as Buildings 11 16 and 16X are currently slated for demolition in 2007 The demolition debris materials from those buildings that are not approved for re-use as backfillgrading material at portions ofthe GE plant site (and that are suitable for disposition at the Hill 78 OPCA) will be transported to and consolidated at the Hill 78 OPCA GE cannot provide a firm schedule for placing such demolition debris into the Hill 78 OPCA because the timeframe for doing so is dependent on a number of factors
bull For Buildings 7 17 17C and 19 the structural demolition cannot be initiated until approvals have been obtained for the disposition of the building demolition debris GEs proposed disposition methods for the materials from these buildings have been submitted to EPA in draft Once the demolition is initiated GE estimates that the structural demolition of these buildings and subsequent handling segregation processing and transport to the Hill 78 OPCA ofthe demolition debris that will not be used on-site will require approximately 4 to 6 months
bull For Buildings 11 16 and 16X the structural demolition cannot begin until approvals have been obtained for the disposition of the building demolition debris (for which GE anticipates submitting a proposal to EPA by around the end of March 2007) and the asbestos abatement program has been completed (approximately July 2007) Once initiated GE estimates that the structural demolition of these buildings and subsequent debris handling segregation processing and transport to the Hill 78 OPCA will require approximately 6 to 8 months
EPA Ouestion 5 Provide a firm schedule for the capping of remaining 41 acres ofthe Hill 78 OPCA
GE Response 5 For the reasons described above GE cannot provide a firm schedule for capping the remaining 41-acre portion of the OPCA It is GEs intent to cap that remaining portion as soon as practicable after completion of the consolidation material placement in that area GE anticipates that this capping will be performed in 2008 As we have done in the past GE will continue to coordinate with EPA concerning the status of OPCA operations including the scope and schedule for fiiture capping activities
EPA Ouestion 6 Provide an estimated schedule for the relocation ofthe storm and sewer lines currently located in the Hill 78 OPCA
GE Response 6 GE anticipates that the activities necessary to install the new stormwater and sanitary sewer pipeline sections (soil investigations detailed design approvals contractor bidding and selection etc) can be completed in 2007 GE submitted its Supplemental Sampling Plan for the soil investigations along the
VGE_Pittsfield_CD_OPCAsCorrespondenceFinal017711202doc
Mr Dean Tagliaferro February 21 2007
Page 3 of3
planned routes of these re-routed pipelines on February 19 2007 That plan proposes submission ofa Supplemental Sampling and Engineering Design Report within 120 days after EPA approval of the Supplemental Sampling Plan
EPA Ouestion 7 Provide the results of the 20062007 survey that shows the current elevations of the OPCAs Also provide a plan view of the Hill 78 OPCA that identifies where the remaining waste material will be placed
GE Response 7 Survey maps showing the current surface elevations ofthe Hill 78 OPCA (as of December 2006) and the final consolidation elevations for the Building 71 OPCA (prior to capping) are included as an attachment to this letter A figure depicting the areas within the Hill 78 OPCA that remain available for consolidation material placement is also included as an attachment to this letter (Figure 1)
Please feel free to contact me ifyou have any additional questions
Sincerely
t Richard Gates Remedial Project Manager
Attachments
cc Rich Cavagnero EPA Bob Cianciarulo EPA John Kilborn EPA Richard Hull EPA Susan Steenstrup MDEP Anna Symington MDEP Mayor James Ruberto City of Pittsfield Tom Hickey Director PEDA Michael Carroll GE Andrew Silfer GE James Bieke Goodwin Procter James Nuss ARCADIS BBL Samuel Gutter Sidley Austin
VGE_Pittsfield_CD_OPCAsCorrespondenceFinal0177ll202doc
ARCADIS BBL
Figure 1
Hill 78 Remaining Consolidation Fill
Area
LEGEND
9 SU inCY BOtCHUARK fgtS^Si^^sl^i^tA RPRAP
SAS l U K X E R CENTERUNE DITCH
T SUY AigCHOR ABOVE GROUND S1EAU PIPE
laquo U O M T O W G a E l L DRAINACE UNES
laquo W A U R SUPPLY laquo E U OVERHEAD UTIUTY
reg SANITARY M A m O L E CHAIN UNK FENCE
a CATCH flASIN WOOD STOCKADE FENCE
IE INDEX CONTOUR UNE
H WATIR METER PIT INTERMEDIATE CONTOUR UNE
O ELEC1RIC MANHOLE VEGETATION
1 1 i n i U T Y P O l pound lpoundACHATE COLLECTION FORCEMAW
IXI WATER VALVE IMDERGROUND ELEC1TlaquoC UNES
w F)RE HYDRANT SEIER
bull BOOARD REMAINING CONSOUDATION FILL AREA
a WELL
e T l
UMIT OF EXISTINGCOVER (SCE NOTE
FINAL 5)
NOTES
APPROXIMATE UMIT OF FINAL COVER GRADING (SEE NOTE 6
N F P|-nSFIELD GENERA-nNG COMPANY FACILITY
1 BASE MAP INFORMATION SHOWN ON THIS DRAWING WAS DEVELOPED FROM FELD SURVEY DATA OBTAINED BY 8LASLAND BOUCK i l LpoundE INC ON 2 1 0 9 9 AS-BUILT R O D SURVEY OBTAINED BY MAXVMILUAN TECHNOLOGIES AND PREPARED BY HILL ENSNEERS ARCHITECTS tt PLANNERS INC ON 1 1 9 0 0 (CADD FILE NO M X - 3 6 - 2 0 W G ) FIELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS amp PLANNERS INC ON 3 8 0 0 ANO 3 1 4 0 0 (CADD RLE NO SRV-4541i3WG) REVISION A FIELD SURVEY OF THE BUILDING 71 OPCA ADJACENT AREA TO THE WEST AND IHE STORMWATER SASIN TO THE NORTHVEST OBTAINED BY SK DESIGN GROUP INC ON 12 a O O (PROJECT NO 000156) FIELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS amp PLANNERS INC ON 1 2 2 7 0 1 AS-BUILT FIELD SURVEY OBTAINED BY DR BILLINGS ANO PREPARED BY SK DESIGN GROUP INC ON 1 1 2 5 0 3 1 7 0 4 (PROJECT NO 020085-LDO) 1 0 6 0 6 (PROJECT NO 0 2 0 0 8 5 - A B I 0 - 0 6 - 0 6 ) ANO 1 2 1 1 0 6 (PROJECT NO 0 2 0 0 a 5 - A 6 - 1 2 - 1 1 - 0 6 ) HELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS i PLANNERS INC IN JANUARY 2005 AND FIELD SURVEY OBTAINED BY DR BILLLINGS AND PREPARED BY SK DESIGN GROUP INC ON 1 2 3 0 6 (PROJECT NO 0 2 0 0 a 5 - A B - 1 - 2 3 - 0 6 ) CERTAIN FEATURES SHOWN MAY BE APPROXIMATE SINCE SNOW AND ICE ACCUMULATIONS WERE PRESENT AT THE TIME OF CERTAIN SURVEYS
2 ELEVATIONS SHOWN ARE REFERENCED TO NATIONAL GEODETIC VERTICAL DATUM (NGVD 1929)
3 HORIZONTAL DATUM IS REFERENCED TO THE MASSACHUSETTS STATE PLANE COORDINATE SYSTEM (NAD 1927)
4 CONTOUR INTERVAL EQUALS 1 FOOT
5 UMIT OF EXISTING FINAL COVER REPRESENTS EDGE OF FULL THICKNESS FINAL COVER (I8 EDGE OF COVER GEOMEMBRANE)
6 UMIT OF RNAL COVER GRADING EXTENDS BEYOND EDGE OF COVER GEOMEMBRANE BUT DOES NOT INCLUDE GRADING ASSOCIATED WITH PERIMETER DITCHES OF ACCESS ROADS LOCATED ALONG SOUTHERLY AND WESTERLY SIDES OF THE HILL 7 8 OPCA
SP - ij--^j^lt^yjiy-c^w ^Uss-fyifyfi reg P-
GRAPHIC SCALE
l GENERAL ELECTRIC COMPANY -iS- PITTSFIELD MASSACHUSETTS
HILL 78 AND BUILDING 71 OPCAs
HILL 78 REMAINING y ^
CONSOLIDATION FILL AREA
HGURE
lt^ ARCADIS BBL hfrastTuaur^ environment facilities 1
ARCADIS BBL
Attachment A
Drawing No 1 Phase II As-Built
(Top of Liner) dated October 6 2006
Of
N 53580000
N53i75COO
N 53570000
N 53555000
fS - bull
6d y
X y
y
y
y N 53595000
y
DMH y
y y
y
y y
shy
y
y
y
y
3590000
OUTLET STRUCTURE RIM 101763 INV 101330
BASIN
s v
N
N 53585000
1020 i ^ 1_II bull
EDGE OF LINER-
tfmdash 102S
- ^ y f~x^-j^-mdashy
ddird^-^^^trade^-shy
iy^dr------Er^
mdash1030
103S
1040 _ _
fifll II 1111 id fltiijgt j r ^ ^ z ^ y - y
^ x J -
N r
J bull
V
t
N 53580000
rryy-y- fdjy---shyJ y - shy -shyr-yy Lid i r W bull gt
mdash
-1035
1040
EDGE OF LINER
N 53575000
bullH(Ma
Nshy
N 53570000
V^
^ d WW lt
EDGE OF U N E R A W ^
bull
(
y
y
y
^ ^
w ^
i y y ^ y y y y y
f y y
y y y y y -
I yyyy ^ shy ryyyy^-
I Wd f (ddyy [ VidHiliildfW
yy-UiUm-Ul-U-m shy
^
bull - mdash = - - lt - - ^ y y y ^ d i
N 53555000
O
PROJECT NO 020085-AB10-06-06
DRAWN BY JES
Civil Engineers Surveyors Consultants
2 FEDERXX) DRIE bull PITTSFEU) HASSACHUSETIS 01201 bull (413)443-3537
DATE NOVEMBER 21 2006
SCALE r = 20
DESIGNED BY NA
APPROVED BY JES
LAYOUT DRAWINGS OF
GENERAL ELECTRIC PLANT PREPARED FOR
DR BILLINGS PirTSHEia MASSACHUSETTS
AS-BUILT LINER
DWG NO
A
ARCADIS BBL
Attachment B
Drawing No 1 Hill 78 OPCA and
Phase I Cover As-Built dated
December 11 2006
iJIS shy
Mr Dean Tagliaferro February 21 2007
Page 2 of 3
2006 That document was conditionally approved by EPA on August 1 2006 and in response to EPAs conditional approval letter and subsequent communications between EPA and GE GE submitted an Addendum to Phase II Final OPCA Cover Construction Plan on August 25 2006 which was approved by EPA on August 29 2006 Although those documents focused largely on the Phase II capping activities planned for 2006 the 2006 Phase II Final Cover Construction document also provided fmal cover construction details for the entirety of the Hill 78 OPCA and the additional cover installation procedures described in the August 2006 Addendum will also apply to capping the entire Hill 78 OPCA GE will reshysubmit this design and implementation information as it relates to the capping ofthe remaining 41-acre portion ofthe Hill 78 OPCA to EPA for approval by April 15 2007 as requested
EPA Ouestion 4 Provide a firm schedule for the placement of the remaining material Into the Hill 78 OPCA
GE Response 4 It is anticipated that the majority of the remaining capacity at the Hill 78 OPCA will be utilized for the consolidation of building demolition debris Buildings 7 17 17C and 19 as well as Buildings 11 16 and 16X are currently slated for demolition in 2007 The demolition debris materials from those buildings that are not approved for re-use as backfillgrading material at portions ofthe GE plant site (and that are suitable for disposition at the Hill 78 OPCA) will be transported to and consolidated at the Hill 78 OPCA GE cannot provide a firm schedule for placing such demolition debris into the Hill 78 OPCA because the timeframe for doing so is dependent on a number of factors
bull For Buildings 7 17 17C and 19 the structural demolition cannot be initiated until approvals have been obtained for the disposition of the building demolition debris GEs proposed disposition methods for the materials from these buildings have been submitted to EPA in draft Once the demolition is initiated GE estimates that the structural demolition of these buildings and subsequent handling segregation processing and transport to the Hill 78 OPCA ofthe demolition debris that will not be used on-site will require approximately 4 to 6 months
bull For Buildings 11 16 and 16X the structural demolition cannot begin until approvals have been obtained for the disposition of the building demolition debris (for which GE anticipates submitting a proposal to EPA by around the end of March 2007) and the asbestos abatement program has been completed (approximately July 2007) Once initiated GE estimates that the structural demolition of these buildings and subsequent debris handling segregation processing and transport to the Hill 78 OPCA will require approximately 6 to 8 months
EPA Ouestion 5 Provide a firm schedule for the capping of remaining 41 acres ofthe Hill 78 OPCA
GE Response 5 For the reasons described above GE cannot provide a firm schedule for capping the remaining 41-acre portion of the OPCA It is GEs intent to cap that remaining portion as soon as practicable after completion of the consolidation material placement in that area GE anticipates that this capping will be performed in 2008 As we have done in the past GE will continue to coordinate with EPA concerning the status of OPCA operations including the scope and schedule for fiiture capping activities
EPA Ouestion 6 Provide an estimated schedule for the relocation ofthe storm and sewer lines currently located in the Hill 78 OPCA
GE Response 6 GE anticipates that the activities necessary to install the new stormwater and sanitary sewer pipeline sections (soil investigations detailed design approvals contractor bidding and selection etc) can be completed in 2007 GE submitted its Supplemental Sampling Plan for the soil investigations along the
VGE_Pittsfield_CD_OPCAsCorrespondenceFinal017711202doc
Mr Dean Tagliaferro February 21 2007
Page 3 of3
planned routes of these re-routed pipelines on February 19 2007 That plan proposes submission ofa Supplemental Sampling and Engineering Design Report within 120 days after EPA approval of the Supplemental Sampling Plan
EPA Ouestion 7 Provide the results of the 20062007 survey that shows the current elevations of the OPCAs Also provide a plan view of the Hill 78 OPCA that identifies where the remaining waste material will be placed
GE Response 7 Survey maps showing the current surface elevations ofthe Hill 78 OPCA (as of December 2006) and the final consolidation elevations for the Building 71 OPCA (prior to capping) are included as an attachment to this letter A figure depicting the areas within the Hill 78 OPCA that remain available for consolidation material placement is also included as an attachment to this letter (Figure 1)
Please feel free to contact me ifyou have any additional questions
Sincerely
t Richard Gates Remedial Project Manager
Attachments
cc Rich Cavagnero EPA Bob Cianciarulo EPA John Kilborn EPA Richard Hull EPA Susan Steenstrup MDEP Anna Symington MDEP Mayor James Ruberto City of Pittsfield Tom Hickey Director PEDA Michael Carroll GE Andrew Silfer GE James Bieke Goodwin Procter James Nuss ARCADIS BBL Samuel Gutter Sidley Austin
VGE_Pittsfield_CD_OPCAsCorrespondenceFinal0177ll202doc
ARCADIS BBL
Figure 1
Hill 78 Remaining Consolidation Fill
Area
LEGEND
9 SU inCY BOtCHUARK fgtS^Si^^sl^i^tA RPRAP
SAS l U K X E R CENTERUNE DITCH
T SUY AigCHOR ABOVE GROUND S1EAU PIPE
laquo U O M T O W G a E l L DRAINACE UNES
laquo W A U R SUPPLY laquo E U OVERHEAD UTIUTY
reg SANITARY M A m O L E CHAIN UNK FENCE
a CATCH flASIN WOOD STOCKADE FENCE
IE INDEX CONTOUR UNE
H WATIR METER PIT INTERMEDIATE CONTOUR UNE
O ELEC1RIC MANHOLE VEGETATION
1 1 i n i U T Y P O l pound lpoundACHATE COLLECTION FORCEMAW
IXI WATER VALVE IMDERGROUND ELEC1TlaquoC UNES
w F)RE HYDRANT SEIER
bull BOOARD REMAINING CONSOUDATION FILL AREA
a WELL
e T l
UMIT OF EXISTINGCOVER (SCE NOTE
FINAL 5)
NOTES
APPROXIMATE UMIT OF FINAL COVER GRADING (SEE NOTE 6
N F P|-nSFIELD GENERA-nNG COMPANY FACILITY
1 BASE MAP INFORMATION SHOWN ON THIS DRAWING WAS DEVELOPED FROM FELD SURVEY DATA OBTAINED BY 8LASLAND BOUCK i l LpoundE INC ON 2 1 0 9 9 AS-BUILT R O D SURVEY OBTAINED BY MAXVMILUAN TECHNOLOGIES AND PREPARED BY HILL ENSNEERS ARCHITECTS tt PLANNERS INC ON 1 1 9 0 0 (CADD FILE NO M X - 3 6 - 2 0 W G ) FIELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS amp PLANNERS INC ON 3 8 0 0 ANO 3 1 4 0 0 (CADD RLE NO SRV-4541i3WG) REVISION A FIELD SURVEY OF THE BUILDING 71 OPCA ADJACENT AREA TO THE WEST AND IHE STORMWATER SASIN TO THE NORTHVEST OBTAINED BY SK DESIGN GROUP INC ON 12 a O O (PROJECT NO 000156) FIELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS amp PLANNERS INC ON 1 2 2 7 0 1 AS-BUILT FIELD SURVEY OBTAINED BY DR BILLINGS ANO PREPARED BY SK DESIGN GROUP INC ON 1 1 2 5 0 3 1 7 0 4 (PROJECT NO 020085-LDO) 1 0 6 0 6 (PROJECT NO 0 2 0 0 8 5 - A B I 0 - 0 6 - 0 6 ) ANO 1 2 1 1 0 6 (PROJECT NO 0 2 0 0 a 5 - A 6 - 1 2 - 1 1 - 0 6 ) HELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS i PLANNERS INC IN JANUARY 2005 AND FIELD SURVEY OBTAINED BY DR BILLLINGS AND PREPARED BY SK DESIGN GROUP INC ON 1 2 3 0 6 (PROJECT NO 0 2 0 0 a 5 - A B - 1 - 2 3 - 0 6 ) CERTAIN FEATURES SHOWN MAY BE APPROXIMATE SINCE SNOW AND ICE ACCUMULATIONS WERE PRESENT AT THE TIME OF CERTAIN SURVEYS
2 ELEVATIONS SHOWN ARE REFERENCED TO NATIONAL GEODETIC VERTICAL DATUM (NGVD 1929)
3 HORIZONTAL DATUM IS REFERENCED TO THE MASSACHUSETTS STATE PLANE COORDINATE SYSTEM (NAD 1927)
4 CONTOUR INTERVAL EQUALS 1 FOOT
5 UMIT OF EXISTING FINAL COVER REPRESENTS EDGE OF FULL THICKNESS FINAL COVER (I8 EDGE OF COVER GEOMEMBRANE)
6 UMIT OF RNAL COVER GRADING EXTENDS BEYOND EDGE OF COVER GEOMEMBRANE BUT DOES NOT INCLUDE GRADING ASSOCIATED WITH PERIMETER DITCHES OF ACCESS ROADS LOCATED ALONG SOUTHERLY AND WESTERLY SIDES OF THE HILL 7 8 OPCA
SP - ij--^j^lt^yjiy-c^w ^Uss-fyifyfi reg P-
GRAPHIC SCALE
l GENERAL ELECTRIC COMPANY -iS- PITTSFIELD MASSACHUSETTS
HILL 78 AND BUILDING 71 OPCAs
HILL 78 REMAINING y ^
CONSOLIDATION FILL AREA
HGURE
lt^ ARCADIS BBL hfrastTuaur^ environment facilities 1
ARCADIS BBL
Attachment A
Drawing No 1 Phase II As-Built
(Top of Liner) dated October 6 2006
Of
N 53580000
N53i75COO
N 53570000
N 53555000
fS - bull
6d y
X y
y
y
y N 53595000
y
DMH y
y y
y
y y
shy
y
y
y
y
3590000
OUTLET STRUCTURE RIM 101763 INV 101330
BASIN
s v
N
N 53585000
1020 i ^ 1_II bull
EDGE OF LINER-
tfmdash 102S
- ^ y f~x^-j^-mdashy
ddird^-^^^trade^-shy
iy^dr------Er^
mdash1030
103S
1040 _ _
fifll II 1111 id fltiijgt j r ^ ^ z ^ y - y
^ x J -
N r
J bull
V
t
N 53580000
rryy-y- fdjy---shyJ y - shy -shyr-yy Lid i r W bull gt
mdash
-1035
1040
EDGE OF LINER
N 53575000
bullH(Ma
Nshy
N 53570000
V^
^ d WW lt
EDGE OF U N E R A W ^
bull
(
y
y
y
^ ^
w ^
i y y ^ y y y y y
f y y
y y y y y -
I yyyy ^ shy ryyyy^-
I Wd f (ddyy [ VidHiliildfW
yy-UiUm-Ul-U-m shy
^
bull - mdash = - - lt - - ^ y y y ^ d i
N 53555000
O
PROJECT NO 020085-AB10-06-06
DRAWN BY JES
Civil Engineers Surveyors Consultants
2 FEDERXX) DRIE bull PITTSFEU) HASSACHUSETIS 01201 bull (413)443-3537
DATE NOVEMBER 21 2006
SCALE r = 20
DESIGNED BY NA
APPROVED BY JES
LAYOUT DRAWINGS OF
GENERAL ELECTRIC PLANT PREPARED FOR
DR BILLINGS PirTSHEia MASSACHUSETTS
AS-BUILT LINER
DWG NO
A
ARCADIS BBL
Attachment B
Drawing No 1 Hill 78 OPCA and
Phase I Cover As-Built dated
December 11 2006
iJIS shy
Mr Dean Tagliaferro February 21 2007
Page 3 of3
planned routes of these re-routed pipelines on February 19 2007 That plan proposes submission ofa Supplemental Sampling and Engineering Design Report within 120 days after EPA approval of the Supplemental Sampling Plan
EPA Ouestion 7 Provide the results of the 20062007 survey that shows the current elevations of the OPCAs Also provide a plan view of the Hill 78 OPCA that identifies where the remaining waste material will be placed
GE Response 7 Survey maps showing the current surface elevations ofthe Hill 78 OPCA (as of December 2006) and the final consolidation elevations for the Building 71 OPCA (prior to capping) are included as an attachment to this letter A figure depicting the areas within the Hill 78 OPCA that remain available for consolidation material placement is also included as an attachment to this letter (Figure 1)
Please feel free to contact me ifyou have any additional questions
Sincerely
t Richard Gates Remedial Project Manager
Attachments
cc Rich Cavagnero EPA Bob Cianciarulo EPA John Kilborn EPA Richard Hull EPA Susan Steenstrup MDEP Anna Symington MDEP Mayor James Ruberto City of Pittsfield Tom Hickey Director PEDA Michael Carroll GE Andrew Silfer GE James Bieke Goodwin Procter James Nuss ARCADIS BBL Samuel Gutter Sidley Austin
VGE_Pittsfield_CD_OPCAsCorrespondenceFinal0177ll202doc
ARCADIS BBL
Figure 1
Hill 78 Remaining Consolidation Fill
Area
LEGEND
9 SU inCY BOtCHUARK fgtS^Si^^sl^i^tA RPRAP
SAS l U K X E R CENTERUNE DITCH
T SUY AigCHOR ABOVE GROUND S1EAU PIPE
laquo U O M T O W G a E l L DRAINACE UNES
laquo W A U R SUPPLY laquo E U OVERHEAD UTIUTY
reg SANITARY M A m O L E CHAIN UNK FENCE
a CATCH flASIN WOOD STOCKADE FENCE
IE INDEX CONTOUR UNE
H WATIR METER PIT INTERMEDIATE CONTOUR UNE
O ELEC1RIC MANHOLE VEGETATION
1 1 i n i U T Y P O l pound lpoundACHATE COLLECTION FORCEMAW
IXI WATER VALVE IMDERGROUND ELEC1TlaquoC UNES
w F)RE HYDRANT SEIER
bull BOOARD REMAINING CONSOUDATION FILL AREA
a WELL
e T l
UMIT OF EXISTINGCOVER (SCE NOTE
FINAL 5)
NOTES
APPROXIMATE UMIT OF FINAL COVER GRADING (SEE NOTE 6
N F P|-nSFIELD GENERA-nNG COMPANY FACILITY
1 BASE MAP INFORMATION SHOWN ON THIS DRAWING WAS DEVELOPED FROM FELD SURVEY DATA OBTAINED BY 8LASLAND BOUCK i l LpoundE INC ON 2 1 0 9 9 AS-BUILT R O D SURVEY OBTAINED BY MAXVMILUAN TECHNOLOGIES AND PREPARED BY HILL ENSNEERS ARCHITECTS tt PLANNERS INC ON 1 1 9 0 0 (CADD FILE NO M X - 3 6 - 2 0 W G ) FIELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS amp PLANNERS INC ON 3 8 0 0 ANO 3 1 4 0 0 (CADD RLE NO SRV-4541i3WG) REVISION A FIELD SURVEY OF THE BUILDING 71 OPCA ADJACENT AREA TO THE WEST AND IHE STORMWATER SASIN TO THE NORTHVEST OBTAINED BY SK DESIGN GROUP INC ON 12 a O O (PROJECT NO 000156) FIELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS amp PLANNERS INC ON 1 2 2 7 0 1 AS-BUILT FIELD SURVEY OBTAINED BY DR BILLINGS ANO PREPARED BY SK DESIGN GROUP INC ON 1 1 2 5 0 3 1 7 0 4 (PROJECT NO 020085-LDO) 1 0 6 0 6 (PROJECT NO 0 2 0 0 8 5 - A B I 0 - 0 6 - 0 6 ) ANO 1 2 1 1 0 6 (PROJECT NO 0 2 0 0 a 5 - A 6 - 1 2 - 1 1 - 0 6 ) HELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS i PLANNERS INC IN JANUARY 2005 AND FIELD SURVEY OBTAINED BY DR BILLLINGS AND PREPARED BY SK DESIGN GROUP INC ON 1 2 3 0 6 (PROJECT NO 0 2 0 0 a 5 - A B - 1 - 2 3 - 0 6 ) CERTAIN FEATURES SHOWN MAY BE APPROXIMATE SINCE SNOW AND ICE ACCUMULATIONS WERE PRESENT AT THE TIME OF CERTAIN SURVEYS
2 ELEVATIONS SHOWN ARE REFERENCED TO NATIONAL GEODETIC VERTICAL DATUM (NGVD 1929)
3 HORIZONTAL DATUM IS REFERENCED TO THE MASSACHUSETTS STATE PLANE COORDINATE SYSTEM (NAD 1927)
4 CONTOUR INTERVAL EQUALS 1 FOOT
5 UMIT OF EXISTING FINAL COVER REPRESENTS EDGE OF FULL THICKNESS FINAL COVER (I8 EDGE OF COVER GEOMEMBRANE)
6 UMIT OF RNAL COVER GRADING EXTENDS BEYOND EDGE OF COVER GEOMEMBRANE BUT DOES NOT INCLUDE GRADING ASSOCIATED WITH PERIMETER DITCHES OF ACCESS ROADS LOCATED ALONG SOUTHERLY AND WESTERLY SIDES OF THE HILL 7 8 OPCA
SP - ij--^j^lt^yjiy-c^w ^Uss-fyifyfi reg P-
GRAPHIC SCALE
l GENERAL ELECTRIC COMPANY -iS- PITTSFIELD MASSACHUSETTS
HILL 78 AND BUILDING 71 OPCAs
HILL 78 REMAINING y ^
CONSOLIDATION FILL AREA
HGURE
lt^ ARCADIS BBL hfrastTuaur^ environment facilities 1
ARCADIS BBL
Attachment A
Drawing No 1 Phase II As-Built
(Top of Liner) dated October 6 2006
Of
N 53580000
N53i75COO
N 53570000
N 53555000
fS - bull
6d y
X y
y
y
y N 53595000
y
DMH y
y y
y
y y
shy
y
y
y
y
3590000
OUTLET STRUCTURE RIM 101763 INV 101330
BASIN
s v
N
N 53585000
1020 i ^ 1_II bull
EDGE OF LINER-
tfmdash 102S
- ^ y f~x^-j^-mdashy
ddird^-^^^trade^-shy
iy^dr------Er^
mdash1030
103S
1040 _ _
fifll II 1111 id fltiijgt j r ^ ^ z ^ y - y
^ x J -
N r
J bull
V
t
N 53580000
rryy-y- fdjy---shyJ y - shy -shyr-yy Lid i r W bull gt
mdash
-1035
1040
EDGE OF LINER
N 53575000
bullH(Ma
Nshy
N 53570000
V^
^ d WW lt
EDGE OF U N E R A W ^
bull
(
y
y
y
^ ^
w ^
i y y ^ y y y y y
f y y
y y y y y -
I yyyy ^ shy ryyyy^-
I Wd f (ddyy [ VidHiliildfW
yy-UiUm-Ul-U-m shy
^
bull - mdash = - - lt - - ^ y y y ^ d i
N 53555000
O
PROJECT NO 020085-AB10-06-06
DRAWN BY JES
Civil Engineers Surveyors Consultants
2 FEDERXX) DRIE bull PITTSFEU) HASSACHUSETIS 01201 bull (413)443-3537
DATE NOVEMBER 21 2006
SCALE r = 20
DESIGNED BY NA
APPROVED BY JES
LAYOUT DRAWINGS OF
GENERAL ELECTRIC PLANT PREPARED FOR
DR BILLINGS PirTSHEia MASSACHUSETTS
AS-BUILT LINER
DWG NO
A
ARCADIS BBL
Attachment B
Drawing No 1 Hill 78 OPCA and
Phase I Cover As-Built dated
December 11 2006
iJIS shy
ARCADIS BBL
Figure 1
Hill 78 Remaining Consolidation Fill
Area
LEGEND
9 SU inCY BOtCHUARK fgtS^Si^^sl^i^tA RPRAP
SAS l U K X E R CENTERUNE DITCH
T SUY AigCHOR ABOVE GROUND S1EAU PIPE
laquo U O M T O W G a E l L DRAINACE UNES
laquo W A U R SUPPLY laquo E U OVERHEAD UTIUTY
reg SANITARY M A m O L E CHAIN UNK FENCE
a CATCH flASIN WOOD STOCKADE FENCE
IE INDEX CONTOUR UNE
H WATIR METER PIT INTERMEDIATE CONTOUR UNE
O ELEC1RIC MANHOLE VEGETATION
1 1 i n i U T Y P O l pound lpoundACHATE COLLECTION FORCEMAW
IXI WATER VALVE IMDERGROUND ELEC1TlaquoC UNES
w F)RE HYDRANT SEIER
bull BOOARD REMAINING CONSOUDATION FILL AREA
a WELL
e T l
UMIT OF EXISTINGCOVER (SCE NOTE
FINAL 5)
NOTES
APPROXIMATE UMIT OF FINAL COVER GRADING (SEE NOTE 6
N F P|-nSFIELD GENERA-nNG COMPANY FACILITY
1 BASE MAP INFORMATION SHOWN ON THIS DRAWING WAS DEVELOPED FROM FELD SURVEY DATA OBTAINED BY 8LASLAND BOUCK i l LpoundE INC ON 2 1 0 9 9 AS-BUILT R O D SURVEY OBTAINED BY MAXVMILUAN TECHNOLOGIES AND PREPARED BY HILL ENSNEERS ARCHITECTS tt PLANNERS INC ON 1 1 9 0 0 (CADD FILE NO M X - 3 6 - 2 0 W G ) FIELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS amp PLANNERS INC ON 3 8 0 0 ANO 3 1 4 0 0 (CADD RLE NO SRV-4541i3WG) REVISION A FIELD SURVEY OF THE BUILDING 71 OPCA ADJACENT AREA TO THE WEST AND IHE STORMWATER SASIN TO THE NORTHVEST OBTAINED BY SK DESIGN GROUP INC ON 12 a O O (PROJECT NO 000156) FIELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS amp PLANNERS INC ON 1 2 2 7 0 1 AS-BUILT FIELD SURVEY OBTAINED BY DR BILLINGS ANO PREPARED BY SK DESIGN GROUP INC ON 1 1 2 5 0 3 1 7 0 4 (PROJECT NO 020085-LDO) 1 0 6 0 6 (PROJECT NO 0 2 0 0 8 5 - A B I 0 - 0 6 - 0 6 ) ANO 1 2 1 1 0 6 (PROJECT NO 0 2 0 0 a 5 - A 6 - 1 2 - 1 1 - 0 6 ) HELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS i PLANNERS INC IN JANUARY 2005 AND FIELD SURVEY OBTAINED BY DR BILLLINGS AND PREPARED BY SK DESIGN GROUP INC ON 1 2 3 0 6 (PROJECT NO 0 2 0 0 a 5 - A B - 1 - 2 3 - 0 6 ) CERTAIN FEATURES SHOWN MAY BE APPROXIMATE SINCE SNOW AND ICE ACCUMULATIONS WERE PRESENT AT THE TIME OF CERTAIN SURVEYS
2 ELEVATIONS SHOWN ARE REFERENCED TO NATIONAL GEODETIC VERTICAL DATUM (NGVD 1929)
3 HORIZONTAL DATUM IS REFERENCED TO THE MASSACHUSETTS STATE PLANE COORDINATE SYSTEM (NAD 1927)
4 CONTOUR INTERVAL EQUALS 1 FOOT
5 UMIT OF EXISTING FINAL COVER REPRESENTS EDGE OF FULL THICKNESS FINAL COVER (I8 EDGE OF COVER GEOMEMBRANE)
6 UMIT OF RNAL COVER GRADING EXTENDS BEYOND EDGE OF COVER GEOMEMBRANE BUT DOES NOT INCLUDE GRADING ASSOCIATED WITH PERIMETER DITCHES OF ACCESS ROADS LOCATED ALONG SOUTHERLY AND WESTERLY SIDES OF THE HILL 7 8 OPCA
SP - ij--^j^lt^yjiy-c^w ^Uss-fyifyfi reg P-
GRAPHIC SCALE
l GENERAL ELECTRIC COMPANY -iS- PITTSFIELD MASSACHUSETTS
HILL 78 AND BUILDING 71 OPCAs
HILL 78 REMAINING y ^
CONSOLIDATION FILL AREA
HGURE
lt^ ARCADIS BBL hfrastTuaur^ environment facilities 1
ARCADIS BBL
Attachment A
Drawing No 1 Phase II As-Built
(Top of Liner) dated October 6 2006
Of
N 53580000
N53i75COO
N 53570000
N 53555000
fS - bull
6d y
X y
y
y
y N 53595000
y
DMH y
y y
y
y y
shy
y
y
y
y
3590000
OUTLET STRUCTURE RIM 101763 INV 101330
BASIN
s v
N
N 53585000
1020 i ^ 1_II bull
EDGE OF LINER-
tfmdash 102S
- ^ y f~x^-j^-mdashy
ddird^-^^^trade^-shy
iy^dr------Er^
mdash1030
103S
1040 _ _
fifll II 1111 id fltiijgt j r ^ ^ z ^ y - y
^ x J -
N r
J bull
V
t
N 53580000
rryy-y- fdjy---shyJ y - shy -shyr-yy Lid i r W bull gt
mdash
-1035
1040
EDGE OF LINER
N 53575000
bullH(Ma
Nshy
N 53570000
V^
^ d WW lt
EDGE OF U N E R A W ^
bull
(
y
y
y
^ ^
w ^
i y y ^ y y y y y
f y y
y y y y y -
I yyyy ^ shy ryyyy^-
I Wd f (ddyy [ VidHiliildfW
yy-UiUm-Ul-U-m shy
^
bull - mdash = - - lt - - ^ y y y ^ d i
N 53555000
O
PROJECT NO 020085-AB10-06-06
DRAWN BY JES
Civil Engineers Surveyors Consultants
2 FEDERXX) DRIE bull PITTSFEU) HASSACHUSETIS 01201 bull (413)443-3537
DATE NOVEMBER 21 2006
SCALE r = 20
DESIGNED BY NA
APPROVED BY JES
LAYOUT DRAWINGS OF
GENERAL ELECTRIC PLANT PREPARED FOR
DR BILLINGS PirTSHEia MASSACHUSETTS
AS-BUILT LINER
DWG NO
A
ARCADIS BBL
Attachment B
Drawing No 1 Hill 78 OPCA and
Phase I Cover As-Built dated
December 11 2006
iJIS shy
LEGEND
9 SU inCY BOtCHUARK fgtS^Si^^sl^i^tA RPRAP
SAS l U K X E R CENTERUNE DITCH
T SUY AigCHOR ABOVE GROUND S1EAU PIPE
laquo U O M T O W G a E l L DRAINACE UNES
laquo W A U R SUPPLY laquo E U OVERHEAD UTIUTY
reg SANITARY M A m O L E CHAIN UNK FENCE
a CATCH flASIN WOOD STOCKADE FENCE
IE INDEX CONTOUR UNE
H WATIR METER PIT INTERMEDIATE CONTOUR UNE
O ELEC1RIC MANHOLE VEGETATION
1 1 i n i U T Y P O l pound lpoundACHATE COLLECTION FORCEMAW
IXI WATER VALVE IMDERGROUND ELEC1TlaquoC UNES
w F)RE HYDRANT SEIER
bull BOOARD REMAINING CONSOUDATION FILL AREA
a WELL
e T l
UMIT OF EXISTINGCOVER (SCE NOTE
FINAL 5)
NOTES
APPROXIMATE UMIT OF FINAL COVER GRADING (SEE NOTE 6
N F P|-nSFIELD GENERA-nNG COMPANY FACILITY
1 BASE MAP INFORMATION SHOWN ON THIS DRAWING WAS DEVELOPED FROM FELD SURVEY DATA OBTAINED BY 8LASLAND BOUCK i l LpoundE INC ON 2 1 0 9 9 AS-BUILT R O D SURVEY OBTAINED BY MAXVMILUAN TECHNOLOGIES AND PREPARED BY HILL ENSNEERS ARCHITECTS tt PLANNERS INC ON 1 1 9 0 0 (CADD FILE NO M X - 3 6 - 2 0 W G ) FIELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS amp PLANNERS INC ON 3 8 0 0 ANO 3 1 4 0 0 (CADD RLE NO SRV-4541i3WG) REVISION A FIELD SURVEY OF THE BUILDING 71 OPCA ADJACENT AREA TO THE WEST AND IHE STORMWATER SASIN TO THE NORTHVEST OBTAINED BY SK DESIGN GROUP INC ON 12 a O O (PROJECT NO 000156) FIELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS amp PLANNERS INC ON 1 2 2 7 0 1 AS-BUILT FIELD SURVEY OBTAINED BY DR BILLINGS ANO PREPARED BY SK DESIGN GROUP INC ON 1 1 2 5 0 3 1 7 0 4 (PROJECT NO 020085-LDO) 1 0 6 0 6 (PROJECT NO 0 2 0 0 8 5 - A B I 0 - 0 6 - 0 6 ) ANO 1 2 1 1 0 6 (PROJECT NO 0 2 0 0 a 5 - A 6 - 1 2 - 1 1 - 0 6 ) HELD SURVEY PERFORMED BY HILL ENGINEERS ARCHITECTS i PLANNERS INC IN JANUARY 2005 AND FIELD SURVEY OBTAINED BY DR BILLLINGS AND PREPARED BY SK DESIGN GROUP INC ON 1 2 3 0 6 (PROJECT NO 0 2 0 0 a 5 - A B - 1 - 2 3 - 0 6 ) CERTAIN FEATURES SHOWN MAY BE APPROXIMATE SINCE SNOW AND ICE ACCUMULATIONS WERE PRESENT AT THE TIME OF CERTAIN SURVEYS
2 ELEVATIONS SHOWN ARE REFERENCED TO NATIONAL GEODETIC VERTICAL DATUM (NGVD 1929)
3 HORIZONTAL DATUM IS REFERENCED TO THE MASSACHUSETTS STATE PLANE COORDINATE SYSTEM (NAD 1927)
4 CONTOUR INTERVAL EQUALS 1 FOOT
5 UMIT OF EXISTING FINAL COVER REPRESENTS EDGE OF FULL THICKNESS FINAL COVER (I8 EDGE OF COVER GEOMEMBRANE)
6 UMIT OF RNAL COVER GRADING EXTENDS BEYOND EDGE OF COVER GEOMEMBRANE BUT DOES NOT INCLUDE GRADING ASSOCIATED WITH PERIMETER DITCHES OF ACCESS ROADS LOCATED ALONG SOUTHERLY AND WESTERLY SIDES OF THE HILL 7 8 OPCA
SP - ij--^j^lt^yjiy-c^w ^Uss-fyifyfi reg P-
GRAPHIC SCALE
l GENERAL ELECTRIC COMPANY -iS- PITTSFIELD MASSACHUSETTS
HILL 78 AND BUILDING 71 OPCAs
HILL 78 REMAINING y ^
CONSOLIDATION FILL AREA
HGURE
lt^ ARCADIS BBL hfrastTuaur^ environment facilities 1
ARCADIS BBL
Attachment A
Drawing No 1 Phase II As-Built
(Top of Liner) dated October 6 2006
Of
N 53580000
N53i75COO
N 53570000
N 53555000
fS - bull
6d y
X y
y
y
y N 53595000
y
DMH y
y y
y
y y
shy
y
y
y
y
3590000
OUTLET STRUCTURE RIM 101763 INV 101330
BASIN
s v
N
N 53585000
1020 i ^ 1_II bull
EDGE OF LINER-
tfmdash 102S
- ^ y f~x^-j^-mdashy
ddird^-^^^trade^-shy
iy^dr------Er^
mdash1030
103S
1040 _ _
fifll II 1111 id fltiijgt j r ^ ^ z ^ y - y
^ x J -
N r
J bull
V
t
N 53580000
rryy-y- fdjy---shyJ y - shy -shyr-yy Lid i r W bull gt
mdash
-1035
1040
EDGE OF LINER
N 53575000
bullH(Ma
Nshy
N 53570000
V^
^ d WW lt
EDGE OF U N E R A W ^
bull
(
y
y
y
^ ^
w ^
i y y ^ y y y y y
f y y
y y y y y -
I yyyy ^ shy ryyyy^-
I Wd f (ddyy [ VidHiliildfW
yy-UiUm-Ul-U-m shy
^
bull - mdash = - - lt - - ^ y y y ^ d i
N 53555000
O
PROJECT NO 020085-AB10-06-06
DRAWN BY JES
Civil Engineers Surveyors Consultants
2 FEDERXX) DRIE bull PITTSFEU) HASSACHUSETIS 01201 bull (413)443-3537
DATE NOVEMBER 21 2006
SCALE r = 20
DESIGNED BY NA
APPROVED BY JES
LAYOUT DRAWINGS OF
GENERAL ELECTRIC PLANT PREPARED FOR
DR BILLINGS PirTSHEia MASSACHUSETTS
AS-BUILT LINER
DWG NO
A
ARCADIS BBL
Attachment B
Drawing No 1 Hill 78 OPCA and
Phase I Cover As-Built dated
December 11 2006
iJIS shy
ARCADIS BBL
Attachment A
Drawing No 1 Phase II As-Built
(Top of Liner) dated October 6 2006
Of
N 53580000
N53i75COO
N 53570000
N 53555000
fS - bull
6d y
X y
y
y
y N 53595000
y
DMH y
y y
y
y y
shy
y
y
y
y
3590000
OUTLET STRUCTURE RIM 101763 INV 101330
BASIN
s v
N
N 53585000
1020 i ^ 1_II bull
EDGE OF LINER-
tfmdash 102S
- ^ y f~x^-j^-mdashy
ddird^-^^^trade^-shy
iy^dr------Er^
mdash1030
103S
1040 _ _
fifll II 1111 id fltiijgt j r ^ ^ z ^ y - y
^ x J -
N r
J bull
V
t
N 53580000
rryy-y- fdjy---shyJ y - shy -shyr-yy Lid i r W bull gt
mdash
-1035
1040
EDGE OF LINER
N 53575000
bullH(Ma
Nshy
N 53570000
V^
^ d WW lt
EDGE OF U N E R A W ^
bull
(
y
y
y
^ ^
w ^
i y y ^ y y y y y
f y y
y y y y y -
I yyyy ^ shy ryyyy^-
I Wd f (ddyy [ VidHiliildfW
yy-UiUm-Ul-U-m shy
^
bull - mdash = - - lt - - ^ y y y ^ d i
N 53555000
O
PROJECT NO 020085-AB10-06-06
DRAWN BY JES
Civil Engineers Surveyors Consultants
2 FEDERXX) DRIE bull PITTSFEU) HASSACHUSETIS 01201 bull (413)443-3537
DATE NOVEMBER 21 2006
SCALE r = 20
DESIGNED BY NA
APPROVED BY JES
LAYOUT DRAWINGS OF
GENERAL ELECTRIC PLANT PREPARED FOR
DR BILLINGS PirTSHEia MASSACHUSETTS
AS-BUILT LINER
DWG NO
A
ARCADIS BBL
Attachment B
Drawing No 1 Hill 78 OPCA and
Phase I Cover As-Built dated
December 11 2006
iJIS shy
Of
N 53580000
N53i75COO
N 53570000
N 53555000
fS - bull
6d y
X y
y
y
y N 53595000
y
DMH y
y y
y
y y
shy
y
y
y
y
3590000
OUTLET STRUCTURE RIM 101763 INV 101330
BASIN
s v
N
N 53585000
1020 i ^ 1_II bull
EDGE OF LINER-
tfmdash 102S
- ^ y f~x^-j^-mdashy
ddird^-^^^trade^-shy
iy^dr------Er^
mdash1030
103S
1040 _ _
fifll II 1111 id fltiijgt j r ^ ^ z ^ y - y
^ x J -
N r
J bull
V
t
N 53580000
rryy-y- fdjy---shyJ y - shy -shyr-yy Lid i r W bull gt
mdash
-1035
1040
EDGE OF LINER
N 53575000
bullH(Ma
Nshy
N 53570000
V^
^ d WW lt
EDGE OF U N E R A W ^
bull
(
y
y
y
^ ^
w ^
i y y ^ y y y y y
f y y
y y y y y -
I yyyy ^ shy ryyyy^-
I Wd f (ddyy [ VidHiliildfW
yy-UiUm-Ul-U-m shy
^
bull - mdash = - - lt - - ^ y y y ^ d i
N 53555000
O
PROJECT NO 020085-AB10-06-06
DRAWN BY JES
Civil Engineers Surveyors Consultants
2 FEDERXX) DRIE bull PITTSFEU) HASSACHUSETIS 01201 bull (413)443-3537
DATE NOVEMBER 21 2006
SCALE r = 20
DESIGNED BY NA
APPROVED BY JES
LAYOUT DRAWINGS OF
GENERAL ELECTRIC PLANT PREPARED FOR
DR BILLINGS PirTSHEia MASSACHUSETTS
AS-BUILT LINER
DWG NO
A
ARCADIS BBL
Attachment B
Drawing No 1 Hill 78 OPCA and
Phase I Cover As-Built dated
December 11 2006
iJIS shy
ARCADIS BBL
Attachment B
Drawing No 1 Hill 78 OPCA and
Phase I Cover As-Built dated
December 11 2006
iJIS shy
iJIS shy